Amendment 003_ CGC HOLLYHOCK DS FY25.doc
DOC document 72 KB Posted
- Attached to
- Dock-side (DS): USCGC HOLLYHOCK FY25 Repair
- Solicitation number
- 70Z08525QLREP0003
About this file
This document is an Amendment (Amendment 003) to a U.S. Coast Guard solicitation for dock-side repairs to the USCGC HOLLYHOCK in Fiscal Year 2025. The solicitation (No. 70Z08525QLREP0003) is for ship maintenance and repair work to be performed in Honolulu, Hawaii, with the first task order's performance period from 4 August 2025 to 18 September 2025. The amendment addresses submitted Request for Quotes (RFQs) and clarifies technical details, specifically addressing two contractor questions about soft patch removal, with the government confirming that no soft patch removal is required for Work Item 06.
The contract will be administered by the USCG Surface Forces Logistics Center in Alameda, California, with an ordering period from the date of award through 18 September 2025. The scope encompasses comprehensive ship maintenance, repair, and associated support work for the USCGC HOLLYHOCK, to be specified via individual task orders under a requirements contract. The amendment provides contractors an opportunity to modify previously submitted offers and requires acknowledgment of the amendment's receipt.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 006-24APR2025.doc | DOC document | |
| Amendment 005_CGC HOLLYHOCK DS FY25.pdf | ||
| Amendment 004_CGC HOLLYHOCK DS FY25.pdf | ||
| Amendment 002_ CGC HOLLYHOCK DS FY25.doc | DOC document | |
| Amendment 001_ CGC HOLLYHOCK DS FY25-7 April.doc | DOC document | |
| ATTACHMENT 2 PRICE SCHEDULE.xlsx | XLSX spreadsheet | |
| ATTACHMENT 1 HOLLYHOCK SPECIFICATION.pdf | ||
| ATTACHMENT 5 PAST PERFORMANCE INFORMATION FORM.doc | DOC document | |
| Solicitation_70Z08525QLREP0003.pdf | ||
| ATTACHMENT 4 GOVERNMENT PROPERTY REPORT.docx | DOCX document | |
| ATTACHMENT 3 Clarification Request HOLLYHOCK DS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment 003 |
| 04/09/2025 |
| 6. ISSUED BY |
| CODE |
| 70Z085 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| 70Z085 |
USCG Surface Forces Logistics Center
U.S. Coast Guard Island, Building 55
Alameda CA 94501
USCG Surface Forces Logistics Center
U.S. Coast Guard Island, Building 55
Alameda CA 94501
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
70Z08525QLREP0003
| X |
| 9B. DATE (SEE ITEM 11) |
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
| ( |
| C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
D. OTHER (Specify type of modification and authority).
Contract Clause, H.4 Option Item; FAR 17.207©
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USCGC HOLLYHOCK FY25 Dock Side Repair Solicitation
The purpose of this amendment is to address submitted RFQ’s
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Andrew Jacobs
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| BY |
| 9 April 2025 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83) PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.243
Standard Form 30 Continued Question 1: Paragraph 3.2 describes Soft Patch Removal as identified in Table 1, there is no mention of soft patch removal in Table 1, the description in 3.2 does not seem to fit the scope of work for this item, please confirm the intent of 3.2 Soft Patch Removal?
Specification Paragraph Reference: WI-006 Paragraph 3.
Answer: Soft Patch not removal not required
Question 2: Work Item 6 directs removal of various soft patches. Will USG provide representative photos of some of these soft patches and their locations? Specification Paragraph Reference: N/A
Answer: No Soft Patch removal required for Work Item 06
File details come from the government source that posted it. Updated .