Attachment 2 CDRL A006 - CFSR.pdf
PDF 160 KB Posted
- Attached to
- The Federal Aviation Administration (FAA) has a requirement for Second Level Engineering Services
- Solicitation number
- 6973GH-26-R-00011
About this file
This document is a Contract Data Requirements List (CDRL) for Second Level Engineering Services with several key details. The CDRL identifies Data Item No. A006 for a Contractor Furnished Status Report (CFSR), which is to be submitted monthly, with the first report due 30 days after the start of the period of performance (POP). The report is to be submitted on the 15th of each month until the POP end date, with the contractor's format being acceptable. The requiring office is AJW-1, and the document was prepared by Richard Pak (AJW-11) and approved by Chris Trubizi (AJW-14) on January 10, 2025. The contract/PR number and contractor are currently marked as TBD (To Be Determined), indicating this is likely a pre-solicitation or early-stage contract document.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
SEE BLOCK 16 TDP ____ TM _____ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SECOND LEVEL ENGINEERING SERVICES TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 CFSR
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
SOW 8.6 AJW-1
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A REQUIRED MONTHLY SEE BLOCK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft Final
SEE BLK 16 15TH OF EACH MONTH Reg Repro
16. REMARKS AJW-1/COR 1
BLOCK A - 0006, 1006, 2006, 3006, 4006
BLOCK 11 - 30 DAYS AFTER START OF POP
BLOCK 12 - 30 DAYS AFTER START OF POP, FIRST REPORT IS DUE ON THE 15TH OF FOLLOWING
MONTH AND EACH MONTH THERE AFTER TILL POP END DATE
CONTRACTOR FORMAT IS ACCEPTABLE.
15. TOTAL ▬▬▬▬► 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
RICHARD PAK, AJW-11
JAN10, 2025 CHRIS TRUBIZI, AJW-14
Jan 10, 2025
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
File details come from the government source that posted it. Updated .