Attachment 26_Map Rail Ridge 2026 Planting Unit_50.pdf
PDF 621 KB Posted
- Attached to
- Malheur NF Tree Planting Federal contract opportunity
- Solicitation number
- 1240BK26R0003
- Issued by
- Department of Agriculture Forest Service
About this file
This is a project map for the Rail Ridge Planting 2026 initiative on the Malheur National Forest. Unit 50 encompasses 23 acres designated for reforestation with a target of 195 trees per acre (TPA) at an average spacing of 15x15 feet. The planting specification calls for 100% Ponderosa Pine (PIPO) species composition. The map displays the unit boundaries in green, stream categories (uncategorized, Category 1, Category 2, and Category 4), and road statuses including closed roads, high clearance vehicle routes, and passenger car-suitable roads varying in user comfort levels. Additional features shown include 100-foot and 500-foot contour lines, with the unit located in Township 14 South, Range 28 East, spanning sections 27, 34, and surrounding areas. The map provides spatial context for implementation of the 2026 planting project across the Rail Ridge area of the Malheur National Forest.
View the file
Other files for this federal contract opportunity
Show all 50
Malheur NF Tree Planting has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T 14 S R 28 E
2150060
0 0.150.07 Miles
Rail 26 Planting Units
Stream Category Uncategorized Stream
Category 1 Stream
Category 2 Stream
Category 4 Stream
Road Status
CLOSED ROADS
HIGH CLEARANCE VEHICLES
SUITABLE FOR PASSENGER CARS
MODERATE DEGREE OF USER
COMFORT
HIGH DEGREE OF USER
COMFORT
Interstate
US or State Higway
100 foot contour
500 foot contour
Rail Ridge Planting 2026 - Malheur NF
Target TPA: 195
Average Spacing: 15x15
Species Mix:
UNIT 50 - 23 Acres
PIPO (100%)
File details come from the government source that posted it. Updated .