Attachment 3 - CDR.pdf
PDF 234 KB Posted
- Attached to
- 9930--Manufacture, Supply, and Distribute Flat Bronze Markers Federal contract opportunity
- Solicitation number
- 36C78626R0104
About this file
This is a Contract Discrepancy Report (CDR) template and instructions document used to document, track, and resolve performance or compliance issues on federal contracts.
The form serves as a formal mechanism for identifying and managing contract discrepancies through a structured process involving the Contracting Officer (CO), Contracting Officer's Representative (COR), and contractor. Field 1 captures the base contract or agreement number, including agency awards, VA FSS, NAC BPAs, MAS, GWACs, and other agency MACs. Field 2 requires a unique CDR tracking number using the order or contract number followed by "CDR" and a sequential identifier (e.g., VA118-16-F-0202CDR-0001). The form documents three key dates: when the discrepancy was identified, when the CDR was delivered to the contractor, and when corrective actions must commence. Field 6 requires a detailed description of the discrepancy with cross-references to applicable Performance Work Statement (PWS), Performance Requirements Statement (PRS), and Quality Assurance Surveillance Plan (QASP) sections. The contractor must provide a narrative response explaining the cause, proposed corrective actions, and preventive measures, citing relevant Quality Control Plan procedures. The Government evaluates whether corrective actions resolve the discrepancy and may initiate cure notice or stop-work order procedures if resolution is not achieved. Final closure requires acknowledgment from the contractor, COR, and CO confirming cooperative resolution and appropriate remedies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q-A - Flat Bronze 26R0104 Amend 0001.docx | DOCX document | |
| 36C78626R0104 - Flat Bronze Markers - Amend 0001.docx | DOCX document | |
| 36C78626R0104 0001.docx | DOCX document | |
| Attachment 4 - Sample Review Form - Flat Bronze Markers - Rev.pdf | ||
| Attachment 1 - Price-Cost Schedule - Flat Bronze Markers.xlsx | XLSX spreadsheet | |
| Attachment 5 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 4 - Sample Review Form - Flat Bronze Markers.pdf | ||
| Attachment 2 - All Drawings Portfolio - Flat Bronze Markers.pdf | ||
| 36C78626R0104_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DISCREPANCY REPORT
1. CONTRACT OR AGREEMENT NUMBER: 2. REPORT NUMBER FOR THIS DISCREPANCY:
3. TO: 4. FROM:
5. DATES
a. DISCREPANCY IDENTIFIED: b. CDR DELIVERED/RECEIVED: c. INITIATE CORRECTIVE ACTION:
6. DISCREPANCY OR PROBLEM: (Describe in detail. Include reference to PWS section; use attached continuation sheet(s) if necessary.)
7. SIGNATURE OF COR: DATE:
8. SIGNATURE OF CONTRACTING OFFICER: DATE:
9a. TO: 9b. TITLE:
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Quality Control Plan procedures or new procedures. Use attached continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE:
12. GOVERNMENT ACTIONS. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)
13. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)
14. CDR CLOSE OUT. (Following successful resolution of contract discrepancy(ies).)
ACKNOWLEDGEMENT: TO THE BEST OF MY KNOWLEDGE AND BELIEF - INITIALS DATE
a. CONTRACTOR: (I accept that appropriate corrective actions and close out remedies where employed.)
b. COR: (I accept that appropriate corrective actions and close out remedies where employed.)
c. CO: (I accept that the parties worked cooperatively to correct the discrepancy(ies).)
Attachment 4: Contractor Discrepancy Report
INSTRUCTIONS FOR COMPLETION:
1. State the base contract or agreement number for which task/delivery orders are being issued against.
This includes agency awards which contain either A, C, or D in the numbering convention (e.g. VA118 16 C 0001) as well as VA FSS or NAC BPAs. This also includes MAS, GWACs, and other agency MACs authorized as either assisted acquisition or direct acquisition by another agency.
2. Generate a unique report number to track each CDR, using the current order number which contains F or J; or definitive contract number which contains C, followed by the initials ‘CDR’ and then a sequential number, as the official numbering convention (e.g. [VA118 16 F 0202]CDR 0001).
3. Print name of the Prime Contractor Company.
4. Print name of the division/department/party affected by the discrepancy.
5. Pertinent dates, (a) when was the discrepancy first identified, (b) when was the CDR delivered to the Contractor POC for their review/comment, and (c) after delivery of the CDR when does the Program Office require corrective actions to commence. (Note: The CDR is considered to be received by the Contractor at time of delivery).
6. Provide a concise yet vivid explanation of what the discrepancy is. Cross reference the discrepancy to the corresponding PWS, PRS and/or QASP sections in discrepancy.
7. COR signs, certifying delivery of the CDR.
8. CO signs, certifying notification of CDRs delivery.
9. Responsible Contractor POC name and title (e.g. ProgramManager, CEO, etc.).
10. The Contractor POC narrative explanation as to what, in their view, caused the discrepancy along with the proposed corrective measures.
11. The Contractor POC signs, certifying responsibility for correcting the CDR.
12. In the event there is shared responsibility for causing the discrepancy, the Government must also state actions it will take concurrent with Contractor actions, otherwise this is not applicable. (Note:
Government actions will be initiated commensurate with the date established at block 5(c).)
13. After corrective actions have been taken, evaluate whether actions had an impact in being able to resolve the discrepancy. In the event corrective actions are long term in scope, evaluate whether proposed actions provide adequate assurance of being able to resolve the discrepancy. For any matter that is not able to be resolved, the Program Office shall initiate steps for issuance of a cure notice.
14. Upon successful resolution of the discrepancy, or after determining that either a cure notice or stop work order is required, the CDR shall be acknowledged as a closed action.