Attachment 13a - FEPIB 2020-03.doc

DOC document 39 KB Posted

Attached to
Patent Data and Document Management (PDDM)
Solicitation number
1333BJ20R00151004
Issued by

About this file

This document is a correction notice for a Front-End Processing Information Bulletin. The notice corrects guidance around processing applications without a matching application number in the Patent Application Locating and Monitoring system. It adds instructions to forward packages without a matching number for a National Stage Application or non-supported PCT country code to a specific mailbox with an indicator. It also clarifies that the official electronic file wrapper flag should still be activated after application delivery, even if the application number is not found. Additionally, it removes an instruction bullet and adds guidance that a petition type will not be changed as a result of certain deficiency payments related to small entity status.

This solicitation seeks contractor support to manage the entire life cycle of patent application processing for the United States Patent and Trademark Office, from initial filing through final disposition. Offerors should thoroughly review the request for proposals and statement of work attachments to fully understand the requirements, which include application intake, docketing, examination support, and maintenance functions. The solicitation provides details on the scope of work, evaluation factors, and instructions for proposal preparation and submission.

View the file

Other files

File Type Posted
Attachment 40-Pricing Template_updated Amendment 0004.xlsx XLSX spreadsheet
1333BJ20R00151004_Amendment 0004 track changes.pdf PDF
1333BJ20R00151004_Amendment 0003_track changes.pdf PDF
Attachment 40-Pricing Template_updated Amendment 0003.xlsx XLSX spreadsheet
PDDM RFP Questions and Responses Round Two_8.12.pdf PDF
Attachment 05a - Historical Data_Page Counts and Volumes_updated.docx DOCX document
Attachment 40-Pricing Template_updated.xlsx XLSX spreadsheet
Attachment 13a - FEPIB 2020-04.doc DOC document
Attachment 08 - Glossary of Terms_updated.docx DOCX document
Attachment 26 - DCB 2020-15.docx DOCX document
Attachment 3d - Current Compatible Printers.docx DOCX document
RFP 1333BJ20R00151004_Amendment 0002_track changes.pdf PDF
Attachment 26 - DCB 2020-16.docx DOCX document
Attachment 41 - Past Performance Questionnaire_updated.docx DOCX document
Attachment 13a - FEPIB 2020-05.doc DOC document
PDDM RFP Questions and Responses.pdf PDF
Attachment 26 - DCB 2020-17.docx DOCX document
Attachment 26 - DCB 2020-14.docx DOCX document
Attachment 39 - Transition Plan Framework_updated.docx DOCX document
Attachment 13a - FEPIB 2020-06.doc DOC document
Amendment 0001_1333BJ20R00151004.pdf PDF
Attachment 22 - DataEntryManual-UTILITY-2020.doc DOC document
Attachment 25b - Consolidated Listing of Official Gazette Notices_2018-01-25.pdf PDF
Attachment 05a - Historical Data_Page Counts and Volumes.docx DOCX document
Attachment 32 - CofC Patent Term Adjustment SOP_Nov 13 2017.pptx PPTX presentation
Attachment 38a - Cloud Services Usage Policy.pdf PDF
Attachment 23 - DataEntryManual-NON-UTILITY-2020.doc DOC document
Attachment 26.zip ZIP file
Attachment 31 - CofC_manual_PaDaCap_2020.docx DOCX document
Attachment 33 - PALM Basics.pptx PPTX presentation
Attachment 38b - IT_Security_Handbook.pdf PDF
Attachment 13 - Front End Processing (FEP) Manual for Indexing and Scanning.docx DOCX document
Attachment 38 - IT Security Requirements - 2020-04.docx DOCX document
Attachment 12 - Front End Processes.pdf PDF
Attachment 41 - Past Performance Questionnaire.docx DOCX document
Attachment 31a - DCB 2020-None.docx DOCX document
Attachment 11 - Link to Public PAIR.docx DOCX document
Attachment 13a - FEPIB 2020-01.doc DOC document
Attachment 19 - PG Pub - Red Book Instructions.docx DOCX document
Attachment 01a - Contractors Access to USPTO v4.1 Before Awarded 12-09-2019 Final.doc DOC document
Attachment 05b- Weekly Serialized Filings.xls XLS spreadsheet
Attachment 03a - USPTO Computer Specs.xlsx XLSX spreadsheet
Attachment 10a - Sample Issued Patents and Cooperative Patent Classification.docx DOCX document
Attachment 17b - (jpg) u-bibdat1.jpg JPG image
Attachment 15 - CRF_Transfer_Participant_Manual_Final_Revision_2019-03-18.pdf PDF
Attachment 29 - Patent Official Gazette (eOGP).docx DOCX document
Attachment 40 - Pricing Template.xlsx XLSX spreadsheet
Attachment 17a - DPMpgpub-2020.doc DOC document
Attachment 27 - Grant - Red Book Instructions.docx DOCX document
Attachment 30 - Certificate of Correction Process.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F r o n t - E n d P r o c e s s i n g

I n f o r m a t i o n B u l l e t i n FEPIB No. 2020-3 June 8, 2020 Correction to FEPIB No. 2019-2 The information in this bulletin will be included in the next revision of

FRONT-END PROCESSING MANUAL

***This bulletin is effective immediately.*** The FEPIB 2019-2 dated October 23, 2019, is hereby revised by the additions shown in red on Page 2 of this bulletin.

On Page 2 of the July 2018 FEP manual in the Image File Wrapper Flag (New and Residual Applications section add the following indented bullets between existing bullets 2 and 3.

Image File Wrapper Flag (New and Residual Applications)

· The contractor will verify that the application number exists in PALM using USPTO supplied services.

· If the application number is not found, then the contractor will forward the documents to the appropriate Government Representative with the following exceptions.

· If the application number is not found for a new National Stage Application, the contractor shall deliver the package with an embedded message indicator (MBX 1428). The message indicator will allow for system delivery of a message to the IFW PCTUnmatched mailbox.

· If the application number is not found for a non-supported PCT Country code, the contractor shall deliver the package with an embedded message indicator (MBX 1428). The message indicator will allow for system delivery of a message to the IFW PCTUnmatched mailbox.

· The contractor will ensure that the official electronic file wrapper flag is activated indicating the application has been delivered to the official electronic file wrapper.

On page 2 of the July 2018 manual replace the last word “below” with “described later in this document”.

License and Review Secrecy Status (New and Residual Applications)

· The contractor will verify the application is not under secrecy order (L&R code = 4) prior to delivery to the official electronic file wrapper.

· If the case is under secrecy order, the contractor will process the documents according to Secrecy Order Process below described later in this document.

On Page 3 of the July 2018 manual delete the first bullet.

· The contractor will deliver the package and attach the corresponding mailbox message (MBX1428) although there is no PALM record.

At the end of Appendix Eight – Supplemental Guidance add the following language.

PET.OP/SES.LOSS
PET.OP will not be changed to SES.LOSS for any paper containing a fee deficiency payment made as a result of a loss of entitlement to small entity. If the PET.OP is a renewed request the deficiency payment can be found with the previously filed petition.

FEPIB No. 2020-3 Page 1 of 2

File details come from the government source that posted it. Updated .