Technical Questions Phase 1 - FINAL - Reno EHRM.pdf

PDF 152 KB Posted

Attached to
Y1BG--EHRM Infrastructure Upgrades Design Build - Reno Federal contract opportunity
Solicitation number
36C77621R0117
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains a tracking sheet of technical questions and responses related to Solicitation Number 36C77621R0117 for EHRM Infrastructure Upgrades Design Build services at the Reno VA Medical Center. The contractor shall provide design, construction, and closeout services to relocate or remodel approximately 28 telecommunications rooms and 1 data center to meet VA OIT standards, while maintaining IT system operations. Key details include that the project value is $10-20 million, sales tax must be included, experience submitting 1-3 design-build projects as prime contractor is required or 1-2 A/E firm projects if no design-build expertise, and outages of several hours for horizontal cable replacement must be coordinated with VA. Room sizes for new and renovated telecommunications rooms were also confirmed.

View the file

Other files for this federal contract opportunity

Other files attached to Y1BG--EHRM Infrastructure Upgrades Design Build - Reno, newest first.
File Type Posted
Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM REV - 7-29-21.pdf PDF
36C77621R0117 0001.docx DOCX document
Attachment 20 - Construction Wage Rates - Washoe County 7-2-21.pdf PDF
Attachment 12 - Physical Security and Resiliency Design Manual AppxA1.pdf PDF
Attachment 11 - Physical Security and Resiliency Design Manual 20210101.pdf PDF
Attachment 10 - OIT-Infrastructure Stds Telecomm Spaces V3.0 Aug 21 2020.pdf PDF
Attachment 23 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 22 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 21 - Labor Wage Rates - Washoe County 5-21-21.pdf PDF
Attachment 13 - Physical Security and Resiliency Design Manual AppxA2.pdf PDF
Attachment 9 - OIT-Design Guide Templates-Critical Telecomm Spaces V1.0 27 Dec 2018.pdf PDF
Attachment 8 - OEHRM Site Infrastructure Requirements - V2.0.pdf PDF
Attachment 5 - Basic Guidance - Zone PDU Power Distribution.pdf PDF
Attachment 14 - Physical Security and Resiliency Design Manual AppxA3.xlsx XLSX spreadsheet
Attachment 4 - Basic Guidance - 208V Power Distribution White Paper.pdf PDF
Attachment 19 - VASNHCS Project Manual Updated Final 20210310.pdf PDF
Attachment 17 - Telecommunications Special Telecommunications Systems Design Manual Feb 2016.pdf PDF
Attachment 16 - SOCAMES 6 Design Alert 1 thru 4.pdf PDF
Attachment 15 - Physical Security and Resiliency Design Manual AppxB.xlsx XLSX spreadsheet
Attachment 6 - Manual for Preparation of Cost Estimates _ Related Documents.pdf PDF
Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM 20210623.pdf PDF
Attachment 18 - VA Standards Alert 017 20201101.pdf PDF
Attachment 7 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
Attachment 3 - App A - Appendices B C D Project 654-20-700.pdf PDF
Attachment 2 - VASNHCS EHRM Specifications Final 20210623.pdf PDF
36C77621R0117_1.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # 36C77621R0117 EHRM Infrastructure Upgrades - Reno Phase I - Technical Questions and VA Response Tracking Sheet

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

1. 7-8-21 7-12-21 The RFP indicates that the VAAR Magnitude of Construction is $10,000,000 - $20,000,000, however, on page 12 of 69 under Factor 2: Specialized Experience it states, “Project(s) shall have a minimum value of $2M and be 75% completed for Design-Bid-Build (D-B-B) or D-B.” Can you please confirm that the VAAR Magnitude of Construction is correct at $10M - $20M.

The VAAR Magnitude citing of $10M - $20M is correct and Factor 2 is correct.

2. 7-13-21 7-13-21 Is this project tax-exempt? If yes, please issue the Tax Exemption number for bidding purposes. If not, what is the percentage of tax?

No, this is not exempt of sales tax. Contractors are required to pay sales and excise tax. Offerors shall include all applicable taxes in accordance with FAR by Reference Clause 52.229-3 “Federal, State and Local Taxes.” Percentage of tax information is the responsibility of the offeror.

3. 7-20-21 Please confirm that projects with specialized experience from the design AE that is part of the DB team is required as part of the Factor 2 documentation.

If the contractor does not possess Design-Build (D-B) experience, provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

4. 7-20-21 Please confirm if the total number of specialized experience projects is 1 -3 for the GC plus 1-3 for the AE for a possible total of 6 projects? Or is it 1 – 3 for the entire DB team?

If the GC has DB experience, please “Provide a minimum of one (1) and a maximum of three (3) projects completed within the last five (5) years similar in size, complexity, and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. The five (5) years applies from the issuance date of the solicitation.”

If the GC does not have DB experience, “provide a minimum of (1) and a maximum of two (2) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to three (3) projects submitted for the prime contractor.”

The max total of project would be 5, not 6, if the GC does not have DB experience. If the GC has DB experience, there should only be a max of 3 DB projects and NO projects from the AE.

5. 7-20-21 There is reference in the project description that the expectation is that “IT services remain operational”. In projects of this type it is typical that it existing pathway used by the existing cabling is reused by the horizontal cable replacement portion of the project. When this is performed, there is typically a brief outage of several hours while the old cabling is removed in an area and new cabling is placed and brought online. Is this consistent with the expectation of the project or is there the expectation that the project will provide entirely new horizontal cabling pathway?

The expectation of VA is contractor shall coordinate with COR time duration of data/phone outages to limit time and location affects of outages. The assumption is correct that some outage of data/telephone lines will be necessary for replacement of the cabling.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

6. A considerable portion of the work of the project is associated with replacement of the existing horizontal cabling extending from each TR however there does not seem to be reference to where the existing WAO’s are.

Does the Government have records of where each of the existing station cables to be replaced terminates? What information exists regarding existing pathway to the existing WAOs?

The VA does not have detailed listings of the locations of WAOs. It is responsibility of the contractor to review drawings and current locations to determine full extent of replacement.

Contractor is required under this contract to verify all distances/lengths from TR to WAO to insure they meet VA OIT standards.

7. Has a test fit of the indicated TR’s scheduled for renovation been performed to validate that VA OIT standard racks terminating the indicated number of station cables with maximum jack densities per rack meeting VA OIT standards will fit in each of the spaces?

A test fit has been performed and rooms do not fully comply with required amount of space, due to physical limitations on existing floors. VA accepts sizes indicated on drawings for existing rooms and also accepts sizes for newly created rooms indicated for renovation.

Additionally, VA is adding two TR rooms for expansion, TR B4196 and TR B5196, both located in Building 12. TR B4196 will expand into room B4198 (currently a Housekeeping Aid Closet) to form a single room. TR B5196 will expand into room B5198 (currently a Housekeeping Aid Closet) to form a single room.