Attachment 13a - FEPIB 2020-03.doc

DOC document 39 KB Posted

Attached to
Patent Data and Document Management (PDDM) Federal contract opportunity
Solicitation number
1333BJ20R00151004
Issued by
Department of Commerce US Patent and Trademark Office

About this file

This document is a correction notice for a Front-End Processing Information Bulletin. The notice corrects guidance around processing applications without a matching application number in the Patent Application Locating and Monitoring system. It adds instructions to forward packages without a matching number for a National Stage Application or non-supported PCT country code to a specific mailbox with an indicator. It also clarifies that the official electronic file wrapper flag should still be activated after application delivery, even if the application number is not found. Additionally, it removes an instruction bullet and adds guidance that a petition type will not be changed as a result of certain deficiency payments related to small entity status.

This solicitation seeks contractor support to manage the entire life cycle of patent application processing for the United States Patent and Trademark Office, from initial filing through final disposition. Offerors should thoroughly review the request for proposals and statement of work attachments to fully understand the requirements, which include application intake, docketing, examination support, and maintenance functions. The solicitation provides details on the scope of work, evaluation factors, and instructions for proposal preparation and submission.

View the file

Other files for this federal contract opportunity

Other files attached to Patent Data and Document Management (PDDM), newest first.
File Type Posted
Attachment 40-Pricing Template_updated Amendment 0004.xlsx XLSX spreadsheet
1333BJ20R00151004_Amendment 0004 track changes.pdf PDF
PDDM RFP Questions and Responses Round Two_8.12.pdf PDF
Attachment 13a - FEPIB 2020-05.doc DOC document
Attachment 26 - DCB 2020-15.docx DOCX document
Attachment 05a - Historical Data_Page Counts and Volumes_updated.docx DOCX document
Attachment 3d - Current Compatible Printers.docx DOCX document
Attachment 39 - Transition Plan Framework_updated.docx DOCX document
Attachment 13a - FEPIB 2020-06.doc DOC document
Attachment 26 - DCB 2020-14.docx DOCX document
Amendment 0001_1333BJ20R00151004.pdf PDF
Attachment 37 - PreExam Manual with Supplemental Instructions 9-20-2018.pdf PDF
Attachment 30 - Certificate of Correction Process.pdf PDF
Attachment 27 - Grant - Red Book Instructions.docx DOCX document
Attachment 10c - Link to USPTO Website.docx DOCX document
Attachment 17e - (txt) -ExportTOC1.txt TXT text file
Attachment 21 - Post Allowance Processes.pdf PDF
Attachment 35a - PE2E-eDRS-Manual.pdf PDF
Attachment 28 - Grant - Yellow Book Instructions.docx DOCX document
Attachment 23 - DataEntryManual-NON-UTILITY-2020.doc DOC document
Attachment 17c - (jpg) u-suppub8-2012-12-04.jpg JPG image
Attachment 42 - Small Business Subcontracting Plan Template.docx DOCX document
Attachment 10a - Sample Issued Patents and Cooperative Patent Classification.docx DOCX document
Attachment 09 - Link to Patent Classifications and Definitions.docx DOCX document
Attachment 29a - Patent Official Gazette Notices.docx DOCX document
Attachment 36 - PE2E-OC OPESS Manual.pdf PDF
Attachment 31 - CofC_manual_PaDaCap_2020.docx DOCX document
Attachment 34 - PALM-Correspondence Processing.pptx PPTX presentation
Attachment 00 - Section J Technical References Index and Crosswalk.docx DOCX document
Attachment 01b - OCIO Personal Identity Verification (PIV) Card Authentication Policy OCIO-POL-49.pdf PDF
Attachment 02 - TIC Ref Arch v2.2 2017.pdf PDF
Attachment 04 - Crosswalk of CLINs to SOW and Historical Volumes.xlsx XLSX spreadsheet
Attachment 03c - Windows 10 LTSB Baseline for CEP - CEDP COR Systems Baseline.docx DOCX document
Attachment 03b - USPTO Enterprise Workstation Naming Convention.docx DOCX document
Attachment 22 - DataEntryManual-UTILITY-2020.doc DOC document
Attachment 25b - Consolidated Listing of Official Gazette Notices_2018-01-25.pdf PDF
Attachment 05c - QA of EFS WEb Submissions Error Categories and Historical Volumes.xlsx XLSX spreadsheet
Attachment 16 - PG Pub Processes.pdf PDF
Attachment 39 - Transition Plan Framework.docx DOCX document
Attachment 13a - FEPIB 2020-02.doc DOC document
Attachment 25a - eOG_manual_2020.docx DOCX document
Attachment 14 - Quality Assurance of EFS-Web Submissions20190917.docx DOCX document
Attachment 10b.zip ZIP file
Attachment 13 - Front End Processing (FEP) Manual for Indexing and Scanning.docx DOCX document
Attachment 38b - IT_Security_Handbook.pdf PDF
Attachment 33 - PALM Basics.pptx PPTX presentation
Attachment 05a - Historical Data_Page Counts and Volumes.docx DOCX document
Attachment 41 - Past Performance Questionnaire.docx DOCX document
Attachment 31a - DCB 2020-None.docx DOCX document
Attachment 26.zip ZIP file
Show all 50

Patent Data and Document Management (PDDM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F r o n t - E n d P r o c e s s i n g

I n f o r m a t i o n B u l l e t i n FEPIB No. 2020-3 June 8, 2020 Correction to FEPIB No. 2019-2 The information in this bulletin will be included in the next revision of

FRONT-END PROCESSING MANUAL

***This bulletin is effective immediately.*** The FEPIB 2019-2 dated October 23, 2019, is hereby revised by the additions shown in red on Page 2 of this bulletin.

On Page 2 of the July 2018 FEP manual in the Image File Wrapper Flag (New and Residual Applications section add the following indented bullets between existing bullets 2 and 3.

Image File Wrapper Flag (New and Residual Applications)

· The contractor will verify that the application number exists in PALM using USPTO supplied services.

· If the application number is not found, then the contractor will forward the documents to the appropriate Government Representative with the following exceptions.

· If the application number is not found for a new National Stage Application, the contractor shall deliver the package with an embedded message indicator (MBX 1428). The message indicator will allow for system delivery of a message to the IFW PCTUnmatched mailbox.

· If the application number is not found for a non-supported PCT Country code, the contractor shall deliver the package with an embedded message indicator (MBX 1428). The message indicator will allow for system delivery of a message to the IFW PCTUnmatched mailbox.

· The contractor will ensure that the official electronic file wrapper flag is activated indicating the application has been delivered to the official electronic file wrapper.

On page 2 of the July 2018 manual replace the last word “below” with “described later in this document”.

License and Review Secrecy Status (New and Residual Applications)

· The contractor will verify the application is not under secrecy order (L&R code = 4) prior to delivery to the official electronic file wrapper.

· If the case is under secrecy order, the contractor will process the documents according to Secrecy Order Process below described later in this document.

On Page 3 of the July 2018 manual delete the first bullet.

· The contractor will deliver the package and attach the corresponding mailbox message (MBX1428) although there is no PALM record.

At the end of Appendix Eight – Supplemental Guidance add the following language.

PET.OP/SES.LOSS
PET.OP will not be changed to SES.LOSS for any paper containing a fee deficiency payment made as a result of a loss of entitlement to small entity. If the PET.OP is a renewed request the deficiency payment can be found with the previously filed petition.

FEPIB No. 2020-3 Page 1 of 2

File details come from the government source that posted it. Updated .