attachment_3_RFB DMAVS 2025-03.pdf

PDF 87 KB Posted

Attached to
NHARNG Strafford Water Disinfection
Solicitation number
RFB DMAVS 2025-03
Issued by
Strafford County, New Hampshire

About this file

This document is an Exhibit B - Scope of Services issued by the State of New Hampshire's Department of Military Affairs and Veterans Services for the NHARNG Strafford Water Disinfection project. The project involves installing a permanent water disinfection system at the Center Strafford Training Facility to replace a temporary chlorination system currently in place in Building #1. The new system will provide long-term water disinfection and offers the flexibility to adjust chlorination doses based on system startup and changing conditions, with plans to remove the temporary system when its permit expires in 2024.

The scope of services references additional project details within the Project Manual (Attachment 12) and authorized construction drawings/documents (Attachment 11), indicating that comprehensive technical specifications exist beyond this summary document. The water disinfection system appears to be specifically designed for the New Hampshire Army National Guard (NHANG) facility, suggesting this is a targeted infrastructure improvement project to enhance water treatment capabilities at a military training location.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 1 Initials: __________ Date: __________

STATE OF NEW HAMPSHIRE

DEPARTMENT OF MILITARY AFFAIRS AND VETERANS SERVICES

EXHIBIT B – SCOPE OF SERVICES

SUBJECT: NHARNG Strafford Water Disinfection

The Exhibit B – (“ Scope of Services”) as stated in the contract (Form P-37) and related to the above referenced project, shall include all the information and requirements about the project that are derived from the Project Manual (Attachment 12), the authorized construction drawings / documents and clarification sketches (Attachment 11) as well as any addendums.

PROJECT OVERVIEW:

This project will include the installation of a water disinfection system to provide long term disinfection.

It will replace the New Hampshire Army National Guard (NHANG) temporary chlorination system installed at the Center Strafford training Facility in 2024. The new permanent system will be in place of the current temporary system in Building #1, which will be removed when the temporary permit expires.

The proposed system will present the option to switch to a lower dose but will be adjustable based on startup of the system and changing conditions.

STATE OF NEW HAMPSHIRE
PROJECT OVERVIEW:

File details come from the government source that posted it. Updated .