About this file

This file is an RFI Responses document in spreadsheet format related to Amendment 4 of the Golden Spike Visitor Center Remodel solicitation (140P1426R0012). The document contains responses to questions submitted by potential vendors regarding the remodel project at Golden Spike National Historic Park, which is managed by the Department of the Interior National Park Service Intermountain Region.

The spreadsheet appears to be organized to track and document inquiries and corresponding answers from government officials regarding project specifications, requirements, and clarifications. This RFI response document serves as a mechanism for providing transparency and equal information to all prospective bidders during the pre-solicitation phase, ensuring that vendors have consistent and comprehensive understanding of the project scope before submitting formal proposals. The document supports the procurement process for the visitor center remodel, which involves designing and constructing new exhibits within the existing facility.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Questions Sheet #1

RFI No.SubjectRFI NarrativeResponse
RFI-001Project ManualThe project manual appears to reference a different project and does not include applicable sitework specifications. Please provide the correct project manual and confirm the governing specifications.Please reference Amendment 0002 which was issued to remove Attachment 2 - Drawings, titled "Fossil Butte National Monument." These drawings were inadvertently included with the solicitation, apply to a different project, and are not applicable to the Golden Spike Visitor Center Remodel project.
RFI-002Quantity DiscrepanciesThe demolition and reclaimed asphalt quantities shown on the summary do not match the route quantities. Please confirm the governing quantities for bidding.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-003Asphalt PavingPlease provide the paving areas and confirm the asphalt lift thickness associated with the scheduled asphalt tonnage.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-004Prevailing WagePlease confirm the applicable Davis-Bacon wage determination for the paving work, as the current determination is listed as Building.Wage Determination UT20260104, Construction Type: Highway, for Box Elder County, Utah, is included.
RFI-005EV InfrastructurePlease provide conduit lengths, routing, trench requirements, and confirm whether the future EV infrastructure is conduit only.Future EV is Conduit only per Sheet ES1.1
RFI-006Pavement MarkingsPavement marking quantities shown on the plans differ from the summary. Please confirm the required lane letters, arrows, and ADA markings.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project
RFI-007Site RestorationPlease provide the limits of disturbance and restoration quantities for seeding, topsoil, and landscaping.Site restoration is limited to the area impacted by the temporary access and facilities, new sidewalk and underground conduit that is part of the Visitor Center remodel contract.
RFI-008Aggregate BasePlease confirm the required aggregate base quantity associated with the full-depth pavement replacement areas.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-009Site FurnishingsPlease confirm quantities for bollards, frost-free hydrants, shed removals, and associated concrete pads.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-010Water LinePlease provide installation requirements, testing procedures, burial depth, and abandonment requirements for the proposed water line.Refer to sheet PL1.2
RFI-011Concrete CurbPlease confirm whether the island curb replacement is included within the scheduled curb quantities or is additional work.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-012Culvert ReplacementPlease provide the existing culvert size, replacement requirements, or an allowance for potential replacement.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-013PhasingPlease clarify construction phasing, reclaimed asphalt priorities, road closures, and access requirements during construction.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-014Parking BumpersPlease confirm the total quantity of parking bumpers to be replaced.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-015DrainagePlease provide installation requirements for the proposed HDPE culvert, including bedding, backfill, and end treatments.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-016Base Bid / Option #1 LimitsPlease define the exact limits between the Base Bid and Option #1 work, including finishes, partitions, doors, and required tie-in work if the option is not awarded.See sheet A0.1 & A1.1 for limits of Option#1 Admin wing. Finishes, doors partitions are detailed in Sheets for Area B.
RFI-017Fire ProtectionPlease confirm the existing sprinkler system type, available capacity, and whether a new air compressor and hydraulic calculations are required for the addition.Existing Sprinkler is Dry Pipe. Hydraulic calcuation will be required.
RFI-018Foundation DesignPlease provide frost depth, allowable soil bearing capacity, and foundation connection details between the existing slab and new foundation.Refer to sheet S4 and S5 for foundation details. Match existing foot heights as indicated.
RFI-019Exhibit ScopePlease define the scope split between the General Contractor and exhibit fabricator, including installation responsibilities, mounting, casework, and power/data connections.In exhibit area- Exhibt fabricator will provide, install exhibit casework, features, graphics, signage. The General will provided base finishes, power/data and lighting.
RFI-020AccessibilityPlease confirm retained doors and hardware comply with ABAAS accessibility requirements or identify any required replacements.Retained doors are acceptable as is
RFI-021Historic FinishesPlease provide specifications for finishes identified as "match existing" and identify any historic finishes requiring salvage or protection.The rock walls and slotted ceilings and walls require protection. The "match existing" specifications are listed under 2.2 Exterior Trim, 2.3 Plywood Siding (both on pg 314 of the specifications document) and 2.4 Miscellaneous Materials (pg 315 of specifications document)
RFI-022Temporary FacilitiesPlease identify the approved locations for temporary trailers, ADA restrooms, staging areas, parking, and available utility connections.Temporary trailers indicated on Sheet AS1. Staging area is east (other side) of 22000 W RD.
RFI-023Electrical ServicePlease confirm the existing electrical service and panel capacity are sufficient for the new mechanical and exhibit loads or identify any required upgrades.The transformer is rated at 150KVA and the main disconnect is 400A (3-phase) for the building.
RFI-024Exterior Painting OptionPlease confirm the interpretive shelter is included within the exterior painting option and provide the associated area, substrate, and lead paint requirements.Exterior Painting included interpretive shelter including, siding truss and columns. Per Hazmat report Brown paint contains lead. Note: as part of prep contractor will have to remove bird spikes throughout.
RFI-025Bid Extension RequestDue to the July 4th holiday and the number of outstanding RFIs, we respectfully request a 5–7 day extension to the July 8 bid date to allow adequate time for responses and subcontractor pricing updates.An extension was provided in Amendment 0003. Proposals are now due no later than 1:00 p.m. MDT on July 22, 2026.
RFI-026Existing ConditionsPlease confirm the existing pavement sections shown are representative throughout the project. If unsuitable subgrade or additional pavement thickness is encountered, will it be handled as a change order?The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-027Geotechnical InformationPlease confirm whether a geotechnical report is available for bidding and whether bidders may rely on the report for pavement and earthwork assumptions.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-028Traffic ControlPlease confirm whether traffic control plans, flagging, and public notifications are contractor-designed or owner-provided, and identify any lane closure restrictions.Asphalt contractor to provide traffic control. Coordinate for access to site.
RFI-029Survey & LayoutPlease confirm whether the owner will provide survey control and benchmarks or if all construction staking and layout shall be by the contractor.Not as part of this project.
RFI-030Utility ConflictsPlease confirm all known underground utility conflicts have been identified and whether potholing or utility locating beyond standard utility notification is required.Electric and Telco should be able to be located through standard utility location. Water and fiber-optic communication cables between buildings are NPS owned and the contractor may need to locate through other means.
RFI-031Testing & InspectionPlease identify which material testing and special inspections will be owner-provided versus contractor-provided, including asphalt, concrete, compaction, and density testing.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-032Working HoursPlease confirm allowable working hours, weekend work restrictions, and any limitations on access to the park during construction.Generally working hours are 8am to 4:30pm Monday-Friday. Weekend work may be allowed on a case by case basis, subject to approval by the Contracting Officer.
RFI-033Material DisposalPlease confirm the disposal requirements for removed asphalt, concrete, unsuitable soils, and demolished materials, including whether any material is owner-retained.The asphalt drawings were for reference only and are not part of this project. This is a separate project at the site that will be going on at the same time as the building project. All material special testing and special inspection for building project are contractor provided.
RFI-034Exterior Painting OptionSome of the siding to be repainted is damaged and needs replacement.As part of base bid replace siding as noted on Building Elevations (Sheet A2.0). In addtiona, assume 200 SF of siding replacement as part of Exterior Painting option.

Contractor Questions Sheet #2

RFI No.SubjectRFI NarrativeResponse
RFI-001Finish ScheduleCan you please clarify which resilient floor tile is the correct one?

On the Finish Schedule, it shows VT1 – Vinyl Composite Tile – Marmoleum – E3573 Trace of Nature – Flow Pattern.

In the specs under Resilient Tile it shows RF1 – Resilient Floor Tile – Forbo Colorex EC – 250206 Moonstone (which is a static dissipative tile) The Government has confirmed that RF1 is not specified on the drawings. Provide VT1 in accordance with the Finish Schedule and at the locations shown on the drawings. The RF1 specification is not applicable to this project.

Contractor Questions Sheet #3

RFI No.RFI NarrativeResponse
RFI-001Please confirm the contractor is not responsible for the furnishing and installing of the temporary visitor center trailer ramps, utilities, port-a-johns, signages, etc. We anticipate these to be owner-provided.Contractor is responsible for providing the temporary Visitor Center, temporary bathrooms, signage and temporary storage containers. Requirements are listed in
RFI-002At the site visit held yesterday it was mentioned that the parking lot rehabilitation drawings were included with the contract documents as a reference only, but that the parking lot rehabilitiation work is be performed as another project in the future. Please confirm parking lot rehabilitation is not part of this contract.Confirmed NIC
RFI-003Please provide a copy of the sign-in sheet from the site visit held on June 30th.Contracting Officer will provide as part of solicitation modification
RFI-004Please provide the full Hazardous Materials Survey, including: sample locations, quantities, abatement scope, and whether abatement is included in GC base bid or handled separately by NPS.Haz Mat Survey is in the Specifications. Abatement is part of base bid
RFI-005Can exterior elevations be provided that outline the areas which are to receive new exterior paint? The exterior paint manufacturers and types are all clearly stated in the specifications, as well as the finish schedule on 6.2. However, it's unclear what extent of areas on the exterior that are to receive the paint.Generally entire building to recieve exterior paint except stone surfaces. Including but not limited to Wood siding, trim, flashing, fascia
RFI-006Please confirm whether existing slabs are post-tensioned or if general contractors should include GPR/scanning of existing slabs before saw cutting.Existing slabs are not post-tensioned. They are 4" with 6x6 10/10 Welded wire mesh
RFI-007Drawing Sheet A1.14 Design Minds Exhibit Layout references the following note: "Contractor to refer to The Design Mines drawing set provided by the National Parks Service." This appears to allude that there is a separate set of drawings in addition to this layout exhibit. Is that something that should be part of this RFP? Please advise.Reference drawings of the exhibits project will be provided as a modification to the solicitiation
RFI-008Sheet A-2 Demolition Floor Plan Keynote 10 says, "Remove existing exhibits in return to NPS." From the job walk, these exhibits appear to include a lot of glass as well as delicate and valuable material. Is it the intent that the general contractor remove these items? If so, can you please clarify: if there are any requirement for protection, packaging, storage locations, transfer processes, and whether any museum conservation handling requirements apply.The NPS will remove most of the exhibits including valuables and store them.
RFI-009For the installation of the new 4-inch conduit and 1-inch conduit and pole boxes for Future EV Charging Stations, can landscape drawings and existing site drawings be provided that show the finished material we will have to demolish and reinstall in order to install the conduit? Or is the intent that we install the conduit using a trenchless (Ditch Witch) method?Intent is to install conduit using trenchless method.
RFI-010We respectfully request additional time to put our proposal together depending on the response time to these questions.An extension was provided in Amendment 0003. Proposals are now due no later than 1:00 p.m. MDT on July 22, 2026.

Contractor Questions Sheet #4

RFI No.RFI NarrativeResponse
RFI-001Will the government please extend the bid deadline by a minimum 21 calendar days from when all RFI responses are received so that the contractor can incorporate government responses into the proposal and price accordingly?An extension was provided in Amendment 0003. Proposals are now due no later than 1:00 p.m. MDT on July 22, 2026.
RFI-002The Period of Performance is not long enough for review and approval of government required submittals, procurement of long lead materials and equipment and or onsite construction. Can the Period of Performance be extended?The period of performance is nearly 16 months from notice to proceed. The government believes this is adaquete
RFI-003If a contractor includes specific exclusions or qualifications with our proposal submission, will our proposal be deemed non-responsive?Contractors shall meet or exceed the minimum qualifications/requirements of the evaluation factors.
RFI-004We request the government reconsider this requirement for proposals to “[e.g., 90 Calendar Days]” and adopt a more rational approach such as accepting cost proposals valid for 30 or 60 days, and allowing a fair cost re-evaluation at contract award. Such an approach could save the government quite a bit of money in the case that material prices level off before award. Removing this risk allows for a more competitive bidding climate based on the true value of the project.We will reduce this to 90 Calendar Days.
RFI-005Can the Superintendent perform a dual role? For example, can the Superintendent also be the SSHO?Yes
RFI-006Can the QC Manager perform a dual role? E.g. QC/Superintendent or QC/SSHO.Yes
RFI-007Will the government require the contractor provide an onsite office trailer? Or is it at the contractor’s discretion?Contractor discretion
RFI-008Please indicate acceptable laydown/staging areas?See Sheet ASI
RFI-009Please indicate acceptable haul routes.Stay on asphalt roads
RFI-010Will onsite stockpiling be allowed?Yes see sheet AS1
RFI-011Please provide any available soils reports.The Natural Resources Conservation Service (NRCS) may provide the Web Soil Survey for Golden Spike NHP soils data. Here is the URL: Web Soil Survey
RFI-012Are there any environmental concerns related to areas outside where construction will take place? Please advise.Typical weather hazards for the area.
RFI-013Please provide any available boring logs or Geotech reports for the project.No reports are known to exist. Follow structural design in drawings.
RFI-014Will the reuse of contaminated soils be allowed if encountered? (including within utility trenches)No, but not anticipated onsite.
RFI-015It is not clear in the RFP whether CERCLA requirements will be applicable to this project. Please advise.Not expected
RFI-016Will contractor be required to do confirmation sampling for areas included in the RFP Provided Hazmat report?No, only mitigation of material/ areas as noted
RFI-017Will an NPDES permit be required?No
RFI-018Please advise whether a Storm Water Pollution Prevention Plan will be required for this project.No
RFI-019Will any of the work areas on this project require escorts for access?No
RFI-020Will the government provide escorts for any restricted areas?N/A
RFI-021Please advise if there are any costs for government provided escorts.N/A
RFI-022Please provide a full set of as-builts for the project.Added to this amendment to the solicitation (for reference only).
RFI-023Will the contractor be responsible for all utility costs if temporary utilities are required?Yes.
RFI-024Please provide the going rates for temporary utilities.Contractor will have to determine.
RFI-025Will contractor be responsible for any costs associated with base facilities support where and when required for the project?Yes, for temporary facilities.
RFI-026Please provide rates for government utility support workers and crew makeup for shutoffs, outages etc.Not sure what the questions is referring to.
RFI-027Please confirm this project does not require compliance with the Buy America Act and that compliance with the Buy American Act is acceptable.The solicitation incorporates FAR Clause 52.225-9, Buy American—Construction Materials (Oct 2022) (Deviation) and FAR Provision 52.225-10, Notice of Buy American Requirement—Construction Materials (May 2014). Accordingly, the applicable domestic preference requirement for this project is the Buy American Act as implemented by these FAR provisions. Compliance with these solicitation requirements is required.
RFI-028The civil drawings do not indicate whether existing underground utilities shown have been field-located by survey or utility potholing. Please confirm whether the Contractor may rely on the utility locations shown or should anticipate verification prior to excavation associated with the building addition and site improvements.Anticpate field verification of utilities.
RFI-029Please clarify the required limits of pavement, sidewalk, and landscaping restoration where underground utility work extends beyond the limits shown on the drawings. Confirm whether restoration is limited to disturbed areas only or if full-panel replacement is required.Restoration limited to disturbed areas.
RFI-030Please confirm that existing finish floor elevations and adjacent exterior grades shown on the drawings have been field verified and that the Contractor may rely upon them for establishing finish grades at the new addition and concrete tie-ins.Field verfity existing grades.
RFI-031The addition modifies the existing roof geometry. Please advise whether the existing roof drainage calculations have been evaluated for the revised roof configuration and confirm that no additional roof drains or overflow provisions beyond those shown are required.Addition does not modifty existing roofline as it is under existing covered patio. No addtional drains or overflow provisions are required.
RFI-032Please advise which building systems are included within the commissioning scope, specifically whether fire alarm, lighting controls, HVAC controls, split systems, VRF systems, and exhibit-related electrical systems require formal commissioning and identify the responsible commissioning authority.Follow contractor requirement in comissioning specification section. Commission will be performed by AE team.
RFI-033Please provide a definitive description of the exact limits of Base Bid, Option 1, and Option 2 work where MEP systems transition between renovated and non-renovated spaces to ensure all bidders carry identical scope.Information on this is provided in the "Summary of Work" section of the specifications. Per the drawings, Area A & C (Visitor Center and public restrooms) are part of the base bid, Area B (administrative wing) is option a (#1)., and exterior painting of the entire structure (except stone surfaces) is option b (#2).
RFI-034Please confirm whether all existing underground utilities shown have been field located and whether the Contractor is responsible for additional utility potholing or subsurface utility engineering prior to excavation.Field verify existing utilties
RFI-035The project encloses the existing north porch to create conditioned space.Correct but with new slab and foundation per drawings.
RFI-036Please advise whether existing foundations and structural framing have been field verified and whether the Contractor may rely upon the dimensions shown for fabrication of structural steel and framing without additional exploratory demolition.Original Visitor Center As-builts are provided but it is on the contractor to field verify.
RFI-037Please provide the anticipated electrical loads associated with Government Furnished exhibit equipment and confirm that all panel schedules include sufficient spare capacity for final exhibit connections.Providing a reference copy of the new exhibits drawings for contractor to verify anticipated electrical loads.
RFI-038The drawings indicate modifications to the existing dry-pipe sprinkler system.

Please advise whether:

A. Existing hydraulic calculations may be used.

B. New hydraulic calculations are required.

C. Existing riser capacity has been verified.

D. New water flow testing will be required.New hydraulic calculations are required.
RFI-039The project appears to maintain visitor center operations during portions of construction. Please advise which areas are required occupied areas, locations of temporary entrances if required and any public circulation requirements.Contractor is to provide temporary visitor contact station (requirements are in the specifications document under "temporary facilities.") NPS intends to be out of the building as much as practable during the active construction phase.
RFI-040The drawings identify exhibit layouts and associated utilities; however, the Contract Documents do not clearly define the division of responsibility between Government Furnished Equipment (GFE), Government Installed Equipment (GFI), and Contractor Furnished/Installed Work. Please advise.In exhibit area- Exhibt fabricator will provide, install exhibit casework, features, graphics, signage. The General will provided base finishes, power/data and lighting.
RFI-041The Government conducted the pre-bid site visit on June 30, 2026, leaving approximately eight (8) calendar days before the current bid due date of July 8, 2026.

The site visit provided important information regarding existing conditions, building access, phasing constraints, existing utilities, and renovation sequencing that could not be fully evaluated from the contract documents alone. Following the site visit, offerors require sufficient time to:

•Incorporate field observations into their estimates.
•Develop and submit RFIs resulting from existing field conditions.
•Receive and evaluate Government responses to those RFIs.
•Obtain revised subcontractor and supplier quotations based on site observations.
•Evaluate impacts to means and methods, temporary facilities, and phasing.

Given the complexity of this occupied renovation project and the limited time remaining after the site visit, offerors may not have adequate opportunity to prepare complete and competitive proposals.

Will the government please extend the bid deadline by fourteen (14) or (21) to calendar days to allow adequate time for incorporation of site visit observations, Government responses to RFIs, and preparation of complete and competitive bids? An extension was provided in Amendment 0003. Proposals are now due no later than 1:00 p.m. MDT on July 22, 2026.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwebsoilsurvey.nrcs.usda.gov%2Fapp%2FWebSoilSurvey.aspx&data=05%7C02%7CRichard_Carroll%40nps.gov%7Ccf8a4a18ef5d43a3850408de7eb631d2%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C639087518167623853%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=miRBVGC8az8%2BNNFsiTOvwKNybqWDgG%2BhVsyCBT7Uic4%3D&reserved=0 Contractor Questions Sheet #5

RFI No.RFI NarrativeResponse
RFI-001Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?No
RFI-002Is attachment 3 Parking Lot Rehabilitation Drawings a part of this solicitation to be priced?No
RFI-003Please provide the site visit attendee sign in sheet.Attached to this amendment.
RFI-004Will the building be occupied durring construction?Portions may be occupied see response below.
RFI-005Are there any phasing requirements? How many people will be in the building? Are there any temporary heating/cooling requirements?Each area noted on plans (A,B,C) is considered to be a phase. Restrooms will be completed as a separate phase and contract orwill need to provide access to restroom unless they are actively being worked.
RFI-006Are third party inspections required?Per the specifications.
RFI-007Is permitting required?Only with utilities that interface with city/ county or authorised providers. It is not expected to be required for this project.

Contractor Questions Sheet #6

RFI No.SubjectRFI NarrativeResponse
RFI-001Reference DrawingAttachment 3: Parking Lot Rehabilitation Drawings. I can't see any reference to these drawings in the SOW or Specifications. Do these drawings belong to Notice ID:140P2026R0044-Rehabilitate Asphalt Pavement Parking solicitation?The parking lot rehabilitation drawings are provided as a reference only as the contractor should be aware of potential ongoing work while the Visitor Center is under renovation. Also, there is interface between the conduit for future EV charge stations that both contracts will complete a section of and need to interface.
RFI-002Wage DeterminationCan you please provide the wage determination for asphalt work?The Highway Wage Determination is attached to this amendment.