Attachment_4___Backflow__Prevention_Inventory_Table.pdf
PDF 116 KB Posted
- Attached to
- Fire Alarm Suppression Backflow Inspect Maintain Federal contract opportunity
- Solicitation number
- 140P8326Q0017
About this file
This is Attachment 3 to RFQ 140P8326Q0017 for Mount Rainier National Park, containing a Backflow Prevention Device Inventory Table that lists all backflow assemblies requiring contractor field verification, inspection, testing, and maintenance.
The inventory identifies 29 backflow prevention devices distributed across multiple buildings and quarters throughout Mount Rainier National Park, including facilities at Tahoma Woods, Nisqually Entrance, Longmire, Paradise, White River, Sunrise, Ohana, and Carbon River. Devices are categorized by type (DCVA, RPBA, or combinations thereof) and protect domestic supply systems, fire sprinkler systems, or process water. Most devices have quantities of one per location, with two devices at the Jackson Visitor Center (BLDG P003). All devices are listed with "TBD" for size and make/model specifications, indicating these details must be determined during field verification. The table designates devices as either "Verify" status (29 devices requiring standard inspection and testing) or "Seasonal" status (5 devices at Sunrise and Ohana locations requiring seasonal consideration). The inventory note explicitly states that the list is not all-inclusive and is based on the park's current documentation and 2023 Backflow Testing Records. The contractor is required to identify and document any unlisted, inaccessible, damaged, or newly installed devices and include them in the inspection, testing, and maintenance plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_Wage_Determination_0001.pdf | ||
| Attachment_7_Questions_and_Answers_140P8326Q0014_MORA_Fire_Alarm_Suppression_Backflow_-_Copy_0001.pdf | ||
| Sol_140P8326Q0017_Amd_0001.pdf | ||
| Attachment_2___Fire_Detection___Notification_Systems.pdf | ||
| Attachment_5_-_Longmire_Fire_Alarm_-_Pull_Box_and_EOC_Panel_Zone_Summary.pdf | ||
| Sol_140P8326Q0017.pdf | ||
| Attachment_1-_Statement_of_Work.pdf | ||
| Attachment_3_-_Dry_Water_Based_Fire_Sprinkler_Systems.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140P8326Q0017 Mount Rainier National Park
Attachment 3
ATTACHMENT 3 – BACKFLOW PREVENTION DEVICE INVENTORY TABLE
Contractor shall field-verify all devices. This list may not be all-inclusive.
Additional backflow assemblies identified during inspection shall be added to the final report.
BACKFLOW PREVENTION DEVICE INVENTORY TABLE
Building
Location / Description
Backflow Type
System Protected Size Make / Model
Qty Status
BLDG
T001
Tahoma Woods Administration
DCVA /
RPBA
Domestic Supply TBD TBD 1 Verify
QTRS
T115
Tahoma Woods Temp Curatorial
DCVA Domestic Supply TBD TBD 1 Verify
QTRS
T117
Tahoma Woods Apartments
DCVA /
13D
Fire Sprinkler TBD TBD 1 Verify
QTRS
T118
Tahoma Woods Apartments
DCVA /
13D
Fire Sprinkler TBD TBD 1 Verify
BLDG
N001
Nisqually Entrance Office
DCVA /
RPBA
Domestic & Sprinkler
TBD TBD 1–2 Verify
BLDG
L006
Longmire Community Building (Added per
COR)
DCVA /
RPBA
Domestic/Sprinkler TBD TBD 1 Verify
BLDG
L001
Longmire Administration
DCVA Domestic Supply TBD TBD 1 Verify
BLDG
L005
Tobin Center / Library
RPBA Fire Sprinkler TBD TBD 1 Verify
Location / Description
Backflow Type
System Protected Size Make / Model
Qty Status
BLDG
L135
Library Annex / Tobin
DCVA Domestic TBD TBD 1 Verify
BLDG
L201
Longmire Warehouse
RPBA Sprinkler TBD TBD 1 Verify
BLDG
L209
Longmire Auto Shop
DCVA Domestic TBD TBD 1 Verify
BLDG
L216
Longmire EOC RPBA Fire Sprinkler TBD TBD 1 Verify
BLDG
P003
Jackson Visitor Center
DCVA +
RPBA
Domestic + Sprinkler
TBD TBD 2 Verify
BLDG
P602
Guide House DCVA Domestic TBD TBD 1 Verify
BLDG
P650
WWTP DCVA Process Water TBD TBD 1 Verify
QTRS
P301
Paradise "SKI" Dorm
DCVA /
13R
Sprinkler TBD TBD 1 Verify
QTRS
W222
White River Dorm DCVA Domestic TBD TBD 1 Verify
BLDG
S003
Sunrise Visitor Center
DCVA Domestic TBD TBD 1 Seasonal
QTRS
S001
Sunrise South Block House
DCVA Domestic TBD TBD 1 Seasonal
QTRS
S002
Sunrise North Block House
DCVA Domestic TBD TBD 1 Seasonal
QTRS
O115
Ohana Apartment North
DCVA Domestic TBD TBD 1 Seasonal
Location / Description
Backflow Type
System Protected Size Make / Model
Qty Status
QTRS
O116
Ohana Apartment South
DCVA Domestic TBD TBD 1 Seasonal
BLDG
O208
Ohana Maintenance / Ranger
DCVA Domestic TBD TBD 1 Seasonal
BLDG
C210
Carbon River Thompson House
DCVA Domestic TBD TBD 1 Verify
This list is based on the park’s most current documentation and the 2023 Backflow Testing Records. It may not include all existing devices. The Contractor shall field-verify and document all backflow assemblies. Any unlisted, inaccessible, damaged, or newly installed devices shall be included in the inspection, testing, and maintenance plan.
File details come from the government source that posted it. Updated .