ATTACHMENT 11 - Hazmat Report.pdf

PDF 4 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction San Juan Federal contract opportunity
Solicitation number
36C77624B0012
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Limited NESHAP Pre-Renovation Asbestos Survey and Lead Paint Screening report for the VA San Juan EHRM property located at 10 Calle Casia in San Juan, Puerto Rico. The survey was conducted by ECS Florida, LLC to identify asbestos-containing materials (ACMs) and lead-based paint (LBP) prior to planned renovation activities.

The report summarizes the findings from the asbestos and lead paint screening survey. It identifies 5 ACMs located within the Main Building (Building 1), including 9"x9" white vinyl floor tiles with black mastic, black and red HVAC duct mastics, and 12"x12" gray vinyl floor tiles with black mastic. The report provides estimated quantities for the identified ACMs and recommends proper abatement and disposal by a licensed asbestos abatement contractor prior to renovation. The lead paint screening detected low levels of lead in some paints and coatings, but did not identify any lead-based paint as defined by EPA. The report outlines regulatory requirements for handling ACMs and addressing lead-containing paints during construction activities.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction San Juan, newest first.
File Type Posted
36C77624B0012 0004.pdf PDF
AE302.pdf PDF
Clarifications to Technical Questions 7-17-24.pdf PDF
014535.pdf PDF
Electrical_Addendum01.pdf PDF
GI300.pdf PDF
Structural_Addendum01.pdf PDF
Technology_Addendum01.pdf PDF
283100 Fire Detection and Alarm.pdf PDF
VASJ iSTAR Controller COMM ROOMS Inventory Jun 28 2024.xls XLS spreadsheet
Technical Questions - FINAL - San Juan - 6-28-24.pdf PDF
01-AE103b.pdf PDF
VACHS San Juan Geotehcnical Engineering Report on Sobsoil Exploration .pdf PDF
VASJ APC COMM ROOM Controller Inventory Jun 28 2024.xls XLS spreadsheet
36C77624B0012 0003.pdf PDF
AE500.pdf PDF
Fig 2 Borings Logs Location-Soil Report 2010.pdf PDF
GI103.pdf PDF
Mechanical_Addendum01.pdf PDF
36C77624B0012 0002.pdf PDF
36C77624B0012 0001.pdf PDF
Site Visit Sign-in Sheet - San Juan 5-14-24.pdf PDF
ATTACHMENT 3 - Drawings Vol 1 - Part 1.pdf PDF
ATTACHMENT 4 - Drawings Vol 1 - Part 2.pdf PDF
ATTACHMENT 9 - Drawings Vol 2 - Part 2.pdf PDF
ATTACHMENT 14 - Brand Name Justification - San Juan.pdf PDF
ATTACHMENT 15 - DOL Prevailing Wage Resource Book.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 17 - Site Visit Instructions.pdf PDF
36C77624B0012 - 4-25-24.pdf PDF
ATTACHMENT 2 - Specifications Vol 2.pdf PDF
ATTACHMENT 5 - Drawings Vol 1 - Part 3.pdf PDF
ATTACHMENT 8 - Drawings Vol 2 - Part 1.pdf PDF
ATTACHMENT 12 - CFD Analysis Report.pdf PDF
ATTACHMENT 13 - Pre-Construction Risk Assessment.pdf PDF
ATTACHMENT 1 - Specifications Vol 1.pdf PDF
ATTACHMENT 6 - Drawings Vol 1 - Part 4.pdf PDF
ATTACHMENT 7 - Drawings Vol 1 - Part 5.pdf PDF
ATTACHMENT 10 - Drawings Vol 2 - Part 3.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIMITED NESHAP PRE-RENOVATION ASBESTOS

SURVEY AND LEAD PAINT SCREENING

VA SAN JUAN EHRM PROPERTY

10 CALLE CASIA

SAN JUAN, PUERTO RICO 00907

ECS PROJECT NO. 55:4289

FOR: CB DESIGN GROUP

AUGUST 10, 2023

August 10, 2023

Mr. Wes Bridges CB Design Group 421 King Street Suite 301 Alexandria, Virginia 22314 wbridges@cbdg-ae.com

ECS Project No. 55:4289

Reference: Limited NESHAP Pre-Renovation Asbestos Survey and Lead Paint Screening

VA San Juan EHRM Property

10 Calle Casia, San Juan, Puerto Rico, 00907

Dear Mr. Bridges:

ECS Florida, LLC (ECS) is pleased to provide CB Design Group with the results of the above referenced Limited NESHAP Pre-Renovation Asbestos Survey and Lead Paint Screening performed at VA San Juan EHRM Property located at 10 Calle Casia in San Juan, Puerto Rico. This report summarizes our observations, analytical results, findings, and recommendations related to the work performed. The work described in this report was performed by ECS in general accordance with the Scope of Services described in ECS Proposal Number 55:5989 and the terms and conditions of the agreement authorizing those services.

ECS appreciates this opportunity to provide CB Design Group with our services. If we can be of further assistance to you, please do not hesitate to contact us.

Sincerely, ECS Florida, LLC Asbestos Business Organization ZA355

Stephanie Lister Clare E. Kramer, P.G. John M. Stump, P.G., L.A.C.

Environmental Project Manager Senior Project Manager Florida Licensed Asbestos Consultant

SLister@ecslimited.com ckramer@ecslimited.com License No. AX0000042

561-252-0662 407-859-8378 jstump@armorhill.com

2000 Avenue P, West Palm Beach, Florida 33404 • T:561-840-3667

ECS Florida, LLC • ECS Mid-Atlantic LLC • ECS Midwest, LLC • ECS Southeast, LLP • ECS Southwest, LLP ecslimited.com

PAGETABLE OF CONTENTS

1.0 SITE DESCRIPTION

2.0 PURPOSE

3.0 METHODOLOGY

3.1 Asbestos-Containing Materials

3.2 Screening for Lead in Paint and Surface Coatings

4.0 RESULTS

4.1 Asbestos-Containing Materials

4.2 Suspect or Assumed Asbestos-Containing Materials

4.3 Lead in Paint and Surface Coatings

5.0 RECOMMENDATIONS AND REGULATORY REQUIREMENTS

5.1 Asbestos-Containing Materials

5.2 Handling of ACMs

6.0 LIMITATIONS

ii

TABLE OF APPENDICES

Appendix I: Figures

Appendix II: Drawings

Appendix III: Site Photographs

Appendix IV: Asbestos Bulk and XRF Sample Results

Appendix V: Certifications/Licenses iii

1.0 SITE DESCRIPTION

The subject property is located at 10 Calle Casia in San Juan, Puerto Rico. The property is occupied by the San Juan VA Medical Center. The medical center is composed of the following buildings:

• Main Building (Building 1, built in 1969, 452,162 square feet)

• Laundry Building (Building 2, built in 1969, 10,030 square feet)

• Nursing Home - CLC (Building 10, built in 1988, 93,900 square feet)

• Outpatient - OPA (Building 19, built in 1999, 350,037 square feet)

• North Parking Garage (Building 20, built in 1999, 170,000 square feet)

• SICU (Building 26, built in 2009, 11,477 square feet)

• Electrical Distribution (Building 29, built in 2015, 9,480 square feet)

• South Bed (Building 30, built in 2010, 229,877 square feet)

• Administration (Building 40, built in 2012, 169,538 square feet)

• Modular Buildings (Buildings 50-53, built between 2015-2018, 768 square feet each)

• South Parking Garage (Building 60, built in 2016, 325,641 square feet)

Additional ancillary structures occupy the subject property (e.g. guard towers), but were not included in this scope of work. The project areas were specified as the TRs Server Room Upgrade Locations as specified in Appendix II of this report, no other areas within the subject buildings were included in this scope of work.

Environmental Health & Safety Services (EHSS) previously completed Asbestos Inspection Reports for Building 10 (Dated June 10, 2014), Building 19 (Dated August 16, 2016), Building 30 (Dated July 13, 2016), and Building 40 (Dated August 30, 2016). Based on the laboratory results from the above referenced reports, no asbestos-containing materials (ACMs) were identified and each of the buildings received asbestos-free certifications. As requested by CB Design Group, ECS did not resample building materials which were sampled during the above-referenced surveys.

Prior to ECS's April site visit, ECS was notified of asbestos-containing fireproofing located throughout the basement floor, first floor, and second floorof Building 1. Due to ongoing renovations in Building 1, it is understood that asbestos-containing fireproofing had been abated in select sections of the building. ECS was provided with asbestos-free fireproofing location drawings for Building 1 (dated August 5, 2020) by Radames Perdomo Figueroa, Healthcare Engineer for the VA Caribbean Healthcare System. Plenum spaces, above Building 1 offices and hallways, where asbestos-containing fireproofing is expected to be located, were not accessible for entry and inspection at the time of ECS' April 24-24, 2023 survey.

ECS utilized information regarding the locations of already known ACM in conjunction with the current project area locations to derive the following sampling protocol used for this assessment:

ECS assessed/surveyed suspect ACMs, LBPs, and other possible Hazardous Materials in the existing and planned TRs Server Room Upgrade Locations, as provided in the design plans.

ECS did not access ceiling areas where asbestos‐containing fire proofing is known to exist.

These areas are considered regulated work areas and building materials (such as top of ceiling tiles and TSI pipe‐ wrap) are expected to be in contact with the ACM fireproofing.

ECS Project # 55:4289

ECS did not sample fire-rated building materials such as fire‐rated drywall.

ECS continued with survey/sampling in areas certified to be asbestos free, based on the documentation provided, in the specified project area, as necessary.

ECS collected samples of previously untested suspect bulk materials in areas that have been certified as asbestos free in the specified project area, as necessary.

The buildings were operational at the time of ECS' inspection. It is understood that the structures are planned for renovations. The survey targeted accessible interior and exterior portions of the buildings, not including the roofing systems.

Generally, construction materials included a concrete block and wood-framed structure on concrete slab foundation, with stucco and wood siding exteriors. Interior finishes were typical of commercial buildings and included plaster, drywall, ceiling tiles, ceramic and vinyl flooring.

2.0 PURPOSE

The purpose of the Limited NESHAP Pre-Renovation Asbestos Survey and Lead Paint Screening was to identify Asbestos-Containing Materials (ACMs) and lead based paint (LBP) that may be present within the building, prior to the start of renovation activities.

3.0 METHODOLOGY

ECS performed the authorized Scope of Services in general accordance with our proposal, standard industry practice(s) and methods specified by regulation(s) for the identification of ACMs and LBP.

The asbestos survey was performed on April 24-28, 2023 by Stephanie Lister and John O'Neil, who are EPA certified asbestos inspectors with ECS. ECS is an asbestos-consulting firm licensed by the State of Florida Department of Business and Professional Regulation. This report was reviewed by a Florida Licensed Asbestos Consultant (LAC), as required by statute.

3.1 Asbestos-Containing Materials

US EPA NESHAP regulation requires a survey for asbestos prior to building renovation or demolition.

Demolition is defined under NESHAP as the removal of a load-bearing structure or member.

The survey consisted of observing the accessible areas of the structure for the presence of suspect materials which may contain asbestos. The survey involved detecting both friable materials (materials which can be pulverized or reduced to a powder by hand pressure when dry) and non-friable materials (materials which pose a hazard when sawn, sanded, drilled or pulverized). Homogeneous materials (based on material type, color, texture, etc.) were identified in various functional spaces during the survey.

The NESHAP and EPA sampling guidelines for a comprehensive asbestos inspection are as follows:

Friable Surfacing Material: Friable surfacing materials, where encountered, are sampled based on the recommendations found in the EPA “Pink Book” entitled “Asbestos in Buildings: Simplified Scheme for Friable Surfacing Materials” (EPA document 560/5-85-030a). Nine samples per homogeneous sampling area are recommended. If nine samples cannot be collected then the number of samples collected is based on the square footage of the homogeneous area of the material. If less than 1,000 square-feet (ft2) of suspect friable material is present, three samples are collected. If the area is between 1,000 and 5,000 ft2, five samples are collected. If the area is greater than 5,000 ft2 then seven samples are collected.

Thermal System Insulation (TSI): If present, at least three samples are collected in a randomly distributed manner from each homogeneous area of TSI not assumed to be ACM. At least two samples are collected from each homogeneous area of patched TSI. Where cement or plaster is used on fittings such as tees, elbows, or valves, samples will be collected in such a manner sufficient to determine whether the material is ACM or not ACM.

Miscellaneous Materials: This includes materials such as acoustical ceiling tiles, floor tiles, wallboard, wire insulation, caulking sealants, draperies, etc. (basically, anything that does not fall into the first two categories). Suspect miscellaneous materials will be sampled in such a manner as to determine whether or not they contain asbestos. The number of samples collected of a given miscellaneous material will be left to the discretion of the inspector.

The National Emission Standard for Asbestos (Subpart M 40 CFR Part 61.141 to 157 and Appendix A) of the National Emission Standard for Hazardous Air Pollutants (NESHAP) deals with Regulated Asbestos-Containing Materials (RACMS) during demolition activities. According to the NESHAP, friable RACM and RACM that may become friable must be addressed in buildings that are scheduled for complete demolition. For the purposes of this survey, accessible areas associated with the structure were observed for potential asbestos-containing materials.

Sampling Protocol: After these visual observations were completed, representative samples of select materials were obtained. The sampling protocols were determined in the field by our AHERA certified building inspector based on previous experience and in general accordance with applicable NESHAP and OSHA regulations. Some materials may be hidden and may be only accessible during the demolition process. ECS is not responsible for any non-accessible materials that could not be sampled. However, we can assist in the event that they are identified.

Environmental Health & Safety Services (EHSS) previously completed Asbestos Inspection Reports for Building 10 (Dated June 10, 2014), Building 19 (Dated August 16, 2016), Building 30 (Dated July 13, 2016), and Building 40 (Dated August 30, 2016). Based on the laboratory results from the above-referenced reports, no ACMs were identified and each of the buildings received asbestos free certifications. As requested by CB Design Group, ECS did not resample building materials which were sampled during the above-referenced surveys.

During the survey, ECS attempted to identify suspect ACMs in readily accessible areas. However, due to the destructive means required to identify some materials, certain areas were deemed inaccessible (i.e. behind walls or sub grade materials) and were not surveyed for suspect ACMs.

In Building 1, plenum spaces which still contained asbestos-containing fireproofing were not accessible. Unidentified suspect ACMs may be located in these and/or other inaccessible areas.

Samples were collected in general accordance with EPA Standard 40 CFR 763 Subpart E, Asbestos Hazard Emergency Response Act (AHERA) and OSHA Standard 29 CFR 1926.1101 Inspection Protocol.

Multiple samples of each unique material were submitted.

Samples were analyzed using “Positive Stop” methodology. If one sample of a homogeneous material is reported to contain asbestos, the remaining samples of that material are not analyzed. EPA regulations stipulate that if one sample contains asbestos the entire quantity of that material contains asbestos, regardless of additional analysis.

Samples of suspect ACMs were collected utilizing hand tools and were placed into individual, labeled plastic bags. Unique bulk suspect ACM samples were submitted to Scientific Analytical Institute, Inc.

in Greensboro, North Carolina for analysis via Polarized Light Microscopy (PLM) in accordance with current EPA-600 methodology. Materials consisting of additional layers were analyzed separately.

Scientific Analytical Institute, Inc. is listed as an accredited laboratory by the National Voluntary Laboratory Accreditation Plan (NVLAP) managed by the National Institute of Standards and Technology (NIST) for bulk sample analysis by currently approved EPA methodology by PLM.

3.2 Screening for Lead in Paint and Surface Coatings

The screening was conducted the U.S. EPA definition of LBP. Under this definition, painted surfaces which contain lead in concentrations equal to or greater than 1.0 milligrams per square centimeter (≥ 1.0 mg/cm2) are classified as coated with LBP. Paints with concentrations of lead detectable by the XRF are considered lead-containing paints. Additionally, fixtures or components that are manufactured with a factory applied glazing (i.e., sinks, toilets, ceramic tiles, etc.) are tested as these factory-applied finishes often contain lead. Activities which disturb lead-containing paints and glazing (while not lead-based paints by the U.S. EPA definition) are regulated by OSHA (29 CFR 1926.62).

Because the current or proposed use of the property is not residential or child-occupied, the scope of the LBP screening was not conducted in accordance with HUD Chapter 7 requirements. This representative screening included walls, windows, doors, and miscellaneous components. Walls are listed by letter with wall “A” being the entrance of the subject building, proceeding clockwise to “B, C, D”, etc.

4.0 RESULTS

The following is a summary of laboratory results, findings and observations.

4.1 Asbestos-Containing Materials

An ACM is defined as any material containing more than one percent (>1%) asbestos as determined using the method specified in Appendix A, Subpart F, 40 CFR Part 763, Section 1, PLM. Materials are categorized by the U.S. EPA in the following categories:

• Friable ACMs are defined as any ACM that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure.

• Non-friable ACMs are defined as any ACM that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

• Category I non-friable ACM are listed as the following: packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than one percent (>1%) asbestos.

• Category II non-friable ACM are listed as any material, excluding Category I non-friable ACM, containing more than one percent (>1%) asbestos.

• RACM (Regulated Asbestos-Containing Materials) are friable ACM or non-friable ACM that is damaged, or that will be or has been subjected to sanding, grinding, cutting, or abrading or has crumbled, been pulverized, or reduced to powder in the course of renovation and/or demolition operations.

In total, 198 bulk samples from 35 homogeneous areas (HA) were submitted to the laboratory for analysis. Some of the samples were separated into additional layers by the laboratory for analysis.

The laboratory provided results for 305 analyzed layers. Scientific Analytical Institute, Inc. submitted a signed final laboratory report to ECS on May 9, 2023.

Findings: Based on the PLM laboratory analysis of the bulk samples collected during the survey, five (5) materials listed in Table 1 were reported to contain asbestos above 1% and are therefore considered to be ACM, under EPA definitions. All of the five materials listed are located within the Main Building (Building 1).

HA Area Sample

Number Material Description Location Results Category

Approximate

Quantity*

C220

A. 9" x 9" White with Black Streaks VFT

B. Black Mastic

Situated throughout the floors of the Main Building (Building 1)

A. 4% Chysotile - White VFT

B. 20% Chrysotile-Black Mastic Backing Cat. I NF 1,000 SF

A251

Black HVAC Duct Mastic

Situated near the roof, applied to the HVAC ductwork of the Main

Building (Building 1)

5% Chrysotile-Black Mastic Backing Cat. I NF 1,000 LF

A251

A. Black Mastic

B. 12" x 12" Gray with Specks VFT

Situated throughout the floors of the Main Building (Building 1)

A. 5% Chrysotile-Black Mastic Backing

B. ND - Gray VFT Cat. I NF 3,000 SF

A251

Red HVAC Duct Mastic

Situated near the roof, applied to the HVAC ductwork of the Main

Building (Building 1)

4% Chrysotile-Red Mastic Cat. I NF 1,000 LF

Table 1 - Summary of Identified Asbestos-Containing Materials

Notes: VFT = Vinyl Floor Tile, ND = Not Detected, NF = Non-Friable, SF = Square Feet, LF = Linear Feet

*The Approximate Quantities listed above are for informational purposes only, and are based on observational field estimates of overt, accessible ACM, at the time of our site inspection. These conservative quantity approximations may include estimates of possible presumed ACMs, which may be occluded by overlying building materials or other barriers at the time of our site inspection. These ACM quantity approximations should not be used for legal or financial matters, nor should they be relied on by asbestos abatement contractors for their own contract bidding purposes. Any contactors bidding on asbestos abatement work should visit the project site prior to bidding, to field-verify the locations of named ACMs, and to develop their own quantity estimates.

ECS Project No. 55:4289

Table Page 1 of 1

Based on the PLM laboratory analysis of the bulk samples collected during the survey, five (5) materials were reported to contain asbestos (>1%). All of the five (5) materials listed are located within the Main Building (Building 1).

• HA-C220-A: 9"X9" White with Black Streaks Vinyl Floor Tile (VFT), was found to contain 4% asbestos and is identified as ACM. The ACM is located on the floors in the Main Building (Building 1). The estimated area of ACM is 1,000 SF.

• HA-C220-B: Black Mastic Backing, was found to contain 20% asbestos and is identified as ACM. The ACM is located under 9"X9" White with Black Streaks Vinyl Floor Tile (VFT). The ACM is located on the floors in the Main Building (Building 1). The estimated area of ACM is 1,000

SF.

• HA-A251: Black HVAC Duct Mastic, applied to the HVAC ductwork, was found to contain 5% asbestos and is identified as ACM. The ACM is located on HVAC duct work near the ceilings of the Main Building (Building 1). The estimated area of ACM is 1,000 LF.

• HA-A251-B: Black Mastic, was found to contain 5% asbestos and is identified as ACM. The ACM is located under 12" x 12" Gray with Specks Vinyl Floor Tile (VFT) (which was not identified as ACM). The ACM is located on the floors in the Main Building (Building 1). The estimated area of ACM is 3,000 SF.

• HA-A251: Red HVAC Duct Mastic, applied to the HVAC ductwork, was found to contain 4% asbestos and is identified as ACM. The ACM is located on HVAC duct work near the ceilings of the Main Building (Building 1). The estimated area of ACM is 1,000 SF.

A complete list of the sampled materials submitted for analysis and sample locations are located in the Appendix of this report. Photographs of the project area and collected samples are also located in the Appendix of this report.

4.2 Suspect or Assumed Asbestos-Containing Materials

Due to the inaccessibility or the destructive means that asbestos sampling requires, additional suspect ACMs may remain within the building hidden behind inaccessible areas that include, but are not limited to, sub-grade walls, structural members, topping slabs, sub-grade sealants, flooring located below underlayments, areas behind exterior walls, pipe trenches, and subsurface utilities, etc.

These areas were deemed inaccessible and were not assessed.

If these materials are discovered during construction activities, they should be presumed to contain asbestos and be treated as ACMs or be sampled immediately upon discovery and prior to disturbance for asbestos content by a certified asbestos inspector in accordance with 29 CFR 1926.1101.

4.3 Lead in Paint and Surface Coatings

During ECS' April 24-28 site visit, accessible suspect lead-containing paints/coatings were analyzed in the field using a calibrated X-Ray Fluorescence (XRF) Spectrometer. Paint and surface coatings which contain detectable concentrations of lead are considered “lead-containing paints”. Since OSHA has no specific action level for lead in paint, all paint on the site found to have a measurable concentration of lead should be assumed to be lead containing. Work performed which may disturb lead-containing paint is regulated under OSHA as referenced under 29 CFR 1926.62. A total of 114 XRF scans were conducted during the survey, including calibration scans. Paint and other surface coatings which are defined by applicable regulation as lead-containing paints are summarized in the table below and photographs of lead-containing paints identified are located in the Appendix. It should be noted that lead-based paint (those with detectable concentrations above ≥1.0 mg/cm2) were not detected in the client-designated path of construction.

The following types of materials were found to contain detectable concentrations of lead, and are considered lead-containing paints:

• Building 40 - 2M259 - Red Metal Pipe

• Building 1 - D264 - Tan Metal Door Frame

• Building 1 - C220 - Tan Metal Door

• Building 1 - C220 - Tan Metal Door Frame

• Building 1 - A146 - Tan Metal Door

• Building 1 - A146 - Tan Metal Door Frame

XRF LEAD-CONTAINING PAINT RESULTS

VA San Juan EHRM Infrastructure Upgrades ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

1 0.00

2 0.00

3 0.00

4 0.90

5 1.00

6 1.00

7 Building 40 - B2M015 A White Concrete Wall 0.00

8 Building 40 - B2M015 B White Wood Wall 0.00

9 Building 40 - B2M015 C White Metal Door Face 0.00

10 Building 40 - B2M015 C White Metal Door Frame 0.00

11 Building 40 - 1M117 D White Drywall Wall 0.00

12 Building 40 - 1M101 A White Concrete Wall 0.00

13 Building 40 - 2M259 B Red Metal Pipe 0.04

14 Building 40 - 4MH30a C Red Metal Pipe 0.00

15 Building 40 - 4MH30a A White Drywall Wall 0.00

16 Building 20 - MH204 A Tan Concrete Wall 0.00

17 Building 20 - MH204 B Tan Wood Wall 0.00

18 0.00

19 0.00

20 0.00

Calibration Blank

Calibration Blank

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Calibration Blank

Calibration Blank

Calibration Blank

Notes: Bold = Lead Based Paint

BDL = Below Detection Limit Pb - Lead per mg/cm2

ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

21 0.90

22 0.90

23 0.90

24 Building 60 - MH205 A Tan Concrete Wall 0.00

25 Building 60 - MH205 C Brown Metal Door 0.00

26 Building 60 - MH205 C Brown Metal Door Frame 0.00

27 Building 60 - MH205 A White Concrete Ceiling 0.00

28 Building 60 - MH202 B Tan Concrete Wall 0.00

29 Building 60 - MH202 C Dark Tan Metal Door 0.00

30 Building 60 - MH202 C Dark Tan Metal Door Frame 0.00

31 Building 2 - MH200 A Tan Concrete Wall 0.00

32 Building 2 - MH200 B Tan Metal Door Face 0.00

33 Building 2 - MH200 B Tan Metal Door Frame 0.00

34 Building 29 - MH202 C Gray Concrete Floor 0.00

35 Building 29 - MH202 C Tan Metal Door 0.00

36 Building 29 - MH202 C Tan Metal Door Frame 0.00

37 Building 29 - MH202 B White Drywall Wall 0.00

38 0.00

39 0.00

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Calibration Blank

Calibration Blank

Notes: Bold = Lead Based Paint

ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

40 0.00

41 1.00

42 0.90

43 0.90

44 0.00

45 0.00

46 0.00

47 1.00

48 0.90

49 0.90

50 Building 10 - 2A104 D Peach Concrete Wall 0.00

51 Building 10 - 2A104 A Blue Concrete Wall 0.00

52 Building 10 - 2A104 B Green Concrete Wall 0.00

53 Building 10 - 2A104 B White Drywall Wall 0.00

54 Building 10 - 2A104 C Gray Metal Door 0.00

55 Building 10 - 2A104 C Gray Metal Door Frame 0.00

56 Building 10 - 2A104 A Green Concrete Wall 0.00

57 Building 10 - 2A104 A White/ Tan Concrete Wall 0.00

58 0.00

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Calibration Blank

Calibration Blank

Calibration Blank

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Notes: Bold = Lead Based Paint

ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

59 0.00

60 0.00

61 1.00

62 0.90

63 1.00

64 Building 1 - D264 A White Concrete Wall 0.00

65 Building 1 - D264 C Tan Metal Door 0.00

66 Building 1 - D264 C Tan Metal Door Frame 0.05 +/- 0.01

67 Building 1 - D264 B White Porcelain Sink 0.00

68 Building 1 - D264 B White Porcelain Toilet 0.00

69 Building 1 - D264 A Tan Ceramic 1" x 1" Flooring 0.00

70 Building 1 - C220 B Dark Tan Drywall Wall 0.00

71 Building 1 - C220 C Tan Metal Door 0.31+/-0.07

72 Building 1 - C220 C Tan Metal Door Frame 0.16+/-0.02

73 Building 1 - B209 B Green Drywall Wall 0.00

74 Building 1 - B209 A Dark Tan Drywall Wall 0.00

75 Building 1 - A251 C Gray Plaster/ Drywall Wall 0.00

76 Building 1 - A251 C Tan Plaster/ Drywall Wall 0.00

77 Building 1 - A251 B Tan Plaster/ Drywall Wall 0.00

Calibration Blank

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Notes: Bold = Lead Based Paint

ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

78 Building 1 - D124 B Tan Plaster/ Drywall Wall 0.00

79 Building 1 - D124 A White Ceramic Sink 0.00

80 Building 1 - A146 B Light Green

Plaster/ Drywall Wall 0.00

81 Building 1 - A146 D Tan Metal Door 0.13 +/- 0.03

82 Building 1 - A146 D Tan Metal Door Frame 0.09 +/- 0.01

83 0.00

84 0.00

85 0.00

86 1.00

87 1.00

88 0.90

89 0.00

90 0.00

91 0.00

92 1.00

93 1.00

94 1.00

95 Building 19 - BE122 A Gray Concrete Floor 0.00

96 Building 19 - BE122 A Peach/ White CMU Wall 0.00

Calibration Blank

Calibration Blank

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Calibration Blank

Calibration Blank

Calibration Blank

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Notes: Bold = Lead Based Paint

ECS Project No. 55:4289

Site Visit: April 24 - 28, 2023

Scan No. Room/Location Side Color Substrate Component Lead Concentration %

97 Building 19 - BE122 C White Metal Door Frame 0.00

98 Building 19 - BE109 B Teal Drywall Wall 0.00

99 Building 19 - BE109 C White Drywall Wall 0.00

100 Building 19 - BE109 C Tan Metal Door 0.00

101 Building 19 - BE109 C Tan Metal Door Frame 0.00

102 Building 19 - 1F103 B Yellow Drywall Wall 0.00

103 Building 19 - 1F178 A Yellow Drywall Wall 0.00

104 Building 19 - 2FC105 B Red Metal Pipe 0.00

105 Building 19 - 2FC105 A White Wood Wall 0.00

106 Building 19 - 2FC105 C Tan Metal Door 0.00

107 Building 19 - 2FC105 C Tan Metal Door Frame 0.00

108 Building 1 - Level 3 B Black Metal Pipe 0.00

109 0.00

110 0.00

111 0.00

112 1.00

113 1.00

114 1.00

Calibration SRM 2573

Calibration SRM 2573

Calibration SRM 2573

Calibration Blank

Calibration Blank

Calibration Blank

Notes: Bold = Lead Based Paint

5.0 RECOMMENDATIONS AND REGULATORY REQUIREMENTS

Based on our understanding of the purpose of the Limited NESHAP Pre-Renovation Asbestos Survey and Lead Paint Screening, the results of laboratory analysis, and our findings and observations, ECS presents the following recommendations.

5.1 Asbestos-Containing Materials

Where a material type has been identified as asbestos containing that other materials with similar color, texture, age and size throughout the building’s interior and exterior be assumed to contain asbestos. Please refer to Section 4.1 for a complete list of building materials that were reported positive for asbestos and to Section 4.2 for materials that were assumed to contain asbestos. Figures in the Appendix show their approximate locations.

Based on the PLM laboratory analysis of the bulk samples collected during the survey, the following materials were reported to contain asbestos (>1%):

• HA-C220-A: 9"X9" White with Black Streaks Floor Tile in the Main Building (Building 1)

• HA-C220-B: Black Mastic in the Main Building (Building 1)

• HA-A251: Black HVAC Duct Mastic in the Main Building (Building 1)

• HA-A251-B: Black Mastic in the Main Building (Building 1)

• HA-A251: Red HVAC Duct Mastic in the Main Building (Building 1)

ECS recommends that the above ACMs be properly abated and disposed of by a licensed Puerto Rico Asbestos Abatement Contractor prior to the onset of demolition activities.

A ten day notification is required prior to initiating any renovation, demolition or asbestos abatement activities. Notifications can be submitted in person or via certified mail for EPA approval to the following address: City View Plaza II, #48 Carr. 175 STR 7000, Guaynabo, PR 00968-8073. Following EPA approval, DNER permits can be submitted at www.drna.pr.gov/acai/ asbesto/.

5.2 Handling of ACMs

If ACMs are to be removed, it is recommended that an industrial hygienist or other qualified professional monitor the asbestos abatement project. This involves collecting air samples from within and outside abatement work areas to monitor the asbestos abatement contractor’s work practices over the course of the project. The abatement project monitor should evaluate if the asbestos abatement work is in accordance with project specifications, U.S. EPA regulation 40 CFR Part 61-National Emission Standards for Hazardous Air Pollutants Subpart M: National Emission Standard for Asbestos, and U.S. Occupational Safety and Health Administration (OSHA) regulation 29 CFR

1926.1101 – Asbestos in Construction. The project monitor should assess each work area to monitor the removal of ACMs. Only after the project monitor has determined the identified ACMs have been completely removed and the work area meets visual compliance with ASTM E1368 consensus standards should final clearance air samples be collected (if necessary, for reoccupation of the abated building area).

Federal, state, and local regulations require asbestos-containing materials be removed prior to disturbance by demolition operations. However, if the building is to be demolished, by regulation, Category I non-friable materials and in some instances Category II materials may remain in place during demolition under the following provisions:

• The Contractor must have appropriate training and/or use certified personnel; must notify appropriate state and federal agencies including US EPA (10 Day Demolition Notification), the debris must remain wet during demolition and cannot become friable; the contractor cannot compact the debris once the building is demolished with Category I/II non-friable materials present.

• Salvage of materials is also prohibited once the building is demolished and Category I/II non-friable materials are mixed in the debris.

• The landfill receiving the waste must be permitted to accept asbestos waste, and must also be notified in writing that it is receiving Category I/II non-friable materials, and it must acknowledge that it can accept this type of waste.

• The contractor is required to comply with all OSHA regulations regarding asbestos.

Suspect ACMs not observed due to inaccessibility or not sampled due to the destructive means that sampling would require may also be encountered during construction activities. At the time of the survey, only limited destructive methods, carried out using hand tools, were used to locate or sample suspect ACMs; therefore, additional suspect ACMs may remain within inaccessible areas that include, but are not limited to, sub-grade walls, structural members, topping slabs, exterior areas, sub-grade sealants, flooring located below underlayments, vapor barriers, pipe trenches and other subsurface utilities, etc. If additional suspect ACMs are uncovered which were not accessible during this survey, it is recommended that these materials either be assumed to contain asbestos or be sampled prior to disturbance upon discovery for asbestos content by an asbestos inspector in accordance with 29

CFR 1926.1101.

Lead in Paint and Surface Coatings

Based on the findings of the Lead Paint Screening, detectable concentrations of lead were identified on some paints and surface coatings. Although relatively low levels of lead were detected in these paints and coatings, ECS considers that, using best management practices during renovation, there will be little likelihood of a lead-related hazard to renovation workers. It is unlikely to pose a hazard during renovation activities. It should be noted that lead-based paint (those with detectable concentrations above ≥1.0 mg/cm2) were not detected in the client-designated path of construction.

The EPA definition of lead-based paint is 1.0 mg/cm2, which relates to pre-1978 housing and child-occupied facilities due to the risk of exposure to children. The risk to children is primarily by hand to mouth exposure from dust created from friction surfaces coated with lead-based paint. None of the surfaces identified are friction surfaces and therefore are not likely to generate dust during renovation activities.

The presence of lead is a concern primarily when conditions exist where it may be inhaled or ingested.

Regardless of the analytical results of a material, all painted and/or glazed surfaces may still contain concentrations of lead in the paint, which when disturbed, may generate lead dust greater than the Permissible Exposure Limit (PEL) of 50 micrograms per cubic meter (ug/m3) as an 8-hour Time Weighted Average (TWA) established by the OSHA “Lead Exposure in Construction Rule (29 CFR 1926.62).”

The OSHA standard gives no guidance on acceptable levels of lead in paint at which no exposure to airborne lead (above the action level) would be expected. Rather, OSHA defines airborne concentrations, and references specific types of work practices and operations from which a lead hazard may be generated (reference 29 CFR 1926.62, section d). Environmental and personnel monitoring should be conducted during any removal/demolition process (as appropriate) to verify that actual personal exposures are below the Permissible Exposure Limit (PEL) of 50 micrograms per cubic meter (µg/m3) as an 8-hour Time Weighted Average (TWA). Under OSHA requirements, the contractor performing renovation work will be required to conduct this monitoring and follow applicable requirements under 29 CFR 1926.62 if disturbing lead-containing paint.

6.0 LIMITATIONS

The conclusions and recommendations presented within this report are based upon a reasonable level of assessment within normal bounds and standards of professional practice for a site in this particular geographic setting. ECS is not responsible or liable for the discovery and elimination of hazards that may potentially cause damage, accidents, or injuries.

The observations, conclusions, and recommendations pertaining to environmental conditions at the subject site are necessarily limited to conditions observed, and/or materials reviewed at the time this study was undertaken. No warranty, expressed or implied, is made with regard to the conclusions and recommendations presented within this report. This report is provided for the exclusive use of the client. This report is not intended to be used or relied upon in connection with other projects or by other unidentified third parties without the written consent of ECS and the client.

Our recommendations are in part based on federal, state, and local regulations and guidelines. ECS does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to any local, state, or federal public agencies, any conditions at the site that may present a potential danger to public health, safety, or the environment. Under this scope of services, ECS assumes no responsibility regarding any response actions initiated as a result of these findings. General compliance with regulations and response actions are the sole responsibility of the Client and should be conducted in accordance with local, state, and/or federal requirements.

During this study, samples were submitted for analysis at an accredited laboratory via polarized light microscopy. As with any similar survey of this nature, actual conditions exist only at the precise locations from which samples were collected. Certain inferences are based on the results of this sampling and related testing to form a professional opinion of conditions in areas beyond those from which the samples were collected. No warranty, expressed or implied, is made.

Appendix I: Figures

HA Area Sample

Number Material Description Location Results Category

Approximate

Quantity*

C220

A. 9" x 9" White with Black Streaks VFT

B. Black Mastic

Situated throughout the floors of the Main Building (Building 1)

A. 4% Chysotile - White VFT

B. 20% Chrysotile-Black Mastic Backing Cat. I NF 1,000 SF

A251

Black HVAC Duct Mastic

Situated near the roof, applied to the HVAC ductwork of the Main

Building (Building 1)

5% Chrysotile-Black Mastic Backing Cat. I NF 1,000 LF

A251

A. Black Mastic

B. 12" x 12" Gray with Specks VFT

Situated throughout the floors of the Main Building (Building 1)

A. 5% Chrysotile-Black Mastic Backing

B. ND - Gray VFT Cat. I NF 3,000 SF

A251

Red HVAC Duct Mastic

Situated near the roof, applied to the HVAC ductwork of the Main

Building (Building 1)

4% Chrysotile-Red Mastic Cat. I NF 1,000 LF

Table 1 - Summary of Identified Asbestos-Containing Materials

Notes: VFT = Vinyl Floor Tile, ND = Not Detected, NF = Non-Friable, SF = Square Feet, LF = Linear Feet

*The Approximate Quantities listed above are for informational purposes only, and are based on observational field estimates of overt, accessible ACM, at the time of our site inspection. These conservative quantity approximations may include estimates of possible presumed ACMs, which may be occluded by overlying building materials or other barriers at the time of our site inspection. These ACM quantity approximations should not be used for legal or financial matters, nor should they be relied on by asbestos abatement contractors for their own contract bidding purposes. Any contactors bidding on asbestos abatement work should visit the project site prior to bidding, to field-verify the locations of named ACMs, and to develop their own quantity estimates.

Table Page 1 of 1

Appendix II: Drawings

Source: Google Earth

Figure 1

Site Location Map

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

SUBJECT PROPERTY

XX-XX

Figure 2

Asbestos Survey

Bulk Sample Locations

Building 40 – Basement

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

B2M015- 01-05

B2M015

Figure 3

Asbestos Survey

Bulk Sample Locations

Building 40 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

1M117-06-11

XX-XX

1M117

1M101

Figure 4

Asbestos Survey

Bulk Sample Locations

Building 40 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

XX-XX

2M259

2M208

Figure 5

Asbestos Survey

Bulk Sample Locations

Building 40 – Third Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

XX-XX

3M347

3M303

Figure 6

Asbestos Survey

Bulk Sample Locations

Building 40 – Fourth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

4M430A-12,13, 140XX-XX

4M430a

4M402

Figure 7

Asbestos Survey

Bulk Sample Locations

Building 40 – Fifth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

5M540-14,15XX-XX

5M540

5M504a

Figure 8

Asbestos Survey

Bulk Sample Locations

Building 20 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH204-16,17,18

MH204

Figure 9

Asbestos Survey

Bulk Sample Locations

Building 60 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH201

Figure 10

Asbestos Survey

Bulk Sample Locations

Building 60 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH202-27-30

MH202

Figure 11

Asbestos Survey

Bulk Sample Locations

Building 60 – Third Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH203

Figure 12

Asbestos Survey

Bulk Sample Locations

Building 60 – Fourth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH204

Figure 13

Asbestos Survey

Bulk Sample Locations

Building 60 – Fifth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH205-19-26

MH205

Figure 14

Asbestos Survey

Bulk Sample Locations

Building 60 – Sixth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH206

Figure 15

Asbestos Survey

Bulk Sample Locations

Building 02 – Basement

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH-200-31,32

MH-200-33

MH-200-34,35

MH200

Figure 16

Asbestos Survey

Bulk Sample Locations

Building 29 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH202-36,37

MH202-38,39

MH202-40

MH202-41

MH202-42

MH202-43

MH202-44

MH202-45

MH202

Figure 17

Asbestos Survey

Bulk Sample Locations

Building 10 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

2A104-67-69

2A104

Figure 18

Asbestos Survey

Bulk Sample Locations

Building 10 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

2A104-46-66

2A104

Figure 19

Asbestos Survey

Bulk Sample Locations

Building 26 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

MH201-70,71

MH201-72,73

MH201-74

MH201

Figure 20

Asbestos Survey

Bulk Sample Locations

Building 1 – Basement

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

D38- 120-123

XX-XX

MH205

D-38

A-52

Figure 21

Asbestos Survey

Bulk Sample Locations

Building 1 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

C122 – 116,117

XX-XX

C122

16110 D124

Figure 22

Asbestos Survey

Bulk Sample Locations

Building 1 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

D264 – 79-90

A251 – 102-107A251 – 108-115, 143-146

C220-93,94

C220-91,92, 95-101, 141, 142

XX-XX

D264

C220

B209

A251

Figure 23

Asbestos Survey

Bulk Sample Locations

Building 19 – Basement

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

BE122-124-126, 181-185

BE109 – 186, 187

XX-XX

BE109

BE122

Figure 24

Asbestos Survey

Bulk Sample Locations

Building 19 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

1E170-75-78

1G110- 127-137, 160-163

1F182-139, 164-168

1F103-169-176

1E178-177-180

XX-XX

1F182

1G110

1F103

1E178 1E170

1G170

Figure 25

Asbestos Survey

Bulk Sample Locations

Building 19 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

Positive Bulk Sample

NOTES:

Not to scale

Samples color coded

2G110-138

2FC110- 147-153

2FC105- 154-157

2E110-158,159

XX-XX

2E110

2FC105

2FC110

2G110

2GC105

Figure 26

Asbestos Survey

Bulk Sample Locations

Building 30 – First Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K1226EXT-188-190

K1226EXT-191,192

K1226EXT

Figure 27

Asbestos Survey

Bulk Sample Locations

Building 30 – Second Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K2273A

Figure 28

Asbestos Survey

Bulk Sample Locations

Building 30 – Third Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K3398B-194,195

K3398B-193

K3398B

Figure 29

Asbestos Survey

Bulk Sample Locations

Building 30 – Fourth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K44100-196,197

K44100-198

K44100

Figure 30

Asbestos Survey

Bulk Sample Locations

Building 30 – Fifth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K5596A

Figure 31

Asbestos Survey

Bulk Sample Locations

Building 30 – Sixth Floor

10 C. Casia San Juan, Puerto Rico

ECS Project Number 55-4289

LEGEND

Room Number

Sample Location

Negative Bulk Sample

NOTES:

Not to scale

Samples color coded

K6697

Appendix III: Site Photographs

1 - Subject Property Overview

2 - Main Building (Building 1) - Sampling Area Overview

3 - Main Building (Building 1) - Sampling Area Overview

4 - Main Building (Building 1) - Sampling Area Overview

5 - A251 - Red HVAC Duct Mastic over HVAC Ductwork- Main Building (Building 1)

6 - A251 - Black HVAC Duct Mastic

7 - C220-A & C220-B - 9"X9" White VFT w Black Streaks Over Black Mastic - Main Building (Building 1)

8 - A251- Black Mastic Under 12X12 VFT Gray w/ Speckles

9 - View of Abated Spray-on Fireproofing (Green) - Main Building (Building 1)

10 - Laundry Building (Building 2) - Sampling Area Overview

11 - Nursing Home - CLC (Building 10) - Sampling Area Overview

12 - Nursing Home - CLC (Building 10) - Sampling Area Overview

13 - Outpatient - OPA (Building 19) - Sampling Area Overview

14 - Outpatient - OPA (Building 19) - Sampling Area Overview

15 - Outpatient - OPA (Building 19) - Sampling Area Overview

16 - North Parking Garage (Building 20) - Sampling Area Overview

17 - SICU (Building 26) - Sampling Area Overview

18 - Electrical Distribution (Building 29) - Sampling Area Overview

19 - Electrical Distribution (Building 29) - Sampling Area Overview

20 - South Bed (Building 30) - Sampling Area Overview

21 - South Bed (Building 30) - Sampling Area Overview

22 - Administration (Building 40) - Sampling Area Overview

23 - Administration (Building 40) - Sampling Area Overview

24 - Modular Buildings (Buildings 50-53) - Not Sampled

25 - Modular Buildings (Buildings 50-53) - Not Sampled

26 - Modular Buildings (Buildings 50-53) - Not Sampled

27 - South Parking Garage (Building 60) - Sampling Area Overview

Appendix IV: Asbestos Bulk and XRF Sample Results

B2M015-01

10022695_0001

Silver HVAC Pipe Wrap

None Detected 15% Fiber Glass

Fibrous

Ashed

Silver, White

Homogeneous Other85%

B2M015-02

10022695_0002

Silver HVAC Pipe Wrap

None Detected 15% Fiber Glass

Fibrous

Ashed

Silver, White

Homogeneous Other85%

B2M015-03

10022695_0003

CMU Wall Coating

None Detected 3% Cellulose

Fibrous

Dissolved

White, Gray

Homogeneous Other97%

B2M015-04

10022695_0004

CMU Wall Coating

None Detected 3% Cellulose

Fibrous

Dissolved

White, Gray

Homogeneous Other97%

B2M015-05

10022695_0005

CMU Wall Coating

None Detected 3% Cellulose

Fibrous

Dissolved

White, Gray

Homogeneous Other97%

1M1170-06

10022695_0006

Silver HVAC Pipe Wrap

None Detected Non-Fibrous

Ashed

Silver

Homogeneous Other100%

1M1170-07

10022695_0007

Silver HVAC Pipe Wrap

None Detected Non-Fibrous

Ashed

Silver

Homogeneous Other100%

1M1170-08 - A

10022695_0008

4" Brown Covebase with White Mastic covebase

None Detected Non-Fibrous

Ashed

Brown

Homogeneous Other100%

Page 1 of 31P-F-002 r15 1/15/2023 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Analyst Approved Signatory

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Nicholas Pallares…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .