This document is an engineering drawing (Attachment 24 Drawing 12A) detailing a double swing gate design for a UFC (Unified Facilities Criteria) standard, dated 1 October 2013. The drawing provides a typical configuration for existing gates and corner posts, specifically showing installation instructions for double outriggers with six-strand barbed wire post caps. The drawing is part of the McChord Field Outrigger Installation solicitation (W911S825BA017) issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Joint Base Lewis-McChord.
The related solicitation indicates a firm fixed-price contract will be awarded based on the lowest reasonable and realistic price. The contract will have a base bid item (CLIN 0001AA) and an additive item (CLIN 0001AB), with the government intending to award both CLINs if funding permits. The award methodology prioritizes the lowest aggregate bid that provides the most features within available funds, targeting a responsive and responsible offeror who can best meet the government's gate installation and security enhancement requirements.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 3-5: Double Swing Gate
UFC 4-022-03
Attachment 24: Drawing 12A
Typical for all swing gates.
Example only for existing gates and corner posts to accept double outriggers with six strand barbed wire.
1 October 2013Install Double Outriggers with barbed wire for post caps (typ.)
image1.png image2.png