This is an AF Form 66 Submittal Register for a federal construction contract at Goodfellow Air Force Base, Texas. The project, JCGU 25-7007, involves repair of kitchen flooring in Building 334 and is managed by Project Engineer J. Hernandez with a submittal registration date of December 10, 2025.

The document establishes a comprehensive schedule of material submittals required throughout the construction project, organized by division and submittal type. Submittals are categorized using standard designation codes (SD-01 through SD-11) covering pre-construction documentation, shop drawings, product data, samples, design data, test reports, certifications, manufacturer's instructions, field reports, maintenance data, and closeout submittals. Division 01 (General Requirements) contains 26 submittal line items addressing safety, planning, and compliance requirements, including hot work permits, work clearance requests, crane lift plans, management plans, confined space entry plans, site safety plans, production schedules, and accident prevention plans. Division 02 (Demolition) requires a demolition plan and existing conditions documentation. Division 09 (Finishes) specifies flooring-related submittals including installation drawings, manufacturer's catalog data, hardboard-mounted epoxy flooring samples, flooring mockups, design mix data, product installation listings, standards certificates, and warranties. Division 10 (Specialties) and Division 11 (Equipment) address corner guards and food service equipment documentation, including equipment schedules, startup and operational test reports, and manufacturer qualifications. The form provides columns for tracking required submission dates, dates received in contracting, dates to civil engineering, return suspense dates, submittal numbers, contractor notification dates, resubmittal status, final approval status, and remarks.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JCGU 25-7007 Repair Kitchen Flooring, B334

Goodfellow AFB, TX AF Form 66 Submittal Register 12/10/2025

PROJECT NUMBER : SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Use Electronic Delivery

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

V

ED

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

1 Section 01 00 00 para. 1.7 Hot Work Permit X

Section 01 00 00 para. 1.25, AF Form 103 and Section 01 18 00

Para 2.1 (Work Clearance Request) X

Section 01 00 00 para. 1.32 Crane EM 385-1-1 Form 16-2

(Standard Lift Plan) X

4 Section 01 00 00 para. 1.36 As-Built Drawings X 5 Section 01 01 10-IC para. Infection Control Plan X 6 Section 01 11 00 para. 1.4.6.3 Management Plan X 7 Section 01 11 00 para. 1.4.7.8 Confined Space Entry Plan X 8 Section 01 11 00 para. 1.4.8 Site Specific Site Safety Plan X

Section 01 12 17 para. 1.2 (c) and Section 01 32 16.00 20 Para

1.6 3-Week Short Interval Production Schedule (SIPS) or

Construction Activity Plan (CAP)

X

10 Section 01 18 00 para. 3.3 Drinking Water Analysis Report X

Section 01 18 00 para. 4 and 5 AF Form 3000 (GAFB Fire

Hydrant Use Request) X

12 Section 01 30 00 Para 1.3 Progress and Completion Pictures X X

13 Section 01 30 00 Para 1.5.1 Superintendent Qualifications X X

14 Section 01 30 00 Para 1.6 Pre-Construction Meeting Agenda X

Section 01 32 16.00 20 Para 1.1, Para 1.2 and Para 1.4 SD-01

Baseline Design Schedule and Monthly Updates X

Section 01 32 16.00 20 Para 1.5 , Time Impact Analysis (TIA) for each proposed contract modification.

X

Section 01 35 26 Para 1.3 and Para 1.7 SD-01 Accident

Prevention Plan (APP) - Site Specific X

Section 01 35 26 Para 1.3 and 1.4 SD-06 Monthly Exposure

Reports X

Section 01 35 26 Para 1.3 and 1.13 SD-06 Notifications and

Reports X

Section 01 35 26 Para 1.3 and 1.13 SD-06 Accident Reports

(GLHE)

X

Section 01 35 26 Para 1.3 and 1.9 SD-07 Activity Hazard Reports

(AHA)

X

Section 01 35 26 Para 1.3 and 1.10.1 SD-07 Confined Space

Entry Permit X

23 Section 01 35 26 Para 1.3 and 1.10.1 SD-07 Hot Work Permit X

Section 01 35 26 Para 1.3 and 1.13.3 SD-07 Certificate of

Compliance X

25 Section 01 35 26 Para 1.3 and 1.15 SD-07 License Certificates X

Section 01 35 26 Para 1.3 and 3.8.3 SD-07 Machinery &

Mechanized Equipment Certification Form X

DIVISION 01 - GENERAL REQUIREMENTS

JCGU 25-7007 Repair Kitchen Flooring, B334

PROJECT TITLE:

P R

E- C

O N

ST

R

U C

TI

O

N

SD

-0

SH

O

P D

R A

W

IN

G S

(S D

-0

P R

O D

U C

T D

A

TA

SD

-0

SA

M

P

LE

S (S

D -0

D

ES

IG

N

D A

TA

SD

-0

TE

ST

R

EP

O R

TS

SD

-0

C

ER

TI

FI

C A

TI

O

N S

(S D

-0

M A

N U

FA

C

TU

R

E' S

IN

ST

R U

C

TI

O N

SD

-0

M A

N U

FA

C

TU

R

E' S

FI

EL

D R

EP

O

R

TS

SD

-0

O

TH

ER

M A

N U

FA

C

TU

R

E' S

M A

IN

TE

N A

N C

E D

A

TA

SD

-1

C

LO

SE

O

U T

SU

B

M

IT

TA

LS

SD

-1

J. Hernandez PAGE 1 of 3

AF Form 66 Submittal Register 12/10/2025

PROJECT NUMBER : SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Use Electronic Delivery

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

V

ED

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

JCGU 25-7007 Repair Kitchen Flooring, B334

PROJECT TITLE:

P R

E- C

O N

ST

R

U C

TI

O

N

SD

-0

SH

O

P D

R A

W

IN

G S

(S D

-0

P R

O D

U C

T D

A

TA

SD

-0

SA

M

P

LE

S (S

D -0

D

ES

IG

N

D A

TA

SD

-0

TE

ST

R

EP

O R

TS

SD

-0

C

ER

TI

FI

C A

TI

O

N S

(S D

-0

M A

N U

FA

C

TU

R

E' S

IN

ST

R U

C

TI

O N

SD

-0

M A

N U

FA

C

TU

R

E' S

FI

EL

D R

EP

O

R

TS

SD

-0

O

TH

ER

M A

N U

FA

C

TU

R

E' S

M A

IN

TE

N A

N C

E D

A

TA

SD

-1

C

LO

SE

O

U T

SU

B

M

IT

TA

LS

SD

-1

Section 01 45 00.00 10, Para 1.3 and 3.2 SD-01 Contractor

Quality Control (CQC) Plan X

Section 01 45 00.00 10, Para 1.3 and 3.9.2 SD-06 Verification

Statement X

Section 01 56 00 Para. 1.8 and 18.0 SD-01 Environmental

Management System (EMS) X X

Section 01 56 00 Para. 1.8 and 3.8 Indoor SD-01 Air Quality

Control Plan X

Section 01 56 00 Para. 1.8 and 4.3 SD-01 Hazardous Material

Safety Data Sheet (SDS) X

Section 01 56 00 Para. 1.8 and 4.10 SD-01 Contractor

Hazardous Material Authorization Inventory X

Section 01 56 00 Para. 1.8, 5.0, 16.0, and Appendix B SD-07

Disposal of Non-Hazardous and Special Waste (Construction &

Debris Reports)

X

Section 01 56 00 Para. 1.8, 15.0, Appendix A SD-07 Air Emission

Reporting X

Section 01 56 00 Para. 1.8 and 11.4 SD-11 Non-Asbestos

Containing Material Usage Certification X

Section 01 56 00 Para. 1.8 and 4.4 SD-11 Contractor Hazardous

Material Authorization Final Report (AF Form 3952) X

38 Section 01 57 19 Para 1.4 Environmental Protection Plan (EPP) X

Section 01 74 19 Para. 1.4, 1.5, and 1.7 SD-01 Construction

Waste Management Plan X

40 Section 01 74 19 Para. 1.5 and 1.9 SD-06 Monthly Reports X

Section 01 74 19 Para. 1.5 and 1.10 SD-11 Final Construction

Waste Diversion Plan X

42 Section 01 78 00 Para. 1.5 and 1.6 SD-03 Warranty Package X

43 Section 01 78 00 Para. 1.5 and 3.5 SD-03 Final Cleaning X

44 Section 01 78 00 Para. 1.5 and 1.6.1 SD-08 Posted Instructions X

Section 01 78 00 Para. 1.5 and 3.4 SD-10 Operation and

Maintenance Manuals X

46 Section 01 78 00 Para. 1.5 and 3.1 SD-11 As-Built Drawings X

Section 01 78 00 Para. 1.5 and 3.9.1 SD-11 Interim DD Form

X

Section 01 78 00 Para. 1.5 and 3.9.1 SD-11 Checklist for DD

Form 1354 X

49 Section 02 41 00 Para. 1.5 SD-01 Demolition Plan X

50 Section 02 41 00 Para. 1.5 SD-01 Existing Conditions X

Section 09 67 23.13 Para. 1.3 and 2.1 SD-02 Installation

Drawings X

DIVISION 02 - DEMOLITION

DIVISION 09 - FINISHES

J. Hernandez PAGE 2 of 3

AF Form 66 Submittal Register 12/10/2025

PROJECT NUMBER : SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Use Electronic Delivery

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

V

ED

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

JCGU 25-7007 Repair Kitchen Flooring, B334

PROJECT TITLE:

P R

E- C

O N

ST

R

U C

TI

O

N

SD

-0

SH

O

P D

R A

W

IN

G S

(S D

-0

P R

O D

U C

T D

A

TA

SD

-0

SA

M

P

LE

S (S

D -0

D

ES

IG

N

D A

TA

SD

-0

TE

ST

R

EP

O R

TS

SD

-0

C

ER

TI

FI

C A

TI

O

N S

(S D

-0

M A

N U

FA

C

TU

R

E' S

IN

ST

R U

C

TI

O N

SD

-0

M A

N U

FA

C

TU

R

E' S

FI

EL

D R

EP

O

R

TS

SD

-0

O

TH

ER

M A

N U

FA

C

TU

R

E' S

M A

IN

TE

N A

N C

E D

A

TA

SD

-1

C

LO

SE

O

U T

SU

B

M

IT

TA

LS

SD

-1

Section 09 67 23.13 Para. 1.3 and 1.5.2 SD-03 Manufacturer's

Catalog Data X

Section 09 67 23.13 Para. 1.3 and 1.5.3 SD-04 Hardboard

Mounted Epoxy Flooring Sample X

54 Section 09 67 23.13 Para. 1.3 and 1.5.1 SD-04 Flooring Mockup X

55 Section 09 67 23.13 Para. 1.2.3 and 1.3 SD-05 Design Mix Data X

Section 09 67 23.13 Para. 1.3 and 1.5.2 SD-07 Listing of Product

Installations X

Section 09 67 23.13 Para. 1.3 and 1.5 SD-07 Referenced

Standards Certificates X

58 Section 09 67 23.13 Para. 1.3 and 1.6 SD-11 Warranty X

59 Section 10 26 00 Para. 1.2 SD-03 Corner Guards X 60 Section 10 26 00 Para. 1.2 and 2.2 SD-07 Corner Guards X

61 Section 10 26 00 Para. 1.2 and 2.1 SD-10 Corner Guards X

Section 11 05 40 Para. 1.4 and 1.5.5 SD-01 Pre-Installation

Conference X

Section 11 05 40 Para. 1.2 and 1.4 SD-02 Food Service

Equipment Schedule X

Section 11 05 40 Para. 1.2 and 3.5 SD-06 Equipment Startup and Operational Tests X

Section 11 05 40 Para. 1.2 and 3.2 SD-07 Food Service

Equipment Manufacturer's Qualifications X

DIVISION 10 - SPECIALTIES

DIVISION 11 - EQUIPMENT

J. Hernandez PAGE 3 of 3

File details come from the government source that posted it. Updated .