Attachment_2a_Pricing_Spreadsheet.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 75R60226R00026
About this file
This is a pricing spreadsheet template for the HRSA/MCHB Newborn Screening Systematic Evidence Review IDIQ and Task Order 1 solicitation (75R60226R00026). The template consists of four integrated worksheets designed for offerors to submit firm-fixed-price (FFP) proposals for both the Master IDIQ contract and concurrent Task Order 1. All prices must be firm-fixed and fully burdened, with no alternative payment structures, unrequested costs, or conditional logic permitted. Other Direct Costs (ODCs) are excluded, with database, library, and journal access fees required to be incorporated within standard corporate overhead or labor rates. Travel costs are pre-populated at a fixed Government Not-To-Exceed (NTE) amount of $35,000.00 per year across all five contract periods (Base Year plus four Option Years), totaling $175,000.00.
The Master IDIQ section requires offerors to propose binding maximum labor rates for nine defined labor categories including Project Manager/Director, Principal Investigator/Senior SME, Senior Medical Officer/Clinician, Senior Epidemiologist/Methodologist, Health Economist, Systematic Reviewer/Research Analyst, OMB/PRA Regulatory Specialist, Scientific Writer/Editor, Section 508 Compliance Specialist, and Meeting Coordinator/Logistical Support. Task Order 1 pricing is structured as FFP deliverables mapped to the Statement of Work, including records management training, clinical evidence review reports, consumer-friendly summaries, frameworks and procedures manuals, evidence scans, systematic reviews with economic analysis, compliance tracking reports, and AI risk management plans. Three optional tasks (Policy & Research Briefs, SME/Family Meeting Convenings, and Journal Supplement Preparation) are priced separately for exercise on an as-needed basis. Offerors must complete labor basis of estimate mapping to justify pricing realism by breaking down estimated hours by labor category, with all rates corresponding to the Master IDIQ ceiling rates.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary & Instructions
| Attachment 2a - Pricing Spreadsheet Template |
| Combined Synopsis/Solicitation for Master IDIQ & First Task Order |
MCHB IDIQ Solicitation #75R60226R00026
| Instructions for Offerors: | ||||||
| 1. This pricing template consists of four (4) integrated worksheets. With the exception of the travel costs, which is prepopulated and hard coded into summary, this excel sheet may be adapted to your labor rates to meet the defined tasks. | ||||||
| 2. All prices must be firm-fixed-price (FFP). Alternative payment milestones, unrequested costs, or conditional logic will render the proposal non-responsive. | ||||||
| 3. Other Direct Costs (ODCs) are excluded. Database, library, or journal access fees must be accounted for within standard corporate overhead or labor rates. | ||||||
| 4. Travel costs must utilize the fixed Government Not-To-Exceed (NTE) plug number of $35,000.00 per year, pre-populated in this summary tab. | ||||||
| 5. Highlighted cells indicate input requirements. Ensure formulas in the Summary tab are linking correctly to your proposed details. | ||||||
| VOLUME III - PRICE PROPOSAL SUMMARY | ||||||
| Contract Line Item / Pricing Element | Base Year Price | Option Period 1 Price | Option Period 2 Price | Option Period 3 Price | Option Period 4 Price | Total Proposed Price |
| Task Order 1 Core Requirements (Tasks 1-8) | $0.00 | $0.00 | N/A | N/A | N/A | $0.00 |
| Optional Task 1: Reports & Toolkits | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Optional Task 2: SME/Family Meeting Convenings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Optional Task 3: Journal Supplement & Manuscript Prep | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| NON LABOR TOTAL: Government Pre-Populated Reimbursable Travel NTE | $35,000.00 | $35,000.00 | $35,000.00 | $35,000.00 | $35,000.00 | $175,000.00 |
| TOTAL EVALUATED PRICE FOR CONTRACT | $35,000.00 | $35,000.00 | $35,000.00 | $35,000.00 | $35,000.00 | $175,000.00 |
Master IDIQ Labor Schedule
| PART A: MASTER IDIQ CEILING LABOR RATE MATRIX | |||||
| Offerors must provide fully burdened labor rates for all categories below. These act as binding ceilings for future FFP Task Orders. | |||||
| Proposed Labor Category (LCAT) | Base Year Max Rate | Option Year 1 Max Rate | Option Year 2 Max Rate | Option Year 3 Max Rate | Option Year 4 Max Rate |
| Project Manager / Director/Program Manager/Centralized PM Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Principal Investigator (PI) / Senior SME | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Medical Officer/Clinician | |||||
| Senior Epidemiologist / Methodologist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Health Economist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systematic Reviewer/Research Analyst / Data Extractor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OMB / PRA Regulatory Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Scientific Writer / Editor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Section 508 Compliance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Meeting Coordinator / Logistical Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
TO1 FFP Schedule
| PART B: TASK ORDER 1 FIRM-FIXED-PRICE SCHEDULE | |||||||
| Milestone/Deliverable fixed prices mapped strictly to the SOW deliverables chart. | |||||||
| PWS Task Ref | Deliverable Description | Unit | Est. Qty | Base Unit FFP | Base Total FFP | OPY1 Unit FFP | OPY1 Total FFP |
| Task 1 & 2 | Records Management Training Certs & Monthly/Quarterly PM Progress Reports | Month | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 3 | Clinical Evidence Review Report: Nominated Candidate Condition (Draft & Final) | Lot | 1 | $0.00 | $0.00 | ||
| Task 3 | Consumer-Friendly Summary Report (8th Grade Level, Max 12 pages) | Lot | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 4 | Framework/Manual of Procedures (MOP) for Multi-Condition Review | Lot | 1 | $0.00 | $0.00 | ||
| Task 4 | Accompanying MOP Training Materials for Review Teams/Panels | Lot | 1 | $0.00 | $0.00 | ||
| Task 5 | Evidence Scans & Summaries for Candidate Conditions (10-15 conditions) | Lot | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 6 | Simultaneous Systematic Evidence Reviews & Economic Analysis (Up to 10 conditions) | Lot | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 6 | Consumer-Friendly Summaries per individual reviewed condition | Each | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 7 | Information Security & Physical Access Compliance Tracking Reports | Lot | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task 8 | AI Compliance and Risk Management Plan (Prior to implementation) | Lot | 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBTOTAL TASK ORDER 1 CORE TASKS (1-8) | $0.00 | $0.00 | |||||
| OPTIONAL TASKS - EXERCISED ON AN AS-NEEDED BASIS | |||||||
| Opt Task 1 | Policy & Research Briefs, Toolkits, Reports to Congress (with visualizations) | Lot | 1 | N/A | N/A | $0.00 | $0.00 |
| Opt Task 2 | SME, Families, Lived Experience Meetings & Hybrid Convening Logistics | Lot | 1 | N/A | N/A | $0.00 | $0.00 |
| Opt Task 3 | Preparation of Peer-Reviewed Journal Supplement / Manuscript Support | Lot | 1 | N/A | N/A | $0.00 | $0.00 |
| (Hardcoded Travel NTE is included on the first tab of this spreadsheet) |
TO1 Labor BOE Mapping
| TASK ORDER 1 LABOR BASIS OF ESTIMATE (BOE) MAPPING | ||||
| Offerors must break down estimated hours by LCAT to justify realism. Rates must correspond to Part A master ceilings. | ||||
| SOW Task / Component Link | Proposed IDIQ Labor Category (LCAT) | Base Year Hours | Master LCAT Rate Link | Calculated Base Cost |
| Tasks 1, 4, 5.1 Manual of Procedures (MOP) and Protocol Tasks | 0 | 0 | $0.00 | |
| Task 5: Evidence Scans and Summaries | 0 | 0 | $0.00 | |
| Task 6: Systematic RUSP Reviews | 0 | 0 | $0.00 | |
| Tasks 2, 7, 8: Project Management and compliance | 0 | 0 | $0.00 | |
| 0 | 0 | $0.00 | ||
| 0 | 0 | $0.00 | ||
| 0 | 0 | $0.00 | ||
| 0 | 0 | $0.00 | ||
| TOTAL CALCULATED CORE LABOR COST | $0.00 |
File details come from the government source that posted it. Updated .