Attachment 3 - DHS_Form_700-21.pdf

DHS Form PDF 587 KB Posted

Attached to
Light Emitting Diode (LED) Standalone and Self- Contained Marine Lanterns
Solicitation number
70Z08426QWOPL0007
Issued by

About this file

DHS Form 700-21: Material Inspection Acceptance and Receiving Report

This is a Department of Homeland Security standard form used to document the inspection, acceptance, and receipt of materials and services under federal contracts. The form serves as an official receiving and quality control document that records whether delivered items or performed services conform to contract requirements.

The form captures essential contract and delivery information including contract number, modification number, order number, report number, contractor name, manufacturer, and delivery location. It documents inspection activity through specific date fields (received, ready, started, and completed) and tracks quantities across multiple categories: rejected, accepted in the current report, and cumulative totals to date. The form requires identification of the contract line item number(s) applicable to the inspection. A remarks section allows for detailed notes regarding any deviations or special authorizations. The inspecting official must certify that materials and services listed as accepted conform to contract requirements, while those rejected do not conform and may not be delivered except as authorized under remarks. The form requires signature, printed name, title, telephone number, and date from the inspecting official, along with the same information from the supervising authority if applicable. This two-page form includes a continuation sheet for reporting on multiple line items or providing additional documentation.

View the file

Other versions and copies of DHS Form 700-21

File Revision Posted Attached to
Attachment 9 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Concrete Sinkers for Buoy Tenders
Attachment 4 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Coated Steel Pipe Piles
Attachment 4 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Wood Piles, Range Kits and MDO for ATON
Attachment 4 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Manufacture and Delivery ½ inch (nominal diameter), Type I, General Purpose, Class 2, 6x19 wire rope for various U. S. Coast Guard Units and Cutters
Attachment 4 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Global Navigation Satellite System (GNSS)
Attachment 3 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated LED Marine Lanterns
Attachment 2 - DHS Form 700-21.pdf Revision not stated Ice Buoy Batteries
Attachment 4-DHS_Form_700-21_SOL C2PL2351.pdf Same revision and size as this file Revision not stated Video Recorder (VR) for the USCG Cutter Video Recording System (CVRS)
DHS_Form_700-21.pdf Same revision and size as this file Revision not stated 175'WLM BUOY CRANES
DRAFT Attachment 4-DHS Form 700-21_C2PL7893.pdf Same revision and size as this file Revision not stated FURUNO DS-60 Doppler Speed Log Systems
Attachment 4- DHS_Form_700-21_SOL C2PL2253.pdf Same revision and size as this file Revision not stated Pan Tilt Zoom (PTZ) Camera Assembly for a Flight Deck Video System (FDVS)
Attachment 3-DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Dayboard Film for Marine Aids to Navigation
Attachment 4 - DHS_Form_700-21.pdf Same revision and size as this file Revision not stated 1/2 inch Wire Rope for Various Coast Guard Locations
Attachment 3-DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Retroreflective Elastomeric Film and Characters
Attachment 8 - DHS_Form 700-21.pdf Same revision and size as this file Revision not stated Concrete Sinkers for River Buoy Tenders
(12) DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Overhaul and Repair of Aids to Navigation (ATON) Buoys and Parts
Att.1_-_DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Used Luggage
Section_J_110_DHS_Form_700-21.pdf Same revision and size as this file Revision not stated 270' SERVICE LIFE EXTENSION PROGRAM (SLEP) ELECTRICAL POWER GENERATION SYSTEM
Attachment_7_DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Antenna Tuning Unit (ATU) Electrical Enclosure Fabrication
Attachment_7_DHS_Form_700-21.pdf Same revision and size as this file Revision not stated Second Generation Automatic Identification System (AIS-2)
Show all 20

Who attaches DHS Form 700-21

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE

1. CONTRACT NO. AND LATEST

MODIFICATION NO.

2. ORDER NO. 3. REPORT NO.

4. MATERIAL AND/OR SERVICES INSPECTED

5. CONTRACTOR

7. MANUFACTURER

8. PLACE OF INSPECTION

DHS Form 700-21 (10/14) Page 1 of 2

PREVIOUS

REPORTS

16. SUBMITTED

17. REJECTED

18. ACCEPTED

19. QUANTITY ON

ORDER

22. REMARKS (Use Continuation Sheet for Additional Entries)

23. INSPECTED BY 24. TITLE AND TELEPHONE NUMBER

The materials and/or services listed herein have been inspected or certified test data has been examined, by me or under my supervision.

The materials and/or services listed above as accepted conform to contract requirements. Those listed as rejected do not conform and may not be delivered, except as authorized under "Remarks."

25. SIGNATURE AND PRINTED NAME 26. TITLE AND TELEPHONE NUMBER 27. DATE

DEPARTMENT OF HOMELAND SECURITY

MATERIAL INSPECTION ACCEPTANCE AND RECEIVING REPORT

CONTRACT LINE

ITEM NO(S)

(If applicable)

9.

15. ACCEPTED14. REJECTED

QUANTITY

13. COMPLETED12. STARTED11. READY10. RECEIVED

INSPECTION DATES

20. ACCEPTED TO

DATE

21. BALANCE

REMAINING

THIS

REPORT

TOTAL

TO DATE

6. LOCATION WHERE ITEMS WERE DELIVERED OR

CONTRACTOR PERFORMED

3. REPORT NO.

DEPARTMENT OF HOMELAND SECURITY

MATERIAL INSPECTION ACCEPTANCE AND RECEIVING REPORT (Continued)

CONTRACT LINE

ITEM NO(S)

(If applicable)

9.

15. ACCEPTED14. REJECTED

QUANTITY

13. COMPLETED12. STARTED11. READY10. RECEIVED

INSPECTION DATES

Page 2 of 2DHS Form 700-21 (10/14)

Material Inspection Acceptance and Receiving Report, December 2003 U.S. Department of Homeland Security, Acquisition Policy and Legislation D:20040317145138- 05'00' D:20051012110539- 04'00'

DATE

1. CONTRACT NO. AND LATEST

MODIFICATION NO.

2. ORDER NO.

3. REPORT NO.

4. MATERIAL AND/OR SERVICES INSPECTED

5. CONTRACTOR

7. MANUFACTURER

8. PLACE OF INSPECTION

DHS Form 700-21 (10/14)

PREVIOUS REPORTS

16. SUBMITTED

17. REJECTED

18. ACCEPTED

19. QUANTITY ON ORDER

22. REMARKS (Use Continuation Sheet for Additional Entries)

23. INSPECTED BY

24. TITLE AND TELEPHONE NUMBER

The materials and/or services listed herein have been inspected or certified test data has been examined, by me or under my supervision. The materials and/or services listed above as accepted conform to contract requirements. Those listed as rejected do not conform and may not be delivered, except as authorized under "Remarks."

The materials and/or services listed herein have been inspected or certified test data has been examined, by me or under my supervision. The materials and/or services listed above as accepted conform to contract requirements. Those listed as rejected do not conform and may not be delivered, except as authorized under Remarks.

25. SIGNATURE AND PRINTED NAME

26. TITLE AND TELEPHONE NUMBER

27. DATE

DEPARTMENT OF HOMELAND SECURITY

MATERIAL INSPECTION ACCEPTANCE AND RECEIVING REPORT

CONTRACT LINE

ITEM NO(S)

(If applicable) 9.

15. ACCEPTED

14. REJECTED

QUANTITY

13. COMPLETED

12. STARTED

11. READY

10. RECEIVED

INSPECTION DATES

20. ACCEPTED TO DATE

21. BALANCE REMAINING

THIS

REPORT

TOTAL

TO DATE

6. LOCATION WHERE ITEMS WERE DELIVERED OR

CONTRACTOR PERFORMED

3. REPORT NO.

DEPARTMENT OF HOMELAND SECURITY

MATERIAL INSPECTION ACCEPTANCE AND RECEIVING REPORT (Continued)

CONTRACT LINE

ITEM NO(S)

(If applicable) 9.

15. ACCEPTED

14. REJECTED

QUANTITY

13. COMPLETED

12. STARTED

11. READY

10. RECEIVED

INSPECTION DATES

DHS Form 700-21 (10/14)

9. CONTRACT LINE ITEM NUMBER(S) (If applicable) Line 38 of 38.:
15. Quantity Accepted:
14. Quantity REJECTED:
Inspection Dates. 13. Completed Date. Enter 2-digit month, 2-digit day and 4-digit year.:
Inspection Dates. 12. Started Date. Enter 2-digit month, 2-digit day and 4-digit year.:
Inspection Dates. 11. Ready Date. Enter 2-digit month, 2-digit day and 4-digit year.:
Inspection Dates. 10. Received Date. Enter 2-digit month, 2-digit day and 4-digit year.:
Date. Enter 2-digit month, 2-digit day and 4-digit year.:
1. Contract Number and Latest Modification Number.:
2. ORDER NUMBER.:
4. MATERIAL AND/OR SERVICES INSPECTED.:
5. CONTRACTOR.:
7. MANUFACTURER:
8. PLACE OF INSPECTION:
16. SUBMITTED. PREVIOUS REPORTS:
16. SUBMITTED. THIS REPORT:
16. SUBMITTED. TOTAL TO DATE:
17. REJECTED. TOTAL TO DATE:
17. REJECTED. THIS REPORT:
17. REJECTED. PREVIOUS REPORTS:
18. ACCEPTED. TOTAL TO DATE:
18. ACCEPTED. THIS REPORT:
18. ACCEPTED. PREVIOUS REPORTS:
22. REMARKS (Use Continuation Sheet for Additional Entries). :
23. INSPECTED BY.:
24. TITLE.:
26. TITLE. :
27. DATE. Enter 2-digit month, 2-digit day and 4-digit year.:
19. QUANTITY ON ORDER:
20. ACCEPTED TO DATE:
21. BALANCE REMAINING:
25. PRINTED NAME.:
3. REPORT NUMBER. :
6. LOCATION WHERE ITEMS WERE DELIVERED OR CONTRACTOR PERFORMED.:
26. Telephone Number. Enter 10 digit telephone number including area code.:
25. SIGNATURE. Digital Signature.:

File details come from the government source that posted it. Updated .