Attachment_3_-_Parking_Lot_Rehabilitation_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Remodel Golden Spike Visitor Center Federal contract opportunity
- Solicitation number
- 140P1426R0012
About this file
This document is a set of construction drawings for the Golden Spike National Historic Park in Box Elder County, Utah, prepared by Stantec Consulting Services Inc. The project involves the rehabilitation of asphalt parking areas and related infrastructure across various routes within the park.
The scope of work encompasses five primary work areas: Route 0900 (Visitor Center Parking), Route 0901 (Administrative Lot Parking), Route 0903 (Big Fill Exhibit Lower Parking), Route 0402 (Maintenance Road), and Routes 0401/0906 (Big Fill Road and Upper Parking). Work includes asphalt surface pavement replacement with 3-inch class 2 road asphalt, installation of concrete curbs and gutters, concrete sidewalks, ADA-compliant parking spaces and ramps, pavement markings, erosion and sediment control measures, topsoil preservation and revegetation, utility installations (water lines, electrical conduits for future EV charging), and miscellaneous site improvements such as parking bumper replacement and fence relocation. The drawings specify typical sections for full-depth pavement, asphalt surface pavement replacement, reclaimed asphalt pavement placement prioritized by route, and concrete parking pads with reinforcement. Maintenance of traffic requirements limit full closures to one week for Route 0900, with closures permitted for other routes upon two weeks' notice to stakeholders. Approximately 532 square yards of asphalt removal, 1,144 tons of asphalt surface course, and 100% reclaimed asphalt pavement areas for Routes 0402, 0401, and 0906 are specified. All disturbed areas must be seeded according to specification 32 92 19, with topsoil salvage limited to areas with low invasive plant cover and slopes less than 2H:1V.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
84 15
15 84
SALT
LAKE
CITY
PROVO
OGDEN
BRIGHAM CITY
LOGAN
HOWELL TREMONTON
HEBER
CITY
BOUNTIFUL
IDAHO
UTAH
IDAHO
UTAH
W
YO
M
IN
G U
TA
H
GOLDEN SPIKE
NATIONAL
HISTORIC SITE
GREAT
SALT
LAKE
UTAH
LAKE
BEAR
LAKE
V.C.
GOLDEN
SPIKE
MONUMENT
PROMONTORY
SUMMIT
ENTRANCE
POULSON
ROAD
BLUE
CREEK
AREA
OLD CENTRAL PACIFIC GRADE
OLD UNION
PACIFIC GRADE
SUMMIT
AREA
NORTH
PROMONTORY
MOUNTAINS
PROMONTORY
MOUNTAINS
15 84TO &
TO
PROMONTORY
POINT
TO
KELTON
GOLDEN SPIKE NATIONAL HISTORIC PARK
BASIC DATA:
STATE
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING
UTAH
DRAWING NO.
GOLDEN SPIKE NATIONAL HISTORIC PARK
INTERMOUNTAIN431/80,026C 1/90; 431/80,025A 4/85; PARK MINI FOLDER 1994; REVISED & REDRAWN 6/95. UPDATED 11/98. SGS.
CONSTRUCTION
VARIOUS
QUALITY DESIGN CERTIFIATION
Prepared in Accordance with Design Development (Title I)__________ Variance from Design Development (Title I) Approved by Superintendent on __________ Construction Drawing Not Preceded by Design Development Title I
OR
OR
Project Manager Date
Mark Sheet REVISION
ROUTES 0900,
0901, & 0402
Date InitialA/E FIRM
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
REHABILITATE ASPHALT
PARKING AREAS
PMIS/PKG NO.
SHEET
315426
OF 151
195721
UTAH
BOX ELDER
SHEET INDEX
SHEET: SHEET TITLE:SUB
SHEET:
COVER
LOCATION MAP
GENERAL NOTES & SUMMARY OF QUANTITIES
PAVEMENT MARKING DETAILS
ADDITIONAL DETAILS
TYPICAL SECTIONS
VISITOR CENTER PARKING (ROUTE 0900) LAYOUT
VISITOR CENTER PARKING (ROUTE 0900)
PAVEMENT MARKINGS
ADMINISTRATIVE LOT PARKING (ROUTE 0901)
LAYOUT
ADMINISTRATIVE LOT PARKING (ROUTE 0901)
PAVEMENT MARKINGS
BIG FILL EXHIBIT LOWER PARKING LOT
(ROUTE 0903) LAYOUT
BIG FILL EXHIBIT LOWER PARKING LOT
(ROUTE 0903) PAVEMENT MARKINGS
MAINTENANCE ROAD (ROUTE 0402) RECLAIMED
ASPHALT PAVEMENT AREA
BIG FILL ROAD (ROUTE 0401) & UPPER PARKING
(ROUTE 0906) RECLAIMED ASPHALT
PAVEMENT AREA
VISITOR CENTER PARKING (ROUTE 0900) EROSION
AND SEDIMENT CONTROL PLAN
SCALE OF METERS
SCALE OF FEET
3,000
500 0
1,500
6,000
1,000
3,000
SCALE OF MILES
20 0 20
INFORMATION CENTER
PARK HEADQUARTERS
PARK BOUNDARY
HQ.
V.C.
RANGER STATION
VISITOR CENTER
PAVED ROAD
LEGEND
STATE LINE
G1
G2
G3
G4
G5
G6
C1
C2
C3
C4
C5
C6
C7
C8
C9
ROUTE 0903
ROUTES 0906
& 0401
NORTH CENTRAL
10/01/2025
LOCATION MAP
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
G
EN
ER
AL
\G
L O
C M
AP
.d w g
/3
0/
9:
pm b y lra ke s
R
195721G2
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
ROUTE 0900 VISITOR CENTER
PARKING
(SEE SHEET C1)
ROUTE 0901
ADMINISTRATIVE LOT
PARKING (SEE SHEET C3)
ROUTE 0903 BIG FILL
EXHIBIT LOWER PARKING
(SEE SHEET C5)
ROUTES 0900, 0901 & 0402
ROUTE 0903
0 75 150 Feet
ROUTE 0402 MAINTENANCE
ROAD (SEE SHEET C7)
ROUTE 0906 BIG FILL
EXHIBIT UPPER PARKING
(SEE SHEET C8)
ROUTE 0401 BIG FILL
EXHIBIT ROAD (SEE
SHEET C8)
ROUTE 0906 & 0401
1. CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE SCOPE OF WORK WITHIN THE DOCUMENTS IN
ADDITION TO ANY FURNISHED ESTIMATED QUANTITIES. ESTIMATED QUANTITIES WITHIN THE
SUMMARY ARE FOR INFORMATIONAL PURPOSES ONLY. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY THEM AND NOTIFY THE CO IN WRITING IF A DISCREPANCY EXISTS AND THEIR ASSOCIATED ESTIMATED COSTS PRIOR TO FINAL AWARD. ALL ESTIMATED COSTS SHALL
BE INCLUDED IN THE LUMP SUM ESTIMATED COST FOR THE WORK AT EACH LOCATION.
2. THE PLANS HAVE BEEN DEVELOPED UTILIZING READILY AVAILABLE MAPPING SUCH AS AERIAL IMAGING. THE UTILIZED BASE MAPPING MAY NOT BE A COMPLETE/ACCURATE REPRESENTATION OF THE EXISTING FIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE PRIOR TO BID AND CONFIRMING/IDENTIFYING EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT
THE WORK TO BE PERFORMED.
3. STAGING AREAS SHALL BE LIMITED TO EXISTING PARKING LOTS AT LOCATIONS APPROVED BY CO.
THE CONTRACTOR SHALL NOT CONDUCT ACTIVITIES OUTSIDE THE LIMITS OF THE DEFINED STAGING AREA. STAGING AREAS SHALL BE ON HARD SURFACES ONLY. STAGING AREAS SHALL BE RETURNED TO ORIGINAL CONDITIONS IMMEDIATELY UPON VACATING THE STAGING AREA AND PRIOR TO FINAL
COMPLETION.
4. THE CONTRACTOR SHALL FENCE ALL STAGING LOCATIONS.
5. SCHEDULE, STAGING, SEQUENCING AND SAFETY PLANS MUST BE SUBMITTED BY THE CONTRACTOR
FOR REVIEW AND APPROVAL BY THE CO A MINIMUM OF TWO (2) WEEKS PRIOR TO THE
PRE-CONSTRUCTION MEETING. SAFETY PLANS MUST INCLUDE MATERIAL SAFETY DATA AND
HAZARDOUS MATERIAL PLAN.
6. PRIOR TO INSTALLING PAVEMENT MARKINGS AND CURB STOPS, THE CONTRACTOR SHALL MARK OUT
THEIR PROPOSED LOCATIONS AND OBTAIN APPROVAL FROM THE CO.
7. FENCING MATERIAL USED AT THE ADMINISTRATIVE LOT PARKING SHALL BE APPROVED BY THE CO
PRIOR TO INSTALLATION.
8. THE CONTRACTOR SHALL PROTECT ALL CURB, CURB AND GUTTER, SIDEWALK, STONE MASONRY, AND
LANDSCAPING DURING PAVING OPERATIONS. ANY DAMAGE RESULTING FROM THE CONTRACTOR'S
OPERATION SHALL BE REPAIRED OR CLEANED AT THE CONTRACTOR'S EXPENSE AND TO THE
SATISFACTION OF THE CO.
9. ALL SIGNS ARE TO BE PROTECTED AND/OR RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL
CONDITION AT THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE NOTED.
10. ALL UTILITY STRUCTURES SHALL BE PROTECTED BY THE CONTRACTOR OR RESET WHEN
NECESSARY TO MATCH THE EXISTING STRUCTURE ELEVATION. ANY DAMAGE TO THE EXISTING
UTILITY STRUCTURES SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S DISCRETION. ALL
REPAIR EFFORTS SHALL BE APPROVED BY THE CO.
11. FOR THE TEMPORARY EROSION AND SEDIMENTATION CONTROL, THE CONTRACTOR WITH THE CO AND ENVIRONMENTAL MONITOR, SHALL ADJUST THE LOCATION, QUANTITY AND TYPE OF EROSION
AND SEDIMENT CONTROL ITEMS REQUIRED BASED ON THE ACTUAL FIELD CONDITIONS
ENCOUNTERED AT THE TIME OF CONSTRUCTION AND THE ACTUAL SCHEDULING AND SEQUENCING
OF THE CONSTRUCTION ACTIVITIES.
12. CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE NPDES PERMIT AND ASSUMES RESPONSIBILITY
FOR EROSION CONTROL MEASURES AND MONITORING AS REQUIRED BY CO RELATED TO EROSION
CONTROL MEASURES.
13. THE AREAS BEYOND THE LIMITS OF CONSTRUCTION ARE TO BE PROTECTED FROM EROSION AND SEDIMENTATION. PERIMETER CONTROLS SUCH AS FILTER BARRIER, SILT FENCE, DIVERSION DIKES, TURBIDITY CURTAINS, ETC. SHALL BE INSTALLED PRIOR TO ANY GRUBBING OPERATIONS OR OTHER
EARTH MOVING ACTIVITIES AS DIRECTED BY THE CO.
14. THE CONTRACTOR SHALL INSTALL TREE PROTECTION AND TEMPORARY FENCING TO PROTECT ALL
TREES DURING CONSTRUCTION, UNLESS OTHERWISE NOTED.
15. EXISTING DRAINAGE FACILITIES, INCLUDING PAVED SWALES WHICH RECEIVE RUNOFF FROM THE
LIMITS OF EACH WORK AREA SHALL BE CLEANED AS DIRECTED BY THE CO.
16. CONSTRUCTION EQUIPMENT CLEANING: PREVENT INTRODUCTION OF INVASIVE WEEDS AND
NON-NATIVE PLANT SPECIES INTO THE WORK SITE. ALL VEHICLES AND EQUIPMENT ENTERING THE PROJECT AREA MUST BE CLEAN AND FREE OF PLANT MATERIALS, SOIL, AND ANY SEED. EQUIPMENT MUST BE FREE FROM OIL AND OTHER FLUID LEAKS. PARTICULAR ATTENTION MUST BE SHOWN TO
THE UNDER CARRIAGE, TRUCK BEDS, TRAILER DECKS, WHEEL WELLS, MOWER DECKS (TOP AND
BOTTOM) AND ANY SURFACE WHERE SOIL CONTAINING EXOTIC SEEDS MAY EXIST. ALL EQUIPMENT SUBJECT TO INSPECTION BY CO OR DELEGATED TO NPS PERSONNEL AT STAGING AREA OR OTHER IDENTIFIED INSPECTION AREA PRIOR TO USE WITHIN PROJECT SITE. NOTIFICATION SHALL BE MADE TO NPS CO AT LEAST 2 WEEKS PRIOR TO MOBILIZATION TO ARRANGE FOR INSPECTIONS. FOLLOW
APPLICABLE FEDERAL LAND MANAGEMENT AGENCY REQUIREMENTS AND STATE REQUIREMENTS.
MAINTAIN CLEANING AND INSPECTION RECORDS. EQUIPMENT FOUND OPERATING ON THE PROJECT THAT HAS NOT BEEN INSPECTED OR HAS OIL LEAKS WILL BE SHUT DOWN AND SUBJECT REMOVAL
FROM THE PROJECT AREA AT THE COST OF THE CONTRACTOR.
17. CONTRACTOR SHALL ENSURE LONGITUDINAL PAVING JOINT IS NOT LOCATED WITHIN WHEEL PATH.
GENERAL NOTES
ABBREVIATIONS
ABBREVIATION
NHP
PMIS
NAVD
NAD83
NGS
NTS
NPS
TBD
USPP
GRR
MIN
MAX
TYP
PROP
EXIST
DIA
LF
SY
DEFINITION
NATIONAL HISTORICAL PARK
PROJECT MANAGEMENT INFORMATION SYSTEM
NORTH AMERICAN VERTICAL DATUM
NORTH AMERICAN DATUM OF 1983
NATIONAL GEODETIC SURVEY
NOT TO SCALE
NATIONAL PARK SERVICE
TO BE DETERMINED
UNITED STATES PARK POLICE
GRADED RIPRAP
MINIMUM
MAXIMUM
TYPICAL
PROPOSED
EXISTING
DIAMETER
LINEAR FEET
SQUARE YARDS
LS
SF
APPROX
SHLD
EA
FT
ELEV
LB
LUMP SUM
SQUARE FEET
APPROXIMATE
SHOULDER
EACH
FEET
ELEVATION
POUNDS
STA
BH
STATION
BORE HOLE
CENTERLINE
BIT BITUMINOUS
VC VISITOR CENTER
PSI POUNDS PER SQUARE INCH
RT. ROUTE
CO CONTRACTING OFFICER
HMA HOT MIX ASPHALT
FG FINISHED GROUND
BC BOTTOM OF CURB
TC TOP OF CURB
GENERAL NOTES AND
SUMMARY OF QUANTITIES
QUANTITY NOTES:
1. THE QUANTITIES BELOW ARE PROVIDED FOR INFORMATION AND CONVENIENCE ONLY AND SHOULD
NOT BE CONSIDERED FINAL OR ALL INCLUSIVE. ALL QUANTITIES SHALL BE FIELD VERIFIED BY THE
CONTRACTOR
2. MOBILIZATION AND DEMOBILIZATION SHALL INCLUDE ALL APPROPRIATE COSTS ASSOCIATED WITH
CONSTRUCTING ALL FEATURES LISTED IN THE SPECIFICATION AND/OR SHOWN IN THE PLANS.
MAINTENANCE OF TRAFFIC NOTES:
1. ROUTE 0900 - VISITOR CENTER PARKING
CLOSURES NEEDED FOR CURB WORK SHALL BE LIMITED TO THE USE OF BARRELS TO DELINEATE
AND CLOSE THE WORKING AREA. CONTRACTOR SHALL MAINTAIN ACCESS TO PARKING AREAS
AWAY FROM CURB WORK.
CONTRACTOR SHALL LIMIT FULL CLOSURE TO ONE WEEK TO COMPLETE ASPHALT PAVING AND
PAVEMENT MARKING OPERATIONS.
2. ROUTE 0901 - ADMINISTRATIVE LOT, ROUTE 0903 - BIG FILL EXHIBIT LOWER PARKING & ROUTES
0401/0906 - BIG FILL EXHIBIT UPPER PARKING
ASPHALT PAVING AND PAVEMENT MARKING OPERATIONS WILL BE PERFORMED BY CLOSING THE
ROADWAYS.
3. ROUTE 0402 - MAINTENANCE ROAD
CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE RESIDENCE.
FOR ALL WORK THE CONTRACTOR SHALL COORDINATE THE WORK WITH THE CONTRACTING OFFICER GIVING 2 WEEKS NOTICE TO ALLOW AMPLE TIME FOR THE CONTRACTING OFFICER TO COORDINATE WITH
THE LOCAL STAKEHOLDERS ABOUT THE CLOSURES.
CLIN CONTRACT LINE ITEM NUMBER
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
G
EN
ER
AL
\G
G
EN
_S U
M .d w g
/3
0/
9:
pm b y lra ke s
R
195721G3
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
18. WEED FREE MATERIAL SOURCES: DO NOT IMPORT INTO THE PROJECT LIMITS ROCK, SAND, GRAVEL, EARTH, SUBSOIL, RIP RAP, GABIONS, OR OTHER NATURAL MATERIALS FROM SOURCES THAT HAVE NOT BEEN CERTIFIED FREE OF NON-NATIVE, INVASIVE PLANT SPECIES. MATERIALS IMPORTED INTO THE PROJECT LIMITS WHICH DO NOT INCLUDE A WEED-FREE CERTIFICATION MAY BE REJECTED AND ORDERED BY THE CO TO BE REMOVED FROM THE PROJECT LIMITS. THE CO HAS THE DISCRETION OF REQUESTING INSPECTION OF CERTIFIED MATERIALS BY A THIRD PARTY AND REJECTING THE USE OF THE SOURCE IF NON-NATIVE PLANTS OR SEEDS THEREOF ARE FOUND TO BE PRESENT.
TOPSOIL SHALL NOT BE BROUGHT INTO THE PROJECT AREAS WITHOUT THE APPROVAL OF THE CO.
19. DO NOT FEED OR DISTURB WILDLIFE. TO PREVENT UNNATURAL ATTRACTANTS TO WILDLIFE, KEEP ALL FOODS, PET FOODS, GARBAGE, DRINKS, TRASH, OR FOOD AND DRINK CONTAINERS INSIDE VEHICLES, OR ENCLOSED CONSTRUCTION EQUIPMENT, EXCEPT DURING ACTUAL USE. SUPPLY GARBAGE BINS, WITHIN THE CONSTRUCTION SITE THAT ARE BEAR AND ANIMAL PROOF. REMOVE ALL GARBAGE AND FOOD TRASH FROM THE PROJECT SITE DAILY.
20. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE SEEDED ACCORDING TO SPECIFICATION 32 92 19.
21. TOP SOIL PRESERVATION AND STOCKPILING:
CONSERVED TOPSOIL: TOPSOIL REFERS TO THE UPPERMOST SOIL HORIZON INCLUDING THE TOP 6 INCHES WHICH INCLUDES ORGANIC DUFF AND OTHER MATERIALS CAPABLE OF SUPPORTING VEGETATION. REMOVE TOPSOIL BEFORE EXCAVATING ANY AREA. DO NOT STRIP TOPSOIL IN FROZEN, SNOW COVERED, OR SATURATED CONDITIONS.
ONLY AREAS WITH LOW INVASIVE PLANT COVER (MAX OF 10-15% COVER) AND LESS THAN 2H:1V SLOPES WILL HAVE TOPSOIL SALVAGED, AS DETERMINED BY THE CO. REMOVE THE TOPSOIL IN ONE PASS. USE EQUIPMENT CAPABLE OF EXCAVATING SMALL, ISOLATED POCKETS OF TOPSOIL. HAND SALVAGE TOPSOIL IN AREAS WHERE TOPSOIL CANNOT BE MECHANICALLY REMOVED. STOCKPILE TOPSOIL IN AN AREA DETERMINED BY THE CO, BUT GENERALLY IMMEDIATELY BEYOND THE ROUNDING LIMITS OF CUT AND EMBANKMENT SLOPES, IMMEDIATELY ADJACENT TO LIMITS OF EXCAVATION, OR IN OTHER APPROVED LOCATIONS. STORE TOPSOIL IN WINDROW OR PILE FORMATION WITH A MAXIMUM HEIGHT OF 3 FEET UNLESS OTHERWISE APPROVED BY THE CO. SEPARATE TOPSOIL FROM OTHER EXCAVATED MATERIAL. DO NOT MIX TOPSOIL WITH SUBSOIL. STOCKPILES SHALL BE STABILIZED WITH EXCELSIOR LOGS/SILT FENCE OR NATURAL FIBER (EXCLUDING STRAW) BLANKETS IF DETERMINED NECESSARY BY THE CO. FLAG OR INSTALL BARRIERS TO KEEP HEAVY EQUIPMENT/VEHICLES FROM DRIVING ON STOCKPILED TOPSOIL. COORDINATE AT LEAST 2 WEEKS PRIOR TO TOPSOIL SALVAGE WITH CO AND NPS TO ENSURE THEIR ON-SITE PRESENCE AT THE
INITIATION OF SALVAGE ACTIVITIES.
GRASSES, SMALL SHRUBS, AND OTHER MINOR BRUSH LESS THAN 3-FEET IN HEIGHT MAY BE INCORPORATED INTO THE TOPSOIL (SEE 201.05). BRUSH/TREES OVER 3-FEET OR WITH DIAMETERS OVER 2-INCHES MUST BE REMOVED FROM THE SITE. REMOVE THE TOPSOIL IN THE LEAST AMOUNT OF PASSES POSSIBLE UNDER DRY SOIL CONDITIONS. USE EQUIPMENT CAPABLE OF EXCAVATING SMALL, ISOLATED POCKETS OF TOPSOIL. DO NOT MIX TOPSOIL WITH SUBSOIL.
PLACE CONSERVED TOPSOIL ON COMPLETED SLOPES. CONTRACTOR MUST APPLY 12 TO 1 INCH OF WEED-FREE PEAT OR COMPOST OVER THE TOPSOIL. HAND BROADCAST THE SEED, THEN RAKE IT IN TO A DEPTH OF APPROXIMATELY 14 INCH PRIOR TO HYDROMULCHING. SUBMIT THE PROPOSED COMPOST OR PEAT SOURCE TO THE CO FOR APPROVAL
BEFORE PURCHASE AND PLACEMENT.
AFTER TOPSOIL HAS BEEN SPREAD, THE DISTURBED AREA TO BE SEEDED SHOULD BE DECOMPACTED AND THE SEEDBED PREPARED. DECOMPACTION SHALL BE PERFORMED BY EQUIPMENT CAPABLE OF DECOMPACTING SOIL DOWN TO A DEPTH OF 12 INCHES AND SCARIFICATION ON SLOPES STEEPER 3H:1V DOWN TO 6 INCHES, OR TO A DEPTH AS SITE CONDITIONS ALLOW –DETERMINED BY THE CO. DECOMPACTION/SCARIFICATION SHALL NOT OCCUR WHEN SOILS ARE EXCESSIVELY WET OR FROZEN. DECOMPACTION/SCARIFICATION FURROWS SHALL BE NO FURTHER THAN 6 INCHES APART AND, WHERE POSSIBLE, EQUIPMENT WILL TRAVEL ACROSS THE SITE IN 2 PASSES IN PERPENDICULAR DIRECTIONS (CROSS-HATCHED PATTERN) OR IN A MANNER THAT ALLOWS FOR THE COMPLETE DECOMPACTION OF SOIL ACROSS THE SITE. WHEN DECOMPACTING/SCARIFYING, MINIMIZE WATER USAGE TO ONLY THE AMOUNT NEEDED TO ABATE DUST. LEAVE THE SOIL SURFACE ROUGHENED, BUT SUCH THAT OBVIOUS FURROWS ARE ELIMINATED.
MAXIMUM DIRT CLOD SIZE SHALL BE 2 INCHES IN ORDER TO OBTAIN A ROUGHENED SURFACE THAT WILL MAXIMUM SOIL/SEED CONTACT. VEHICLES AND EQUIPMENT SHALL NOT TRAVEL ON DECOMPACTED/SCARIFIED SOILS OTHER THAN MINIMAL EXPOSURE TO EQUIPMENT PLACING TOPSOIL. SEEDING SHOULD TAKE PLACE WITHIN 24 HOURS AFTER
DECOMPACTION/SCARIFICATION HAS BEEN COMPLETED.
22. SEEDING: SEED: THE SEED SHALL BE GOVERNMENT FURNISHED. THE SEEDING RATE WILL BE DETERMINED BY SEED AVAILABILITY BUT SHOULD BE ANTICIPATED TO BE BETWEEN 10 TO 40 BULK LBS PER ACRE. THE CONTRACTOR WILL GIVE THE GOVERNMENT TWO WEEK NOTICE PRIOR TO THE ANTICIPATED TOP SOIL DECOMPACTION AND SEED INSTALLATION WINDOW TO ALLOW FOR DELIVERY OF SEED. SEEDING SHALL BE COMPLETED IN ACCORDANCE WITH
SEEDING SPECIFICATION 32 92 19.
RECLAIMED ASPHALT PAVEMENT PLACEMENT SHALL FOLLOW THE NUMBERED
PRIORITY SHOWN. IF RECLAIMED ASPHALT PAVING QUANTITY IS INSUFFICIENT,
LOWER-PRIORITY AREAS MAY BE OMITTED WITH CO APPROVAL.:
1. ROUTE 0402 - MAINTENANCE ROAD
2. ROUTE 0401 - BIG FILL ROAD
3. ROUTE 0906 - BIG FILL EXHIBIT UPPER PARKING
10'
20'
10'9'
3'
16'
1'
2'
PEDESTRIAN CROSSWALK
N.T.S
6" PAINTED
WHITE LINE
NOTES:
1. WIDTH OF STALLS SHALL BE FIELD VERIFIED BASED ON
AVAILABLE WIDTH OF PAVEMENT IN PARKING AREA AND
SHALL BE APPROVED BY C.O. PRIOR TO PAVEMENT MARKING
INSTALLATION. PARKING STALL WIDTHS SHALL BE TO THE
WHOLE FOOT ONLY.
2. SEE SPECIFICATION SECTION 32 17 23 PAVEMENT MARKINGS.
PAVEMENT MARKING - RV PARKING STALL
N.T.S
NOTES:
1. SYMBOLS & PARKING STALLS SHALL CONFORM TO THE
REQUIREMENTS OF THE UNITED STATE ACCESS BOARD
GUIDELINES AND STANDARDS AND THE ARCHITECHTURAL
BARRIERS ACT.
2. ALL DIMENSIONS CENTER TO CENTER OF 4" PAVEMENT
STRIPING.
3. ALL STRIPING SHALL BE 4" WIDE SOLID WHITE PAVEMENT
MARKINGS, UNLESS OTHERWISE NOTED.
4. SEE SPECIFICATION 32 17 23 PAVEMENT MARKINGS.
ACCESSIBLE PARKING SPACE
N.T.S
ACCESS AISLE
4" WHITE LINES
24" ON CENTER
4'
4'
(UNLESS
OTHERWISE
INDICATED)
ASJACENT TO
ACCESSIBLE
SPACES
ACCESSIBLE PARKING
4" PAINTED
WHITE LINE
(TYP.)
NOTES:
1. SEE SPECIFICATION SECTION 32 17 23 PAVEMENT MARKINGS.
PAVEMENT MARKING - ANGLED STALL LAYOUT
N.T.S
NOTES:
1. WIDTH OF STALLS SHALL BE FIELD VERIFIED BASED ON
AVAILABLE WIDTH OF PAVEMENT IN PARKING AREA AND
SHALL BE APPROVED BY C.O. PRIOR TO PAVEMENT MARKING
INSTALLATION. PARKING STALL WIDTHS SHALL BE TO THE
WHOLE FOOT ONLY.
2. SEE SPECIFICATION SECTION 32 17 23 PAVEMENT MARKINGS.
PAVEMENT MARKING - STALL LAYOUT
N.T.S
4" PAINTED
WHITE LINE
(TYP.)
4" PAINTED
WHITE LINE
(TYP.)
4" PAINTED
WHITE LINE
(TYP.)
PARKING LAYOUT DIMENSIONS FOR 9' WIDE STALLS*
*CHART BASED ON DIMENSIONS RECOMMENDED IN "PARKING PRINCIPLES".
ANGLE A
MINIMUM LENGTH OF STALL B 19' 25' 22' 20' 18.5'
STALL WIDTH, C, PARALLEL TO AISLE 10.3' 12.7' 10.4' 9.3' 9.0'
30° 45° 60° 75° 90°
A B
C
PERPENDICULAR ANGLED
PAVEMENT MARKING DETAILS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
G
EN
ER
AL
\G
D
ET
AI
LS
.d w g
/3 0/
9:
pm b y lra ke s R
195721G4
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
8' ON CENTER
4" X 4" PRESSURE
TREATED LUMBER
1" X 8" PRESSURE
TREATED LUMBER
1" X 4" PRESSURE
TREATED LUMBER
1.36"
4" DIA. STEEL PIPE
6'-6"
5'
1'-8"
6"
CONCRETE FOOTING
WOODEN FENCE DETAIL
N.T.S
NOTE: PAINT LUMBER AND STEEL PIPE TO MATCH EXISTING FENCE IN KIND
6'6' 6'
1'
6"
CONCRETE GUTTER
CONCRETE CURB
2'
2" ON CENTER
2" ON CENTER
1"
ADA RAMP DETAIL
N.T.S
6'
1:12CONCRETE SIDEWALK
RELOCATED CHAINLINK FENCE GATE DETAIL
N.T.S
6'
32'
1'
2'-6"
CONCRETE FOOTING
4" DIA. STEEL PIPE
CENTER STOP FOR
DROP ROD
DROP ROD
1'-4"
10'
1'
6"
10"
#4 REBAR
6"
N.T.S
R.V. PARKING BUMPER DETAIL
EXITING GROUND
EXITING GROUND
PROPOSED REINFORCED
CONCRETE SLAB
3'
2'
1' 1'-6"
2"
3'
6" DIA. STA. GALV. STEEL PIPE
FILLED W/ CONC. (APPLY 2 COATS
YELLOW PAINT)
AT LEAST 0.188" WALL THICKNESS
CONC. CAP
CONC. FOOTING
SLOPE CONC. BASE
ASPHALT PAVEMENT
PER PAVING PLAN
GALVANIZED STEEL BOLLARD FILLED W/ CONC.
EXISTING GROUND
N.T.S.
N.T.S
STANDARD BEDDING AND TRENCH DETAIL
NOTE: UTILITY MARKING TAPE TO BE 3" WIDE,
MINIMUM. LETTERING SHALL BE "WATER" FOR
POTABLE WATER LINES
INSTALL UTILITY MARKING TAPE
CONTINUOUSLY ALONG THIS LINE.
SURFACE RESTORATION
PER
TYPICAL ROAD REPAIR DETAILS
18" MAX
2'
1' MIN
TRACER WIRE
12"
APPROVED SELECT BACKFILL OR
PIPE BEDDING
6" IF SUBGRADE IS EARTH
8" IF SUBGRADE IS ROCK
PIPE BEDDING
SUBGRADE
APPROVED SELECT BACKFILL OR
PIPE BEDDING
1' MIN
FROST LINEFROST LINE
2'
2'
GROUND LEVEL
1-1/4" STEEL DRY PIPE
VALVE BODY
BRICK OR FLAT ROCK
WATER SUPPLY
N.T.S
FROST FREE SPIGOT DETAIL
ADDITIONAL DETAILS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
G
EN
ER
AL
\G
D
ET
AI
LS
.d w g
/3 0/
9:
pm b y lra ke s R
195721G5
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
TYPICAL SECTIONS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
G
EN
ER
AL
\G
T
YP
_S
EC
.d w g
/3 0/
9:
pm b y lra ke s R
195721G6
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
ASPHALT SURFACE PAVEMENT REPLACEMENT
EXISTING SUB-GRADE
EXISTING GROUND
CLASS 2 ROAD
ASPHALT - 3"
MATCH EXISTING
ELEVATION IN EXISTING
PARKING LOT
SUB BASE AGGREGATE - APRX. 6"
EXISTING SUB BASE TO REMAIN.
MATCH EXISTING
ELEVATION
SCALE: NOT TO SCALE
SAW CUT ASPHALT
WHERE INDICATED ON
PLANS
INSTALL CURB AND GUTTER
WHERE INDICATED ON PLANS
AND TIE TO EXISTING CURB
AND GUTTER
MILL EXISTING ASPHALT (3")*
*ASPHALT MILLING SHALL BE 3 INCH MINUS MATERIAL
FOR REPLACEMENT ON EXISTING ROUTES 0401, 0402,
& 0906.
FULL DEPTH PAVEMENT
EXISTING SUB-GRADE
EXISTING GROUND
CLASS 2 ROAD
ASHPALT - 3"
SUB BASE AGGREGATE (AASHTO #57) - 6"
SCALE: NOT TO SCALE
INSTALL CURB AND GUTTER
WHERE INDICATED ON PLANS
AND TIE TO EXISTING CURB
AND GUTTER
100% RECLAIMED ASPHALT MILLINGS PAVEMENT SURFACE
(ROUTES 0401 & 0906)
EXISTING GROUND
RECLAIMED ASPHALT
MILLING SURFACE - 4"
EXISTING GRAVEL ROAD
SCALE: NOT TO SCALE
CONCRETE SIDEWALK
EXISTING SUB-GRADE
EXISTING GROUND
COMPACTED GRANULAR BASE - 4"
SCALE: NOT TO SCALE
4" CONCRETE SIDEWALK
TO MATCH EXISTING
WALKING PATHS1/8" X 1/2" SAW CUT
CONTROL JOINT
EXISTING GROUND
5"
1"
1'-0"
3" CLASS 2 ROAD
ASPHALT
EARTH BACKFILL
CONCRETE CURB
CONCRETE CURB AND GUTTER
SCALE: NOT TO SCALE
4" 8" 18"
2 12"
4"
2" R 2" R
2" R
30"
EXISITNG
GROUND 12"
3" MIN
UNTREATED
BASE COURSE
3" CLASS 2 ROAD
ASPHALT
MOUNTABLE CONCRETE CURB & GUTTER (TYPE M1)
SCALE: NOT TO SCALE
INSTALL CURB AND GUTTER
WHERE INDICATED ON PLANS
AND TIE TO EXISTING CURB
AND GUTTER
EXISTING
SUB-GRADE
6"
4"
ADMIN LOT RV CONCRETE PARKING PAD
SCALE: NOT TO SCALE
16" CONCRETE PAD
#6 REBAR
SUB-BASE
AGGREGATE
(AASHTO #57)
ON CENTER
6"
4"
ADA VISITORS LOT CONCRETE PARKING PAD
SCALE: NOT TO SCALE
16"
CONCRETE PAD
#6 REBAR
SUB-BASE
AGGREGATE
(AASHTO #57)
ON CENTER
NOTE: PLACE RECLAIMED ASPHALT MILLINGS IN TWO
EQUAL LIFTS. USE SMOOTH DRUM VIBRATORY
ROLLER WITH A MINIMIUM WORKING WEIGHT OF 8
TONS TO COMPACT EACH LIFT.
100% RECLAIMED ASPHALT MILLINGS PAVEMENT SURFACE
(ROUTES 0402)
EXISTING GROUND
RECLAIMED ASPHALT
MILLING SURFACE - 5"
EXISTING GRAVEL ROAD
SCALE: NOT TO SCALE
NOTE: PLACE RECLAIMED ASPHALT MILLINGS IN TWO
EQUAL LIFTS. USE SMOOTH DRUM VIBRATORY
ROLLER WITH A MINIMIUM WORKING WEIGHT OF 8
TONS TO COMPACT EACH LIFT.
X
X
X X X X X X X
X
X
X
X
X X
X
X
X
EXISTINGELIPTICALCULVERT
C O
N C
. C U
R B
CONC. CURB
CO
NC
. C
UR
B
MONUMENT
BE
NC
HE
S
GOLDEN SPIKE DRIVE
ROUTE 500
GOLDEN SPIKE DRIVE
ROUTE 500
ADMINISTRATIVE BUIILDING
BENCH
MULC
H
ROUTE 0901
ADMINISTRATIVE LOT PARKING
SEE SHEET C3
ROUTE 0900
VISITOR CENTER PARKING
EXISTING RAILROAD
7DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
VC
_L
AY
O U
T.
dw g
/3 0/
9:
pm b y lra ke s R
195721C1
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
VISITOR CENTER PARKING
(ROUTE 0900) LAYOUT
0 30 60 Feet
AREA OF PAVEMENT WORK
SAW CUT ASPHALT
SAW CUT ASPHALT
INSTALL CONCRETE
CURB AND GUTTER
REMOVE EXISTING
ISLAND AND INSTALL
NEW VISITORS LOT
PARKING ISLAND. SEE
DETAIL
INSTALL CONCRETE
CURB AND GUTTER
6' CONCRETE SIDEWALK
TO MATCH EXISTING
CONCRETE AT
MONUMENT; SEE DETAIL
SHEET G6
LEGEND:
ASPHALT SURFACE
PAVEMENT REPLACEMENT
FULL DEPTH
PAVEMENT
2" SUB-BASE
AGGREGATE (AASHTO #57)
100% RECLAIMED
ASPHALT PAVEMENT
CONCRETE PAVEMENT
FOR RV PARKING
ROUTE 0402
MAINTENANCE ROAD
SEE SHEET C7
PLACE EXCESS FILL
OF NATIVE SOIL TO
CREATE 6 FT WIDE
WALKING PATH
1" = 30'
R 5'
R 8.5'
14.8'
14.8'
1'
6"
MOUNTABLE CURB AND
GUTTER (TYPE M-1)
VISITORS LOT PARKING ISLAND
N.T.S
EXISTING STOP SIGN
INSTALL 15 FT OF 15" HDPE
WITH BITUMINOUS COATED
END SECTIONS AT
EXISTING DITCH LINE
CROSSWALK ADA RAMP;
SEE DETAIL (SHEET G5)
SIDEWALK ADA RAMP;
SEE DETAIL (SHEET G5)
CLEAN CULVERT FOR
POSITIVE DRAINAGE
IF CULVERT IS FOUND
TO BE IN POOR
CONDITION THEN
REPLACE IN KIND
REPLACE CONCRETE CURB
AROUND SMALL BEND ON
EXISTING ISLANDS; APPROX
10.5 LF EACH WITH 5' RADIUS
INSTALL A PULL BOX (PG22) ON
EITHER END OF THE ROADWAY AND
ROUTE A 4" CONDUIT FOR POWER
BETWEEN EACH PULL BOX FOR
FUTURE EV PURPOSES
INSTALL A PULL BOX (PG12) ON
EITHER END OF THE ROADWAY AND
ROUTE A 1" CONDUIT FOR POWER
BETWEEN EACH PULL BOX FOR
FUTURE EV PURPOSES
6" REINFORCED CONCRETE PAD TO
MATCH EXISTING
ELEVATIONS AND CROSS SLOPES
(MAX 2%)
RESET EXISTING YIELD SIGN
NOTE: PROTECT ALL EXISTING CURB DURING CONSTRUCTION
X
X
X X X X X X X X X X
X
X
X
X
X
EXISTINGELIPTICALCULVERT
C O
N C
. C U
R B
CONC. CURB
CO
NC
. C
UR
B
MONUMENT
BE
NC
HE
S
GOLDEN SPIKE DRIVE
ROUTE 500
ADMINISTRATIVE BUIILDING
BENCH
MULC
H
RV PARKING
3 X 12' 2 X 16'
9 SPACES
10' X 20'
8 SPACES
10' X 20'
14 SPACES
10' X 20'
8 SPACES
10' X 20'
8DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
VC
_P
AV
M
AR
K.
dw g
/3 0/
9:
pm b y lra ke s R
195721C2
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
VISITOR CENTER PARKING
(ROUTE 0900) PAVEMENT
MARKINGS
0 20 40 Feet
AREA OF PAVEMENT MARKINGS
ROUTE 0901
ADMINISTRATIVE LOT PARKING
SEE SHEET C4 FOR PAVEMENT
MARKING INFORMATION
6' WIDE CROSSWALK
SEE DETAIL ON SHEET G4
1" = 20'
STRIPE FIRE LANE TO
MATCH EXISTING
4 ACCESSIBLE PARKING
10' X 20'
W/ 8.85' LOADING
INSTALL ACCESSIBLE RAMP TO MATCH EXISTING IN KIND
X
X X
X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXISTINGELIPTICALCULVERT
GOLDEN SPIKE DRIVE
0+
1+00
2+00
2+74.81
W W W W W W W W
X X X X X X X X X X X X
W W W W W W W W
9DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
AL
_L
AY
O U
T.
dw g
/3 0/
9:
pm b y lra ke s R
195721C3
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
ADMINISTRATIVE LOT PARKING
(ROUTE 0901) LAYOUT
AREA OF PAVEMENT WORK
SCALE - A (1"=20')
ROUTE 0900
VISITOR CENTER PARKING
INSTALL APPROX. 32 LF OF WOOD FENCE
TO MATCH EXISTING
INSTALL APPROX. 6 LF OF WOOD FENCE
TO MATCH EXISTING
INSTALL APPROX. 19 LF OF WOOD FENCE
TO MATCH EXISTING.
MOVE EXISTING GATE IN LINE WITH NEW
FENCE AREA
CONCRETE PAD FOR
APPROX. 800 SF SUPPLY SHED
REMOVE EXISTING SHED
REMOVE EXISTING SHED
PROTECT EXISTING TANK
DURING CONSTRUCTION
INSTALL BOLLARDS ON 6'
CENTERS
LEGEND:
ASPHALT SURFACE
PAVEMENT REPLACEMENT
FULL DEPTH
PAVEMENT
2" SUB-BASE
AGGREGATE (AASHTO #57)
CONCRETE PAVING FOR
RV PARKING
REMOVE EXISTING CONCRETE PADS
AND INSTALL NEW 6" REINFORCED
CONCRETE SLAB (40' X 80') WITH 4"
THICK SUB-BASE AGGREGATE
EXISTING RAILROAD
ADMINISTRATIVE BUILDING
RETAIN EXISTING
ELECTRICAL BOX AND SHED
TIE IN TO METAL POST
NEXT TO STONE
R.V. WATER FROST
FREE SPIGOTS
APPROX 197' OF 2" FLEXIBLE PVC
RV PARKING AREA
SCALE - B (1"=10')
0 10 20 Feet
1" = 10'
0 20 40 Feet
1" = 20' A
B
EXISTING UTILITY HOOKUPS TO
REMAIN AND BE PROTECTED
DURING CONSTRUCTION
80'
18.5'
2'
REPLACE CONCRETE
SIDEWALK APPROX. 125 SF
REMOVE EXISTING SHEDPROTECT EXISTING GAS TANK
DURING CONSTRUCTION
TIE WATERLINE INTO EXISTING WATERLINE
STUB OUT FROM ADMINISTRATIVE BUILDING.
ABANDON EXISTING WATERLINE IN PLACE
X
X X
X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXISTINGELIPTICALCULVERT
GOLDEN SPIKE DRIVE
8 SPACES
10' X 20'
4 SPACES
10' X 20'
1 ACCESIBLE
SPACE
10' X 20'
3 SPACES
10' X 20'
10DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
AL
_P
AV
M
AR
K.
dw g
/3 0/
9:
pm b y lra ke s R
195721C4
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
ADMINISTRATIVE LOT PARKING
(ROUTE 0901)
PAVEMENT MARKINGS
0 20 40 Feet
AREA OF PAVEMENT MARKINGS
ROUTE 0900
VISITOR CENTER PARKING
SEE SHEET C2 FOR PAVEMENT MARKING
INFORMATION
1" = 20'
EXISTING RAILROAD
ADMINISTRATIVE BUILDING
X X
X X
X
GOLDEN SPIKE DRIVE
ROUTE 500
GOLDEN SPIKE DRIVE
ROUTE 500
CONCRETE
OBSERVATION
AREA
11DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
BF
_L O
W _L
AY
.d w g
/3
0/
9:
pm b y lra ke s
R
195721C5
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
BIG FILL EXHIBIT LOWER
PARKING LOT (ROUTE 0903)
LAYOUT
0 20 40 Feet
AREA OF PAVEMENT WORK
LEGEND:
ASPHALT SURFACE
PAVEMENT REPLACEMENT
SAW CUT ASPHALT
7X PARKING BUMPERS
EXISTING PARKING
BUMPERS TO BE
REPLACED
1" = 20'
X X
X X
X
GOLDEN SPIKE DRIVE
ROUTE 500
GOLDEN SPIKE DRIVE
ROUTE 500
CONCRETE
OBSERVATION
AREA
1 RV SPACE
10' X 58'
6 SPACES
1 ACCESSIBLE SPACE
10' X 20'
RV PARKING
0+00 1+00 2+002+04.38
12DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
BF
_L O
W _P
AV
M
.d w g
/3 0/
9:
pm b y lra ke s R
195721C6
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
BIG FILL EXHIBIT LOWER
PARKING LOT (ROUTE 0903)
PAVEMENT MARKINGS
0 20 40 Feet
AREA OF PAVEMENT MARKINGS
1" = 20'
MONUMENT
BE
NC
HE
S
GOLDEN SPIKE DRIVE
ROUTE 500
GOLDEN SPIKE DRIVE
ROUTE 500
MULC
H
13DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
M
R _R
AP
.d w g
/3
0/
9:
pm b y lra ke s
R
195721C7
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
MAINTENANCE ROAD
(ROUTE 0402)
RECLAIMED ASPHALT
PAVEMENT AREA
0 60 120 Feet
AREA OF 100% RECLAIMED ASPHALT PAVING AREA
ROUTE 0900
VISITOR CENTER PARKING
SEE SHEET C1
ROUTE 0402
MAINTENANCE ROAD
LEGEND:
ASPHALT SURFACE
PAVEMENT REPLACEMENT
FULL DEPTH
PAVEMENT
2" SUB-BASE
AGGREGATE
100% RECLAIMED
ASPHALT PAVEMENT 1" = 60'
EXISITNG
MAINTENANCE BUILDINGS
EXISTING RAILROAD
RECLAIMED ASPHALT PAVEMENT PLACEMENT SHALL FOLLOW THE NUMBERED
PRIORITY SHOWN. IF RECLAIMED ASPHALT PAVING QUANTITY IS INSUFFICIENT,
LOWER-PRIORITY AREAS MAY BE OMITTED WITH CO APPROVAL.:
1. ROUTE 0402 - MAINTENANCE ROAD
GOLDEN SPIKE DRIVE
ROUTE 500
GOLDEN SPIKE DRIVE
ROUTE 500
0+
1+00
2+00
3+00
3+42.44
14DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
BF
_R
AP
.d w g
/3 0/
9:
pm b y lra ke s R
195721C8
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
BIG FILL ROAD (ROUTE 0401)
& UPPER PARKING (ROUTE 0906)
RECLAIMED ASPHALT
PAVEMENT AREA
AREA OF 100% RECLAIMED ASPHALT PAVING AREA
ROUTE 0401
BIG FILL ROAD
ROUTE 0906
BIG FILL EXHIBIT UPPER PARKING
LEGEND:
100% RECLAIMED
ASPHALT PAVEMENT
0 20 40 Feet
1" = 20'
RECLAIMED ASPHALT PAVEMENT PLACEMENT SHALL FOLLOW THE NUMBERED
PRIORITY SHOWN. IF RECLAIMED ASPHALT PAVING QUANTITY IS INSUFFICIENT,
LOWER-PRIORITY AREAS MAY BE OMITTED WITH CO APPROVAL.:
1. ROUTE 0402 - MAINTENANCE ROAD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXISTINGELIPTICALCULVERT
C O
N C
. C U
R B
CONC. CURB
CO
NC
. C
UR
B
MONUMENT
BE
NC
HE
S
GOLDEN SPIKE DRIVE
ROUTE 500
ADMINISTRATIVE BUIILDING
BENCH
MULC
H
15DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
OF
TITLE OF SHEET
GOLDEN SPIKE NATIONAL HISTORIC PARK09/29/2025
/3
0/
1:
C :\U se rs
\lr ak es \D
C \A
C C
D oc s\ St an te c C on su lti ng
\2
9_
G O
SP
-P av em en t_
R eh ab \P ro je ct F ile s\
G O
SP
\3
6\ C
AD
v
D R
AW
IN
G S\
C
IV
IL
\C
ES
_P
LA
N .d w g
/3
0/
9:
pm b y lra ke s
R
195721C9
A/E FIRM
LR
LR
JMB
PRIME/CIVIL:
STANTEC
CONSULTING
SERVICES INC.
CHARLESTON, WV
SHEET
315426
VISITOR CENTER PARKING
(ROUTE 0900) EROSION &
SEDIMENT PLAN
0 20 40 Feet
1" = 20'
PROVIDE INLET PROTECTION
PROVIDE APPROPRIATE TREE PROTECTION
NOTE:
CONTRACTOR SHALL PROTECT FIELD AREAS.
CONTRACTOR SHALL NOT USE GRASS AREAS FOR STAGING.
LIMITS OF DISTURBANCE
| Sheets and Views |
| G1 COVER-Layout1 |
| G2 LOC MAP-Layout1 |
| G3 GEN_SUM-Layout1 |
| G4 DETAILS-Layout1 |
| G5 DETAILS-Layout1 |
| G6 TYP_SEC-Layout1 |
| C1 VC_LAYOUT-Layout1 |
| C2 VC_PAVMARK-Layout1 |
| C3 AL_LAYOUT-Layout1 |
| C4 AL_PAVMARK-Layout1 |
| C5 BF_LOW_LAY-Layout1 |
| C6 BF_LOW_PAVM-Layout1 |
| C7 MR_RAP-Layout1 |
| C8 BF_RAP-Layout1 |
| C9 ES_PLAN-Layout1 |
File details come from the government source that posted it. Updated .