This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Colorado Department of Corrections project EMP26-002 / FCF Grease Interceptor. The form provides a standardized template for bidders to submit pricing for optional project modifications. One additive alternate has been specified: A.A.1 for a new 6" concrete slab around new tanks, referenced in Sheet 2 of the project specifications. The form accommodates up to ten additive alternates and ten deductive alternates, though only the single additive alternate has been populated in this instance. Bidders must understand that additive and deductive alternates are mutually exclusive—only one category may be used in any given bid submission.

The form requires bidders to reference the Instructions to Bidders (SBP-6.12) for comprehensive alternate information and the contract documents for thorough descriptions of each alternate. Pricing for the specified alternate must be entered on the form, and the base bid will be modified accordingly if alternates are accepted. The bidder's authorized representative must sign and date the form, certifying company name and authorization to submit the bid. No specific pricing amounts, response deadlines, or award dates are indicated in this particular form document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.131

Rev 7/2025 R1

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID ALTERNATES

Institution or Agency:

Project No./Project Name:

INSTRUCTIONS:

1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.

2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.

3. Refer to the contract documents for thorough description(s) of the alternates.

4. If alternates are accepted, the base bid will be modified by the amount entered below.

ADDITIVE ALTERNATES

Alt. # Description of Additive Alternate Spec. Section Pricing

A.A.1 $

A.A.2 $

A.A.3 $

A.A.4 $

A.A.5 $

A.A.6 $

A.A.7 $

A.A.8 $

A.A.9 $

A.A.10 $ lanexxTX Line lanexxTX Line

SBP-6.131

Rev 7/2025 R1

DEDUCTIVE ALTERNATES

Alt. # Description of Deductive Alternate Spec. Section Pricing

D.A.1

D.A.2 $

D.A.3 $

D.A.4 $

D.A.5 $

D.A.6 $

D.A.7 $

D.A.8 $

D.A.9 $

D.A.10 $

THE BIDDER

BY_________________________________________________________________

Company Name

BY__________________________________________________________________

Signature Date

BID ALTERNATES
INSTRUCTIONS:
ADDITIVE ALTERNATES
DEDUCTIVE ALTERNATES
THE BIDDER
TextInput.127: Colorado Department of Corrections
TextInput.173: EMP26-002 / FCF Grease Interceptor
TextInput:
AA1:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1: New 6" concrete slab around new tanks
AA1S:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1: Sheet 2
AA1P:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
DA1:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1S:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1P:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:

Company Name:

File details come from the government source that posted it. Updated .