This is a Questions and Answers document for solicitation 140P8326Q0017, a Mount Rainier National Park (MORA) contract for fire alarm suppression and backflow inspection, maintenance, and repair services. The contract requires annual inspections of all listed fire alarm and backflow prevention systems at multiple park buildings. Contractors should expect to perform two three-year test cycles and one five-year test cycle over the contract period. Typical inspection dates are April through May parkwide, except for Sunrise and White River areas which are inspected May through July. An NPS representative will be present during testing. Reports must be emailed to the Contracting Officer. The work is subject to prevailing wage requirements in accordance with the attached Wage Determination.
Water containment and disposal is not required for fire suppression or backflow prevention testing. Fire pumps and fire hydrants are explicitly excluded from the scope of work. All available device counts for audible and visual notification appliances are provided in the solicitation attachments, which included a site visit. Quoters may provide pricing in their own format for both the base year and option years, as long as all services are quoted. Option year pricing should be quoted in accordance with page 12 of the solicitation document and should reflect any three-year or five-year test cycles. The evaluation will compare base and option pricing in aggregate for balance, making it not advantageous to quote these cyclical services in option years rather than the base period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P8326Q0017 Mount Rainier National Park
Fire Alarm Suppression Backflow
Questions and Answers
The following is a detail of the questions and answers for solicitation 140P8326Q0017 MORA
Fire Alarm Suppression Backflow Inspect Maintain and Repair.
1. Q: Are there any fire pumps getting tested?
A: No
2. Q: Does water need to be contained and removed offsite from fire suppression or backflow prevention testing?
A: No
3. Q: What will be the typical inspection dates requested?
A: April-May parkwide except Sunrise and White River areas May-July
4. Q: Will a representative from NPS be present during testing?
A: Yes
5. Q: Is this prevailing wage?
A: Yes. Work will be performed in accordance with the Wage Determination attached to this amendment.
6. Q: Is this an annual inspection per year per building?
A: Yes. Every listed system is to be inspected annually.
7. Q: Where do the reports get sent to?
A: Reports will be emailed to the Contracting Officer
8. Q: Sprinkler - Attachment 3 lists obstruction investigations. These are typically performed once every 5 years. How many and/or which systems are due for obstruction investigations and during which year of the contract? How many and/or which systems are due for 3-year full trip of dry systems and during which year of the contract?
A: Please see question 6 above. This requirement is for annual inspections. For three year test requirements, quoter can expect to perform two. For five year test requirements, the quoter can expect to perform one. If performance years, base or option, are quoted at a price to reflect three or five year test cycles, please indicate this. Refer to 52.212-2
Evaluation—Commercial Products and Commercial Services (Nov 2021) on page 12 of the solicitation for how base and options will be evaluated. It is not advantageous to quote these services in an option year as opposed to the base. They are evaluated in aggregate and compared against each other for balance.
9. Q: Collection and Disposal of Water/fluids: Can you please confirm the applicability of this and define proper disposal and documentation? Should disposal be allowed at the site, how many gallons can we expect at each location? Are any of the testing drain sites farther than 100' from road access?
A: See question 2 above. Containment and or disposal is not required.
10. Q: Fire Alarm - Attachment 2 shows 44 horn/strobes for Building P602, however the other buildings do not provide a count of audible/visual notification appliances. Can you
140P8326Q0017 Mount Rainier National Park
Fire Alarm Suppression Backflow please provide device counts for audible/visual notification devices for each building?
Also, can you please provide a quantity of notification appliance circuits for each building?
A: All available device counts are provided. A site visit was conducted.
11. Q: Attachment 5 references fire hydrant locations, however the scope of work does not.
Can you please confirm fire hydrants are not included in this scope of work?
A: Fire Hydrants are not included in this scope of work
12. Q: The scope of work references NFPA 20 for stationary fire pumps. Can you provide the make and model of all fire pumps requiring inspection and testing, and which structures are they located in?
A: Please see question 1 above. No fire pumps are to be tested.
13. Q: Under Price – Block 24, only services for the base period of performance are available to price, but the contract is for a base year plus up to four additional option years if exercised by the government. Can you please provide a revised pricing structure to include line items for the additional option years?
A: Block 24 line items are provided for the base year. The option years should be quoted in accordance with page 12 of the solicitation document, price. Quoter may provide rates in any format, so long as all services are quoted. Please quote in your own format.