Attachment 19 - VASNHCS Project Manual Updated Final 20210310.pdf
PDF 11 MB Posted
- Attached to
- Y1BG--EHRM Infrastructure Upgrades Design Build - Reno Federal contract opportunity
- Solicitation number
- 36C77621R0117
About this file
This solicitation is for a design-build project to upgrade telecommunications infrastructure at Veterans Affairs facilities in Reno, Nevada. The contractor shall relocate or remodel approximately 28 telecommunications rooms and 1 data center to meet the agency's IT standards, while maintaining operational IT services. The scope of work includes all labor, materials, tools, and services for design, pre-construction, construction, and closeout. The contractor must provide a turn-key solution in accordance with VA Office of Information and Technology and Eastern Health Region Medical Center infrastructure guidelines. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 21 CM/PM Electronic Health
Records Modernization (EHRM) PHASE I Support Task
PO# 612C209
Sierra Nevada Health Care System Reno VA Medical Center
P R O J E C T C O N TA C T D I R E C T O R Y
Concourse Federal Group
123 S. Royal Street Alexandria, Virginia 22314
Tim Hower, Project Manager .........................................................................................thower@concousefederal.com
Lorena Alvarez.................................................................................................................IaIvarez@concousefederaI.com
Mike Olson .................................................................................................................... molson@concousefederal.com
Marshall Contino, Concourse A|E Vice President ........................................................ mcontino@concousefederal.com
DHE Engineering 3300 N. Central Ave. 3300 Tower Suite, 1520, Phoenix, AZ 85012
Rick Seger P.E., Principal, Electrical Engineer................................................................rseger@dheeng.com
Kory Young, EIT, Senior Mechanical Engineer.................................................................kyoung@dheeng.com
VA Reno Health Care System
David Law, Chief Engineer..............................................................................................David.Law2@va.gov
Steve Elliott, PE….............................................................................................................Steven.Elliott3@va.gov
Mark Vine, IT Specialist...................................................................................................Mark.Vine@va.gov
VHARENEllioS Text Box
VHARENEllioS Text Box Modified by COR, 3/8/2021.
Project Team Contributors
Overview
Vicinity Map/Building Addresses
Campus Map/Building Information
VAMC EHRM Fiber Distances
VASNHCS Bldg. 1:
First and Second Floor
Third and Fourth Floor
Fifth and Sixth Floor
VASNHCS Bldg. 1A:
First Floor Plan
VASNHCS Bldg. 1D:
First Floor Plan
Second Floor Plan
Third Floor Plan
Identification of Network Spaces
VASNHCS Bldg. 5:
First Floor Plan
Second Floor Plan
VASNHCS Bldg. 6:
First Floor Plan
Second Floor Plan
VASNHCS Bldg. 7:
First Floor Plan
VASNHCS Bldg. 8:
First Floor Plan
VASNHCS Bldg. 10:
Basement
First Floor Plan
VASNHCS Bldg. 12:
First Floor Plan
Second Floor Plan
Third Floor Plan
Fourth Floor Plan
Fifth Floor Plan
Sixth Floor Plan
Ta b l e o f C o n t e n t s
Network Space Design
Bldg. 1:
C1353
Design Matrix
Enlarged Plan – Existing
Bldg. 1:
C2355
Design Matrix
Enlarged Plan - Existing
Bldg. 1:
C3355
Design Matrix
Enlarged Plan - Existing
Bldg. 1:
C4355
Design Matrix
Enlarged Plan - Existing
Bldg. 1:
C5355
Design Matrix
Enlarged Plan - Existing
Bldg. 1:
C6359
Design Matrix
Enlarged Plan - Existing
Bldg. 1A:
D2456
Design Matrix
Enlarged Plan - Existing
Bldg. 1D:
G1585/G1576A
Design Matrix
Enlarged Plan - Existing
Bldg. 1D:
G1644
Design Matrix
Enlarged Plan - Existing
Bldg. 1D:
H1703
Design Matrix
Enlarged Plan – Existing
Bldg. 1D:
H2703
Design Matrix
Enlarged Plan - Existing
Bldg. 1D:
G2571 Design Matrix
Enlarged Plan – Existing
Bldg. 1D:
G3633
Design Matrix
Enlarged Plan - Existing
Bldg. 1D:
H3706
Design Matrix
Enlarged Plan - Existing
Bldg. 5:
K1778
Design Matrix
Enlarged Plan - Existing
Bldg. 5:
K2784A
Design Matrix
Enlarged Plan - Existing
Bldg. 6:
F1479
Design Matrix
Enlarged Plan - Existing
Bldg. 6:
F2476
Design Matrix
Enlarged Plan - Existing
Bldg. 7:
N217
Design Matrix
Enlarged Plan – Existing
Bldg. 8:
Boiler Plant Closet /N105
Design Matrix
Enlarged Plan - Existing
Network Space Design (cont’d)
Network Space Design (Cont’d)
Bldg. 10:
L0873
Design Matrix
Enlarged Plan - Existing
Bldg. 10:
L1826
Design Matrix
Enlarged Plan - Existing
Bldg. 10:
L1874
Design Matrix
Enlarged Plan - Existing
Bldg. 12:
B1169
Design Matrix
Enlarged Plan - Existing
Bldg. 12:
B2263
Design Matrix
Enlarged Plan - Existing
Bldg. 12:
B4196
Design Matrix
Enlarged Plan - Existing
Bldg. 12:
B5196
Design Matrix
Enlarged Plan - Existing
Bldg. 12:
B6197
Design Matrix
Enlarged Plan – Existing
On Campus Rooms
Not Visited By RFP Developer.
Scope Derived From Facility Self-
Assessment
Bldg. 12:
B3198
Design Matrix
Appendix A – Power Installation Example
Appendix B – Compliance Requirements
Appendix C – Rack Labeling Standard
Appendix
V i c i n i t y M a p B u i l d i n g A d d r e s s e s
I o a n n i s A . L o u g a r i s
V A M e d i c a l C e n t e r 9 7 5 K i r m a n A v e n u e R e n o , N V 8 9 5 0 2
VHARENEllioS Line
VHARENEllioS
PLEASE NOTE: The CBOCs are no longer part of this Design-Build project. Any references to work to be performed at the CBOCs in the RFP to DB Narrative, Specs, Project Manual or any other documentation in this solicitation/contract shall be disregarded.
C a m p u s M a p - R e n o M e d i c a l C e n t e r B u i l d i n g I n f o r m a t i o n
Bldg # ABBR Bldg Name Data Ctr Levels
12 Reno Medical Center 1 6
Bldg # ABBR Bldg Name TR Qty Levels
1 Reno Medical Center 6 6
1A Reno Medical Center 1 2
1D Reno Medical Center 7 3
4 Reno Medical Center 0 1
5 Reno Medical Center 2 2
6 Reno Medical Center 2 2
7 Reno Medical Center 1 1
8 Reno Medical Center 1 1
10 Reno Medical Center 3 1
12 Reno Medical Center 5 6
1A
1D
1D
8 7
VAMC FIBER DISTANCES
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
Create redundant fiber feed from existing server room to each building and TR. Path to be diverse from existing fiber to preclude interruption to service.
Building Floor Room Distance From Existing
Server Room (FT) Notes Fiber type Conduit Type
1 1 C1353 403 24 strand mulitmode Interior - 4" EMT
1 2 C2355 378 24 strand mulitmode Interior - 4" EMT
1 3 C3355 338 24 strand mulitmode Interior - 4" EMT
1 4 C4355 376 24 strand mulitmode Interior - 4" EMT
1 5 C5355 388 24 strand mulitmode Interior - 4" EMT
1 6 C6359 394 24 strand mulitmode Interior - 4" EMT
1A 2 D2456 446 24 strand mulitmode Interior - 4" EMT
1D 1 G1585/G176A 337 Distance to new room 24 strand mulitmode Interior - 4" EMT
1D 1 G1644 444 24 strand mulitmode Interior - 4" EMT
1D 1 H1703 383 24 strand mulitmode Interior - 4" EMT
1D 2 H2703 399 24 strand mulitmode Interior - 4" EMT
1D 2 G2571 424 24 strand mulitmode Interior - 4" EMT
1D 3 G3633 426 Relocated from G3614 24 strand mulitmode Interior - 4" EMT
1D 3 H3706 388 24 strand mulitmode Interior - 4" EMT
5 1 K1778 502 24 strand mulitmode Interior - 4" EMT
5 2 K2784A 586 24 strand mulitmode Interior - 4" EMT
6 1 F1479 705 24 strand mulitmode Interior - 4" EMT
6 2 F2476 679 24 strand mulitmode Interior - 4" EMT
7 N217 552 Building east of campus 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
8 BP/N105 748 Building east of campus 24 strand single mode Exterior - Concrete encased 4" PVC or HDPE with (4)1" interducts. Interior - 4" EMT
10 B L0873 617 24 strand mulitmode Interior - 4" EMT
10 1 L1826 855 Relocated from L1908 24 strand mulitmode Interior - 4" EMT
10 1 L1874 678 24 strand mulitmode Interior - 4" EMT
12 1 B1169 211 24 strand mulitmode Interior - 4" EMT
12 2 B2263 Server Room 24 strand mulitmode Interior - 4" EMT
12 3 B3167 191 24 strand mulitmode Interior - 4" EMT
12 4 B4196 194 24 strand mulitmode Interior - 4" EMT
12 5 B5196 212 24 strand mulitmode Interior - 4" EMT
12 6 B6197 241 24 strand mulitmode Interior - 4" EMT
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1” = 40’
DATE: 07/14/2020
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1” = 40’
DATE: 07/14/2020
N N
REMEDIATE IN PLACE
TELECOMMUNICATION
ROOM C1353
EXPAND IN PLACE
TR
C2355A
EXISTING WALL AND CEILING
TO BE REMOVED TO UPGRADE
RACK & AC UNIT
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
I D E N T I F I C AT I O N O F N E T WO R K S PAC E S
BLDG: 1 - RENO MEDICAL
LEVEL: 3
SCALE: 1” = 40’
DATE: 07/14/2020
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 4
SCALE: 1” = 40’
DATE: 07/14/2020
N N
REMEDIATE IN PLACE
TELECOMMUNICATION
ROOM C3355
REMEDIATE IN PLACE
IT CLOSET
COMMUNICATIONS
C4355
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 1 RENO MEDICAL
LEVEL: 5
SCALE: 1” = 40’
DATE: 07/14/2020
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
EXISTING TR LOCATION(S)
SIERRA NEVADA HEALTHCARE SYSTEM
RENO MEDICAL CENTER
BLDG: 1 RENO MEDICAL
CENTER
LEVEL: 6
SCALE: 1”=40’
DATE: 07/14/2020
N N
REMEDIATE IN PLACE
TR
C6359REMEDIATE IN PLACE
IT CLOSET
C5355
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
EXISTING TR LOCATION(S)
RENO MEDICAL CENTER
BLDG: 1 A - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/16” = 1’0”
DATE: 07/14/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
REMEDIATE IN PLACE
G1644
REMEDIATE IN PLACE
H1703
TELE-COMMUNICATION
G1585
RELOCATE TO G1576A
RELOCATE G1585 TO G1576A
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
REMEDIATE IN PLACE
G2571
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
REMEDIATE IN PLACE
H2703
RENO MEDICAL CENTER
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 3
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
TEL
G3614
RELOCATE TO G3633
G3633
SIM COMM ALCOVE
H3706
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 5 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
IT CLOSET
K1778
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 5 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
IT CLOSET
K2784A
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 6 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/16” = 1’-0”
DATE: 07/14/2020
N
IT
F1479
REMEDIATE IN
PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 6 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/16” = 1’-0”
DATE: 07/14/2020
N
IT
F2476
REMEDIATE IN
PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 7 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 3/32” = 1’-0”
DATE: 07/14/2020
N
OIT
N217
REMEDIATE
IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 8 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/16” = 1’-0”
DATE: 07/14/2020
N
CLOSET
BOILER ROOM
CLOSET/N105
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 0 - RENO MEDICAL
CENTER
LEVEL: BASEMENT
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
CLOSET
IDF
L0873
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 0 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
TELE
L1908
RELOCATE TO L1826
NEW
LOCATION
L1826
TELE
L1874
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
IT CLOSET
B1169
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
SERVER ROOM
B2263
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 3
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT.
IT
B3198
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 4
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
CLOSET
B4196
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 5
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
TELE EQUIP
B5196
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
RENO MEDICAL CENTER
BLDG: 1 2 - RENO MEDICAL
CENTER
LEVEL: 6
SCALE: 1/32” = 1’-0”
DATE: 07/14/2020
N
TELE EQUIP
B6197
REMEDIATE IN PLACE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
N E T WO R K S PAC E D E S I G N
C1353
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
N
ROOM NO. C1353 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
C2355
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
WALL AND CEILING TO BE
REMOVED TO UPGRADE
RACK AND A/C UNIT
ROOM NO. C2355 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED. ROOM WILL BE ENLARGED TO ACCOMMODATE AN ADDITIONAL RACK.
C O
O
LI
N G
ROOM NO. C2355 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insuficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadaquate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
Approximate number of cables =
700. Approximate total cable length = 115,500’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M) N
TR
C3355
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 3
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
ROOM NO. C3355 OFFICE
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. C3355 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
972. Approximate total cable length = 160,400'
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M) N
C4355
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 4
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
ROOM NO. C4355 OFFICE
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: DUCT PENETRATION THRU WALLS NEEDS TO BE FIRE CAULKED. AC UNIT DISCONTINUED.
C O
O
LI
N G
ROOM NO. C4355 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
743. Approximate total cable length = 122,600'
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
C5355
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 5
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
ROOM NO. C5355 OFFICE
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. C5355 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
608. Approximate total cable length = 100,300'
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
C6359
RENO MEDICAL CENTER
BLDG: 1 - RENO MEDICAL
CENTER
LEVEL: 6
SCALE: 1/4” = 1’-0”
DATE: 07/14/2020
ROOM NO. C6359 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. C6359 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate numbers of cables =
288. Approximate total cable length = 47,600’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M) N
TR
D2456
RENO MEDICAL CENTER
BLDG: 1 A - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
ROOM NO. D2456 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
X Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
X Remote Controlled battery thermostat
Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. D2456 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
N
G1585 (Moving to G1576A)
RENO MEDICAL CENTER
ROOM NO. G1576A CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
NOTES: RELOCATE EXISTING KELE CONDENSATE LEAK DETECTOR.
C O
O
LI
N G
ROOM NO. G1585/G1567A CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
500. Approximate total cable length = 82,500’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
G1644
RENO MEDICAL CENTER
ROOM NO. G1644 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
NOTES: CURRENTLY SERVED BY HOUSE AIR.
C O
O
LI
N G
ROOM NO. G1644 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
500. Approximate total cable length = 82,500’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
H1703
RENO MEDICAL CENTER
ROOM NO. H1703 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
X Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
X No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
NOTES: REQUIRES CONDENSATE PAN WITH PAN LEAK DETECTOR.
C O
O
LI
N G
ROOM NO. H1703 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
H2703
RENO MEDICAL CENTER
ROOM NO. H2703
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate
No air conditioning in closet. Have TAB technician determine if the air handler can accommodate TR cfm. Otherwise, provide new HVAC unit as shown above.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commerciall condensate pump
NOTES: THIS IS A VERY SMALL CLOSET UNDER 20 SF MONITORS 3 MRIs. SUGGEST USING HOUSE AIR.
C O
O
LI
N G
ROOM NO. H2703 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
300. Approximate total cable length = 49,500’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
G2571
RENO MEDICAL CENTER
ROOM NO. G2605 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
C O
O
LI
N G
ROOM NO. G2605 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insuficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadaquate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
460. Approximate total cable length = 75,900’
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
N
VHARENEllioS
G2571
G3633
RENO MEDICAL CENTER
ROOM NO. G3633
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
C O
O
LI
N G
ROOM NO. G3614 CLOSET (MOVING TO G3633)
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
X Inadequate fiber optic cabling to
TR
Install new as required
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
608. Approximate total cable length = 77,300'
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 3
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
H3706
RENO MEDICAL CENTER
ROOM NO. H3706 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
Remote Controlled battery thermostat Wired thermostat
Micro condensate pump Commercial condensate pump
NOTES: CURRENTLY SERVED BY HOUSE AIR.
C O
O
LI
N G
ROOM NO. H3706 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 1 D - RENO MEDICAL
CENTER
LEVEL: 3
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
K1778
RENO MEDICAL CENTER
ROOM NO. K1778 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate This unit is undersized by 1/4 to 1/2 ton.
Advise replacing as shown above.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
X Remote Controlled battery thermostat
Wired thermostat
X Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. K1778 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 5 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
K2784A
RENO MEDICAL CENTER
ROOM NO. K2784A CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate This unit is undersized by 1/4 to 1/2 ton.
Advise replacing as shown above.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
X Remote Controlled battery thermostat
Wired thermostat
Micro condensate pump Commercial condensate pump
NOTES: AC MODEL DISCONTINUED.
C O
O
LI
N G
ROOM NO. K2784A CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 5 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
F1479
RENO MEDICAL CENTER
ROOM NO. F1479 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
X Remote Controlled battery thermostat
Wired thermostat
Micro condensate pump Commercial condensate pump
C O
O
LI
N G
ROOM NO. F1479 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 6 - RENO MEDICAL
CENTER
LEVEL: 1
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
F2476
RENO MEDICAL CENTER
ROOM NO. F2476 CLOSET
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
Cooling inadequate Needs modifications to existing HVAC systems
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperture and humidity monitoring and/or controls from BMS
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from BMS
Piping over equipment Relocate piping or pipe trough
X UPS Central Monitoring BACnet conversion
No condensate leak detection Needs condensate leak detection
X Remote Controlled battery thermostat
Wired thermostat
Micro condensate pump Commercial condensate pump
C O
O
LI
N G
ROOM NO. F2476 CLOSET
E le ct ri ca l
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Missing grounding bus bar Install copper grounding bus bar
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per
VA Telecommunications and
Special Telecommunications
Systems Design Manual
X
TR ground bar not connected to
Telecom Main Ground Bar
(TMGB) in the data room
Provide grounding cable to MDF ground bar.
X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
C a b li n g
Inadequate fiber optic cabling to
TR
Install new as required
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A
X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
BLDG: 6 - RENO MEDICAL
CENTER
LEVEL: 2
SCALE: 1/4” = 1’0”
DATE: 07/14/2020
N217
RENO MEDICAL CENTER
ROOM NO. N217 STORAGE
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated HVAC unit
This is the start of the file's text. The full file is on GovTribe.