Attachment_2a_Pricing_Template-A1.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
HRSA/MCHB Newborn Screening Systematic Evidence Review IDIQ and Task Order 1
Solicitation number
75R60226R00026
Issued by

About this file

This is a Pricing Template (Attachment 2a) for the HRSA/MCHB Newborn Screening Systematic Evidence Review IDIQ Solicitation #75R60226R00026. The template establishes the pricing structure for both the master IDIQ contract ceiling rates and the concurrent Task Order 1 firm-fixed-price deliverables.

The template requires offerors to submit all pricing on a firm-fixed-price (FFP) basis with no alternative payment milestones or conditional logic permitted. Part A establishes maximum hourly labor rate ceilings across five labor categories (Project Manager/Director, Principal Investigator/Senior SME, Senior Medical Officer/Clinician, Senior Epidemiologist/Methodologist, Health Economist, Systematic Reviewer/Research Analyst, OMB/PRA Regulatory Specialist, Scientific Writer/Editor, Section 508 Compliance Specialist, and Meeting Coordinator/Logistical Support) that serve as binding ceilings for the entire five-year IDIQ life. Part B details Task Order 1 firm-fixed-price deliverables mapped to Statement of Work requirements, including Records Management Training Certificates, Clinical Evidence Review Reports, Consumer-Friendly Summaries, Framework/Manual of Procedures, Evidence Scans and Summaries, Systematic Evidence Reviews and Economic Analysis, Compliance Tracking Reports, and AI Compliance Plans. The Government pre-populates a fixed Reimbursable Travel Not-To-Exceed of $35,000 annually for Base Year and Option Period 1 only; Option Periods 2-4 are locked to N/A. Part C requires offerors to break down labor hours by category to justify cost realism. The template notes that Task 6 Consumer-Friendly Summaries require a unit price per summary multiplied by 10 total summaries, and all operational costs must be fully incorporated into labor rates with no separate Other Direct Costs permitted.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Volume III - Price Summary

VOLUME III - PRICE PROPOSAL SUMMARY
MCHB IDIQ Solicitation #75R60226R00026 - Amended Template
Instructions for Offerors:
1. All prices must be firm-fixed-price (FFP). Alternative payment milestones or conditional logic will render the proposal non-responsive.
2. Other Direct Costs (ODCs) are strictly excluded. All operational costs (honoraria, platforms, etc.) must be fully built into labor rates.
3. Reimbursable Travel utilize the fixed Government Not-To-Exceed (NTE) plug number of $35,000.00 per year.
4. Yellow highlighted cells indicate required input areas. Gray cells indicate N/A or formula-driven results.
5. Offerors shall note that the Government Pre-Populated Reimbursable Travel NTE applies strictly to the active execution periods of Task Order 1 (Base Year and Option Period 1). Option Periods 2 through 4 have been hard-locked to N/A for Travel to accurately calculate the 2-year TEP for Task Order 1."
6. For Task 6 Consumer-Friendly Summaries, offerors must provide a unit price per summary ('Base Unit FFP') that multiplies out to the total lot quantity of 10 ('Base Total FFP') to align with the overarching Task 6 capacity lot model.
Contract Line Item / Pricing ElementBase Year PriceOption Period 1 PriceOption Period 2 PriceOption Period 3 PriceOption Period 4 PriceTotal Proposed Price
Task Order 1 Core Requirements (Tasks 1-7)$0.00$0.00N/AN/AN/A$0.00
Optional Task 1: Policy & Research Briefs / ToolkitsN/A$0.00N/AN/AN/A$0.00
Optional Task 2: SME/Family Meeting ConveningsN/A$0.00N/AN/AN/A$0.00
Optional Task 3: Journal Supplement & Manuscript PrepN/A$0.00N/AN/AN/A$0.00
Government Pre-Populated Reimbursable Travel NTE$35,000.00$35,000.00NANANA$70,000.00
TOTAL EVALUATED PRICE FOR CONTRACT$35,000.00$35,000.00$0.00$0.00$0.00$70,000.00

Part A - IDIQ Labor Schedule

PART A: MASTER IDIQ CEILING LABOR RATE MATRIX
Offerors must provide fully burdened maximum hourly labor rates. These act as binding ceilings for the 5-year life of the IDIQ.
Proposed Labor Category (LCAT)Base Year Max RateOption Year 1 Max RateOption Year 2 Max RateOption Year 3 Max RateOption Year 4 Max Rate
Project Manager / Director / Program Manager / Centralized PM Specialist
Principal Investigator (PI) / Senior SME
Senior Medical Officer / Clinician
Senior Epidemiologist / Methodologist
Health Economist
Systematic Reviewer / Research Analyst / Data Extractor
OMB / PRA Regulatory Specialist
Scientific Writer / Editor
Section 508 Compliance Specialist
Meeting Coordinator / Logistical Support

Part B - TO1 FFP Schedule

PART B: TASK ORDER 1 FIRM-FIXED-PRICE SCHEDULE
Milestone/Deliverable fixed prices mapped strictly to the SOW deliverables chart.
PWS Task RefDeliverable DescriptionUnitEst. QtyBase Unit FFPBase Total FFPOPY1 Unit FFPOPY1 Total FFP
Task 1 & 2Records Management Training Certs & Monthly/Quarterly PM Progress ReportsMonth12$0.00$0.00
Task 3Clinical Evidence Review Report: Nominated Candidate Condition (Draft & Final)Lot1$0.00N/AN/A
Task 3Consumer-Friendly Summary Report (8th Grade Level, Max 12 pages)Lot1$0.00$0.00
Task 4Framework/Manual of Procedures (MOP) for Multi-Condition ReviewLot1$0.00N/AN/A
Task 4Accompanying MOP Training Materials for Review Teams/PanelsLot1$0.00N/AN/A
Task 5Evidence Scans & Summaries for Candidate Conditions (10-15 conditions)Lot1$0.00$0.00
Task 6Simultaneous Systematic Evidence Reviews & Economic Analysis (Up to 10 conditions Lot)LOT1$0.00$0.00
Task 6Consumer-Friendly Summaries per individual reviewed conditionLot10$0.00$0.00
Task 7Information Security & Physical Access Compliance Tracking ReportsLot1$0.00$0.00
AI Compliance and Risk Management Plan (Post-Award Deliverable)Lot1N/AN/AN/AN/A
SUBTOTAL TASK ORDER 1 CORE TASKS (1-7)$0.00$0.00
OPTIONAL TASKS - EXERCISED ON AN AS-NEEDED BASIS
Opt Task 1Policy & Research Briefs, Toolkits, Reports to Congress (with visualizations)Lot1N/AN/A$0.00
Opt Task 2SME, Families, Lived Experience Meetings & Hybrid Convening LogisticsLot1N/AN/A$0.00
Opt Task 3Preparation of Peer-Reviewed Journal Supplement / Manuscript SupportLot1N/AN/A$0.00

Part C - TO1 Labor BOE Mapping

TASK ORDER 1 LABOR BASIS OF ESTIMATE (BOE) MAPPING
Offerors must break down hours by LCAT to justify realism. Formulas link back to Part A ceiling rates.
SOW Task / Component LinkProposed IDIQ Labor Category (LCAT)Base Year HoursMaster LCAT Rate LinkCalculated Base Cost
Tasks 1, 4, 5.1 Manual of Procedures (MOP) and Protocol TasksSelect Category...$0.00$0.00
Task 5: Evidence Scans and SummariesSelect Category...$0.00$0.00
Task 6: Systematic RUSP ReviewsSelect Category...$0.00$0.00
Tasks 2, 7: Project Management and complianceSelect Category...$0.00$0.00
TOTAL CALCULATED CORE LABOR COST0$0.00

File details come from the government source that posted it. Updated .