Attachment 15 -- RTAM Range Inventory Real Property Form.docx
DOCX document 14 KB Posted
- Attached to
- U. S. Marine Corps Training & Education Command (TECOM) Range and Training Area Management Branch (RTAM) Military Operations Data Support Federal contract opportunity
- Solicitation number
- M67854-21-R-7901
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RTAM Range, Training and Impact Area, iNFADS Data Requirements Form
1. Agency From
2. Date of Record (in YYYYMMDD)
3. Project Number
4. Serial Number
5. Installation
6. Installation Code
7. Contract Number
9. Items Contained
10a. Facility Number
10b. RPUID
10c. RFMSS ID
11. Category Code
12. Catcode Description
13. Type of Construction
15. Area UOM 1
16. Total Quantity UOM 1
19. Cost
20. Funding Source
21. Funding Organization
22. Interest Code
23. Item Remarks
28. Project Remarks
Deliverable Number:
Contractor Signature:
Attached Site Map: Enclosure 1
Government Acceptance Signature:
Date:
Date Reported to the Installation RPAO:
Key from 1354
1. From. Name of the transferring agency.
2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).
3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.
4. Serial Number. Sequential serial number assigned by the preparing organization (e.g., 2010-0001).
5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).
6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.
7. Contract Number(s). Contract number(s) for this project.
7a. Placed-In-Service Date. RPA Placed In Service Date. This is the date the asset is actually placed-in-service.
8. Transaction Details. a. Method of Transaction. Mark (X) as many boxes as apply. b. When/Event. When or event causing preparation of DD Form 1354. X only one box. c. Type. Draft, interim, or final DD Form 1354. X only one box.
9. Item Number. Use a separate item number for each facility, no item number for additional usages.
10a. Facility Number. Assigned in accordance with the Installation/Base Master Numbering Plan.
10b. RPUID. Identified in Real Property Inventory.
11. Category Code. The category code describes the facility usage.
12. Catcode Description. The category code name which describes the facility usage.
13. Type. Type of construction: P for Permanent; S for Semi- permanent; T for Temporary.
14. Sustainability Code. Reports whether or not an asset meets the sustainability guidelines set forth in Section 2(g) of Executive Order 13514. Valid values are: 1 (asset meets the guidelines); 2 (asset does not meet the guidelines); 3 (asset not evaluated); 4 (asset not subject to guidelines).
15. Area: UM 1. Area unit of measure; use the unit of measure associated with the category code selected in 11.
16. Total Quantity UM 1. The total area for the measure identified in Item 15. Use negative numbers for demolition.
17. Other: UM 2. Unit of Measure 2 is the capacity or other measurement unit (e.g., LF, MB, EA, etc.).
18. Total Quantity UM 2. The total capacity/other for the measure identified in Item 17.
19. Cost. Cost for each facility; for capital improvements to existing facilities, show amount of increase only. If there is no increase for the capital improvement, enter N/A.
20. Fund Source. Enter the Fund Source Code for this item.
21. Funding Organization. Enter the code for the organization responsible for acquiring this facility.
22. Interest Code. Enter the code that reflects government interest or ownership in the facility.
23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.
24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent.
25. Accepted By. Typed name, signature, title, and date of signature by the RPAO or accepting official.
26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.
27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.
28. Project Remarks. Project level remarks and continuation of blocks.
File details come from the government source that posted it. Updated .