ATTACHMENT 3 - SCHEDULE OF SUBMITTALS.pdf
PDF 102 KB Posted
- Attached to
- B1044 Chiller and CRAC Units Replacement Federal contract opportunity
- Solicitation number
- W50S8G-25-B-A001
- Issued by
- Department of the Army National Guard
About this file
The document is an Air Force Form 66 Schedule of Material Submittals for a project to replace a chiller and CRAC units in Building 1044 at Kirtland Air Force Base. The schedule requires 12 specific submittals from the contractor, all of which must be provided in 3 copies, with most required prior to work commencement and two (O&M's & Warranties and As-Built drawings) required at work completion.
Specific submittal requirements include a project schedule, work certifications for CRAC unit installation, details for a 70-TON chiller, two CRAC units (in Rooms 103 and 308), a refrigerant disposal plan, mechanical engineer stamped drawings, surge protection device documentation, test and balance report, manufacturer startup report, operation and maintenance manuals, warranties, and as-built drawings in both AutoCAD and PDF formats. Each submittal line item has designated columns for tracking receipt, review, and approval by the project engineer and contracting office.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Fm 66
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
MHMV252100
PROJECT TITLE
Building 1044 Chiller & CRAC Replacement 2025
WORK ORDER NUMBER
202500581
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING
L i n e N u m b e r
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF
COPIES
REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTED
FINAL
APPROVAL
REMARKS
APPROVED DISAPPROVED
1 Project Schedule 3 Prior to work
2 Work certifications for Install of CRAC units
Prior to
3 Chiller 70 TON 3 Prior to
4 CRAC unit #1 (Room # 103)
3 Prior to
5 CRAC unit #2 (Room # 308)
6 Refrigerant Disposal Plan/form
7 Mechanical Engineer stamped drawing
8 Surge Protection Device 3 Prior to
9 Test and Balance report 3 Prior to
10 Manufacturer start up report
11 O&M’s & Warranties 3 End of
12 As-Built drawings AutoCAD & PDF format
3 End of
| DATE |
| DISAPPROVED |