36C25026B0042 0002.docx

DOCX document 27 KB Posted

Attached to
Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201 Federal contract opportunity
Solicitation number
36C25026B0042
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is an Amendment/Modification (Standard Form 30) to a Request for Invitation for Bid (IFB) for the Department of Veterans Affairs Network Contracting Office (NCO) in Cincinnati, Ohio. The amendment extends the bid opening date and time to June 16, 2026, at 1:00 PM EDT and provides government responses to ten Requests for Information (RFIs) submitted by prospective bidders.

The project involves replacing dual duct mixing boxes on the second floor of the Veterans Affairs Medical Center (VAMC) in Cincinnati, Ohio (Project Number 539-21-201, Solicitation 36C25026B0042). Key clarifications from the RFI responses include: no guaranteed laydown space available for contractors; no contractor parking permitted on the VA campus; superintendent and Site Safety and Health Officer (SSHO) roles may be combined; lead-based paint (480 ppm) is present on white-painted plaster walls requiring OSHA compliance; Procore construction management software is acceptable; life safety drawings showing existing smoke and fire walls are provided; asbestos-containing material (ACM) removal is limited to mechanical demolition scope only; corridor abatement work must occur during weekends (8 PM Friday to 6 AM Monday) with traffic restrictions permitted during those hours; and paint is an acceptable finish alternative for wall covering with coordination required for color matching. Three technical attachments are referenced: Lead Paint Report, Life Safety Plan, and ACM Survey Report. The contracting officer for this amendment is Ronald Heidemann (NCO1015L3-0502).

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201, newest first.
File Type Posted
Atch RFI 7 ACM SURVEY REPORT.pdf PDF
Atch RFI 4 Lead Paint Report.pdf PDF
Atch RFI 6 life safety plan.pdf PDF
36C25026B0042_1.pdf PDF
36C25026B0042 0001.docx DOCX document
Attachment 7 - Request for Information.docx DOCX document
36C25026B0042_1.docx DOCX document
Attachment 11 -Honeywell Siemens JCI Redacted.pdf PDF
Attachment 10 - FX Controls Redacted.pdf PDF
Attachment 9 - PCRA.pdf PDF
Attachment 6 - EMR Form.docx DOCX document
Attachment 5 - VAAR 852.219-75.docx DOCX document
Attachment 12 - Tridium Niagara Redacted.pdf PDF
Attachment 8 - ICRA.pdf PDF
Attachment 1 - OH20260082 01022026.pdf PDF
Attachment 4 - Drawings.pdf PDF
Attachment 3 - Specs.pdf PDF
Attachment 2 - VHA Directive 1192.01.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-04-2026 539-26-1-6905-0003 539-21-201 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 To all Offerors/Bidders

36C25026B0042 05-12-2026

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-16-2026 1:00 PM EDT

539-3660162-6905-854200-3220-23NRNR000

X This amendment is issued to provide the following information:

-Post the Government's response to the RFI's (see page 2) -New bid opening date and time is June 16, 2026, at 1:00 PM EDT. The bid opening call in information (TEAMS) is located in amendment 0001 on page 10 of the solicitation.

Ronald Heidemann Contracting Officer

NCO1015L3-0502

CONTINUATION PAGE

REPLACE DUAL DUCT BOXES

ON THE SECOND FLOOR

FOR THE

VETERANS AFFAIRS MEDICAL CENTER (VAMC)—CINCINNATI, OH

PROJECT NUMBER: 539-21-201

QUESTIONS AND ANSWERS (RFIs)

TO REQUEST FOR INVITATION FOR BID (IFB) NUMBER:

36C25026B0042

QUESTIONS AND ANSWERS

1. RFI #1 Question: spec 01 00 00 lay down and dumpster area: Where will the laydown and dumpsters area be located?

Answer: There is no guarantee of laydown space, contractors shall plan accordingly to support their material. Yes, power is available. Dumpster location will be coordinated with COR.

2. RFI #2 Question: Parking: How many parking spaces will be provided?

Answer: Per specification 010000 section: 1.5F2. There will be no parking by any contractors on the VA campus

3. RFI #3 Question: spec 01 35 26 SSHO: Can the superintendent be dual-hatted and fulfill the role of SSHO?

Answer: Yes, the superintendent and SSHO can perform both roles

4. RFI #4 Question: spec 02 83 33.13 LBP: Can the government please identify the location and quantities of LBP (lead-based paint) remediation?

Answer: The samples tested pertained to painted plaster (white) walls. The analytical results indicated that the white-painted plaster walls contain 480 parts per million (ppm) of lead. If white painted plaster walls are Impacted by the project, contractors should be aware and take the appropriate precautions to comply with OSHA regulations and VA project specifications – see lead paint report attached.

5. RFI #5 Question: Procore software: Will the government accept the use of Procore construction management software?

Answer: Yes.

6. RFI #6 Question: Life safety drawings: Can the government please provide life safety drawing showing existing smoke and fire walls within the project boundaries?

Answer: Existing smoke and fire walls are shown on the drawings. No changes in the safety plan – see attached life safety plan.

7. RFI #7 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work: Is all the ACM removal associated with the mechanical demo? I.E. no abatement is expected to remove mastic etc. on duct, pipe boxes that are not shown for removal.

Answer: Yes, the abatement scope is associated with the mechanical demo- see mechanical drawings - see attachment.

8. RFI #8 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work material locations table: Where is Corridor A-2-15 located?

Answer: Contractor to bid quantities for removal. Corridor is C*2*3. Also, corridor A-2-15 is to the north.

9. RFI #9 Question: spec 02 82 11 3.2 removal of ACM/phasing: As the specs call for critical barriers, an attached 3-stage decontamination unit, drop cloths beneath the work, and negative pressure requirements of this specification for any level of abatement. Would the Government allow the phasing for the abatement to include "owning" both sides of the corridors (closed to traffic) for the abatement in the corridors?

Answer: All work within corridors shall occur during weekends, between 8PM Friday and 6AM Monday. The corridors shall be opened for normal operations outside of these hours. It is permissible to own both sides (closing traffic) during weekend work. Coordinate with COR.

10. RFI #10 Question: Drawing 1-A001 detail 16 and note 2: 1) Note 2 calls for new wall covering. Does the VA have attic stock to match? If not, can we paint, or please provide the wallpaper manufacturer series and color? 2) detail 16 labels room as C242 is this mislabeled and should be A242?

Answer: Paint is an acceptable finish – coordinate with COR to match attic stock; the contractor is to provide a level 5 finish from corner to corner. Detail 16 label is mislabeled and should be A242.

ATTCHMENTS:

Atch RFI 4 Lead Paint Report.

Atch RFI 6 life safety plan.