About this file

This is an Addendum No. 2 to the Construction Documents for Project No. 546-22-110, issued January 31, 2025, by Above Group, Inc. for the construction of a new boiler building and controls in the old incinerator area with graphic control expansion/move at Building No. 44, VAMC Miami, FL.

The addendum modifies specifications and drawings across multiple disciplines. In specifications, Section 09 91 00 (Painting) was added to the Table of Contents, and Sections 23 21 13 (Hydronic Piping) and 23 22 13 (Steam and Condensate Piping) were revised to change ASTM Standard references from A307 to A193 bolts per VHA Memorandum dated December 13, 2024. Drawing revisions address the relocation of the temporary boiler plant and include additions and modifications across Civil (three new sheets: CS-023, CS-103, CS-602), Architecture (revised temporary boiler plant location and security measures on G201; added existing louver elevation on A201), Structural (revised temporary boiler plant location on SB101), Mechanical (ten drawings revised or added to reflect relocated temporary boiler plant siting, utility coordination, piping isometrics, P&IDs, and phased work sequences), and Electrical (revised electrical requirements on E-004 including site lighting, added fixture F1 on E-801, and updated Panelboard 44-TEMP BOILER on E-802). All other contract document conditions remain unchanged.

View the file

Other files

File Type Posted
ATTACHMENT 2 - EMR.pdf PDF
ATTACHMENT 6 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
ATTACHMENT 7 - Site Map.pdf PDF
ATTACHMENT 10 - Drawings 3 of 3.pdf PDF
ATTACHMENT 11 - Site Specific Health and Safety Plan For Contaminated Soil Contact.pdf PDF
ATTACHMENT 14 Yarway BlowOff Valve.pdf PDF
ATTACHMENT 23 Addendum 1 Section 232300 Refrigerant Piping.pdf PDF
ATTACHMENT 25 Addendum 1 Section 232113 Hydronic Pumps.pdf PDF
ATTACHMENT 30 VHA Master Specifications.pdf PDF
ATTACHMENT 33 - Boiler Safety Device Interim Safety Measure Form.pdf PDF
ATTACHMENT 34 - Miami Main Boiler Semi Annual Safety Device Testing Documentation.pdf PDF
ATTACHMENT 35 - Common and Emergency Parts Inventory Recommendation and Tracking Sheet.pdf PDF
ATTACHMENT 36 C - SARGENT 10X Line Catalog.pdf PDF
S02 - 36C24826R0090 - 03302026.pdf PDF
ATTACHMENT 1 - Wage Determination.pdf PDF
ATTACHMENT 4 - Past Performance Forms.pdf PDF
ATTACHMENT 8 - Drawings 1 of 3.pdf PDF
ATTACHMENT 9 - Drawings 2 of 3.pdf PDF
ATTACHMENT 16 - Physical Security Resiliency Design Manual - PSRDM.pdf PDF
ATTACHMENT 18 Addendum 1 Section 238216 Air Coils.pdf PDF
ATTACHMENT 20 Addendum 1 Section 238123 ComputerRoom AirConditioners.pdf PDF
ATTACHMENT 26 Addendum 1 Section 223500 Domestic Water Heat Exchangers.pdf PDF
ATTACHMENT 29 Addendum 2 Drawings.pdf PDF
ATTACHMENT 31 Section 099100 Painting.pdf PDF
ATTACHMENT 36 A - Electronic Key Project 546-23-106 Specs.pdf PDF
ATTACHMENT 36 B - SARGENT 10X Line Sell Sheet.pdf PDF
ATTACHMENT 37 - PCRA.pdf PDF
ATTACHMENT 3 - Specialized Experience Form.pdf PDF
ATTACHMENT 5 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 12 - Soil Management and Dust Control Plan.pdf PDF
ATTACHMENT 15 Architectural Narrative.pdf PDF
ATTACHMENT 17 Addendum 1.pdf PDF
ATTACHMENT 21 Addendum 1 Section 237300 Indoor Central Station Air Handling Units.pdf PDF
ATTACHMENT 28 Addendum 2 Section 232213 Steam and Condensate Heating Piping.pdf PDF
ATTACHMENT 38 - ICRA.pdf PDF
ATTACHMENT 13 - First Quarterly Groundwater Monitoring Report.pdf PDF
ATTACHMENT 19 Addendum 1 Section 238200 Convection Heating and Cooling Units.pdf PDF
ATTACHMENT 22 Addendum 1 Section 234000 HVAC Air Cleaning Devices.pdf PDF
ATTACHMENT 24 Addendum 1 Section 232113 Hydronic Piping.pdf PDF
Attachment 32 - DERM Letter.pdf PDF
ATTACHMENT 36 D - Medeco CLIQ Brochure.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT A NEW BOILER BUILDING AND CONTROLS

IN THE OLD INCENERATOR AREA EXPAND/MOVE

GRAPHIC CONTROL

BUILDING NO. 44

VAMC MIAMI, FL PROJECT NO. 546-22-110

Above Group, Inc. Page 1 of 2

ADDENDUM NO. 2

to the

CONSTRUCTION DOCUMENTS

January 31, 2025

General The following changes, additions or deletions shall be made to the following Contract Documents. All other conditions shall remain the same.

I. SPECIFICATIONS

A. SECTION 00 01 10 – TABLE OF CONTENTS: Updated to include 09 91 00 Painting section.

B. SECTION 09 91 00 – PAINTING: ADDED Section.

C. SECTION 23 21 13 – HYDRONIC PIPING – REVISED ASTM Standard reference from A307 to

A193 per VHA Memorandum “Requirements for Identification and Replacement of A307 Bolts on Steam and Hot Water Piping Systems” issued December 13, 2024.

D. SECTION 23 22 13 – STEAM AND CONDENSATE PIPING – REVISED ASTM Standard reference from A307 to A193 per VHA Memorandum “Requirements for Identification and Replacement of A307 Bolts on Steam and Hot Water Piping Systems” issued December 13, 2024.

II. DRAWINGS

CIVIL

A. CS-023 – ADDED Existing Conditions sheet.

B. CS-103 – ADDED Site Plan sheet.

C. CS-602 – ADDED Site Details sheet.

ARCHITECTURE

A. G201 – REVISED temporary boiler plant location.

• REVISED security measures.

B. A201 – ADDED existing louver elevation.

STRUCTURAL

D. SB101 – REVISED temporary boiler plant location.

MECHANICAL

A. M-004 – Relocated Temporary Boiler Plant siting and adjusted/modified/coordinated utilities to new location.

B. M-005 - Relocated Temporary Boiler Plant siting and adjusted/modified/coordinated utilities to new location.

C. M-006 – Revised Sections (1) and (2) relative to the new temporary boiler plant location.

D. M-007 – Revised 3D VIEWS (1) and (2) relative to the new temporary boiler plant location.

E. M-008 - Revised PIPING ISOMETRIC relative to the new temporary boiler plant location.

F. MD301 – Revised phased work associated with temporary boiler plant connections and existing boiler plant piping routing.

G. MD401 – Revised phased work associated with temporary boiler plant connections and existing boiler plant piping routing.

CONSTRUCT A NEW BOILER BUILDING AND CONTROLS

IN THE OLD INCENERATOR AREA EXPAND/MOVE

GRAPHIC CONTROL

BUILDING NO. 44

VAMC MIAMI, FL PROJECT NO. 546-22-110

Above Group, Inc. Page 2 of 2

H. MD601A – Revised P&ID phased work associated with temporary boiler plant connections and existing boiler plant piping routing.

I. MD601B – Revised P&ID phased work associated with temporary boiler plant connections and existing boiler plant piping routing. Existing steam vent silencer and several connections are existing to remain.

J. MP114 – Revised steam and condensate piping scope of work relative to temporary plant relocation.

K. MP115 – Added steam, condensate, fuel oil, and domestic water pipe routing for connection to temporary plant piping system.

L. MP121 – Added steam condensate and domestic water pipe routing for connection to temporary plant piping system.

M. MP124 – Revised scope to remove temporary boiler piping routing to end of Building 1. Existing boiler piping and condensate piping is existing to remain.

N. M-302 – Revised Building 1 piping work associated with temporary plant connections.

O. M-401 – Revised phased work associated with temporary boiler plant connections and existing boiler plant piping routing.

P. MI602A – Revised P&ID to include piping connectivity to relocated temporary plant.

Q. MI602B – Revised P&ID to include piping connectivity to relocated temporary plant.

R. MI602C – Revised P&ID steam piping to/from temporary boiler plant.

ELECTRICAL

A. E-004 – Revised electrical requirements associated with temporary boiler plant connections and new location. Added site lighting and other related site electrical SOW.

B. E-801 – Added fixture F1.

C. E-802 – Updated Panelboard: 44-TEMP BOILER.

END OF ADDENDUM