About this file

This is a Confirmation Letter form for Disabled Veteran Business Enterprise (DVBE) subcontractors issued by the California Arts Council (CAC) in connection with RFP-AIC-25-003 for an Event Producer for California Arts Council's 50th Anniversary Awards Ceremony. The form requires bidders to submit a written confirmation letter for each DVBE subcontractor identified on the Bidder Declaration form DGS PD-05-105. The confirmation letter must include the solicitation number and be signed by both the bidder and the DVBE subcontractor. Bidders are required to outline the DVBE subcontractor's scope of work, specify the work to be performed, identify the term and anticipated dates of performance, and provide a complete description of deliverables.

In Part 2 of the form, bidders must provide the payment rate, conditions of payment with detailed explanation, and the total amount to be paid to the DVBE subcontractor. Additionally, bidders must complete a DGS PD 843 DVBE Declaration form for all DVBE participants, whether serving as prime contractor or subcontractor. Failure to submit a signed confirmation letter with the bid may render the bid non-responsive. The State reserves the right to obtain additional information to verify compliance with DVBE requirements if further verification is necessary.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No.: ______________

ATTACHMENT ______: CONFIRMATION LETTER DVBE SUBCONTRACTOR

Submit a written Confirmation Letter/Form for each DVBE subcontractor identified on the Bidder Declaration DGS PD-05-105. The written confirmation must include the solicitation number and be signed by the Bidder and the DVBE subcontractor(s).

Company Name (Bidder): __________________________________________

DVBE Name (Subcontractor): __________________________________________

PART 1: Bidder must outline or describe the DVBE subcontractor’s scope of work, work to be performed by the DVBE, term of intended subcontract with the DVBE, anticipated dates the DVBE will perform required work

Term (duration) of Intended Subcontract with DVBE:

Work Performed by DVBE Subcontractor (outline/provide complete details of work and/or deliverables)

Anticipated Dates Will Perform Required Work

Carla Pareja Highlight

PART 2: Bidder must provide rate and conditions of payment and total amount to be paid to the DVBE.

Rate

Conditions of Payment (Provide details.)

Total Amount to be paid to DVBE subcontractor

PART 3: Complete a DGS PD 843 DVBE Declaration form for all DVBE participants (prime or subcontractor).

Failure to submit a signed confirmation letter with the bid may render the bid non-responsive. If further verification is necessary, the State will obtain additional information to verify compliance with the above requirements.

Bidder Company:

Authorized Representative: _______________________________ Date: ________________ Signature

DVBE Subcontractor Company Authorized Representative: ________________________________ Date: ________________ Signature

RFP No: RFP-AIC-25-003
ATTACHMENT: 13
DVBE Name Subcontractor:
Term duration of Intended Subcontract with DVBE:
Work Performed by DVBE Subcontractor outlineprovide complete details of work andor deliverablesRow1:
Anticipated Dates Will Perform Required WorkRow1:
Rate:
Conditions of Payment Provide details:
Total Amount to be paid to DVBE subcontractor: