Attachment 27 Submittal Form ENG 4025 Example.pdf

PDF 81 KB Posted

Attached to
McChord Field Outrigger Installation Federal contract opportunity
Solicitation number
W911S825BA017
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

The document is an ENG Form 4025-R, a Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer's Certificates of Compliance for an Airfield Fence & Security Measures project. The form includes 10 submittal items requiring contractor review and government approval, with submittal type codes ranging from SD-01 (Preconstruction) to SD-11 (Closeout). The specific items to be submitted include the Project Schedule, QC designation, submittal log, outriggers and certifications, item samples, closeout documents, shop drawings, hazardous material documentation, permit copies, and additional items as requested by the government. The form provides detailed instructions for completing the transmittal, including guidance on numbering, submittal types, and action codes for review and approval.

View the file

Other files for this federal contract opportunity

Other files attached to McChord Field Outrigger Installation, newest first.
File Type Posted
Attachment 2 Picture 1.png PNG image
Attachment 5 Picture 4.png PNG image
Attachment 11 Picture 10.png PNG image
Attachment 13 Picture 12.png PNG image
Attachment 23 Drawing 13A.pdf PDF
Attachment 29 ER 415-1-10 Contractor Submittal Procedures.pdf PDF
Attachment 30 Example NOI Form.pdf PDF
Site Visit Instructions.docx DOCX document
Attachment 1-Mcchord Airfield Map.png PNG image
Attachment 4 Picture 3.png PNG image
Attachment 9 Picture 8.png PNG image
Attachment 12 Picture 11.png PNG image
Attachment 14 Picture 13.png PNG image
Attachment 19 Picture 18.png PNG image
Attachment 21 Picture 20.png PNG image
WD WA20250111 Dated 6 Jun 2025.pdf PDF
Solicitation - W911S825BA017.pdf PDF
Attachment 6 Picture 5.png PNG image
Attachment 7 Picture 6.png PNG image
Attachment 8 Picture 7.png PNG image
Attachment 15 Picture 14.png PNG image
Attachment 17 Picture 16.png PNG image
Attachment 18 Picture 17.png PNG image
Attachment 20 Picture 19.png PNG image
Attachment 22 Picture 21.png PNG image
Attachment 24 Drawing 12A.docx DOCX document
Attachment 25 Daily Contractor Quality Control Inspection Report.docx DOCX document
SOW McChord Field Outriggers_ 6 Jun 2025 Rev 1.docx DOCX document
Attachment 3 Picture 2.png PNG image
Attachment 10 Picture 9.png PNG image
Attachment 16 Picture 15.png PNG image
Attachment 26 Submittal Form ENG 4025.pdf PDF
Attachment 28 Submittal Procedures Reference UFGS 01 33 00.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a. i.c. d. e. f. g. h.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)

REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.ENG FORM 4025-R, MAR 2012

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted on drawings. Resubmission not required.

C -- Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025-R, MAR 2012

Page of

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

ITEM

NO.

(See Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation (See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a.

i.

c.

d.

e.

f.

g.

h.

b.

CONTRACT DOCUMENT

REFERENCE

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.

ENG FORM 4025-R, MAR 2012

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted. B -- Approved, except as noted on drawings. Resubmission not required. C -- Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D -- Will be returned by separate correspondence. E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts) R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025-R, MAR 2012

1.0 darwin.chen@usace.army.mil 2012-03-27 Forms Design Team Darwin Chen

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

2012-03-29

CurrentPage:
PageCount:
No1_DateTime:
No2_Transmittal: REQ'D
No3_To: REQ'D
No8_Pro_Title: Airfield Fence & Security Measures
No7_Specification: REQ'D
No4_From: REQ'D
No5_Cont_No: REQ"D
No6a_CheckBox: 0
No6b_CheckBox: 0
No6_Transmittal: REQ"D
No9a_CheckBox: 0
No9b_CheckBox: 0
No9c_CheckBox: 0
No9d_CheckBox: 0
No9e_CheckBox: 0
No9f_CheckBox: 0
ITEM NO. (See Note 3): 1
ITEM NO. (See Note 3): 10
ITEM NO. (See Note 3): 9
ITEM NO. (See Note 3): 8
ITEM NO. (See Note 3): 7
ITEM NO. (See Note 3): 6
ITEM NO. (See Note 3): 5
ITEM NO. (See Note 3): 4
ITEM NO. (See Note 3): 3
ITEM NO. (See Note 3): 2
DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Project Schedule

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): As Requested by Gov't

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Copies of Permits (Dig, Hot Work,any others)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Hazardous material and HJB form

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Shop dwg of wall Outrigger and attachment plate

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Closeout Documents

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Item Samples

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Outriggers and item information and cerifications

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): Filled in submittal Log ENG 4025-R

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.): QC designation by Contractor

SUBMITTAL TYPE CODE (See Note 8): SD-01
SUBMITTAL TYPE CODE (See Note 8): SD-07
SUBMITTAL TYPE CODE (See Note 8): SD-05
SUBMITTAL TYPE CODE (See Note 8): SD-02
SUBMITTAL TYPE CODE (See Note 8): SD-11
SUBMITTAL TYPE CODE (See Note 8): SD-03
SUBMITTAL TYPE CODE (See Note 8): SD-07
SUBMITTAL TYPE CODE (See Note 8): SD-01
SUBMITTAL TYPE CODE (See Note 8): SD-01
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
NO. OF COPIES: PDF
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
SPEC. PARA. NO.: REQ'd
DRAWING SHEET NO. :
CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

CONTRACTOR REVIEW CODE

: REQ'd

VARIATION Enter "Y" if requesting a variation (See Note 6):
USACE ACTION CODE (Note 9) :
Remarks: By Government

See sheet 2 for further information

ATTACHMENT #27 Example Submittal Form Filled in

Contractor_Name: REQ"D
Contractor_Signature:
Authority_Name: Government
Authority_Signature:
Authority_DateTime:
Enclosures: Government

File details come from the government source that posted it. Updated .