This package includes construction drawings and specifications for a mental health building and parking lot project to be awarded through a solicitation by the Department of Veterans Affairs Technology Acquisition Center Austin. Key requirements include construction of a new two-story mental health clinic building with associated site utilities and parking area. The drawings depict demolition plans, foundation plans, first and second floor plans, roof plans, enlarged mechanical room plans, and plumbing details. Plumbing fixtures, equipment, and materials are specified through schedules. Bids are due under Solicitation Number 36C77622B0047 by an unspecified date, with award planned for early 2023.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIRCUIT SETTER
HOSE BIBB
PETE'S PLUG
BALL VALVE
PRESSURE REDUCING VALVE
CHECK VALVE
GATE VALVE
VENT THROUGH ROOF
CLEANOUT
WALL CLEANOUT
FLUSH CLEANOUT OR SURFACE CLEANOUT
3"CO
UNIONVENT PIPING
HOT WATER CIRCULATION PIPING
HOT WATER PIPING
COLD WATER PIPING
AUTOMATIC OR MANUAL AIR VENT
FLOOR & FUNNEL DRAIN
FLOOR DRAIN
WASTE PIPING
PUMP
CIRCULATION PUMPPIPE SLOPE (DOWNWARD IN DIRECTION OF ARROW)
BRANCH - SIDE CONNECTION METER
BACKFLOW PREVENTER ASSEMBLY
3"WCO
3"CO
FUNNEL DRAIN
STRAINER W/ BLOWDOWN VALVE & 3/4" HOSE CONNECTION
PIPE OR DUCT BREAK (GRAPHIC ONLY - CONTINUOUS PIPE/DUCT)
M
BFP
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SYMBOL LEGEND
PRESSURE REGULATING VALVE
CAPPED OUTLET
PLUG VALVE
TEMPERING VALVE
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PJ001
463-301
DEC. 7, 2020 JB KT
LEGEND, ABBREVIATION
LIST, AND GENERAL
NOTES
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
WCO WALL CLEANOUT
WC WATER COLUMN
W WASTE
W WATT
W/ WITH
VTR VENT THROUGH ROOF
VFD VARIABLE FREQUENCY DRIVE
VA UNITED STATES DEPARTMENT OF VETERAN'S AFFAIRS
V VENT
TYP TYPICAL
TS THERMOSTATIC
TEMP TEMPERATURE
RPM REVOLUSTIONS PER MINUTE
RP REDUCED PRESSURE
RL RAIN LEADER
PVC POLYVINYL CHLORIDE
PSI POUNDS PER SQUARE INCH
PRV PRESSURE REDUCING VALVE
PB PRESSURE BALANCE
ORL OVERFLOW RAIN LEADER
NPSHR NOMINAL PUMP SUCTION HEAD REQUIRED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
N/A NOT APPLICABLE
MRT MEAN RADIANT TEMPERATURE
MIN MINIMUM
MFG MANUFACTURER
MCA MINIMUM CIRCUIT AMPACITY
MC MECHANICAL CONTRACTOR
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MAX MAXIMUM
LBS POUNDS
KW KILOWATT
J-BOX JUNCTION BOX
INDW INDIRECT WASTE
IN INCH
HWC HOT WATER CIRCULATION
HW HOT WATER
HP HORSEPOWER
GPM GALLONS PER MINUTE
GPF GALLONS PER FLUSH
GPD GALLONS PER DAY
GC GENERAL CONTRACTOR
GAL GALLON
G GAS
FU FIXTURE UNITS
FT FEET
FD FLOOR DRAIN
FCO FLUSH CLEANOUT
EFF EFFICIENCY
EC ELECTRICAL CONTRACTOR
DN DOWN
DEG F DEGREES FAHRENHEIT
DC DOUBLE CHECK
CW COLD WATER
CV COEFFICIENT OF FLOW
COND CONDENSATE
CIRC CIRCULATION
CFH CUBIC FEE PER HOUR
BTU BRITISH THERMAL UNIT
BFP BACKFLOW PREVENTER
ASJ ALL SERVICE JACKET
AMP AMPERES
AG AIRGAP
ADA AMERICANS WITH DISABILITIES ACT
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
A/E ARCHITECT/ENGINEER
(E) EXISTING
°F DEGREES FAHRENHEIT
ABBREVIATIONS LIST GENERAL NOTES
1. PROVIDE SYSTEM STARTUP, TESTING, & ADJUSTMENTS OF INSTALLED SYSTEMS TO MEET PERFORMANCE
REQUIREMENTS INDICATED IN THE CONTRACT DOCUMENTS.
2. CONTRACTOR SHALL SUPPORT SYSTEM COMMISSIONING AND SHALL COORDINATE WITH PROJECT COMMISSIONING
AGENT.
3. CONTRACTOR SHALL PROVIDE ALL DOCUMENTATION REQUIRED TO SUPPORT SYSTEM COMMISSIONING.
4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND CONSTRUCTION FEES. FURNISH COPIES OF
ALL CONSTRUCTION PERMITS, FINAL APPROVED PERMITS, AND SIMILAR DOCUMENTS TO OWNER SHOWING
COMPLIANCE WITH CODE REQUIREMENTS.
5. PROVIDE ENERGY METERING DEVICES FOR NATURAL GAS SUPPLY. DATA SHALL BE ACCESSIBLE THROUGH THE
BUILDING MANAGEMENT SYSTEM.
6. LOCATE ALL VALVES, TRAPS, TEST PORTS, CONTROLS, CLEANOUTS, ETC. TO BE ACCESSIBLE FOR MAINTENANCE, ADJUSTMENT, & TESTING. PROVIDE ACCESS PANELS FOR ALL CONCEALED DEVICES. ACCESS PANEL LOCATIONS SHALL
BE COORDINATED WITH ARCHITECT.
7. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED
CEILING SYSTEM.
8. PROVIDE 10W/FT HEAT TRACE FOR ALL RAINLEADERS, STORM DRAIN PIPING, DOMESTIC WATER PIPING, & P-TRAPS IN
UNHEATED SPACES OR EXPOSED TO EXTERIOR ENVIRONMENT.
9. DISCHARGE TEMPERATURE OF PUBLIC LAVATORIES SHALL BE SET AT 104 DEGREES FAHRENHEIT MAXIMUM.
10. CONFIGURE HOT AND TEMPERED WATER CONNECTIONS TO LAVATORY FIXTURES SO THAT MAXIMUM UN-
RECIRCULATED PIPING LENGTH DOES NOT EXCEED 24” DEVELOPED LENGTH FROM RECIRCULATION CONNECTION TO
FIXTURE INLET.
11. UN-RECIRCULATED HOT AND TEMPERED WATER SYSTEM BRANCHES SHALL NOT EXCEED 25 FEET IN DEVELOPED
LENGTH.
12. ALL PRESSURES LISTED ARE GAGE PRESSURES UNLESS OTHERWISE NOTED.
13. PROVIDE SYSTEM FLUSHING CONNECTIONS THROUGHOUT DOMESTIC HOT, TEMPERED, AND COLD WATER SYSTEM.
FLUSHING CONNECTIONS SHALL HAVE ISOLATION VALVES AND HOSE CONNECTIONS TO ENABLE COMPLETE PIPE SYSTEM FLUSH WITH HIGH-TEMPERATURE WATER OR SANITIZING CHEMICALS. SYSTEM FLUSHING CONNECTIONS
LOCATED IN FINISHED AREAS SHALL BE CONCEALED BEHIND ACCESS PANELS.
14. PROVIDE SEISMIC SUPPORT AND ATTACHMENT FOR PIPING AND EQUIPMENT.
15. COORDINATE ALL PLUMBING WORK WITH OTHER TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR
WORK WITH THE WORK OF PLUMBING CONTRACTOR. PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR
TO FABRICATION AND INSTALLATION.
16. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 70 STANDARDS AND LOCAL REQUIREMENTS.
17. ALL FIELD WIRING SHALL REQUIRE AN ELECTRICAL PERMIT AND SHALL BE PERFORMED BY A LICENSED ELECTRICIAN.
18. A SHORT DASH IN A SCHEDULE TABLE CELL INDICATES THAT THE COLUMN HEADING IS NOT USED OR NOT APPLICABLE
TO THAT SCHEDULED ITEM.
19. MAINTAIN AND RESTORE (IF INTERRUPTED) ALL CONDUITS & CONDUCTORS, PIPING, & DUCTWORK PASSING THROUGH
RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
20. REMOVE ALL ABANDONED DUCTWORK, PIPING, CONTROLS, WIRING, ETC., WHERE ACCESSIBLE IN RENOVATED AREAS.
21. WHERE CONTROLS ARE DEMOLISHED, REMOVE WIRING BACK TO NEAREST CONTROL PANEL OR JUNCTION BOX.
REMOVE ACCESSIBLE CONDUIT, JUNCTION BOXES, ETC.
22. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT AND COMPONENTS REMOVED DURING
DEMOLITION.
9'0 W
180'0 S
210'0 S
240'0 S
270'0 S
300'0 S
GLAZING NOT SHOWN ON PLANS
H O
S E
B
IB
B 150'0 S
180'0 S
210'0 S
240'0 S
270'0 S
300'0 S
9'0 W
T V
(E) 3/4" CW
(E) HB(E) RL DOWNSPOUT
(E) 4" RL
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
1/8" = 1'-0"
PD101
463-301
DEC. 7, 2020 Checker Author
PLUMBING DEMOLITION
PLAN
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
- SCALE:PD101 1/8" = 1'-0"PD101
FIRST FLOOR PLUMBING DEMOLITION PLAN11
- SCALE:PD101 1/8" = 1'-0"PD101
SECOND FLOOR PLUMBING DEMOLITION PLAN22
S300
W9
W0
W32
W33
W34
S21
S22
S23
S270 S240 S210 S180 S150 S120 S90
S24 S25 S26 S27 S28
E31
E30
E29
3"ø RL
3"ø RL
6"ø ORL
SP-1
SP-2
6" UP TO FCO
6" RL I.E. -4.583' BELOW
FINISHED FLOOR. REFER TO
C3.0 FOR CONTINUATION
2"ø V 4"ø W 2"ø W
4"ø W
5'' RAINLEADER UP
TO FIRST FLOOR
6'' UP TO
DOWNSPOUT
2'' V UP TO
FIRST FLOOR
2'' V UP TO
FIRST FLOOR
2"ø W
2"ø W
2"ø V
3"ø W
2"ø W
4"ø W
4"ø W
4"ø W
2'' V UP TO
FIRST FLOOR
UP TO
FCO
2'' CW UP
4'' W UP SUMP PIT
4"ø RL
3'' RAINLEADER UP
TO FIRST FLOOR
4" UP
TO FCO
4" CAPPED WASTE STUB OUT
FOR FUTURE 1ST FLOOR
CONNECTIONS
I.E. -5.500'
4"ø V
3"ø ORL
1-1/2" G UP
1-1/2" G. REFER TO GS-104
FOR CONTINUATION
2" CW. REFER TO C5.0 FOR
CONTINUATION
3" W UP
6"ø RL
4"ø RL
4"ø W
2"ø V
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
1/8" = 1'-0"
PP101
463-301
DEC. 7, 2020 JB KT
FOUNDATION PLUMBING
PLAN
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
- SCALE:PP101 1/8" = 1'-0"PP101
FOUNDATION PLUMBING PLAN11
TRUE
NORTH
PROJECT
NORTH
UP
FIRE
SPRINKLER
1A301
ELEVATOR
RM
1A300
STAIRS
STORAGE
1A401
CORRIDOR
C1-1A
CORRIDOR
C1-1B
INTERSTITIAL
SPACE
1A403
MECHANICAL
ROOM
1A402
S300
W9
W0
W32
W33
W34
S21
S22
S23
S270 S240 S210 S180 S150 S120 S90
S24 S25 S26 S27 S28
E31
E30
E29
3"ø W
UP TO FCO
FCO
CONNECT TO (E) 4" W STUB
FROM SECOND FLOOR
OVERFLOW
DOWNSPOUT
OVERFLOW
DOWNSPOUT
2" V UP
4" V
UP/DNFD-C
P-FD-S
FCO
WH-1 2"ø W
2"ø W
4"ø W
2"ø W
2"ø W
2"ø W
2"ø W
4"ø W 4"ø W 2"ø V
4"ø W
4"ø W
4"ø W4"ø W
4"ø W2"ø W 3"ø W
4"ø W
4"ø W
3"ø W
4"ø W
2"ø V
4"ø W
4"ø W
3"ø W
2"ø CW
FD-C
FD-C
FD-C
ET-3
ET-4
BFP-1
BFP-3
BFP-4
BFP-2
FD-M
4"ø W
UP TO
FCO
UP TO FCO
UP TO WCO
2"ø V
2"ø W
2"ø V
2"ø W
2"ø W
2"ø V
2"ø V
2"ø W
2"ø W
4"ø W 4"ø W
2'' V DN
SUMP PIT
FCO
2'' CW, 1'' HW, 1'' HWC
UP TO SECOND FLOOR
2'' V UP/DN
PP401
2'' V UP
ET-2
3" FCO
6" FCO
5"ø RL
4"ø RL
4"ø RL
4"ø RL
3" CO
2"ø W
4" FCO
PP501
5 (TYP)
PP501
3(TYP)
PP501
PP501
2"ø V
4"ø W
2"ø V
1-1/4" G DN
AS-2
AS-3
AS-1
2"ø W
2"ø W
2" CW DN
GAS PRESSURE
REGULATOR
HU-1
3" RL UP/DN
2" V DN
3" RL UP/DN
3" RL UP4" RL UP
5" RL DN
3" W DN
P-801
3/4" CW UP
P-801
P-801
3/4"ø CW
(E) 3/4" CW
(E) RELOCATED HOSE BIBB
PP502
FD-S
FD-S
PP501
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
1/8" = 1'-0"
PP102
463-301
DEC. 7, 2020 JB KT
FIRST FLOOR PLUMBING
PLAN
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
- SCALE:PP102 1/8" = 1'-0"PP102
FIRST FLOOR PLUMBING PLAN11
TRUE
NORTH
UP
OFFICE
COUNSELOR
2A311
SUPERVISOR
OFFICE
2A313
CONSULTATION
OFFICE
2A317
CONSULTATION
OFFICE
2A321
CONSULTATION
OFFICE
2A329
SUPERVISOR
OFFICE
2A312
CONSULTATION
ROOM
2A306
EXAM
ROOM
2A308
EXAM
ROOM
2A309
MULTISTATION
WORK
ROOM
2A305
STORAGE
2A302
CORRIDOR
C2-2F
EXAM
2A330
EXAM
2A332
OFFICE
COUNSELOR
2A331
CONSULTATION
OFFICE
2A333
CONSULTATION
OFFICE
2A335
CONSULTATION
OFFICE
2A334
CONSULTATION
OFFICE
2A345
EXAM
2A348
PATIENT
TOILET
2A325
CORRIDOR
C2-2C
CORRIDOR
C2-2G
ELECTRICAL
2A400
GROUP
THERAPY
2A307
MULTISTATION
WORK
ROOM
2A304
CONSULTATION
ROOM
2A306
CONSULTATION
OFFICE
2A314
CORRIDOR
C2-2D
MH CHIEF
2A310
OFFICE
COUNSELOR
2A315
CONSULTATION
OFFICE
2A323
CONSULTATION
OFFICE
2A327
STAFF
TOILET
2A318
IT/DATA
2A351
TELEHEALTH
2A350
CONSULTATION
OFFICE
2A347
CONSULTATION
OFFICE
2A343
STAFF
TOILET
2A340
BREAK RM
2A339
MULTISTATION
WORK
ROOM
2A338
CONSULTATION
OFFICE
2A342
CONSULTATION
OFFICE
2A336
EXAM
2A346
CONSULTATION
OFFICE
2A344
PATIENT
TOILET
2A324
JANITOR
2A326
STOR.
2A328
WAITING
AREA
2A352
CHECK IN
2A353
CHECK
OUT
2A354
MULTISTATION
WORK
ROOM
2A319
SUPERVISOR
OFFICE
2A320
TELEHEALTH
2A349
CORRIDOR
C2-2E
STORAGE
2A341
CORRIDOR
C2-2C
STAIRS
OFFICE
COUNSELOR
2A322
ELEVATOR
P-3 CORRIDOR
C2-2B
CORRIDOR
C2-2A
S300
W0
W32
W33
W34
S21
S22
S23
S270 S240 S210 S180 S150 S120 S90
S24 S25 S26 S27 S28
E31
E30
E29
3"ø ORL
4"ø ORL
4"ø RL
3"ø ORL
3"ø RL
3"ø RL
2" V UP TO VTR
2" V UP TO VTR
4" V UP
TO VTR
3" UP TO
VTR
3" RL/ORL UP
TO P-930
3/4" CW UP
TO P-805
P-103
P-103
P-103
P-103
P-418
P-418
P-418
P-419
P-418
P-419
P-419
P-419
P-528
P-502
WCO
2"ø V
1"ø HW
1 1/4"ø CW
FD-C
FCO
FD-C
FD-C
FD-C
2"ø V
3/4"ø HWC
1"ø HW
1"ø HW
1 1/2"ø CW
3/4"ø HWC
2"ø CW
2'' V DN TO
FIRST FLOOR
2"ø V
3/4"ø HWC
2"ø V
2'' CW, 1'' HW, 1'' HWC DN
TO MECHANICAL ROOM
1"ø HWC
1"ø HW 2"ø CW
FCO
FCO
FCO
2'' V DN TO
FIRST FLOOR
3/4"ø HWC 3/4"ø HWC
3"ø RL
3"ø ORL
4" FCO
PP501
5 (TYP)
PP501
3(TYP)
PP501
7 (TYP)
3" RL/ORL DN
3" RL/ORL
UP
4" RL/OLR DN
3" RL/ORL UP
3" RL/ORL DN
3" RL/ORL UP
1 1/4"ø CW
3/4" CW DN
3/4"ø HW
P-418
P-418
3/4"ø HWC 3/4"ø HW
3/4"ø CW 2"ø V
3/4"ø COND
3/4"ø COND 3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND 3/4"ø COND 3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND 3/4"ø COND
3/4"ø COND 3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND 3/4"ø COND 3/4"ø COND
3/4"ø COND
3/4"ø COND
3/4"ø COND 3/4"ø COND
3/4"ø COND
3" RL/OLR DN
2"ø V
1 1/2"ø CW
1 1/4"ø CW
3/4"ø CW
3/4" CW DN
TO HB-1
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
1/8" = 1'-0"
PP103
463-301
DEC. 7, 2020 JB KT
SECOND FLOOR PLUMBING
PLAN
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
- SCALE:PP103 1/8" = 1'-0"PP103
SECOND FLOOR PLUMBING PLAN11
TRUE
NORTH
PROJECT
NORTH
PLAN NOTES
1 1/2" COLD WATER, 1/2" HOT WATER, 2" VENT, 2" WASTE.
2 ROUTE 3/4" CONDENSATE FROM MECHANICAL EQUIPMENT TO
THIS LOCATION. PROVIDE AIR GAP FITTING WITH ACCESS
HATCH.
GENERAL NOTES
1 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE. REFER TO
MECHANICAL HVAC DOCUMENTS AND SCHEDULES FOR
EQUIPMENT AND PRODUCT INFORMATION.
S300
W9
W0
W32
W33
W34
S21
S22
S23
S270 S240 S210 S180 S150 S120 S90
S24 S25 S26 S27 S28
E31
E30
E29
P-930P-930
P-930
P-930
4" VTR
3" VTR
3" VTR
4" VTR
P-805
PP501
7 (TYP)
PP501
2 (TYP)
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
1/8" = 1'-0"
PP104
463-301
DEC. 7, 2020 JB KT
ROOF PLUMBING PLAN MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
- SCALE:PP104 1/8" = 1'-0"PP104
ROOF PLUMBING PLAN11
TRUE
NORTH
ELEVATOR
RM
1A300
STORAGE
1A401
CORRIDOR
C1-1B
MECHANICAL
ROOM
1A402
W32 W33 W34
S21
HRU-1
B-3B-2
B-1
AS-1
ET-4
BT-1
PU-6A
PU-6B
BT-2
WSHP-2
BFP-4
BFP-1
BFP-3
BFP-2
WH-1
PU-9
PU-5B
PU-5A
PU-7
PU-4B
PU-4A
1"ø CW
1"ø CW
1"ø CW
2"ø CW
ET-3
PU-3PU-2
PU-1
FD-C
FD-C
FD-C
FD-M
FCO
ET-2
AS-3
AS-2
SUMP PIT, SP-1 AND SP-2
LOCATED WITHIN
4"ø W
2"ø CW
2'' CW, 1'' HW AND 1'' HWC
UP TO SECOND FLOOR
4'' RAINLEADER DOWN
TO FOUNDATION
2'' VENT DN
2"ø CW
1 1/4"ø CW
1"ø CW
1"ø CW
1"ø CW
1"ø CW
1"ø CW
1"ø CW
1"ø CW
1"ø CW 1"ø CW
1"ø CW
1"ø CW
2'' VENT UP TO
SECOND FLOOR
2'' VENT UP TO
SECOND FLOOR
SUMP PUMP
CONTROL PANEL
3" RAINLEADER
UP AND DOWN
WSHP-1
CP-1
3" FCO
2" FCO
1"ø G
1"ø G
1"ø G
1 1/2"ø G
1 1/4"ø G
LOCATION OF FUTURE WATER SOURCE
HEAT PUMPS FOR FIRST FLOOR
1-1/2" G DN
2" CW DN
3/4" CW UP 1 1/2"ø G
3/4"ø G
PU-8
3/4"ø CW
PP501
5 (TYP)
PP501
3(TYP)
PP501
100-TV-1
3/4"ø CW
3"ø W
HU-1
4"ø V
2"ø V
GAS METER
3/4"ø CW
P-801
RAINLEADER DOWNSPOUT
FD-S
FD-S
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
3/8" = 1'-0"
PP401
463-301
DEC. 7, 2020 JB KT
ENLARGED MECHANICAL
ROOM PLUMBING PLANS
MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
TRUE
NORTH
PROJECT
NORTH
- SCALE:PP401 3/8" = 1'-0"PP401
ENLARGED MECHANICAL ROOM PLUMBING PLAN11
GENERAL NOTES
1 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE. REFER TO
MECHANICAL HVAC DOCUMENTS AND SCHEDULES FOR
EQUIPMENT AND PRODUCT INFORMATION.
PLAN NOTES
1 ROUTE CONDENSATE PIPING TO NEAREST FLOOR SINK.
2 ROUTE DRAIN AND CONDENSATE PIPING TO NEAREST FLOOR
SINK.
CHROME WALL COVER
AND SCREW
PLUGGED TEE
WITH CLEANOUT
FLOOR LINE
WASTE PIPE
PIPE INSULATION
PIPE HANGER
RIGID INSULATION
6" MIN
10" MIN
PIPE INSULATION
PIPE
THREADED ROD;
ATTACH TO STRUCTUREGALVANIZED METAL OR RUBBER SHIELD
BETWEEN HANGER AND INSULATION UP TO
CENTERLINE OF PIPE
LOCK NUT
TURNBUCKLE
STEEL STRAP
INSULATION
STEEL CLEVIS
DOMESTIC WATER PIPE 18 GA. SM SHEILD
RIGID INSULATION
PIPE HANGER
6" MIN
PIPE
THREADED ROD;
ATTACH TO STRUCTURE
PLASTIC PIPE
PROVIDE RUBBER OR GALVANIZED PIPE SHIELD TO
PROTECT PLASTIC PIPING (PIPE SHIELDS SHALL
SURROUND ENTIRE PIPE CIRCUMFERENCE)
PLASTIC PIPE
PROVIDE RUBBER OR GALVANIZED PIPE SHIELD TO
PROTECT PLASTIC PIPING (PIPE SHIELDS SHALL
SURROUND ENTIRE PIPE CIRCUMFERENCE)
PROVIDE RUBBER OR GALVANIZED
PIPE SHIELD TO PROTECT PLASTIC
PIPING (PIPE SHIELDS SHALL
SURROUND ENTIRE PIPE
CIRCUMFERENCE)
TURNBUCKLE
STEEL STRAP
PIPING (TYP)
LOCKING NUTS TOP
AND BOTTOM
PROVIDE INSULATION ON
PIPE MOUNTING STRAP
PIPE MOUNTING STRAP (TYP)
UNISTRUT CHANNEL
COORDINATE WITH
NUMBER OF PIPES
21-1/2" FLASHING
12" ALUMINUM BASE
FLANGE, BASE OF MVENT
NON-REINFORCED
SBS TARGET
DECK
INSULATION
BASE SHEET
FIELD SHEET
FLASHING
5" HEIGHT OF
ALUMINUM
VENT
5-1/2" BOOT HEIGHT
(BEFORE CUTTING)
6" I.D.
SANTOPRENE
BOOT
VENT PIPE
FLOOR
2" CW
AIRGAP FITTING
100-BFP-1
2"
1" TO INDIRECT DRAIN
AT FLOOR DRAIN (TYP)
NOTE:
RACK-MOUNT ALL RISER COMPONENTS TO WALL.
2'' DOMESTIC CW
TO FIXTURES
BFP
100-BFP-2
1"
1" TO SNOW MELT LOOP
MAKEUP WATER
BFP
AIRGAP FITTING
M
CW METER. REFER TO
CIVIL DOCUMENTS FOR
MORE INFORMATION.
AIRGAP FITTING
3/4" TO INDIRECT DRAIN AT
FLOOR DRAIN (TYP)
1" TO WATER SOURCE
LOOP MAKEUP WATER
BFP
100-BFP-3
2"
AIRGAP FITTING
3/4" TO INDIRECT DRAIN AT
FLOOR DRAIN (TYP)
1" TO BOILER LOOP
MAKEUP WATER
BFP
100-BFP-4
3/4" TO INDIRECT DRAIN AT
FLOOR DRAIN (TYP)
1"
1"
AFTER CONCRETE HARDENS (STEP #2)
DURING CONCRETE POUR (STEP #1)
DUCT TAPE
FLOOR DRAIN
BODY
PIPE
NOTE:
COMPLETE INSTALLATION OF FLOOR DRAIN AND
SETTING OF FINAL ELEVATION SHALL NOT BE
ALLOWED DURING INITIAL CONCRETE POUR
CUT 1-1/2" RIGID
INSULATION TO FIT.
ATTACH WITH DUCT
TAPE
FLASHING
COLLAR
FINISHED
GROUT
STRAINER
STRAINER
HEAD
VAPOR
BARRIER (TYP)
CONCRETE
BY GC CONCRETE
BY GC
FLOOR
DRAIN BODY
INSTALL STRAINER, STRAINER
HEAD, & FLASHING COLLAR
(SEE FINAL ELEVATION)
REMOVE AND STORE
STRAINER, STRAINER HEAD AND
FLASHING COLLAR
ROOF ASSEMBLY
PER ARCHITECTURAL
PRIMARY AND OVERFLOW
ROOF DRAIN
JUNCTION BOX
PER ELECTRICAL
HEAT TRACE, WRAP
AROUND PIPES INSIDE
INSULATION MINIMUM
10'
ROOF DRAIN
CONDUCTOR, SIZE PER
PLANS
CEILING
CLEANOUT
FLEXIBLE
COUPLING (TYP)
RAINLEADER AND OVERFLOW
RAINLEADER PIPING TO
COMBINE AT NEXT VERTICAL DROP.
WALL ASSEMBLY PER
ARCHITECTURAL DRAWINGS
OVERFLOW DOWNSPOUT NOZZEL
6' SELF LIMITING HEAT TRACE
INSULATION
SECURE PIPING TO STRUCTURE (TYP)
PIPE CHASE PER ARCHITECTURAL
J-BOX, SEE ELECTRICAL
PROVIDE ACCESS DOOR
INSTALL PIPE IN
CHASE, SEE
ARCHITECTURAL
SLEEVE AND SEAL
PENETRATION (TYP)
SPLASH BLOCK
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PP501
463-301
DEC. 7, 2020 JB KT
DETAILS MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
SCALE: NONEPP501
WALL CLEANOUT DETAIL11
SCALE: NONEPP501
PIPE SUPPORT55
SCALE: NONEPP501
VENT FLASHING DETAIL22
SCALE: NONEPP501
BACKFLOW PREVENTER INSTALLATION66
SCALE: NONEPP501
FLOOR DRAIN INSTALLATION DETAIL33
SCALE: NONEPP501
ROOF AND OVERFLOW DRAIN DETAIL77
SCALE: NONEPP501
OVERFLOW DOWNSPOUT NOZZLE DETAIL44
CATCH BASIN LID (W/ ACCESS
PANELS, FLUSH W/ GRADE)
LIFTING CABLE OR CHAIN
VALVE HANDLE EXTENSION
SLIDE RAIL SYSTEM
CATCH BASIN
4" DISCHARGE PIPE. -5.96' I.E.
GATE VALVE
UNION
QUICK DISCONNECT
CHECK VALVE
6" MINIMUM PEA GRAVEL
BEDDING BELOW CATCH BASIN
SP-1/SP-2
I.E. -6.75'
PUMP SHUTOFF
PUMP 1 ON
HIGH WATER ALARM
FLOAT
SWITCHES
INLET WASTE PIPE (TYP)
SPARE WIRE COILED UP (TYP)
2" VENT PIPE
CONNECT TO BUILDING
SANITARY VENT PIPING
SYSTEM
ALARM/CONTROL CABINET
(LOCATED IN MECHANICAL ROOM)
2" CONDUIT AND
CONTROL WIRING
J-BOX
2" CONDUIT AND
CONTROL WIRING
NOTES:
PROVIDE COMPLETE SUMP PUMP SYSTEM INCLUDING (2) PUMPS, CHECK VALVE, QUICK DISCONNECT, UNION, SHUTOFF VALVE AND PIPING TO CONNECT ALL COMPONENTS TO SANITARY SEWER SYSTEM, CONTROL PANEL, FLOATS, AND WIRING. PROVIDE POWER AND CONTROL WIRING
AND CONDUIT FROM SUMP TO CONTROL/ALARM PANEL.
PROVIDE PRECAST CONCRETE CATCHBASIN, 3' X 3' X 7' INSIDE CLEAR DIMENSIONS (MINIMUM). CATCHBASIN SHALL BE TIED TO CONCRETE
FLOOR SYSTEM VIA REBAR, REFER TO STRUCTURAL DOCUMENTS FOR TIE-IN REQUIREMENTS.
PROVIDE 3' X 3' ACCESS HATCH WITH ANTI-SKID SURFACE, PNEUMATIC OR HYDRAULIC ASSIST, AND RECESSED LOCKING MECHANISM. HATCH
FRAME SHALL BE SET IN CONCRETE FLOOR SLAB.
PROVIDE PERMANENTLY-INSTALLED VALVE HANDLE EXTENSIONS FOR ALL OPERABLE VALVES IN CATCH BASIN. EXTEND VALVE HANDLE
OPERATOR(S) TO WITHIN 12"OF TOP OF CATCH BASIN.
NO JUNCTION BOXES OR WIRE SPLICES SHALL BE ALLOWED IN THE CATCH BASIN. WIRING SHALL BE CONTINUOUS BETWEEN DEVICES IN CATCH
BASIN AND MECHANICAL ROOM.
FLOAT SWITCH ELEVATIONS (IE):
HIGH WATER ALARM: -2.0'
PUMP 2 ON: -4.0'
PUMP 1 ON: -6.0'
PUMP SHUTOFF: -6.5'
I.E. -7.0'
PUMP 2 ON
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PP502
463-301
DEC. 7, 2020 Checker Author
DETAILS MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
SCALE: NONEPP502
CATCH BASIN DETAIL11
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
PP601
463-301
DEC. 7, 2020 JB KT
SCHEDULES MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
THE PRODUCTS OR SERVICES IN THE BASIS OF DESIGN AND EQUIPMENT/PRODUCT
SCHEDULES ON THIS DRAWING WERE PURPOSELY SELECTED BY THE A/E TO MEET
THE OWNERS PROGRAMMING REQUIREMENTS AND ARE NOT BEING "SOLE-
SOURCED" BY THE VA UNLESS NOTED OTHERWISE. OTHER MANUFACTURERS WITH
EQUAL SALIENT CHARACTERISTICS, EQUAL QUALITY, EQUAL LEAD TIMES, AND
EQUAL MAINTENANCE COSTS MAY USE THOSE PRODUCTS OR EQUIPMENT TO BID
AND CONSTRUCT THE PROJECT. BIDDERS SHALL CONTACT THE A/E VIA THE VA
PROJECT CONTRACTING OFFICER DURING THE BID PHASE FOR APPROVAL OF THE
SUBSTITUTION REQUEST ON EACH ITEM. IN THE EVENT A CONTRACTOR IS
AWARDED THE PROJECT WITHOUT OBTAINING VA APPROVAL OF THE SUBSTITUTION
REQUEST DURING THE BID PHASE AND THE SHOP DRAWINGS AND SUBMITTALS OF
ALTERNATE MANUFACTURERS ARE NOT APPROVED BY THE A/E OR THE VA THEN
THE CONTRACTOR MUST INSTALL THE BASIS OF DESIGN PRODUCTS OR SERVICES
AT THE CONTRACTOR'S EXPENSE. NON-APPROVED PRODUCTS OR SERVICES ARE
AT THE CONTRACTOR'S RISK AND NO EQUITABLE ADJUSTMENT TO TIME OR MONEY
WILL BE MADE FOR COST DIFFERENCES BETWEEN APPROVED VERSUS NON-
APPROVED AFTER BIDDING HAS BEEN CLOSED. ALLOW SEVEN CALENDAR DAYS
BEFORE BIDS ARE DUE TO OBTAIN APPROVAL.
BASIS OF DESIGN NOTES
NOTES:
BFP-4 WATTS LF009 1.00 BOILER LOOP X X X 0.75 - - 12
BFP-3 WATTS LF009 1.00 WATER SOURCE LOOP X X X 0.75 - - 12
BFP-2 WATTS LF009 1.00 SNOW MELT LOOP X X X 0.75 - - 12
BFP-1 WATTS LF009 2.00 DOMESTIC WATER X X X 1.00 - - 30
SIZE (IN) RP DC AG (IN) INLET OUTLET (LBS)
SYMBOL MANUFACTURER MODEL LINE SERVICE TYPE AIRGAP WATER PRESSURE (PSI) WEIGHT NOTES
BACKFLOW PREVENTER SCHEDULE
NOTES:
P-710 WATTS LFE480 X - 1/2'' 1/2'' - - 0.50 4 104 LAVATORIES -
P-705 WATTS LFN170-M3 X - 1-1/4'' 1-1/4'' - 13.42 4 104 120 DOMESTIC HOT WATER 19.3
TS PB INLET OUTLET PRV MIN MAX TEMP ( °F) (LBS)
SYMBOL MANUFACTURER MODEL TYPE LINE SIZE (IN) CV FLOW (GPM) OUTLET SERVICE WEIGHT NOTES
TEMPERING VALVE SCHEDULE
6. PROVIDE WITH FUNNEL OPTION FIGURE 3581.
5. PROVIDE WITH HARDWIRED ELECTRICAL CONNECTION CONFIGURATION, INCLUDING TRANSFORMER.
4. PROVIDE WITH 1-1/4" TRAP & TAILPIECE.
3. PROVIDE WITH TEMPERING VALVE 100-P-710 AT EACH FIXTURE.
2. ALL LAVATORIES TO BE MOUNTED TO WALL WITH MANUFACTURERS' CARRIER AND STEEL BACKING PLATE.
1. INSTALL IN ACCORDANCE WITH ABAAS AND ADA REQUIREMENTS.
NOTES:
RD-1 ROOF AND OVERFLOW DRAIN ZURN 930/931 COMBINATION MAIN ROOF AND OVERFLOW DRAIN 3" - - - - - - - - - - ROOF -
FD-S FLOOR SINK JR SMITH 3450 16X16X12", CAST IRON, ACID RESISTANT PORCELAIN ENAMEL FINISH 4" - 2" - - - - - - - - FLOOR -
FD-M FUNNEL FLOOR DRAIN JR SMITH 2005 TYPE M, MEDIUM DUTY, SQUARE OR ROUND STRAINER WITH ADJUSTABLE FUNNEL STRAINER 2" - 2" - - - - - - - - FLOOR - 6
FD-C FLOOR DRAIN JR SMITH 2005 TYPE C, MEDIUM DUTY, SQUARE OR ROUND GRATE 2" - 2" - - - - - - - - FLOOR -
P-805 ROOF HYDRANT JR SMITH Z1388 FREEZE PROOF, EXPOSED HEAD, ROOF HYDRANT - - - - 3/4" - - - - - - ROOF -
P-801 WALL HYDRANT JR SMITH 5509QT FREEZE PROOF, 1/4 TURN LOCKED BOX - - - - 3/4" - - - - - - WALL -
FAUCET ZURN Z831B4-XL-HS SENSOR CONTROL, GOOSENECK SPOUT, CENTER MOUNTED
P-528 KITCHEN SINK KOHLER K-3894-4 SINGLE COMPARTMENT, SELF-RIMMING, BACK FAUCET LEDGE 2" - 2" 1/2" 1/2" 2.20 - 120 1 COUNTER - 3,5
FAUCET STERN-WILLIAMS T-10-VB WALL MOUNT FAUCET WITH VACUUM BREAKER, CHROME FINISH
P-502 SERVICE SINK STERN-WILLIAMS CRS-2210 TERAZZO, 28X28", CORNER FLOOR MOUNTED SINK, WALL MOUNT FAUCET 2" - 2" 3/4" 3/4" 2.50 - - - - - FLOOR -
P-419 LAVATORY BRADLEY LD-5010 TERREON DECK, 12X22" BASIN, SINGLE COMPARTMENT, SENSOR OPERATED ALL IN ONE WASHBAR 2" - 2" 1/2" 1/2" 0.50 - 120 1 WALL - 1,2,3,4,5
FAUCET SLOAN SF-2200-4-PLG-TEE SENSOR CONTROL, GOOSENECK SPOUT, CENTER MOUNTED
P-418 LAVATORY KOHLER K-2031 WALL MOUNTED 20X18" VITREOUS CHINA 2" - 2" 1/2" 1/2" 0.50 - 120 1 WALL - 1,2,3,4,5
FLUSH VALVE ZURN ZEMS6000AV-HET 1.28 GPF HARDWIRED SENSOR FLUSH VALVE
SEAT ZURN
P-103 WATER CLOSET ZURN Z5665-BWL-AM ADA, VITREOUS CHINA, FLOOR MOUNTED, SIPHON JET TYPE 4" - 2" - 1-1/2" - 1.28 - - - - FLOOR - 1
WASTE INDW VENT HW CW GPM GPF W AMP VOLT PHASE (LBS)
SYMBOL FIXTURE MANUFACTURER MODEL DESCRIPTION PLUMBING CONNECTIONS (IN) FLOW ELECTRICAL MOUNTING WEIGHT NOTES
PLUMBING FIXTURE SCHEDULE
3. PROVIDE WITH ALUMINUM JACKETING FOR ALL EXTERIOR LOCATIONS.
2. INSULATION REQUIREMENTS SHALL APPLY TO HEAT TRACED PIPING APPLICATIONS ALSO.
1. PROVIDE WITH PVC JACKETING IN ALL EXPOSED LOCATIONS (MECHANICAL ROOMS, UTILITY ROOMS, STORAGE ROOMS, ETC.).
GENERAL NOTES:
DRAINS AND TRAPS <40 0.20-0.26 75 0.5 1.0 1.0 1.0 1.5 FLEXIBLE ELASTOMERIC 1,2,3
CONDENSATE DRAIN 40-60 0.21-0.27 75 0.5 0.5 1.0 1.0 1.0 FIBERGLASS W/ ASJ 1,2,3
RAINLEADER 40-60 0.21-0.27 75 0.5 0.5 1.0 1.0 1.0 FIBERGLASS W/ ASJ 1,2
CW 40-60 0.21-0.27 75 0.5 0.5 1.0 1.0 1.0 FIBERGLASS W/ ASJ 1,2
HW, HWC 105-140 0.21-0.28 100 1.0 1.0 1.5 1.5 1.5 FIBERGLASS W/ ASJ 1,2
( °F) K FACTOR MRT ( °F) <1" 1" - 1-1/4" 1-1/2" - 3" 4" - 8" >8"
APPLICATION TEMP RANGE INSULATION CONDUCTIVITY NOMINAL PIPE SIZE (IN) TYPE NOTES
PIPE INSULATION SCHEDULE
1. ASME CONSTRUCTION.
NOTES:
ET-1 AMTROL ST-20-VC DOMESTIC HW EXPANSION TANK DIAPHRAGM 150 8.00 3.20 4.5 1
(PSI) TOTAL ACCEPTANCE (LBS)
SYMBOL MANUFACTURER MODEL SERVES TYPE CONFIGURATION PRESSURE VOLUME (GAL) WEIGHT NOTES
EXPANSION TANK SCHEDULE
2. PROVIDE WITH BACNET GATEWAY.
1. PROVIDE WITH MANUFACTURER'S CONDENSATE NEUTRALIZER KIT.
NOTES:
WH-1 AO SMITH BTX-80 50 76 68.5 90% 140 82.20 100 120 1 < 0.6 210 1,2
(GAL) INPUT OUTPUT TEMP (DEG F) GPH TEMP RISE VOLT PHASE KW (LBS)
SYMBOL MANUFACTURER MODEL CAPACITY GAS RATINGS (MBH) EFF DISCHARGE RECOVERY ELECTRICAL WEIGHT NOTES
GAS WATER HEATER SCHEDULE
NOTES:
SP-2 BELL & GOSSETT 2WF1034 SANITARY SUMP 48 - - 28 - 1800 1.00 - 2.90 460 3 X VERTICAL 11
SP-1 BELL & GOSSETT 2WF1034 SANITARY SUMP 48 - - 28 - 1800 1.00 - 2.90 460 3 X VERTICAL 11
CP-1 BELL & GOSSETT ECOCIRC 19-16 DOMESTIC CIRCULATION CIRC. PUMP 2 - - 10 - 2060 - 60 - 120 1 X INLINE -
GPM (DESIGN) GPM (MIN) GPD (FT) (FT) HP W AMP VOLT PHASE VFD MFG EC N/A (LBS)
SYMBOL MANUFACTURER MODEL SERVICE TYPE FLOW HEAD NPSHR RPM ELECTRICAL STARTER MOUNTING WEIGHT NOTES
PUMP SCHEDULE
BFP
BFP
BFP
BFP
FIRST FLOOR
SECOND FLOOR
(76 FU)
2A318
(5 FU)
FIRST FLOOR
SECOND FLOOR
ROOFROOF
P-103
2A318
(1 FU)
P-419
2A324
(5 FU)
P-103
2A324
(1 FU)
P-419
2A325
(1 FU)
P-419
2A325
(5 FU)
P-103
2A326
(3 FU)
P-502
2A330
(1 FU)
P-418
2A348
(1 FU)
P-418
2A346
(1 FU)
P-418
2A332
(1 FU)
P-418
2A339
(1.5 FU)
P-528
2A340
(1 FU)
P-419
2A340
(5 FU)
P-103
(6 FU)
(5 FU)(1 FU)
(1 FU)
(1.5 FU)
(1.5 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(3 FU)
(3 FU)
(5 FU)(5 FU)(5 FU) (1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(7.5 FU)
(2 FU)
(12 FU)(13 FU)
(4 FU)(11 FU)(16 FU)
(2 FU)
(6 FU) (4 FU)
(29 FU) (4.5 FU)
(2 FU)
(2.5 FU)(5.5 FU)(11.5 FU)
(6 FU)(1 FU)
(37 FU)(14.5 FU)
(37 FU)
(14.5 FU)
(7 FU)(2 FU)
(APPROX. 36 FU)
(APPROX. 15 FU)
(30 FU)
(30 FU)
2A309
(1 FU)
P-418
(1 FU)
(1 FU)
2A308
(1 FU)
P-418
(1 FU)
(1 FU)
(8 FU)
(2 FU)
(2 FU)
(3 FU)
(2.5 FU)
P-801
(2.5 FU)
(1 FU)
P-801
(1 FU)
(1 FU)
P-801
(1 FU)
(10 FU)
WH-1
TV-1
ET-1
2" CW
CP-1
SEE CIVIL FOR
CONTINUATION
1" HWC
BFP-4
BFP-3
BFP-2
BFP-1
BOILER LOOP
MAKEUP WATER
WATER SOURCE LOOP
MAKEUP WATER
SNOW MELT LOOP
MAKEUP WATER
P-805
1" CW
1"1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
3/4"
3/4"
1"1"1" 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
3/4"
1-1/4" CW
3/4" CW
1-1/4" CW1-1/4" CW
3/4" CW1-1/4" CW1-1/2" CW
3/4" HW
3/4" HW 3/4" CW
1-1/2" CW 3/4" HW
3/4" HW
3/4" HW3/4" HW1" HW
1" CW1/2" HW
2" CW1" HW
2" CW
1" HW
3/4" HWC 3/4" HWC
1-1/4" CW3/4" CW
2" CW
1" HW
1-1/4" HW
1-1/4" HW
1-1/4" CW
2" CW, 1" HW, 3/4" HWC
CAPPED FOR FUTURE
1/2"
1/2"
1/2"
1/2"
1" CW
3/4" CW
3/4" HW
3/4" HW
1"
3/4"3/4"1/2"
H-1
1-1/4" CW
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PP701
463-301
DEC. 7, 2020 JB KT
PLUMBING DIAGRAMS MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
SCALE: NONEPP701
PLUMBING RISER11
1A402
FD-S
1A402
FD-M
2A318
FD-C
1A301
FD-C
1A301
FD-S
1A402
FD-C
1A402
FD-C
2A318
P-103
2A318
P-419 2A325
FD-C
2A324
P-419
2A325
P-419
2A325
P-103
2A330
P-418 2A326
P-502
2A324
FD-C
2A348
P-418
2A346
P-418
2A332
P-418
2A324
P-103
2A339
P-528
2A340
P-419 2A340
FD-C
2A325
P-103
2A308
P-418
2A309
P-418
1A402
FD-S
(2 FU)
(2 FU)
(4 FU)
(2 FU)
(2 FU) (4 FU)(2 FU)(2 FU)
(2 FU)
(4 FU)
(4 FU)
(1 FU)
(1 FU)
(2 FU)
(1 FU) (1 FU) (4 FU) (1 FU)
(2 FU)(2 FU)
(1 FU) (1 FU) (1 FU)(4 FU) (2 FU) (1 FU)
(2 FU)
(4 FU)
(2 FU) (4 FU) (2 FU) (4 FU)
(2 FU) (2 FU) (2 FU) (2 FU) (2 FU)(4 FU) (4 FU) (4 FU)(1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (1 FU) (2 FU) (1 FU)
(6 FU)(3 FU)(9 FU)(9 FU)(2 FU)(11 FU)(12 FU)(16 FU)(3 FU)(7 FU)(3 FU)(4 FU)(11 FU)(13 FU)(29 FU)(3 FU)(7 FU)(38 FU)
(44 FU) (6 FU)(44 FU)(6 FU) (42 FU)
(109 FU)
(1 FU)
(1 FU)
(1 FU)
(1 FU)
(8 FU)(9 FU)
(2 FU)
(2 FU)
FIRST FLOOR
SECOND FLOOR
ROOF
F C
O
2"
2"2" 2" 2"
F C
O
F C
O
2" 2"
F C
O
2"2" 2"
F C
O
2" 2" 2"2"
F C
O
2" 2" 2"
F C
O
2"
2" 2"
F C
O
2" 2"
F C
O
F C
O
FIRST FLOOR
SECOND FLOOR
ROOF
4" 3"
2"2"2"
2"2"
4" 3"
2"2"
SP-1
SP-2
2"
2"W 2"W 2"W 3"W 2"W 2"W
2"W4"W 2"W 2"W 2"W 2"W 2"W4"W 4"W 4"W2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W
4"W2"W4"W4"W2"W4"W4"W4"W4"W4"W2"W2"W4"W4"W4"W4"W4"W4"W
4"W 4"W4"W2"W
2"V2"V2"V
2"V2"V
2"V 2"V 2"V2"V
2"V 2"V 2"V 2"V
4" W STUB OUT FOR FUTURE.
APPROXIMATELY 38 FU
4"W
3"W
2"W2"W
4"W4"W
SUMP PUMP
(E) 4" W RISER
2"W
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
7 DFU12 DFU10 DFU
D
F U
4 DFU
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
D
F U
8 DFU
4 DFU 3 DFU 14 DFU12 DFU
18 DFU 3 DFU
D
F U
D
F U
3 DFU
D
F U
5 DFU
D
F U
D
F U
D
F U
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PP702
463-301
DEC. 7, 2020 JB KT
PLUMBING DIAGRAMS MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
SCALE: NONEPP702
WASTE RISER11
M
B-1 B-2 B-3WH-1 HU-1
SHUT OFF SOLENOID
1250 CFH 1250 CFH 1250 CFH
1"1"1"
1" 1250 CFH
SEE CIVIL FOR
CONTINUATION
GRADE
ROOF
SECOND FLOOR
FIRST FLOOR
MEDIUM PRESSURE GAS
SUPPLY FROM UTILITY
76 CFH
1/2"
EXTERIOR WALL
GAS METER
GAS VENT TERMINATION AT
EXTERIOR WALL WITH
DOWNTURNED PIPE ELBOW
3/4" 3/4" 3/4"3/4"
1"1"1"
3/4"
1"
1-1/4" 2500 CFH1-1/2" 3750 CFH1-1/2" 4009 CFH
183 CFH
1/2"
1-1/2" 3933 CFH
P-930 P-930 P-930P-930
3" RL
3" ORL
3" RL
4" RL
4" ORL
4" RL
5" RL 4" RL
3" RL 3" ORL 3" RL 3" ORL
5" RL
6" RL
3" RL
3" ORL
3" RL 3" ORL
3" RL
4" RL
6" RL6" RL
3" RL
3" ORL
3" RL 3" ORL
3" RL
6" DOWNSPOUT3" DOWNSPOUT
3" CLEANOUT
3" RL
ROOF
SECOND FLOOR
FIRST FLOOR
3058 SF 3537 SF 3038 SF723 SF
6575 SF 3038 SF
6575 SF
6575 SF
3058 SF
9633 SF10356 SF
723 SF
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
12" = 1'-0"
PP703
463-301
DEC. 7, 2020 JB KT
PLUMBING DIAGRAMS MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
SCALE: NONEPP703
GAS RISER11
2 PSI 1-1/2" PIPE TOTAL CFH 4009
2018 IFGC TOTAL BTU 4009000
HU-1 183 183000 1 183000 183
WH-1 76 76000 1 76000 76
B-1 1250 1250000 1 1250000 1250
B-1 1250 1250000 1 1250000 1250
B-1 1250 1250000 1 1250000 1250
FIXTURE MBH BTU QUANTITY TOTAL BTU CFH
GAS CALCULATION
SCALE: NONEPP703
RAINLEADER DIAGRAM22
2. SECONDARY ROOF DRAINAGE SYSTEM SHALL CONNECT TO THE VERTICAL PIPING OF THE PRIMARY ROOF DRAINAGE SYSTEM DOWNSTREAM OF THE LAST HORIZONTAL OFFSET LOCATED BELOW THE ROOF. COMBINATION RAINLEADER AND OVERFLOW RAINLEADER RATES BASED ON DOUBLE THE RAINFALL RATE.
1. ANCHORAGE HAS A 1 (IN/H) RAINFALL RATE. RAINFALL RATES AND PIPE SIZING INFORMATION PER 2018 UPC.
NOTES:
15 2473 238000 119000 79333 - - -
12 1384 133200 66600 44400 - - -
10 860 82800 41400 27600 - - -
8 478 46000 23000 15330 116000 58000 38660
6 222 21400 10700 7133 54000 27000 17995
5 139 13360 6680 4453 34600 17300 11530
4 78 7520 3760 2506 18400 9200 6130
3 34 3288 1644 1096 8800 4400 2930
2 - - - - 2880 1440 960
IN GPM 1 (IN/H) 2 (IN/H) 3 (IN/H) 1 (IN/H) 2 (IN/H) 3 (IN/H)
(1/8 in/ft slope) HORIZONTAL RAINWATER PIPING VERTICAL RAINWATER PIPING
SIZE OF PIPE FLOW MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALLS RATES (SF)
SIZING OF RAINWATER PIPING
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
FACILITY
MANAGEMENT
SERVICE
(FMS)
Phase
Scale
Revisions: Date:
100% CONSTRUCTION
SUBMITTAL
A/E: STAMP
HOOD RIVER ENGINEERS
1784 MAY STREET
HOOD RIVER, OR 97031
541-436-4723
ADAM GODDIN, PE
VA FORM 08 - 6231
A
B
C
D
E
321 4 5 6 7 8 9 10 11 12
321 4 5 6 7 8 9 10 11 12
F
G
H
12/07/2020100% CONSTRUCTION SUBMITTAL
PP801
463-301
DEC. 7, 2020 JB KT
PLUMBING CALCULATION MENTAL HEALTH BUILDING AND
PARKING LOT
AVAHS Muldoon Clinic
1201 N. MULDOON RD, ANCHORAGE AKDEC. 7, 2020
STORAGE REQUIRED: 43.27 Gallons (Possible demand x Demand factor x Storage factor)=Gallons
46.51 MBH (8.33 x GPH x DT)/1000=MBH
HEAT REQUIRED: 13.62 KW (GPH x dT)/410=KW
PROBABLE DEMAND: 56.4 GPH
DEMAND FACTOR: 0.3
POSSIBLE DEMAND: 188
POSSIBLE DEMAND FOR DISHWASHERS (GPH) 0
Makeup water/certain conveyer types (180 deg F) 0 139 0
Utensil washer 0 75 0
Silver washer 0 45 0
Multiple tank conveyer dishwasher (dishes inclined) 0 277 0
Multiple tank conveyer dishwasher (dishes flat) 0 347 0
Single tank conveyer dishwasher 0 416 0
Undercounter door type dishwasher 0 15 0
Door type dishwasher (20x20 rack) 0 104 0
Door type dishwasher (18x18 rack) 0 87 0
Door type dishwasher (16x16 rack) 0 69 0
DISHWASHERS
POSSIBLE DEMAND FOR FIXTURES (GPH) 188
H/C Hosebib 0 5 0
Clothes washer 0 40 0
Bar sink 0 30 0
Recirculating pre-flush 0 40 0
Pre-flush (closed type) 0 240 0
Pre-flush (hand operated) 0 45 0
Pre-scrapper (open type) 0 180 0
Triple pot sink 0 90 0
Double pot sink 0 60 0
Single pot sink 0 30 0
Vegetable sink 0 45 0
Mop sink 2 20 40
Showers 0 30 0
Pantry sink 0 10 0
Laundry, stationary tubs 0 0 0
Kitchen sink 2 20 40
Foot basins 0 0 0
Bathtubs 0 0 0
Basins, public lavatory 18 6 108
Basins, private lavatory 0 2 0
FIXTURE NAME QUANTITIY
GPH DEMAND
(EA FIXTURE)
TOTAL GPH
DEMAND
WATER HEATER CALCULATION
SIZE 4"
FIXTURE UNITS 96
WC +1.6 GPF FV 0 6.0 0
WC +1.6 GPF GT 0 6.0 0
WC 1.6 GPF FV 8 4.0 32
WC 1.6 GPF FT 0 4.0 0
WC 1.6 GPF GT 0 4.0 0
WASH FOUNT. CIRC. 0 3.0 0
URINAL FLUSH TANK 0 2.0 0
URINAL +1.0 GPF 0 2.0 0
URINAL 1.0 GPF 0 2.0 0
HAND SINK 0 2.0 0
SERVICE SINK 2 3.0 6
LAUNDRY SINK 0 2.0 0
KITCHEN SINK 2 2.0 4
CLINIC FLUSH VALVE 0 6.0 0
CLINIC FAUCET 0 6.0 0
BAR SINK 0 1.0 0
MOBILE HOME 0 12.0 0
COM W/ FOOD WASTE 0 3.0 0
EYEWASH 0 1.0 0
LAVATORY 20 1.0 20
EMERGENCY FLOOR DRAIN 2 4.0 8
FLOOR DRAIN 13 2.0 26
WATERCOOLER 0 0.5 0
DISH WASHER 0 2.0 0
DENTAL CUSP. 0 1.0 0
CLOTHES WASH. 0 3.0 0
BIDET 0 2.0 0
SHOWER 0 2.0 0
TUB/SHOWER 0 2.0 0
FIXTURE TOTAL FIX GPH/FIXTURE TOTAL UNITS
WASTE CALCULATION
SIZE 2"
GALLONS PER MINIUTE 57
FIXTURE UNITS 69
WC +1.6 GPF FV 8.0 0
WC +1.6 GPF GT 5.5 0
WC 1.6 GPF FV 8 5.0 40
WC 1.6 GPF FT 2.5 0
WC 1.6 GPF GT 2.5 0
WASH FOUNT. CIRC. 4.0 0
URINAL FLUSH TANK 2.0 0
URINAL +1.0 GPF 5.0 0
URINAL 1.0 GPF 4.0 0
HAND SINK 2.0 0
SERVICE SINK 2 3.0 6
LAUNDRY SINK 1.5 0
KITCHEN SINK 2 1.5 3
CLINIC FLUSH VALVE 8.0 0
CLINIC FAUCET 3.0 0
BAR SINK 2.0 0
MOBILE HOME 12.0 0
LAWN SPRINK. EA. 1.0 0
EYE WASH 1.0 0
LAVATORY 20 1.0 20
HOSE BIBB ADD. 1.0 0
HOSE BIBB 2.5 0
WATERCOOLER 0.5 0
DISH WASHER 1.5 0
DENTAL CUSP. 1.0 0
CLOTHES WASH. 4.0 0
BIDET 1.0 0
SHOWER 2.0 0
3/4" BATH FILL 10.0 0
TUB/SHOWER 4.0 0
FIXTURE TOTAL FIX WSFU TOTAL WSFU
DOMESTIC WATER CALCULATION