About this file

This document is a Daily Contractor Quality Control Inspection Report template designed for tracking daily contract work progress and compliance. The template is specifically associated with the McChord Field Outrigger Installation contract (Solicitation Number: W911S825BA017) issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Joint Base Lewis-McChord. The comprehensive form includes sections for documenting contract details, work performed, equipment usage, worker count, contractor instructions, difficulties encountered, safety observations, and various approval signatures. The form is intended to provide a structured method for contractors to record daily work activities, track project progress, and ensure quality control and compliance with contract specifications.

View the file

Other files for this federal contract opportunity

Other files attached to McChord Field Outrigger Installation, newest first.
File Type Posted
Attachment 1-Mcchord Airfield Map.png PNG image
Attachment 4 Picture 3.png PNG image
Attachment 9 Picture 8.png PNG image
Attachment 12 Picture 11.png PNG image
Attachment 14 Picture 13.png PNG image
Attachment 19 Picture 18.png PNG image
Attachment 21 Picture 20.png PNG image
WD WA20250111 Dated 6 Jun 2025.pdf PDF
Attachment 2 Picture 1.png PNG image
Attachment 5 Picture 4.png PNG image
Attachment 11 Picture 10.png PNG image
Attachment 13 Picture 12.png PNG image
Attachment 23 Drawing 13A.pdf PDF
Attachment 29 ER 415-1-10 Contractor Submittal Procedures.pdf PDF
Attachment 30 Example NOI Form.pdf PDF
Site Visit Instructions.docx DOCX document
Solicitation - W911S825BA017.pdf PDF
Attachment 6 Picture 5.png PNG image
Attachment 7 Picture 6.png PNG image
Attachment 8 Picture 7.png PNG image
Attachment 15 Picture 14.png PNG image
Attachment 17 Picture 16.png PNG image
Attachment 18 Picture 17.png PNG image
Attachment 20 Picture 19.png PNG image
Attachment 22 Picture 21.png PNG image
Attachment 24 Drawing 12A.docx DOCX document
Attachment 27 Submittal Form ENG 4025 Example.pdf PDF
SOW McChord Field Outriggers_ 6 Jun 2025 Rev 1.docx DOCX document
Attachment 3 Picture 2.png PNG image
Attachment 10 Picture 9.png PNG image
Attachment 16 Picture 15.png PNG image
Attachment 26 Submittal Form ENG 4025.pdf PDF
Attachment 28 Submittal Procedures Reference UFGS 01 33 00.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT NUMBER

3. ABBREVIATED CONTRACT NAME
4. NAME OF CONTRACTOR (COMPANY NAME)

2. SPECIFICATION NUMBER

5. NOTICE TO PROCEED DATE
7. WEATHER AND TEMPERATURE
AM
PM

6. ACTUAL DATE STARTED

8a. CONTRACTOR DESCRIBE WORK BEING PERFORMED (INCLUDE LOCATION OF WORK)

Total Hrs Work Performed

Equipment DataOwned/RentedHours UsedHours Standby
0.0
HRS THIS DATE

PREVIOUS HRS

0.0
TOTAL HOURS

8b. NUMBER OF WORKERS ON JOB 8c. NAME OF CONTRACTOR'S REPRESENTATIVE

9. CONTRACTOR INSTRUCTIONS GIVEN/RECEIVED (i.e materials received, off site activities, three phase meetings-inspections)

10. CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED (INCLUDE DELAYS, DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, CORRECTIVE ACTIONS Etc.)

11.GOVERNMENT REPRESENTATIVE COMMENTS (comments to items 8,9, and 10) Was site inspection performed of any work? Yes Date of inspection. No NA

12. SAFETY OBSERVATIONS

Contractor Verification: The above report is complete and correct. All material, equipment used, and work performed during this reporting period are in compliance with the contract documents except as noted above.

13. CONTRACT COMPLETION DATE
14. PERCENT COMPLETE
15. QUALITY CONTROL SIGNATURE AND DATE

16. QUALITY ASSURANCE SIGNATURE AND DATE

17. PROJECT MANAGER REVIEW

18. CONTRACTING ADMINISTRATOR'S SIGNATURE AND DATE
19. DATE OF REPORT (S)
20. REPORT SERIAL NUMBER

DAILY CONTRACT INSPECTION REPORT Attachment #25