ATTACHMENT 2 PRICE SCHEDULE.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Dock-side (DS): USCGC HOLLYHOCK FY25 Repair
- Solicitation number
- 70Z08525QLREP0003
About this file
This document is a Price Schedule for the USCGC HOLLYHOCK (WLB-225B) Dockside Availability in FY2025, associated with Solicitation Number 70Z08525QLREP0003 issued by the US Coast Guard. The pricing schedule includes multiple line items for ship maintenance and repair services, such as fire prevention requirements, deck preservation, compartment and piping insulation renewal, tenting, and door installation. The pricing template shows a composite labor rate of $150 per hour, with additional cost breakdown factors including a 15% G&A factor and 10% profit factor. The contract covers dock-side repairs in Honolulu, HI, with a performance period from 4 August 2025 to 18 September 2025, and an overall ordering period through 18 September 2025. Despite the detailed pricing template, the total price for definite and optional items is currently showing as $0.00, indicating the pricing is still in development or placeholder status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 006-24APR2025.doc | DOC document | |
| Amendment 005_CGC HOLLYHOCK DS FY25.pdf | ||
| Amendment 004_CGC HOLLYHOCK DS FY25.pdf | ||
| Amendment 003_ CGC HOLLYHOCK DS FY25.doc | DOC document | |
| Amendment 002_ CGC HOLLYHOCK DS FY25.doc | DOC document | |
| Amendment 001_ CGC HOLLYHOCK DS FY25-7 April.doc | DOC document | |
| ATTACHMENT 1 HOLLYHOCK SPECIFICATION.pdf | ||
| ATTACHMENT 5 PAST PERFORMANCE INFORMATION FORM.doc | DOC document | |
| Solicitation_70Z08525QLREP0003.pdf | ||
| ATTACHMENT 4 GOVERNMENT PROPERTY REPORT.docx | DOCX document | |
| ATTACHMENT 3 Clarification Request HOLLYHOCK DS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC HOLLYHOCK (WLB-225B) DOCKSIDE AVAILABILITY FY2025 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | |||
| D-002 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | |||
| D-003 | Compartment Insulation, General, Renew | JOB | |||
| D-004 | Piping Insulation, Renew | JOB | |||
| D-005 | Tenting, Provide | JOB | |||
| D-006 | Non-Tight Joiner Door Installation | JOB | |||
| O-00A | Composite Labor Rate | $150.00 | Hour | 0 | 0 |
| O-00Z | Laydays | Day | 5 | ERROR:#VALUE! | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
(12/17/2024)_x000D_ Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate