Attachment 20 Pricing Table Excel Spreadsheet for Price Submission.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- ENTERPRISE HEALTH UNIT SERVICES
- Solicitation number
- 70LGLY26RGLB00001
About this file
This is a Pricing Table Excel Spreadsheet template for price submission related to Enterprise Health Unit Services (EHUS) for the Department of Homeland Security Federal Law Enforcement Training Centers (FLETC) at four locations: Glynco, Georgia; Artesia, New Mexico; Charleston, South Carolina; and Cheltenham, Maryland. The pricing table is structured as a fixed-price, Indefinite Delivery/Indefinite Quantity (ID/IQ) contract with a base performance period of 11 months plus a 1-month phase-in period, followed by four optional one-year extension periods.
The template organizes pricing by Contract Line Items (CLINs) corresponding to each site and performance period. For each site, pricing must be submitted for labor categories including Project Management, Basic Health Services, Work Outside of Regular Hours (Non-Surge), Medicines/Formulary/Lab Work/X-Rays/Equipment Calibrations/Miscellaneous Supplies, Surge Overtime Outside of Basic Hours, and Surge Medicines/Supplies. Offerors must provide detailed cost breakdowns including Direct Labor, Fringe, Overhead percentage and amount, General & Administrative percentage and amount, Materials, Other Direct Costs (ODCs), Subcontractor Costs, Profit percentage and amount, resulting in a Unit Price and Line Item Total for each CLIN. The template includes columns for an associated Labor Breakdown section requiring labor category, Service Contract Act (SCA) Code, Full-Time Equivalents (FTE), Hours, Base Rate, Fringe, Overhead, G&A, Profit, and Fully Burdened Rate. All prices must include escalation for option periods, with wage rate adjustments permissible only for prevailing wage determination changes as required by law. The total contract price sums across all CLINs for the base year and all four option years.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Summary
| CLIN | Description | Quantity | Unit of Issue | Direct Labor ($) | Fringe ($) | OH % | OH ($) | G&A % | G&A ($) | Materials ($) | ODCs ($) | Subcontractor Costs ($) | Profit % | Profit ($) | Unit Price* | Line Item Total ($) | Comments/Notes |
| 0001 LOT I – SITE 1 GLYNCO GA - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||||||||||||
| 0001AA | PROJECT MANAGEMENT | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AB | BASIC GLYNCO HEALTH SERVICES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0001AG | PHASE IN | 1 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002 LOT I – SITE 2 ARTESIA NM - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||||||||||||
| 0002AA | PROJECT MANAGEMENT | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AB | BASIC ARTESIA HEALTH SERVICES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0002AG | PHASE IN | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003 LOT I – SITE 3 CHARLESTON SC - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||||||||||||
| 0003AA | PROJECT MANAGEMENT | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AB | BASIC CHARLESTON HEALTH SERVICES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003AG | PHASE IN | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0004 LOT I – SITE 4 CHELTENHAM MD - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||||||||||||
| 0004AA | PROJECT MANAGEMENT | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0004AB | BASIC CHELTENHAM HEALTH SERVICES | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 0004AC | LAB WORK/X-RAYS (for Medical Surveillance Program (MSP)) | 11 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Base Year Price $ - 0
| CLIN | Description | Quantity | Unit of Issue | Direct Labor ($) | Fringe ($) | OH % | OH ($) | G&A % | G&A ($) | Materials ($) | ODCs ($) | Subcontractor Costs ($) | Profit % | Profit ($) | Unit Price | Line Item Total ($) | Comments/Notes |
| 1001 LOT II – SITE 1 GLYNCO GA - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||||||||||||
| 1001AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1001AB | BASIC GLYNCO HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1001AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1001AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1001AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1001AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002 LOT II – SITE 2 ARTESIA NM - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||||||||||||
| 1002AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002AB | BASIC ARTESIA HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1002AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003 LOT II – SITE 3 CHARLESTON SC - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||||||||||||
| 1003AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003AB | BASIC CHARLESTON HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1003AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1004 LOT II – SITE 4 CHELTENHAM MD - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||||||||||||
| 1004AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1004AB | BASIC CHELTENHAM HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1004AC | LAB WORK/X-RAYS (for Medical Surveillance Program (MSP)) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
**Prices shall include any escalation applied for each option period. Escalation adjustments after award will not be considered with the exception of Wage Rate Adjustments to the prevailing Wage Determination as required by law. Total Option Year 1 Price** $ - 0
| CLIN | Description | Quantity | Unit of Issue | Direct Labor ($) | Fringe ($) | OH % | OH ($) | G&A % | G&A ($) | Materials ($) | ODCs ($) | Subcontractor Costs ($) | Profit % | Profit ($) | Unit Price | Line Item Total ($) | Comments/Notes |
| 2001 LOT III – SITE 1 GLYNCO GA - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||||||||||||
| 2001AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2001AB | BASIC GLYNCO HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2001AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2001AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2001AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2001AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002 LOT III – SITE 2 ARTESIA NM - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||||||||||||
| 2002AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002AB | BASIC ARTESIA HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2002AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003 LOT III – SITE 3 CHARLESTON SC - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||||||||||||
| 2003AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003AB | BASIC CHARLESTON HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2003AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2004 LOT III – SITE 4 CHELTENHAM MD - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||||||||||||
| 2004AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2004AB | BASIC CHELTENHAM HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2004AC | LAB WORK/X-RAYS (for Medical Surveillance Program (MSP)) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
**Prices shall include any escalation applied for each option period. Escalation adjustments after award will not be considered with the exception of Wage Rate Adjustments to the prevailing Wage Determination as required by law. Total Option Year 2 Price** $ - 0
| CLIN | Description | Quantity | Unit of Issue | Direct Labor ($) | Fringe ($) | OH % | OH ($) | G&A % | G&A ($) | Materials ($) | ODCs ($) | Subcontractor Costs ($) | Profit % | Profit ($) | Unit Price | Line Item Total ($) | Comments/Notes |
| 3001 LOT IV – SITE 1 GLYNCO GA - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||||||||||||
| 3001AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3001AB | BASIC GLYNCO HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3001AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3001AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3001AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3001AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002 LOT IV – SITE 2 ARTESIA NM - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||||||||||||
| 3002AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002AB | BASIC ARTESIA HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3002AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003 LOT IV – SITE 3 CHARLESTON SC - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||||||||||||
| 3003AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003AB | BASIC CHARLESTON HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3003AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3004 LOT IV – SITE 4 CHELTENHAM MD - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||||||||||||
| 3004AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3004AB | BASIC CHELTENHAM HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3004AC | LAB WORK/X-RAYS (for Medical Surveillance Program (MSP)) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
**Prices shall include any escalation applied for each option period. Escalation adjustments after award will not be considered with the exception of Wage Rate Adjustments to the prevailing Wage Determination as required by law. Total Option Year 3 Price** $ - 0
| CLIN | Description | Quantity | Unit of Issue | Direct Labor ($) | Fringe ($) | OH % | OH ($) | G&A % | G&A ($) | Materials ($) | ODCs ($) | Subcontractor Costs ($) | Profit % | Profit ($) | Unit Price | Line Item Total ($) | Comments/Notes |
| 4001 LOT V – SITE 1 GLYNCO GA - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||||||||||||
| 4001AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4001AB | BASIC GLYNCO HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4001AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4001AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4001AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4001AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002 LOT V – SITE 2 ARTESIA NM - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||||||||||||
| 4002AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002AB | BASIC ARTESIA HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4002AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003 LOT V – SITE 3 CHARLESTON NM - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||||||||||||
| 4003AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003AB | BASIC CHARLESTON HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003AC | WORK OUTSIDE OF REGULAR HOURS (NON-SURGE) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003AD | MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003AE | SURGE OVERTIME OUTSIDE OF BASIC HOURS | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4003AF | SURGE MEDICINES (FORMULARY), LAB WORK, X-RAYS (for Medical Surveillance Program (MSP)), EQUIPMENT CALIBRATIONS, and MISCELLANEOUS SUPPLIES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4004 LOT V – SITE 4 CHELTENHAM MD - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||||||||||||
| 4004AA | PROJECT MANAGEMENT | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4004AB | BASIC CHELTENHAM HEALTH SERVICES | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4004AC | LAB WORK/X-RAYS (for Medical Surveillance Program (MSP)) | 12 | Month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
**Prices shall include any escalation applied for each option period. Escalation adjustments after award will not be considered with the exception of Wage Rate Adjustments to the prevailing Wage Determination as required by law. Total Option Year 4 Price** $ - 0
*Unit prices and the resulting calculated total for each CLIN shall include all labor, management, supervision, quality, scheduling, safety, and reporting requirements, (including all associated direct and indirect costs). Total Contract Price $ - 0
Labor Breakdown
| CLIN | Labor Category | SCA Code | FTE Hours | Base Rate ($) | Fringe ($) | OH ($) | G&A ($) | Profit ($) | Fully Burdenend Rate ($) | Total ($) | Comments/Notes |
| 0001 LOT I – SITE 1 GLYNCO GA - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 0002 LOT I – SITE 2 ARTESIA NM - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 0003 LOT I – SITE 3 CHARLESTON SC - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 0004 LOT I – SITE 4 CHELTENHAM MD - BASE PERFORMANCE PERIOD INCLUSIVE OF PHASE-IN PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 1001 LOT II – SITE 1 GLYNCO GA - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 1002 LOT II – SITE 2 ARTESIA NM - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 1003 LOT II – SITE 3 CHARLESTON SC - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 1004 LOT II – SITE 4 CHELTENHAM MD - OPTION YEAR ONE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 2001 LOT III – SITE 1 GLYNCO GA - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 2002 LOT III – SITE 2 ARTESIA NM - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 2003 LOT III – SITE 3 CHARLESTON SC - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 2004 LOT III – SITE 4 CHELTENHAM MD - OPTION YEAR TWO PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 3001 LOT IV – SITE 1 GLYNCO GA - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 3002 LOT IV – SITE 2 ARTESIA NM - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 3003 LOT IV – SITE 3 CHARLESTON SC - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 3004 LOT IV – SITE 4 CHELTENHAM MD - OPTION YEAR THREE PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 4001 LOT V – SITE 1 GLYNCO GA - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 4002 LOT V – SITE 2 ARTESIA NM - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 4003 LOT V – SITE 3 CHARLESTON NM - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
| 4004 LOT V – SITE 4 CHELTENHAM MD - OPTION YEAR FOUR PERFORMANCE PERIOD | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0
Total Labor $ - 0
File details come from the government source that posted it. Updated .