Attachment 3 - Bid Alternates.pdf
PDF 233 KB Posted
- Attached to
- CTF FCF Grease Interceptor IFB1 TBD CMS210626
- Solicitation number
- IFB1 CAAA 2027000018 2
- Issued by
- El Paso County, Colorado
About this file
This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Colorado Department of Corrections project EMP26-002 / FCF Grease Interceptor. The form provides a standardized template for bidders to submit pricing for optional project modifications. One additive alternate has been specified: A.A.1 for a new 6" concrete slab around new tanks, referenced in Sheet 2 of the project specifications. The form accommodates up to ten additive alternates and ten deductive alternates, though only the single additive alternate has been populated in this instance. Bidders must understand that additive and deductive alternates are mutually exclusive—only one category may be used in any given bid submission.
The form requires bidders to reference the Instructions to Bidders (SBP-6.12) for comprehensive alternate information and the contract documents for thorough descriptions of each alternate. Pricing for the specified alternate must be entered on the form, and the base bid will be modified accordingly if alternates are accepted. The bidder's authorized representative must sign and date the form, certifying company name and authorization to submit the bid. No specific pricing amounts, response deadlines, or award dates are indicated in this particular form document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Colorado Department of Corrections |
| TextInput.173: EMP26-002 / FCF Grease Interceptor |
| TextInput: |
| AA1: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: New 6" concrete slab around new tanks |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: Sheet 2 |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .