AJJY 25-1074M Repair Saipan Dorm B25007
Solicitation number
FA524025R0004
Issued by

About this file

The file "Attachment 2 Project Requirement Price Schedule.docx" is related to a Design-Build construction project for repairing Saipan Dorm B25007 at Andersen Air Force Base, Guam. The solicitation (FA524025R0004) is a Historically Underutilized Business Zone (HUBZone) Small Business set-aside with a project magnitude between $25-$100 million, targeting commercial and institutional building construction under NAICS code 236220.

The comprehensive renovation encompasses full interior and exterior repairs, including floor, wall, and ceiling updates, complete restroom renovation, HVAC and plumbing system replacements, electrical distribution system overhaul, and fire protection improvements. Key project specifications include replacing central chiller plant, air handlers, ductwork, water heaters, and implementing storm drainage improvements. The project has a 865-calendar day performance period, will be awarded as a Firm Fixed Price contract, and requires electronic proposal submission through the Procurement Integrated Enterprise Environment (PIEE) by the solicitation deadline. A mandatory site visit is scheduled for 24 July 2025, and requests for information are due by 7 August 2025.

View the file

Other files

File Type Posted
Attachment 9a Roofing As-BUILTs B25007.pdf PDF
Solicitation Amendment FA524025R00040002 SF 30.pdf PDF
Attachment 1a Updated Statement of Work AJJY 25-1074M Repair Saipan Dorm B25007 08AUG25.pdf PDF
Attachment 9 As-BUILTs B25007.zip ZIP file
RFI Responses - FA524025R0004 Part 2 _Expanded Cell Blocks.pdf PDF
Solicitation Amendment FA524025R00040001 SF 30.pdf PDF
08 Aug 25_RFI Responses - FA524025R0004 Part 2.pdf PDF
07 Aug 25_RFI Responses - FA524025R0004 Part 1.pdf PDF
Attachment 1D AJJY 25-1074M Repair Saipan Dorm B25007 35 pct Dwgs.pdf PDF
Attachment 8 PIEE Proposal Manager Reference Guide.pdf PDF
Attachment 1 Statement of Work AJJY 25-1074M Repair Saipan Dorm B25007.pdf PDF
Attachment 1J Cat Management 4 HVAC Standardization Policy Guidance Memorandums.pdf PDF
Attachment 3 Past Performance Fact Sheet (PPFS).docx DOCX document
Attachment 5 AAFB IFS_27FEB24.pdf PDF
Attachment 7 Common Construction Prevailing Wage Rates_Guam.pdf PDF
Attachment 1A AAFB Contractor Antiterrorism Awareness.pdf PDF
Attachment 1B 36 CES Contractors Builder Inventory Sheet Template.xlsx XLSX spreadsheet
Attachment 1C AJJY 25-1074M Repair Saipan Dorm B25007 Map.pdf PDF
Attachment 1E AJJY 25-1074M Repair Saipan Dorm B25007 35 pct Concept Design.pdf PDF
Attachment 1F 19960111 B25007 Jacobs Asbestos.pdf PDF
Attachment 1I USAF Fire Alarm Panel Approval Memorandum.pdf PDF
Solicitation - FA524025R0004.pdf PDF
Attachment 1G 201307 B25007 Report B Asbestos and Lead Empsco Apec.docx DOCX document
Attachment 1H 201307 B25007 Report A Asbestos and Lead Empsco Apec.pdf PDF
Attachment 4 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 6 Wage Determination (GU20250001).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUIFA524025R0004
Attachment 02

PROJECT REQUIREMENT PRICE SCHEDULE

Project #: AJJY 25-1074M

Project Name: Repair Saipan Dorm B25007 Andersen Air Force Base, GU

Project Description: The Contractor is tasked with a Design-Build requirement to design and fully repair Saipan Dorm B25007 which includes renovation of interiors including floors, walls, ceiling, finishes, full restroom renovation, updating code for Energy and Life Safety, exterior renovations resulting from recent storm damage. Walkway slabs and spandrel beams will be repaired. Repairs will also include a complete update to the HVAC and Plumbing systems in the Saipan dorm. Saipan is conditioned by a chilled water and a central chiller plant, both will be replaced. A complete replacement of air handlers, ductwork, grilles, variable air volume boxes, and chilled water piping will be replaced. AAFB Justification and Approval (J&A) specifies Dunham Bush as the preferred chiller. Odyne Chillers are also acceptable. The chilled water pump will be replaced. All existing plumbing utilities will be replaced and updated. The existing heat pump water heaters will be replaced with standard electric water heaters with large storage tanks. Electrical updates include an update to the entire electrical distribution system. The system updates will include a complete replacement of electrical distribution from the pad mount transformer secondary conductors to the entire downstream building distribution system. Fire protection updates include sprinkler protection throughout, installation of a mass notification system, and a wet-pipe sprinkler system throughout the dorm. AAFB J&A for the Fire Alarm Panel specifies either Monaco or EST brands. The Saipan dorm must be re-graded to maintain positive drainage away from the building. Existing storm sewer inlets are buried with debris, dirt, and grass- these are to be cleared. Work shall be performed in accordance with the Statement of Work and all associated attachments.

ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
TOTAL EVALUATED PRICE (TEP)
0001
AJJY 25-1074M Repair Saipan Dorm B25007 AAFB, GU
1
LOT
CONTRACTOR/OFFEROR NAME
ADDRESS

Proposal Valid Through (Date): ____________

SIGNATURE DATE SIGNED

CUI

File details come from the government source that posted it. Updated .