This document is a set of construction drawings for a kitchen flooring repair project at Goodfellow Air Force Base in San Angelo, Texas. Project Number JCGU 25-7007 is issued December 4, 2025, and covers repair and replacement of kitchen flooring in Building 334 (Western Winds facility). The project is managed by the 17th Training Wing Civil Engineering Squadron (17 CES/CENMP).
The scope includes demolition of existing quarry tile flooring systems, bases, and substrates; removal of existing threshold and door preparation for new flooring; and installation of new resilient flooring and 6-inch integral cove base throughout, with new stainless steel thresholds and 4-inch stainless steel corner guards. The project is phased into three separate work phases to maintain kitchen operations during construction. Contractor responsibilities include maintaining site cleanliness, providing silt fencing and temporary 6-foot chain-link fencing around work limits, constructing and maintaining truck washout areas per TCEQ regulations, maintaining haul roads, protecting emergency access, compliance with OSHA and Air Force safety standards, mowing grass and vegetation to 3 inches when reaching 6 inches, and providing an as-built set of red-line drawings upon completion. All materials must be new and of industry-wide quality; all work must comply with manufacturer specifications and be warranted for one year after project completion. The drawings include demolition plans, new floorplans with equipment locations, equipment schedule listing 35 kitchen items, sanitary sewer plumbing plan, and phasing plan indicating work sequence across storage, cooking, pot wash, and dishwash areas.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PE
R
IM
ET
ER
R
O
AD
E
AS
T
RETENTION POND
TR
O
O P
W
AL
K
MITCHELL STREET
FT
. L
AN
C
AS
TE
R A
VE
FT
. G
R
IF
FI
N
A
VE
PERIMETER ROAD S
MITCHELL STREET
FT
. S
TO
C
KT
O
N A
VE
GOODFELLOW DRIVE
HORNET STREET
FT
. P
H
AN
TO
M
H
IL
L
AV
E
POLLARD STREET
MATHIS ST.
SC
H
ER
Z
BL
VD
FARROW STREET
FT
. G
R
IF
FI
N
A
VE
NUCHOLS STREET
TR
O
O
PW
AL
KFT
. M cK
AV
ET
T R
D
FT
. M cK
AV
ET
T
R D
FT
. L
AN
C
AS
TE
R A
VE
VANCE CIRCLE
CARSWELL ST.
VANCE CIRCLE
KE
AR
N
EY
B
LV
D
C H
R
IS
TO
VA
L R
O
AD
AP
AC
H E
TR
AI
L
AP
AC
H E
TR
AI
L
VALIANT STREET E
KE
AR
N
EY
B
LV
D
W. VANCE ST
FL
IG
H
TL
IN
E
AV
E
W. CANBERRA STREET
KIC
KAPOO TRAIL
KIC
KAPOO TRAIL
COMANCHE TRAIL
KI
O
W A
TR
AI
L
VANCE ST. E
TEXAN STREET
FT
. L
AN
C
AS
TE
R A
VE
TR
O
O
PW
AL
K
TR
O
O
PW
AL
K
TR
O
O
PW
AL
K
TR
O
O
PW
AL
K
FT
. R
IC
H
AR
D
SO
N
A
VE
JUMANOS TRAIL
FARROW
STREET
SC
H
ER
Z
BL
VD
SC
H
ER
Z
BL
VD
TR
O
O P
W
AL
K
FL
IG
H
TL
IN
E
AV
E
PAINT ROCK ROAD
PAINT ROCK ROAD
PERIMETER ROAD NORTH
E. NORTH PATROL ROAD
W
ES
T
PA
TR
O
L R
O
AD
PERIMETER ROAD SW
PERIMETER ROAD NW
TR
O
O
PW
AL
K
C H
AL
LE
N G
ER
A
VE
GRIFFIN STREET
TROOPWALK
PERIMETER ROAD SE
KEAR
N
EY BLVD
TR
O
O
PW
AL
K
POWELL STREET
ED
G
EW
O
O D
D R
IV
E
SOUTH CHADBOURNE STREET
1250'
EXPLOSIVE CLEAR ZONE
QUANTITY DISTANCE
JOINER AVE.
VANCE ST. E
OLD EOLA ROAD
TROOPWALK
1250'
EXPLOSIVE CLEAR ZONE
QUANTITY DISTANCE
OBSTACLE COURSE
JOINT FORCES
6 6
9 1011
W. VALIANT STREET
CANBERRA STREET E
COMANCHE TRAIL
EN
D
STR
EET PAINT ROCK ROAD
LO
N
G H
O R
N D
R
IVE
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
TRUE NORTH
M
AG
D
EC
MAGNETIC DECLINATION: 5° 18' EAST (2020)
ANNUAL RATE OF CHANGE: 6' WEST/YEAR
SOURCE: https://www.ngdc.noaa.gov/geomag-web/#declination
HAUL ROUTE
WESTERN WINDS, B334
PROJECT LOCATION
COVER SHEET
G-001
DRAWING INDEX
GENERAL
G-001 COVER SHEET
G-002 GENERAL INFORMATION 1
G-003 GENERAL INFORMATION 2
G-004 PHASING PLAN
ARCHITECTURAL
AD-101 DEMOLITION AND NEW FLOORPLAN
Q-101 EQUIPMENT PLAN
PLUMBING
P-101 DEMOLITION PLAN
VISITOR CONTROL
CENTER (VCC), B3005
325-654-4122
GOODFELLOW AFB VICINITY MAP
NTS
REPAIR KITCHEN FLOORING, B334
PROJECT NUMBER: JCGU 25-7007
CONSTRUCTION DOCUMENTS: ISSUED 4 DECEMBER, 2025
GOODFELLOW AFB
4368 S CHADBOURNE
SAN ANGELO, TX 76908
COMMERCIAL VEHICLE
INSPECTION AREA (CVIA), B3020
325-654-4122
CLEAR ZONE -
CONTRACTOR USE & STORAGE
PROHIBITED
FIRE STATION, B3321
325-654-7000
SECURITY FORCES, B3323
325-654-3504
CIVIL ENGINEERING, B3511
325-654-3501
NORTH GATE, B3510
325-654-3528
SOUTH GATE, B3012
IN CASE OF EMERGENCY CALL
325-654-7000
BASE CONTRACTING, B707
325-654-5174
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
GEN. INFO. 1
G-00202
GENERAL NOTES
DRAWING ABBREVIATIONS
A_____________________________
ABA. ARCHITECTURAL BARRIERS ACT
ACT. ACOUSTICAL CEILING TILE
ADA. AMERICANS WITH DISABILITY ACT
ADJ. ADJUSTABLE
AFF. ABOVE FINISH FLOOR
ALUM. ALUMINUM
AHU. AIR HANDLING UNIT
ARCH. ARCHITECT / ARCHITECTURAL
AVG. AVERAGE
ASSY. ASSEMBLY
B_____________________________
BD. BOARD
BDRY. BOUNDARY
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. / BLKG. BLOCK / BLOCKING
BOT. BOTTOM
BUR. BUILT UP ROOF
C_____________________________
CAB. CABINET
CBB. / CEM. BD. CEMENTITIOUS BACKER BOARD
CF/CI CONTRACTOR FURNISHED & CONTRACTOR
INSTALLED
CFE. CONTRACTOR FURNISHED EQUIPMENT
CG. CORNER GUARD
CIP. CAST-IN-PLACE
CL / CENTER LINE
CLG. CEILING
CO. CLEANOUT
CONC. CONCRETE
CMU. CONCRETE MASONRY UNIT
CONF. CONFERENCE
CONT. CONTINUOUS
COORD. COORDINATE
CORR. CORRIDOR
CPT. CARPET
CT. CERAMIC TILE
CTR. CENTER
D____________________________
DBL. DOUBLE
DEMO. DEMOLISH / DEMOLITION
DEPT. DEPARTMENT
DET. / DTL. DETAIL
DIM. DIMENSION
DIST. DISTANCE
DWG. DRAWING
DIA. / Ø DIAMETER
DIR. DIRECTION
DR. DOOR
DS. DOWNSPOUT
E____________________________
EA. EACH
EIFs EXTERIOR INSULATION FINISH SYSTEM
EL. ELEVATION
ELEC. ELECTRICAL
ELEV. ELEVATOR
EWC. ELECTRICAL WATER COOLER
EX. / EXIST. EXISTING
EJ. / EXP. JT. EXPANSION JOINT
EQ. EQUAL
EXP. EXPOSED
EXT. EXTERIOR
F____________________________
FA FIRE ALARM
FACP. FIRE ALARM CONTROL PANEL
FCO. FLOOR CLEANOUT
FD. FLOOR DRAIN
FEC. FIRE EXTINGUISHER CABINET
FLR. FLOOR
FIN. FINISH
FH. FIRE HOSE
FIXT. FIXTURE
FLG. FLOORING
FRMG. FRAMING
FRP. FIBER REINFORCED PLASTIC
FT. FEET
FTG. FOOTING
G___________________________
GA. GAUGE
GALV. GALVANIZED
GFCI GOVERNMENT FURNISHED AND
CONTRACTOR INSTALLED
GCGI. GOVERNMENT FURNISHED AND
GOVERNMENT INSTALLED
GFE. GOVERNMENT FURNISHED
EQUIPMENT
GYP. BD. GYPSUM BOARD
H___________________________
HB. HOSE BIB
HC. HANDICAPPED
HDPE. HIGH DENSITY POLYETHYLENE
HDWD. HARDWOOD
HM. HOLLOW METAL
HORIZ. HORIZONTAL
HT. HEIGHT
I___________________________
IAW. IN ACCORDANCE WITH
INT. INTERIOR
J___________________________
JAN. JANITOR
K___________________________
KIT. KITCHEN
L___________________________
LAM. LAMINATE
LAV. LAVATORY
LDG. LANDING
LF. LINEAR FEET
LIN. LINEAR
LOC. LOCATION
LT. LIGHT
LVR. LOUVRE
M___________________________
MAINT. MAINTENANCE
MATL. MATERIAL
MAX. MAXIMUM
MECH./MECH. RM. MECHANICAL / MECHANICAL ROOM
MFR. MANUFACTURER
MID. MIDDLE
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODIFY
MB. MOISTURE BARRIER
MTG. MOUNTING
MTL. METAL
N___________________________
N. NORTH
NA. NOT APPLICABLE
NIC. NOT IN CONTRACT
O___________________________
OC. / OC.EW. ON CENTER / ON CENTER EACH
WAY
OD. OUTSIDE DIAMETER
OPNG. OPENING
OPP. OPPOSITE
ORIG. ORIGINAL
P___________________________
PA. PUBLIC ADDESS(ING)
PCC. PRECAST CONCRETE
PERF. PERFORATED
PLBG. PLUMBING
PLYWD. PLYWOOD
PNL. PANEL
PRKG. PARKING
PTD. PAINTED
PTN. PARTITION
PWR. POWER
Q___________________________
QT. QUARRY TILE
QTY. QUANTITY
R___________________________
RB. RESILIENT BASE
RBR. RUBBER
RCP. REFLECTED CEILING PLAN
RD. ROOF DRAIN
REC. RECESS(ED)
REF. / RE: REFERENCE / REFER TO
REQ.('D) REQUIRE / REQUIRED
RESIL. RESILIENT
RFG. ROOFING
RH. ROOF HATCH
RM. ROOM
S___________________________
SCHED. SCHEDULE
SGL. SINGLE
SHTHG. SHEATHING
SIM. SIMILAR
SLNT. SEALANT
SP. EL. SPOT ELEVATION
SPEC. SPECIFICATION / AS SPECIFIED
SS. STAINLESS STEEL
STD. STANDARD
STL. STEEL
STOR. STORAGE
T___________________________
TD. TRENCH DRAIN
TEL. TELEPHONE
TEMP. TEMPORARY
THK. THICK/THICKNESS
TYP. TYPICAL
U___________________________
UE UNDERGROUND ELECTRICAL
V___________________________
VCT. VINYL COMPOSITION TILE
VERT. VERTICAL
W___________________________
WD. WOOD
WDW. WINDOW
W/ WITH
WWF. WELDED WIRE FABRIC
1. ALL WORK SHALL BE NEW, UNUSED, AND OF INDUSTRY-WIDE QUALITY OR AS
INDICATED HEREIN, WHICHEVER IS OF THE HIGHEST QUALITY. THE CONTRACTOR
SHALL FIELD VERIFY ALL DIMENSIONS.
2. THE CONTRACTOR SHALL MAINTAIN A CONSTRUCTION SITE NEAT AND CLEAN OF
DEBRIS AS DIRECTED BY THE CONTRACTING OFFICER. THE CONTRACTOR'S WASTE
DUMPSTERS SHALL BE EMPTIED ON A REGULAR BASIS. ROADWAYS SHALL BE CLEAR OF
DIRT AND DEBRIS. THE CONTRACTOR SHALL WATER-DOWN AREA FOR DUST CONTROL.
3. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SILT FENCING AROUND THE LIMITS
OF CONSTRUCTION SITE. SILT FENCING SHALL ALSO BE PROVIDED AROUND AREA
STORM DRAINAGE SURFACE INLETS. AT THE POST CONSTRUCTION PHASE, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL MATERIALS RELATED
TO THE PROJECT SILT FENCING TO INCLUDE ACCUMULATED DEBRIS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR BRINGING THE AREA AROUND ALL SILT FENCING BACK TO
THEIR ORIGINAL CONDITION PRIOR TO THE INSTALLATION OF SAID FENCING AND
PROJECT CONSTRUCTION. THE CONTRACTOR SHALL MAINTAIN RECORDS OF THE
ORIGINAL CONDITION OF THE SITE. SUCH RECORDS SHALL BE IN THE FORM OF COLOR
PHOTOGRAPHS THAT SHALL BE KEPT ON FILE AS WELL AS TRANSMITTED TO THE
GOVERNMENT FOR SAFE KEEPING.
4. THE CONTRACTOR SHALL INSTALL AND MAINTAIN A 6'-0" TALL TEMPORARY
CONSTRUCTION CHAIN-LINK FENCE AROUND THE LIMITS OF WORK, NOT INCLUDING
THE CONSTRUCTION ACCESS ROAD. COORDINATE CHAINS AND PADLOCKS ON GATES
WITH GOODFELLOW FIRE DEPARTMENT. EACH GATE SHALL BE NUMBERED FOR
EMERGENCY ACCESS AND SHALL HAVE INGRESS/EGRESS SIGNAGE AND AREA
LIGHTING. THE CONTRACTOR SHALL MAINTAIN FIRE ACCESS THROUGH EACH
INDIVIDUAL CONSTRUCTION SITE AT ALL TIMES.
5. TRUCK WASHOUT AREA SHALL BE CONSTRUCTED, MAINTAINED, AND CLEANED IN
ACCORDANCE WITH TCEQ REGULATIONS. PROVIDE DETAILS AND MAINTENANCE PLAN
AS PART OF THE STORMWATER POLLUTION PREVENTION PLAN. STORMWATER
PERMITS SHALL BE REQUIRED PRIOR TO THE START OF CONSTRUCTION.
6. ALL CONTRACTORS SHALL STOCKPILE REQUIRED MATERIALS AND EQUIPMENT WITHIN
THE LIMITS OF RESPECTIVE PROJECT AREAS OR STAGING AREA AS INDICATED ON THE
DRAWINGS.
7. ALL HAUL ROADS SHALL BE MAINTAINED SUCH THAT UNOBSTRUCTED ACCESS SHALL
BE PROVIDED AT ALL TIMES FROM THE ROAD TO THE STAGING AREA AND FROM THE
STAGING AREA TO THE WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE
BASE AT ALL TIMES. THE MAINTENANCE OF HAUL ROADS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AT NO ADDITIONAL COST TO THE
GOVERNMENT. THE HAUL ROAD LOCATIONS SHALL BE AS INDICATED ON THE
STAGING/LAYDOWN AND ACCESS PLAN, OR BY THE CONTRACTING OFFICER.
8. THE CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A
MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL
TIMES WITHOUT DELAYS TO EMERGENCY VEHICLES RESPONSE TIME.
9. WHILE WITHIN GOODFELLOW AFB, THE CONTRACTOR SHALL COMPLY WITH BASE
REGULATIONS PERTAINING TO "NO FIREARMS" AND "NO ILLEGAL DRUGS."
10. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON EXISTING PAVEMENT THAT IS
TO REMAIN IN PLACE.
11. ALL CONTRACTOR OPERATIONS SHALL BE CONDUCTED AND PERFORMED WITHIN
ACCORDANCE OF DEPARTMENT OF LABOR OSHA REQUIREMENTS FOUND IN 29 CFR
1910 [1910.146 AND 1910.147] AND 29 CFR 1926, AND AIR FORCE OCCUPATIONAL
SAFETY AND HEALTH [AFOSH] AND AIR FORCE INSTRUCTION [AFI] STANDARDS
INCLUDING AFI 91-203, AIR FORCE CONSOLIDATED OCCUPATIONAL SAFETY
INSTRUCTION. THE CONTRACTOR SHALL ALSO ENSURE THAT ALL WORK IS PERFORMED
IN ACCORDANCE WITH PROJECT IDENTIFIED NATIONAL STANDARDS, MILITARY
MANUALS, PAMPHLETS, INSTRUCTIONS, STANDARDS, HANDBOOKS AND WITH THE
CORPS OF ENGINEERS [COE] SAFETY MANUAL 385-1-1 [EDITION IN EFFECT ON THE
DATE OF THIS SOLICITATION]. ALL PROJECT SITES SHALL BE SUBJECT TO INSPECTION BY
THE DEPARTMENT OF LABOR. IN THE EVENT OF CONFLICT BETWEEN THE OSHA
STANDARDS AND THESE REQUIREMENTS, THE MOST STRINGENT SHALL APPLY.
12. AT ALL TIMES, THE CONTRACTOR SHALL MAINTAIN ONE FIRE LANE FREE OF
OBSTRUCTION AND MAINTAIN ACCESS TO THE SITE AND ALL SURROUNDING ROADS
AND STREETS.
13. GRASS AND WEEDY VEGETATION WITHIN THE AREAS UTILIZED BY THE CONTRACTOR,
INCLUDING WORK AREAS, ADMINISTRATIVE AREAS AND STORAGE AREAS SHALL BE
MOWED WHEN THE GRASS AND WEEDY VEGETATION IS AT A HEIGHT OF 6 INCHES,
MOWING SHALL BE TO A HEIGHT OF 3 INCHES. MOWING SHALL BE ACCOMPLISHED
WITH A ROTARY MOWER THAT LEAVES THE CLIPPINGS EVENLY DISTRIBUTED ON THE
SOIL SURFACE. MOWING SHALL BE ACCOMPLISHED DURING PERIODS AND IN SUCH A
MANNER THAT THE SOIL AND GRASS SHALL NOT BE DAMAGED. TOWED OR
SELF-PROPELLED RIDING MOWERS SHALL NOT BE OPERATED WITHIN 3 FEET OF TREES
OR SHRUBS. AREAS ADJACENT TO TREES AND SHRUBS SHALL BE MOWED WITH
HAND-PROPELLED MOWERS.
14. EROSION CONTROL DEVICES SHALL BE USED FOR STAGING AREAS AND MATERIAL
STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORMWATER RUNOFF IN
ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS. A SWPPP SHALL BE
SUBMITTED PRIOR TO MOBILIZING.
A. GENERAL NOTES CONT'D
1. CONSTRUCTION ACCESS TO THE SITE SHALL BE THROUGH THE EXISTING SOUTH GATE
LOCATED ON SOUTH CHADBOURNE STREET. ALL CONSTRUCTION TRAFFIC ENTERING
THE BASE IS REQUIRED TO PASS THROUGH THE COMMERCIAL VEHICLE INSPECTION
AREA LOCATED TO THE EAST OF KEARNEY BOULEVARD. HOURS OF OPERATION ARE
FROM 6:00 A.M. TO 2:00 P.M. MONDAY THROUGH FRIDAY, PHONE 325-654-1290.
2. CONTRACTORS SHALL KEEP ALL PUBLIC ROADS AND STREETS CLEAN OF
CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL PROVIDE
EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS REQUESTED BY THE
CONTRACTING OFFICER. THE CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO
STREETS, PARKING AREAS AND BASE OR GOVERNMENT PROPERTY DAMAGED FROM
THEIR CONSTRUCTION ACTIVITIES.
3. CONTRACTORS SHALL MAINTAIN A CONSTRUCTION SITE NEAT AND CLEAN OF DEBRIS AS
DIRECTED BY CONTRACTING OFFICER. CONTRACTOR WASTE DUMPSTERS SHALL BE
EMPTIED ON A REGULAR BASIS.
4. THE CONTRACTOR AND CONTRACTOR PERSONNEL WILL NOT BE REQUIRED TO
PARTICIPATE IN BASEWIDE ACTIVE SHOOTER DRILLS, EMERGENCY RESPONSE
DRILLS, AND OTHER INCIDENT RESPONSE DRILLS. THE GOVERNMENT WILL COORDINATE
THE OCCURRENCE OF THESE DRILLS WITH THE CONTRACTOR IN THE EVENT THAT
DRILLS WILL AFFECT CONTRACTOR ACCESS TO GOODFELLOW AFB.
B. STAGING NOTES
1. TRUCK WASHOUT AREA SHALL BE CONSTRUCTED, MAINTAINED AND CLEANED IN
ACCORDANCE WITH TCEQ REGULATIONS. PROVIDE DETAILS AND MAINTENANCE PLAN
AS PART OF THE STORMWATER POLLUTION PREVENTION PLAN. STORMWATER PERMITS
ARE REQUIRED PRIOR TO THE START OF CONSTRUCTION.
2. ALL CONTRACTORS SHALL STOCKPILE REQUIRED MATERIALS AND EQUIPMENT WITHIN
LIMITS OF RESPECTIVE PROJECT AREAS OR STAGING AREA AS INDICATED ON THE
DRAWINGS.
3. CONTRACTOR SHALL CONNECT TO EXISTING OR NEW FIRE HYDRANTS FOR TEMPORARY
CONSTRUCTION WATER. INSTALL QUICK DISCONNECT, BACK FLOW PREVENTER AND
SHUT-OFF VALVE ON 2 1/2" HOSE CONNECTION ONLY. PRIOR TO MAKING ANY
CONNECTIONS TO BASE WATER SYSTEMS, THE CONTRACTOR MUST NOTIFY AND
COORDINATE WITH 17CES. A FIRE PLUG USAGE PERMIT IS REQUIRED AND USAGE SHALL
BE METERED AT ALL TIMES.
4. ALL TEMPORARY ELECTRIC POWER FACILITIES SHALL MEET OR EXCEED NESC AND NEC
REQUIREMENTS AS APPLICABLE FOR PRIMARY AND SECONDARY FACILITIES.
C. ACCESS AND VEHICLE PARKING
1. ACCESS TO THE PROJECT FOR ALL CONSTRUCTION PERSONNEL, VEHICLES AND
EQUIPMENT IS ILLUSTRATED ON THE STAGING/LAYDOWN AND ACCESS PLAN. ACCESS
ROUTES MAY BE SUBJECT TO CHANGE BASED ON OPERATIONAL REQUIREMENTS.
POTENTIAL SCHEDULE IMPACTS SHALL BE COORDINATED WITH 17CES.
2. LOCATION OF ACCESS/ HAUL ROADS ARE AS INDICATED ON G-001 AND G-002.
3. ALL HAUL ROADS SHALL BE MAINTAINED SUCH THAT UNOBSTRUCTED ACCESS WILL BE
PROVIDED AT ALL TIMES FROM THE ROAD TO THE STAGING AREA AND FROM THE
STAGING AREA TO THE WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE
AT ALL TIMES. THE MAINTENANCE OF HAUL ROADS SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. THE HAUL ROAD
LOCATIONS SHALL BE AS INDICATED ON G-000 AND G-001.
4. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A
MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL
TIMES WITHOUT DELAYS TO EMERGENCY VEHICLES RESPONSE TIME.
5. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY SECURITY
FORCES WHEN ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL
ENTERING GOODFELLOW A.F.B. MUST HAVE A VALID PHOTO ID PER BASE SECURITY
REQUIREMENTS. ALL VEHICLES ENTERING THE BASE MUST HAVE CURRENT/ VALID
REGISTRATION, CURRENT/ VALID INSURANCE AND CURRENT/ VALID DRIVERS LICENSE
FOR THE OPERATOR. ALL DRIVERS MUST COMPLY WITH ALL GOODFELLOW AFB DRIVING
REQUIREMENTS (SPEED LIMITS, SEATBELTS, ETC.) PERSONNEL ATTEMPTING TO GAIN
ACCESS TO GOODFELLOW AFB NOT IN COMPLIANCE WITH BASE SECURITY
REQUIREMENTS MAY BE REJECTED ACCESS TO THE BASE.
6. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S
CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE WORK AREA
OR STAGING AREA.
D. COORDINATION AND COMMUNICATION DURING CONSTRUCTION
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CORDON OFF THE WORK AREAS
AND STREET CROSSINGS BY USING APPROVED BARRICADES.
E. TRAFFIC CONTROL
1. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON EXISTING PAVEMENT THAT IS TO
REMAIN.
2. ANY DAMAGE TO ROADS AND PAVEMENT DUE TO CONSTRUCTION EQUIPMENT,
CONSTRUCTION TRAFFIC OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED TO THEIR
ORIGINAL CONDITION BY THE CONTRACTOR AT HIS/ HER OWN EXPENSE.
F. EQUIPMENT AND STOCKPILE HEIGHT
1. STOCKPILE ALL CONSTRUCTION MATERIALS WITHIN STAGING AREA. MAXIMUM HEIGHT
15.00' WITH 5:1 SIDE SLOPES. PROVIDE EROSION CONTROL PROTECTION AROUND THE
STOCKPILE LIMITS. ANY MATERIALS THAT ARE TO BE STOCKPILED FOR USE FOR OTHER
PROJECTS ON THE BASE SHALL BE COORDINATED WITH 17CES. ALL MATERIAL NOT
REQUIRED SHALL BE HAULED OFF GOVERNMENT PROPERTY.
G. EXCAVATION AND TRENCHES
1. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE
PROMINENTLY MARKED WITH ORANGE AND WHITE TYPE III BARRICADES AND WITH
FLASHING TYPE A-LOW INTENSITY WARNING LIGHTS FROM DUSK TILL DAWN.
H. OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS.
2. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE FIRE LANE FREE FROM OBSTRUCTION
AND MAINTAIN ACCESS TO THE SITE AND ALL SURROUNDING ROADS AND STREETS.
I. CONTRACTOR SAFETY PLAN SUBMITTALS
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN IN ACCORDANCE WITH
THE SPECIFICATIONS WITH THE PROJECT SCHEDULE. THE SAFETY PLAN SHALL
IDENTIFY THE FOLLOWING ITEMS:
A. PROPOSED ACCESS POINTS, STAGING AREA AND HAUL ROUTES.
B. TEMPORARY MARKINGS TO BE USED, IF ANY.
C. LOCATIONS AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL DEVICES.
D. METHODS BY WHICH THE CONTRACTOR WILL COMMUNICATE WITH 17CES.
J. MAINTENANCE OF STORAGE AREA
1. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE CONSTRUCTION SITE, CONSTRUCTION
TRAILER(S)/BUILDING(S), AND STORAGE AREA(S) IN A CLEAN, NEAT, WORKMAN LIKE
CONDITION, FREE FROM ACCUMULATION OF WASTE, RUBBISH, WEEDS, OVERGROWN
GRASS, OR CONSTRUCTION DEBRIS, TO THE SATISFACTION OF THE CONTRACTING
OFFICER. ALL LOOSE OR LIGHT WEIGHT MATERIALS SHALL BE SECURED TO PREVENT
BLOWING OR SCATTERING. THE BURNING OF TRASH OR CONSTRUCTION DEBRIS IS
STRICTLY PROHIBITED ON GOODFELLOW AFB. PRIOR TO FINAL INSPECTION, THE
CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS, TOOLS, EQUIPMENT, AND
MATERIALS NOT THE PROPERTY OF THE GOVERNMENT. UPON COMPLETION OF THE
WORK, THE CONTRACTOR SHALL LEAVE THE WORK SITE AND STORAGE AREA(S) IN A
CLEAN, NEAT, AND WORKMANLIKE CONDITION SATISFACTORY TO THE CONTRACTING
OFFICER. REFER TO STATEMENT OF WORK.
2. THE CONTRACTOR SHALL KEEP FENCING IN A STATE OF GOOD REPAIR AND PROPER
ALIGNMENT. GRASSED OR UNPAVED AREAS, WHICH ARE NOT ESTABLISHED ROADWAYS,
WILL BE COVERED WITH A LAYER OF GRAVEL AS NECESSARY TO PREVENT RUTTING AND
THE TRACKING OF MUD ONTO PAVED OR ESTABLISHED ROADWAYS, SHOULD THE
CONTRACTOR ELECT TO TRAVERSE THEM WITH CONSTRUCTION EQUIPMENT OR OTHER
VEHICLES; GRAVEL GRADATION WILL BE AT THE CONTRACTOR'S DISCRETION. MOW AND
MAINTAIN GRASS LOCATED WITHIN THE BOUNDARIES OF THE CONSTRUCTION SITE FOR
THE DURATION OF THE PROJECT. GRASS AND VEGETATION ALONG FENCES, BUILDINGS,
UNDER TRAILERS, AND IN AREAS NOT ACCESSIBLE TO MOWERS WILL BE EDGED OR
TRIMMED NEATLY.
3. GRASS AND WEEDY VEGETATION WITHIN THE AREAS UTILIZED BY THE CONTRACTOR,
INCLUDING WORK AREAS, ADMINISTRATIVE AREAS, AND STORAGE AREAS, SHALL BE
KEPT MOWED TO CONTROL VEGETATIVE GROWTH. VEGETATION SHALL BE MOWED
WHEN IT REACHES A HEIGHT OF 6 INCHES. MOWING SHALL BE TO A HEIGHT OF 3 INCHES.
MOWING SHALL BE ACCOMPLISHED WITH A ROTARY MOWER THAT LEAVES THE
CLIPPINGS EVENLY DISTRIBUTED ON THE SOIL SURFACE. MOWING SHALL BE
ACCOMPLISHED DURING PERIODS AND IN SUCH MANNER THAT THE SOIL AND GRASS
WILL NOT BE DAMAGED. TOWED OR SELF-PROPELLED RIDING MOWERS SHALL NOT BE
OPERATED WITHIN 3 FEET OF TREES OR SHRUBS. AREAS ADJACENT TO TREES AND
SHRUBS SHALL BE MOWED WITH HAND-PROPELLED MOWERS.
4. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND ANY
MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER
RUNOFF IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.
5. AREAS NOT MOWED: GOVERNMENT MAY IMMEDIATELY AFTER NOTICE TO THE
CONTRACTOR AND AT THE DISCRETION OF THE CONTRACTING OFFICER MOW THE
CONTRACTOR'S AREAS AT ANY TIME THE VEGETATION HEIGHT EXCEEDS 6 INCHES.
K. WATERING
1. THE CONTRACTOR SHALL COMPLY WITH THE CURRENT CITY OF SAN ANGELO, TEXAS
WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN FOR ALL ON BASE WATER
USAGE.
PROJECT NOTES
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW DIMENSIONS AND CONDITIONS
PRIOR TO COMMENCEMENT OF ANY AND ALL WORK FOR THIS PROJECT.
2. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, TOOLS, EQUIPMENT, AND
ASSOCIATED WORK REQUIRED TO COMPLETELY EXECUTE THE PROJECT.
3. THE CONTRACTOR SHALL PROVIDE ALL WORK COMPLETE, IN THE QUICKEST TIME
PRACTICAL, AND IN A NEAT WORKMANLIKE MANNER.
4. THE CONTRACTOR SHALL PROVIDE ITEMS OF WORK NOT SPECIFICALLY INDICATED, BUT
OBVIOUSLY AND/OR NORMALLY REQUIRED TO COMPLETELY AND PROPERLY EXECUTE
THE WORK.
5. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS GOVERNING SAFETY, SPECIFICALLY
THE "OCCUPATIONAL SAFETY AND HEALTH" STANDARDS (OSHA)
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THE EXISTING ON-SITE
BUILDINGS AND OTHER INSTALLATIONS THAT ARE TO REMAIN INTACT DURING AND
AFTER WORK FOR THIS PROJECT.
7. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT THE PROJECT
DURING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, BRACING AND SHORING OF
DEAD LOADS, CONSTRUCTION LOADS, AND WIND LOADS.
8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN FIRE EXTINGUISHERS ON SITE
DURING CONSTRUCTION FOR THIS PROJECT.
9. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A CLEAN, SECURE, WEATHERTIGHT,
TEMPORARY FIELD OFFICE WITH ALL REQUIRED SERVICES DURING THE COURSE OF THE
PROJECT. THE FIELD OFFICE SHALL BE A PORTABLE FACILITY PLACED ON SITE AT A
LOCATION MUTUALLY AGREEABLE TO BOTH CONTRACTOR AND CONTRACTING OFFICER
OR CONTRACTING OFFICER REPRESENTATIVE.
10. THE CONTRACTOR SHALL MAINTAIN A COMPLETE, CURRENT SET OF THE
CONSTRUCTION DOCUMENTS AND DAILY PROJECT LOG IN THE FIELD OFFICE AT ALL
TIMES. DAILY REPORTS INDICATING NUMBER OF EMPLOYEES WORKING, WORK
PERFORMED, EQUIPMENT USED, AND PROGRESS PICTURES SHALL BE SUBMITTED VIA
EMAIL TO THE CONTRACTING OFFICER OR CONTRACTING OFFICER REPRESENTATIVE ON
A WEEKLY OR DAILY BASIS UNTIL PROJECT COMPLETION.
11. THROUGHOUT THE ENTIRE COURSE OF THE WORK, THE CONTRACTOR SHALL MAINTAIN
A QUALIFIED SUPERINTENDENT ON SITE AT ALL TIMES MONDAY-FRIDAY DURING
DESIGNATED WORK TIMES. CONTRACTOR SHALL PROVIDE AN ASSIGNED ALTERNATE ON
SITE SUPERINTENDENT DURING THE PRIMARY SUPERINTENDENTS ABSENCE. BOTH
SHALL HAVE FULL AUTHORITY TO ACT ON BEHALF OF THE CONTRACTOR.
12. THE CONTRACTOR SHALL COORDINATE ALL WORK FOR THIS PROJECT WITH WORK OF
OTHER TRADES.
13. THE CONTRACTOR SHALL PROVIDE AND PROPERLY MAINTAIN PORTABLE TOILET(S) ON
SITE FOR USE BY CONTRACTOR EMPLOYEES OR SUBCONTRACTORS. USE OF EXISITNG
FIRE STATION RESTROOMS WILL NOT BE ALLOWED.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION
DEBRIS FROM PROJECT SITE AND SHALL PROVIDE AND MAINTAIN DUMPSTERS,
INCLUDING ALL ASSOCIATED DUMPING FEES, HAULING OF DEBRIS FROM SITE, AND
REMOVAL FEES.
15. THE CONTRACTOR SHALL KEEP THE PROJECT FACILITY AND SITE FREE OF ALL DEBRIS
ON A DAILY BASIS AND PROVIDE FINAL CLEANUP IN ACCORDANCE WITH THE
SPECIFICATIONS.
16. THE CONTRACTING OFFICER SHALL BE THE FINAL AUTHORITY IN MATTERS REGARDING
INTERPRETATION OF THE INSTRUCTIONS AND INTENT OF THE CONSTRUCTION
DOCUMENTS.
17. IN THE EVENT OF DISCREPANCIES, SPECIFICATIONS SHALL TAKE PRECEDENT OVER THE
DRAWINGS,
18. THE CONTRACTOR SHALL PROVIDE SUBMITTALS FOR ALL PRODUCTS AND/OR
MATERIALS LISTED IN THE SPECIFICATIONS FOR APPROVAL PRIOR TO INSTALLATION.
19. ALL CHANGES, MODIFICATIONS, AND/OR ALTERATIONS TO THE WORK INCLUSIVE OF
THESE CONTRACT DOCUMENTS SHALL REQUIRE THE STANDARD CHANGE ORDER
PROCESS AND THE ISSUANCE OF A SIGNED CHANGE ORDER (AIA G701) PRIOR TO
PERFORMANCE WORK FOR SAID CHANGES, MODIFICATIONS AND/OR ALTERATIONS.
20. ALL PRODUCTS AND/OR MATERIALS SHALL NOT BE INSTALLED UNTIL APPROVED BY THE
CONTRACTING OFFICER.
21. ALL PRODUCTS AND/OR MATERIALS SHALL BE PROVIDED, STORED, AND INSTALLED PER
THE RESPECTIVE MANUFACTURER'S RECOMMENDATIONS, MINIMUM.
22. THE CONTRACTOR SHALL WARRANT ALL EQUIPMENT, MATERIALS, AND WORKMANSHIP
FOR A PERIOD OF ONE (1) YEAR AFTER PROJECT COMPLETION. ANY MANUFACTURER
AND/OR SPECIFIED WARRANTY THAT IS FOR PERIOD LONGER THAN THE ONE (1) YEAR
WARRANTY SHALL BE SO WARRANTED.
23. THE CONTRACTOR SHALL ENSURE THAT ALL EXTERIOR GRADES AT NEW
CONSTRUCTION PROVIDE FOR POSITIVE DRAINAGE AWAY FROM THE BUILDING.
24. ALL WELDERS SHALL BE CURRENTLY A.W.S. CERTIFIED AND WELDING SHALL COMPLY
WITH CURRENT A.W.S. STANDARDS.
25. GYPSUM WALL AND CEILING BOARDS SHALL BE TEXTURED ORANGE PEEL THROUGHOUT
AND/OR WHERE REQUIRED.
26. THE CONTRACTOR SHALL PROVIDE OWNER WITH A SINGLE "AS-BUILT" SET OF
DRAWINGS COMPRISED OF RED-LINE MARKUPS OF ALL PROJECT ALTERATIONS AND/OR
CHANGES.
27. ALL COMPACTION FOR FILL SHALL BE 95% STANDARD PROCTOR DENSITY, MINIMUM.
28. THE CONTRACTOR SHALL NOT SCALE DRAWINGS HEREIN.
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
GEN. INFO. 2
G-00303
OFFICE
MEN'S
WOMEN
JAN.
STORAGE
140 FOOD PREP
CAN WASH
COOKING
KITCHEN AREA
124HALL
STORAGE
CORR.
DISHWASH
MECHANICAL RM.
SERVING LINE #1
SERVING LINE #2
SERVING LINE #3
FREEZER
POT WASH
OFFICE #2
MEAT REFRIG
130DAIRY REFRIG
REFRIG.
128 FREEZER
VESTIBULE
DINING RM
VESTIBULE
LOBBY
DINING RM
VESTIBULE
MEN'S
WOMEN'S
JAN.
BUSCARTS
SEATING AREA
COOK'S REFRIG
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
PHASING PLAN
G-00404
PHASING PLAN
32" = 1' - 0"1
1 1
X
PHASE 2
PHASE 3
2 2
MEN'S
WOMEN
JAN.
STORAGE
140 FOOD PREP
CAN WASH
COOKING
KITCHEN AREA
124HALL
STORAGE
CORR.
DISHWASH
MECHANICAL RM.
SERVING LINE #1
SERVING LINE #2
SERVING LINE #3
FREEZER
POT WASH
OFFICE #2
MEAT REFRIG
130DAIRY REFRIG
REFRIG.
128 FREEZER
JAN.
SEATING AREA
COOK'S REFRIG
OFFICE
MEN'S
WOMEN
JAN.
STORAGE
140 FOOD PREP
CAN WASH
COOKING
KITCHEN AREA
124HALL
STORAGE
CORR.
DISHWASH
MECHANICAL RM.
SERVING LINE #1
SERVING LINE #2
SERVING LINE #3
FREEZER
POT WASH
OFFICE #2
MEAT REFRIG
130DAIRY REFRIG
REFRIG.
128 FREEZER
JAN.
SEATING AREA
COOK'S REFRIG
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
DEMO AND NEW
FLOORPLAN
AD-10105
DEMOLITION PLAN
SCALE: 3
32" = 1' - 0"1
KEYPLAN
32" = 1' - 0"
FLOORPLAN - NEW
SCALE: 3
32" = 1' - 0"2
X
TYP.
PHASE 2 PHASE 3
PHASE 2 PHASE 3
6 TYP.
4 4
TYP.
TYP. 5
5TYP.
TYP.
TYP.
PHASE 2 PHASE 3
PHASE 2 PHASE 3
X
TYP.
TYP.
5TYP.
TYP.
5 TYP.
TYP.
TYP.
'-3
4' -8
3 4"
6' -1
11 2"
'-4
20'-7"
'-3
29'-9"
'-8
1 2"
17'-4"
5 TYP.
MEN'S
WOMEN
JAN.
STORAGE
140 FOOD PREP
CAN WASH
COOKING
KITCHEN AREA
124HALL
STORAGE
CORR.
DISHWASH
MECHANICAL RM.
SERVING LINE #1
SERVING LINE #2
SERVING LINE #3
FREEZER
POT WASH
OFFICE #2
MEAT REFRIG
130DAIRY REFRIG
REFRIG.
128 FREEZER
JAN.
SEATING AREA
COOK'S REFRIG
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
EQUIPMENT PLAN
Q-10106
EQUIPMENT PLAN
SCALE: 3
32" = 1' - 0"1
PHASE 2
PHASE 2 PHASE 3
KITCHEN EQUIPMENT
TAG # NAME HOOKUP (IF APPLICABLE) MFR (IF AVAILABLE) REMARKS
1 SHELVING N/A N/A 5 TIER MTL SHELVES
2 DUNNAGE RACKS N/A N/A SINGLE TIER FLOOR RACKS
3 3-DOOR REFRIGERATOR ELECTRIC TRAULSEN
4 LARGE STEAM KETTLE GAS / WATER VULCAN 40 GALLON STEAM KEETLE
5 SMALL STEAM KETTLE GAS / WATER VULCAN 6 GALLON STEAM KETTLE
6 COMBINATION OVENS GAS RATIONAL (2) DOUBLE STACKED COMBO
OVENS
7 3-COMPARTMENT SINK WATER WASSERTOM SINK W/ WORK SPACE
8 WORK TABLE W/ SINK WATER N/A
9 3-COMPARTMENT FRYER GAS PITCO
10 OVERN ELECTRIC DUKE CONVECTION OVEN AND PROOFER
11 BLAST CHILLER ELECTRIC TRAULSEN
12 3-DOOR FREEZER ELECTRIC TRAULSEN
13 ICE MACHINE AND BIN WATER HOSHIZAKI AND FOLLET
14 CONVECTION OVEN GAS VULCAN
15 PREP TABLE N/A N/A
16 TILT SKILLET ELECTRIC CLEVELAND RANGE 40 GALLON TILT SKILLET
17 COMBINATION OVEN GAS RATIONAL ROLL-IN COMBO OVEN
18 PASS THROUGH WARMER ELECTRIC TRAULSEN
19 PASS THROUGH FRIDGE ELECTRIC TRAULSEN
20 STAND MIXER ELECTRIC N/A
21 BUFFALO CHOPPER ELECTRIC N/A
22 METAL LOCKERS N/A N/A
23 DESK N/A N/A
24 FILING CABINET N/A N/A
25 PASS THROUGH WARMER ELECTRIC VICKTORY
26 REACH-IN WARMER ELECTRIC TRAULSEN
27 SINKS AND COUNTER WATER / ELECTRIC N/A SINK W/GARBAGE DISPOSAL
28 CLIPPER WATER / GAS? HOBART CLIPPER WITH BOOSTER HEATER
29 CLIPPER WATER / ELECTRIC? CHAMPION DISHWASHER AND CONVEYOR BELT
30 TRAY ACCUMULATOR AND TROUGH
COLLECTOR N/A AEROWORKS AND SLAVAJOR
31 ROLLING TABLE N/A N/A
32 ROLLING BREAD RACK N/A N/A
33 ROLLING PUSH CART N/A N/A
34 WHEELED SHELVING N/A N/A 4-TIER METAL SHELVING
35 METAL DOUGH RACK N/A N/A
MEN'S
WOMEN
JAN.
STORAGE
140 FOOD PREP
CAN WASH
COOKING
KITCHEN AREA
124HALL
STORAGE
CORR.
DISHWASH
MECHANICAL RM.
SERVING LINE #1
SERVING LINE #2
SERVING LINE #3
FREEZER
POT WASH
OFFICE #2
MEAT REFRIG
130DAIRY REFRIG
REFRIG.
128 FREEZER
JAN.
SEATING AREA
COOK'S REFRIG
PROJECT NUMBER:
SHEET TITLE
SEQ OFSHEET
JCGU 25-7007
4 DECEMBER 2025
DATE:
G O
O D
FE
LL
O W
A
IR
F O
R C
E
BA
SE
, T
EX
AS
th
T R
AI
N
IN
G
W
IN
G
PR
O
JE
C
T
TI
TL
E
D es ig ne d by
D ra w n by
R ev ie w ed b y:
Su bm itt ed b y:
R
EP
AI
R
K
IT
C H
EN
F
LO
O
R
IN
G , B
JC
G
U
-7
R .T er az as
J.
H er na nd ez
NOT FOR CONSTRUCTION
R .T er az as
J.
H er na nd ez
T.
M ar tin so n
C
ES
/C
EN
M
P
R
EV
IS
IO
N S
N O
D
AT
E
D
ES
C R
IP
TI
O N
SAN. SEWER
PLUMBING PLAN
P-10107
SANITARY SEWER PLAN
SCALE: 3
32" = 1' - 0"1
KEYPLAN
32" = 1' - 0"
X
1 TYP.
1 TYP.
1 TYP.
3 TYP.
3 TYP.
4 TYP.
TYP.
TYP.
1591846821C Typewritten Text Area in RED and Beyond Not in Scope
1591846821C Line
1591846821C Polygonal Line
1591846821C Polygonal Line
| Sheets and Views |
| G-001 COVER SHEET |
| G-002 GEN. INFO. 1 |
| G-003 GEN. INFO. 2 |
| G-004 PHASING PLAN |
| AD-101 DEMO AND NEW FLOORPLAN |
| Q-101 EQUIPMENT PLAN |
| P-101 SAN. SEWER PLUMBING PLAN |