These documents are memorandums from the Air Force Civil Engineer Center (AFCEC) establishing mandatory standardization guidance for HVAC chiller systems across Air Force installations. The memorandums, dated May 16, 2019, direct Base Civil Engineers (BCEs) to perform a comprehensive inventory analysis to identify and select a single manufacturer for HVAC chiller systems at each installation. The standardization initiative aims to reduce total cost of ownership by streamlining procurement, maintenance, and training costs. Key requirements include conducting a Selective Inventory Control Analysis examining manufacturer representation, component replacement value, and remaining service life, as well as performing a Supply Chain Analysis to ensure third-party vendor availability and local economic sustainability. BCEs must submit a Memorandum of Request (MOR) to AFCEC/CO for approval, with a comprehensive inventory analysis to be repeated every five years to confirm continued appropriateness of the selected manufacturer.

View the file

Other files

File Type Posted
Attachment 9a Roofing As-BUILTs B25007.pdf PDF
Solicitation Amendment FA524025R00040002 SF 30.pdf PDF
Attachment 1a Updated Statement of Work AJJY 25-1074M Repair Saipan Dorm B25007 08AUG25.pdf PDF
RFI Responses - FA524025R0004 Part 2 _Expanded Cell Blocks.pdf PDF
Attachment 9 As-BUILTs B25007.zip ZIP file
Solicitation Amendment FA524025R00040001 SF 30.pdf PDF
08 Aug 25_RFI Responses - FA524025R0004 Part 2.pdf PDF
07 Aug 25_RFI Responses - FA524025R0004 Part 1.pdf PDF
Attachment 8 PIEE Proposal Manager Reference Guide.pdf PDF
Attachment 1D AJJY 25-1074M Repair Saipan Dorm B25007 35 pct Dwgs.pdf PDF
Attachment 2 Project Requirement Price Schedule.docx DOCX document
Attachment 1H 201307 B25007 Report A Asbestos and Lead Empsco Apec.pdf PDF
Attachment 7 Common Construction Prevailing Wage Rates_Guam.pdf PDF
Attachment 1A AAFB Contractor Antiterrorism Awareness.pdf PDF
Attachment 1B 36 CES Contractors Builder Inventory Sheet Template.xlsx XLSX spreadsheet
Attachment 5 AAFB IFS_27FEB24.pdf PDF
Attachment 1F 19960111 B25007 Jacobs Asbestos.pdf PDF
Attachment 1 Statement of Work AJJY 25-1074M Repair Saipan Dorm B25007.pdf PDF
Attachment 1E AJJY 25-1074M Repair Saipan Dorm B25007 35 pct Concept Design.pdf PDF
Attachment 1I USAF Fire Alarm Panel Approval Memorandum.pdf PDF
Attachment 1C AJJY 25-1074M Repair Saipan Dorm B25007 Map.pdf PDF
Attachment 3 Past Performance Fact Sheet (PPFS).docx DOCX document
Attachment 1G 201307 B25007 Report B Asbestos and Lead Empsco Apec.docx DOCX document
Solicitation - FA524025R0004.pdf PDF
Attachment 4 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 6 Wage Determination (GU20250001).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE CIVIL ENGINEER CENTER

TYNDALL AIR FORCE BASE FLORIDA

3 May 2019

MEMORANDUM FOR ALMAJCOM-FOA-DRU-PSU

FROM: AFCEC/CO

139 Barnes Drive, STE 1 Tyndall AFB, FL 32403-5319

SUBJECT: HVAC Chiller System Standardization, Single Manufacturer Selection

Reference: (a) AFCEC/CL Memo, 3 May 2019, Air Force Policy Memorandum Mandatory Standardization of Essential HVAC System Components

1. The Air Force Civil Engineer Center Director (AFCEC/CL) serves as the Air Force Category Manager (CM) for the Facilities and Construction Category and he has mandated the standardization of HVAC chiller systems to a single manufacturer at the installation level. The AFCEC/CL has further delegated the authority and responsibility of administering the single manufacturer approval process to the AFCEC Operations Directorate (AFCEC/CO).

2. Standardization of all HVAC chiller systems allows the Air Force to significantly reduce the total cost of ownership which includes the initial procurement, subsequent maintenance, and associated training costs to operate the system over its lifecycle. Since standardization is a long-term strategy, Base Civil Engineers (BCEs) must perform their due diligence during the selection process to mitigate any prolonged adverse effects. This memorandum serves as AFCEC/CO’s official guidance for the evaluation, recommendation, and subsequent approval of a single manufacturer for HVAC chiller systems at each installation.

3. BCEs are required to submit a Memorandum of Request (MOR) to the AFCEC/CO that clearly specifies the requested single manufacturer for HVAC chiller systems at the respective installation as well as provide reasoning and justification per the guidance set forth by this document. In turn, AFCEC/CO will issue an Official Memorandum approving or disapproving the requested manufacturer. Should disapproval be merited, AFCEC/CO shall provide explanation for all disqualifications as well as engage with the BCE directly to identify a suitable alternative.

4. The BCE shall assign a team to perform a comprehensive inventory analysis to identify a single manufacturer for HVAC chiller systems. It is recommended that at a mimum, the team be comprised of the Installation Mechanical and HVAC Systems Sub-AMP Manager, a qualified HVAC technician, and a Material Control representative. However, BCEs may elect to augment and/or enhance the composition of the evaluating team as necessary.