About this file

This document is an amendment to a solicitation for an infrastructure upgrade design-build project at a Veterans Affairs medical center in Reno, Nevada. The project includes relocating or remodeling approximately 28 telecommunications rooms and one data center to meet the agency's EHRM IT standards, while maintaining ongoing IT services. Offerors must submit Phase I proposals electronically to the contracting officer by the amended due date, and address any potential organizational conflicts of interest in accordance with the instructions and included VAAR provision. The amendment provides responses to technical questions, replaces the project narrative and removes a provision regarding organizational conflicts of interest.

View the file

Other files for this federal contract opportunity

Other files attached to Y1BG--EHRM Infrastructure Upgrades Design Build - Reno, newest first.
File Type Posted
Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM REV - 7-29-21.pdf PDF
Technical Questions Phase 1 - FINAL - Reno EHRM.pdf PDF
Attachment 20 - Construction Wage Rates - Washoe County 7-2-21.pdf PDF
Attachment 12 - Physical Security and Resiliency Design Manual AppxA1.pdf PDF
Attachment 11 - Physical Security and Resiliency Design Manual 20210101.pdf PDF
Attachment 10 - OIT-Infrastructure Stds Telecomm Spaces V3.0 Aug 21 2020.pdf PDF
Attachment 23 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 19 - VASNHCS Project Manual Updated Final 20210310.pdf PDF
Attachment 17 - Telecommunications Special Telecommunications Systems Design Manual Feb 2016.pdf PDF
Attachment 16 - SOCAMES 6 Design Alert 1 thru 4.pdf PDF
Attachment 15 - Physical Security and Resiliency Design Manual AppxB.xlsx XLSX spreadsheet
Attachment 6 - Manual for Preparation of Cost Estimates _ Related Documents.pdf PDF
Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM 20210623.pdf PDF
Attachment 22 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 21 - Labor Wage Rates - Washoe County 5-21-21.pdf PDF
Attachment 13 - Physical Security and Resiliency Design Manual AppxA2.pdf PDF
Attachment 9 - OIT-Design Guide Templates-Critical Telecomm Spaces V1.0 27 Dec 2018.pdf PDF
Attachment 8 - OEHRM Site Infrastructure Requirements - V2.0.pdf PDF
Attachment 5 - Basic Guidance - Zone PDU Power Distribution.pdf PDF
Attachment 14 - Physical Security and Resiliency Design Manual AppxA3.xlsx XLSX spreadsheet
Attachment 4 - Basic Guidance - 208V Power Distribution White Paper.pdf PDF
Attachment 18 - VA Standards Alert 017 20201101.pdf PDF
Attachment 7 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
Attachment 3 - App A - Appendices B C D Project 654-20-700.pdf PDF
Attachment 2 - VASNHCS EHRM Specifications Final 20210623.pdf PDF
36C77621R0117_1.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-29-2021 654-20-700 36C776 Thomas Council Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 00076 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 To all Offerors/Bidders

36C77621R0117 07-29-2021

X X X N/A X

1 (ONE)

The purpose of this amendment is to provide the following:

1) All Phase I proposal submissions MUST be sent electronically to the CO Donald A. Marsh III at donald.marsh2@va.gov Any Phase I proposals submitted electronically to Thomas Council will not receive consideration, NO EXCEPTIONS.

2) VA responses to Technical Questions received. See attached - Technical Questions Phase 1 - FINAL - Reno EHRM.

) Provision 2.21 Organizational Conflict of Interest has been removed in its entirety from this RFP. This Provision is replaced by VAAR Provision 852.209-70 (see pg. 2 of this amendment for the Full Provision).

4) The original Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM 20210623 is to be deleted and replaced in its entirety with Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM REV - 7-29-21 (see attached).

5) Additional instructions to Offerors are provided on pg. 2 to address any potential OCI issues.

Donald A. Marsh III Contracting Officer

PCAC15L3-1697

VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)

(a) It is in the best interest of the Government to avoid situations which might create an organizational conflict of interest or where the Offeror’s performance of work under the contract may provide the Contractor with an unfair competitive advantage. The term ‘‘organizational conflict of interest’’ means that because of other activities or relationships with other persons, a person is unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or the person has an unfair competitive advantage.

(b) The Offeror shall provide a statement with its offer which describes, in a concise manner, all relevant facts concerning any past, present, or currently planned interest (financial, contractual, organizational, or otherwise) or actual or potential organizational conflicts of interest relating to the services to be provided under this solicitation. The Offeror shall also provide statements with its offer containing the same information for any consultants and subcontractors identified in its proposal and which will provide services under the solicitation. The Offeror may also provide relevant facts that show how its organizational and/or management system or other actions would avoid or mitigate any actual or potential organizational conflicts of interest.

(c) Based on this information and any other information solicited or obtained by the Contracting Officer, the Contracting Officer may determine that an organizational conflict of interest exists which would warrant disqualifying the Contractor for award of the contract unless the organizational conflict of interest can be mitigated to the Contracting Officer’s satisfaction by negotiating terms and conditions of the contract to that effect. If the conflict of interest cannot be mitigated and if the Contracting Officer finds that it is in the best interest of the United States to award the contract, the Contracting Officer shall request a waiver in accordance with FAR 9.503.

(d) Nondisclosure or misrepresentation of actual or potential organizational conflicts of interest at the time of the offer or arising as a result of a modification to the contract, may result in the termination of the contract at no expense to the Government.

(End of Provision) Additional Instructions to Offerors – Organizational Conflict of Interest

All offerors shall note that an Organization Conflict of Interest may exist for this project. Please refer to VAAR 852.209-70 for instructions on how to address this as part of the Phase I Proposal submissions, as applicable. This documentation, if submitted, will not count as part of any page limitation restrictions.

Please note: that all Phase I proposal submissions MUST be sent electronically to the CO Donald A. Marsh III at donald.marsh2@va.gov. Any Phase I proposals submitted electronically to Thomas Council will not receive consideration, NO EXCEPTIONS. This only applies to Phase I proposals as Mr. Council will be out of office when proposals are due.

See attached document: Technical Questions Phase 1 - FINAL - Reno EHRM.

See attached document: Attachment 1 - 001121 - VASNHCS RFP DB Narrative - Reno EHRM REV - 7-29-21.