This document appears to contain masonry details related to a federal contract opportunity for the "EHRM Infrastructure Upgrades Construction San Juan" project. The key details are:
The project involves general construction, infrastructure upgrades, and reconfiguration/renovation of existing spaces across multiple buildings at the VA Caribbean Health Care System in San Juan, Puerto Rico. The infrastructure upgrades include electrical, HVAC, communications, physical security, and fiber backbone work. The project will also include site work such as modifications to roads, walks, grading, and utilities. The solicitation number is 36C77624B0012 and the federal agency is the Department of Veterans Affairs Technology Acquisition Center Austin.
The masonry details cover aspects such as reinforcing schedules, wall intersections, beam/deck connections to CMU walls, and CMU infill. These technical details would be relevant for contractors to review as part of the bid preparation process for this construction project.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATION
SECTION
1'-0"
1/2"Ø THRU BOLT
AT 24" OC
CONT L6x3x1/4 (LLV) EACH
SIDE). GROUT AS
NECESSARY FOR SNUG FIT
1/2"Ø THRU BOLT
AT 24" OC
CONT L6x3x1/4 (LLV) EACH
SIDE). GROUT AS
NECESSARY FOR SNUG FIT
(E) CMU WALL
NOTES:
1. SAW CUT ONE FACE OF WALL
AND INSTALL ANGLE.
2. SAW CUT OPPOSITE FACE
AND INSTALL SECOND ANGLE.
3. INSTALL THRU BOLTS IN
SOLID GROUTED CELL.
4. SAW CUT REMAINING EDGES
AND REMOVE MASONRY.
5. 4'-0" MAX OPENING WIDTH.
(E) CMU WALL
NEW COURSE OF
CMU 2L3x3x5/16
NOTE:
1. (E) WALL TO BE SHORED AS REQUIRED FOR
INSTALLATION OF NEW LINTEL.
2. 4'-0" MAX OPENING WIDTH.
EL (SEE ARCH)
T.O. OPENING
1/4 3-12
1/4 3-12
ARCH
SEE
CMU WALL REINFORCING SCHEDULE
8"
REMARKS
SINGLE MAT
NOTES:
1. THE ABOVE SCHED SHALL BE MIN REINF FOR ALL BUILDING CMU WALLS.
2. SINGLE MAT REINF SHALL BE IN THE CENTER OF WALL, UON.
3. PLACE HORIZ BAR IN BOND BEAM UNIT, TYP.
4. LOCATE FIRST LAYER OF HORIZ BARS AT 8" MAX FROM BASE OF WALLS AND
FROM TOP AND BOTTOM OF WALL OPENINGS.
5. ALL EXTERIOR WALLS TO BE GROUTED SOLID.
6. PROVIDE 24" LAP SPLICE FOR #5 BARS AND 16" LAP SPLICE FOR #4 BARS.
MAXIMUM
HEIGHT
BAR SIZE AND SPACING EACH MAT
#5 @ 24" OC15'-6"
WALL
THICKNESS VERTICAL
HORIZONTAL
(SEE NOTE 4)
#4 @ 24" OC
OPEN END BLOCK
BREAK SHELL FOR
FLOW OF GROUT, TYP
INTERSECTION
BARS SHALL MATCH
HORIZ WALL OR
BOND BEAM REINF
(1) #5 VERT BAR
(1) #5 VERT BAR
S E
E S
C H
E D
T
Y P
L A
P S
P L
IC
E
NOTES:
1. TYPICAL VERTICAL REINFORCING AND GROUT NOT
SHOWN FOR CLARITY.
2. DETAIL ASSUMES CORNER IS CONSTRUCTED IN
RUNNING BOND WITH UNITS INTERLOCKED.
BEND CORNER
BARS AROUND
VERT REINF
DETAIL IS REQD WHERE
INDICATED HEAD JOINT
IS CONT FULL HEIGHT.
WHERE ALTERNATE
JOINT LOCATION OCCUR,
SEE TYPICAL CORNER
REINF DETAIL
SLAB ON STEEL
DECK SEE PLAN
BOND BEAM
WITH (2) #5 CONT
PL1/4"x7" x CONT WITH 1/2"Ø x 4" HSA @ 16" OC
NOTE:
1. CONTRACTOR TO COORDINATE ACCESS HOLE FOR
GROUT POUR WITH ENGINEER.
SLAB ON STEEL DECK - SEE PLAN
STEEL BEAM - SEE PLAN
PL3/8"x7" x (bf + 1") WITH (2) 1/2"Ø x 4" HSA
BOND BEAM WITH
(2) #5 CONT
CMU WALL
SEE PLAN
(2) 3/4"Ø NELSON CJL REDUCED-
BASE THREADED STUD ANCHORS.
PROVIDE LSL HOLES IN BEAM
FLANGE PARALLEL TO WEB
INFILL BEAM POCKET
AFTER BEAM IS INSTALLED
IN SHADED AREA, FILL ALL CORES IN
WALL WITH GROUT.
MIN AT CORNER CONDITION: 1'-4",
EACH WAY
U
O N
B O
N D
B E
A M
1'-4" MIN1'-4" MIN
SECTION A
A
3/16
CONT L4x4x5/16
BOND BEAM W/
(2) #5, EXTEND 2'
BEYOND BEAM
SLAB ON STEEL DECK
SEE PLAN
L5x5x3/8 x CONT WITH
5/8"Ø HILTI KWIK BOLT TZ
ANCHORS @ 24" OC WITH
4" MIN EMBED
BOND BEAM
WITH (2) #5 CONT
EL (SEE PLAN)
T.O. SLAB
CMU WALL
SEE PLAN
HSA @ 12" OC, TYP
CMU WALL, SEE PLAN
AND SCHEDULE
L6x3 1/2x5/16 (LLV) x CONT W/
5/8"Ø HILTI KWIK BOLT TZ
@ 24" OC MAX INTO DECK
FLUTES WITH 3 3/4" EMBED
EACH SIDE OF WALL.
GROUT SOLID
TYP
1 3/4"
TYP
1 3/4"
5/8"Ø HILTI KWIK BOLT TZ
ANCHORS @ 24" OC W/ 4"
MIN EMBED STAGGER ON
OPPOSITE SIDES OF WALL
(E) SLAB ON STEEL
DECK - SEE PLAN
(E) CMU WALL
SEE PLAN
STEEL BEAM
SEE PLAN
SEE TYP SHEAR
CONNECTION
DETAILS 3/S500
/2
/2
1 1/2" 9"
1 1/2"
(6) 3/4"Ø x 5" HILTI
KWIK BOLT 3
CL OF PLATE &
BEAM
SECTION A
PL3/4"
A
ANCHORS TO BE
INSTALLED IN
SOLID GROUTED
CELLS, VIF
3/16
CONT L4x4x5/16
SLAB ON STEEL
DECK - SEE PLAN
SECTION A
T Y
P
TYP
8"
M A
X
O
C
TYP
2'-0"
2'-0" OC MAX
TYP
#5 DOWEL AND EPOXY
TO (E) CMU W/ HILTI
HY-200, 8" EMBED
(E) 8" CMU WALL
CMU INFILL TO MATCH
EXISTING MATERIAL &
LAYOUT. CUT UNITS AS
REQUIRED & GROUT
SOLID
A
E Q
E Q
CMU WALL
SEE PLAN
(E) CONC BEAM/GRADE
BEAM - SEE PLAN
AT SIM: NEW SLAB
ON GRADE PER
PLAN. SEE 5/S300
EL (SEE PLAN)
T.O. (E) CONC
DOWEL AND EPOXY TO (E) CONC
W/ HILTI HY-200, 5" EMBED.
DOWEL SPACING TO MATCH CMU
VERTICAL BARS, SEE SCHEDULE.
(VIF)
1'-0"
CMU WALL
SEE PLAN
(E) CONC
SEE PLAN
DOWEL AND EPOXY TO (E) CONC
W/ HILTI HY-200, 5" EMBED.
DOWEL SPACING TO MATCH CMU
VERTICAL BARS, SEE SCHEDULE.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
Compass Consulting Group 3401 enterprise Parkway Suite 301 Beachwood, OH 44122 619-925-1647
PROFESSIONAL SEAL:
VA Caribbean Health Care System 10 Calle Casia San Juan Puerto Rico
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
ARCHITECT:
CB DESIGN GROUP
11720 BELTSVILLE DR.
SUITE 350
CALVERTON, MD 20705
443-388-7351
CONSULTANT:
Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456
CONSULTANT:
IMEG
15 Sunnen Drive Suite 104 St. Louis, MO 63143 314-951-2522
12/11/2023
672-21-700
WALLEWHANPOT
EHRM INFRASTRUCTURE UPGRADE
SAN JUAN PR
BID DOCUMENTS SUBMISSION
MASONRY DETAILS
S400
-2
-7
S
/2
/2
.p d f
1" = 1'-0"
EXPOSED LINTEL AT EXISTING WALL
1 3/4" = 1'-0"
CONCEALED LINTEL
AT EXISTING WALL
2 12" = 1'-0"
CMU WALL
REINFORCING SCHEDULE
3 3/4" = 1'-0"
CMU WALL
INTERSECTION DETAIL
3/4" = 1'-0"
ROOF DECK
BEARING AT CMU WALL
5 3/4" = 1'-0"
TYPICAL BEAM BEARING ON CMU
6 3/4" = 1'-0"
SLAB ON DECK
BEARING AT CMU WALL
7 3/4" = 1'-0"
CMU WALL BRACING TO DECK/SLAB
3/4" = 1'-0"
BEAM CONNECTION AT (E) CMU
9 3/4" = 1'-0"
CMU INFILL ELEVATION
10 3/4" = 1'-0"
CMU BEARING ON
(E) CONCRETE DETAIL
11 3/4" = 1'-0"
CMU BELOW (E)
CONCRETE DETAIL
1 ADDENDUM 01 06/11/2024