Attachment 13 - CAC Application Process.pdf

PDF 153 KB Posted

Attached to
Azores Hazardous Waste Removal Federal contract opportunity
Solicitation number
SP450025R0001
Issued by
Defense Logistics Agency

About this file

This is a detailed procedure document outlining the CAC (Common Access Card) application process for contractors under Defense Logistics Agency (DLA) contracts. The document specifies the complete process for obtaining, controlling, and turning in Government-issued CACs, including required forms (DLA Form 1728 and DoD Form 1172-2), submission procedures, and security compliance measures.

The process requires contractors to submit monthly reports of all employees with CACs to the COR/CO, verify continuing CAC requirements, and follow strict procedures for lost/stolen cards and employee terminations. Non-compliance with these procedures can result in serious consequences including work stoppage, payment delays, withholding of final payment, and documentation of non-compliance in CPARS. The document emphasizes security measures such as prohibiting public display of CACs, requiring immediate reporting of lost/stolen cards, and mandating proper turn-in procedures upon contract completion or employee termination. Contractors must establish procedures to control and account for CACs at all times, recognizing them as U.S. Government property.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment:

CAC Application Process

If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.

1. DLA Form 1728

a. The contractor is responsible for ensuring that each contractor employee requiring a CAC completes and signs a DLA Form DH 1728.

b. The contractor employee completes Section I, blocks 1-8 and 16 of the DH 1728. The contractor then forwards the form to the contracting officer (KO) who completes Section

I, blocks 9-15 and 17 as the sponsor.

2. DoD Form 1172-2

a. The contractor has each contractor employee requiring a CAC complete and sign

Sections I and II of the DD Form 1172-2. The instructions for completing the DD

Form 1172-2 are located at o For Section II, Block 22 - If the contractor employee signs and the DD Form

1172-2 it is then forwarded by the contractor. This provides verification for the employee information. If the contractor is submitting a DD Form 1172-2 for him/herself (e.g., the owner), with no higher authority above them for verification, then the signature in Block 22 must be notarized to verify identity.

b. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group):

o The Contracting Officer’s Representative (COR) for the contract, if a COR was designated.

o The Contracting Officer (CO) for the contract, if no COR was designated.

c. Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for the Trusted

Associate Sponsorship System (TASS). The web link for TASS is included in the email.

d. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued

CAC from the nearest Real-Time Automated Personnel Identification System

(RAPIDS) office. The email will also provide a link that identifies the locations of

RAPIDS offices.

e. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.

f. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the CO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.

g. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:

o Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.

o Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government. o

Ensure contractor employees do not abuse or place holes in their CACs.

o Ensure contractor employees do not display their CACs in public.

h. If a contractor CAC is lost or stolen:

o The contractor employee shall immediately notify the contractor that the contractor CAC has been lost or stolen.

o The contractor shall immediately notify the COR (or the CO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor

CAC, as follows:

▪ In person, followed within one (1) business day by a written notice via email, or

▪ In writing, via email, or

▪ By telephone, followed within one (1) business day by a written notice via email.

o The contractor shall report the lost or stolen CAC card to the local DLA

Police/host installation police, who will provide the contractor a police report.

If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/CO, as applicable, detailing the circumstances of how the CAC was lost or stolen.

The COR/CO will provide a memorandum for the contractor employee to support issuance of new CAC.

o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at

Step 1.

i. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a

CAC, the contractor:

o Notifies the COR as follows:

▪ In person, followed within one (1) business day by a written notice via email, or

▪ In writing, via email, or

▪ By telephone, followed within one (1) business day by a written notice via email.

o No less than two (2) weeks prior to the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.

o Brings the expiring CAC to the RAPIDS office for turn-in and receives new

CAC.

o Notifies the COR once a new CAC has been issued.

j. The contractor/contractor employee turns in any found CACs immediately, via hand carry, to the nearest Federal law enforcement office.

k. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:

o Contract completion or termination o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)

l. The contractor:

o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:

i. If the COR/CO is co-located or near enough that in-person transfer of

CACs can be arranged, the contractor:

• Arranges to meet the COR (or the CO, if no COR was designated) to turn-in the collected contractor CAC(s).

• Hand-carries all collected contractor CACs for turn-in to meet the COR (or the CO, if no COR was designated).

• Completes and signs the Government-Issued Contractor CAC

Turn-In Receipt with the COR (or the CO, if no COR was designated). The contractor is provided a copy of the receipt.

ii. If in-person transfer of CAC cannot be arranged, the contractor:

• Sends, via certified mail, the CACs to the COR/CO. The contractor includes in the package the Government-Issued

Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.

• Notifies COR/CO that CACs have been sent via certified mail.

• Receives a completed copy of the receipt from the COR/CO once the COR/CO has received the CACs.

o For termination/reassignment of an employee:

i. Immediately notifies the COR (or the CO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:

• In person, followed within one (1) business day by a written notice via email, or

• In writing, via email, or

• By telephone, followed within one (1) business day by a written notice via email.

ii. Follows the turn-in procedures above for contract completion or termination, as applicable.

3. Contractor CAC Reporting Requirements

Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the CO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/CO when the individual is no longer working under the subject contract.

4. CAC Security Compliance

The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:

a. Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue

b. Disapproval of invoices and delay of payment

c. Withholding of final payment (in accordance with FAR 52.204-9)

d. Documentation of CAC Non-Compliance in the Contractor Performance

Assessment Reporting System (CPARS)

File details come from the government source that posted it. Updated .