This document appears to contain masonry details related to a federal contract opportunity for the "EHRM Infrastructure Upgrades Construction San Juan" project. The key details are:

The project involves general construction, infrastructure upgrades, and reconfiguration/renovation of existing spaces across multiple buildings at the VA Caribbean Health Care System in San Juan, Puerto Rico. The infrastructure upgrades include electrical, HVAC, communications, physical security, and fiber backbone work. The project will also include site work such as modifications to roads, walks, grading, and utilities. The solicitation number is 36C77624B0012 and the federal agency is the Department of Veterans Affairs Technology Acquisition Center Austin.

The masonry details cover aspects such as reinforcing schedules, wall intersections, beam/deck connections to CMU walls, and CMU infill. These technical details would be relevant for contractors to review as part of the bid preparation process for this construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction San Juan, newest first.
File Type Posted
Clarifications to Technical Questions 7-17-24.pdf PDF
014535.pdf PDF
36C77624B0012 0004.pdf PDF
AE302.pdf PDF
36C77624B0012 0003.pdf PDF
AE500.pdf PDF
Fig 2 Borings Logs Location-Soil Report 2010.pdf PDF
GI103.pdf PDF
Mechanical_Addendum01.pdf PDF
Technical Questions - FINAL - San Juan - 6-28-24.pdf PDF
01-AE103b.pdf PDF
VACHS San Juan Geotehcnical Engineering Report on Sobsoil Exploration .pdf PDF
VASJ APC COMM ROOM Controller Inventory Jun 28 2024.xls XLS spreadsheet
283100 Fire Detection and Alarm.pdf PDF
VASJ iSTAR Controller COMM ROOMS Inventory Jun 28 2024.xls XLS spreadsheet
Electrical_Addendum01.pdf PDF
GI300.pdf PDF
Technology_Addendum01.pdf PDF
36C77624B0012 0002.pdf PDF
Site Visit Sign-in Sheet - San Juan 5-14-24.pdf PDF
36C77624B0012 0001.pdf PDF
ATTACHMENT 1 - Specifications Vol 1.pdf PDF
ATTACHMENT 6 - Drawings Vol 1 - Part 4.pdf PDF
ATTACHMENT 7 - Drawings Vol 1 - Part 5.pdf PDF
ATTACHMENT 10 - Drawings Vol 2 - Part 3.pdf PDF
ATTACHMENT 11 - Hazmat Report.pdf PDF
36C77624B0012 - 4-25-24.pdf PDF
ATTACHMENT 2 - Specifications Vol 2.pdf PDF
ATTACHMENT 5 - Drawings Vol 1 - Part 3.pdf PDF
ATTACHMENT 8 - Drawings Vol 2 - Part 1.pdf PDF
ATTACHMENT 12 - CFD Analysis Report.pdf PDF
ATTACHMENT 13 - Pre-Construction Risk Assessment.pdf PDF
ATTACHMENT 3 - Drawings Vol 1 - Part 1.pdf PDF
ATTACHMENT 4 - Drawings Vol 1 - Part 2.pdf PDF
ATTACHMENT 9 - Drawings Vol 2 - Part 2.pdf PDF
ATTACHMENT 14 - Brand Name Justification - San Juan.pdf PDF
ATTACHMENT 15 - DOL Prevailing Wage Resource Book.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 17 - Site Visit Instructions.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELEVATION

SECTION

1'-0"

1/2"Ø THRU BOLT

AT 24" OC

CONT L6x3x1/4 (LLV) EACH

SIDE). GROUT AS

NECESSARY FOR SNUG FIT

1/2"Ø THRU BOLT

AT 24" OC

CONT L6x3x1/4 (LLV) EACH

SIDE). GROUT AS

NECESSARY FOR SNUG FIT

(E) CMU WALL

NOTES:

1. SAW CUT ONE FACE OF WALL

AND INSTALL ANGLE.

2. SAW CUT OPPOSITE FACE

AND INSTALL SECOND ANGLE.

3. INSTALL THRU BOLTS IN

SOLID GROUTED CELL.

4. SAW CUT REMAINING EDGES

AND REMOVE MASONRY.

5. 4'-0" MAX OPENING WIDTH.

(E) CMU WALL

NEW COURSE OF

CMU 2L3x3x5/16

NOTE:

1. (E) WALL TO BE SHORED AS REQUIRED FOR

INSTALLATION OF NEW LINTEL.

2. 4'-0" MAX OPENING WIDTH.

EL (SEE ARCH)

T.O. OPENING

1/4 3-12

1/4 3-12

ARCH

SEE

CMU WALL REINFORCING SCHEDULE

8"

REMARKS

SINGLE MAT

NOTES:

1. THE ABOVE SCHED SHALL BE MIN REINF FOR ALL BUILDING CMU WALLS.

2. SINGLE MAT REINF SHALL BE IN THE CENTER OF WALL, UON.

3. PLACE HORIZ BAR IN BOND BEAM UNIT, TYP.

4. LOCATE FIRST LAYER OF HORIZ BARS AT 8" MAX FROM BASE OF WALLS AND

FROM TOP AND BOTTOM OF WALL OPENINGS.

5. ALL EXTERIOR WALLS TO BE GROUTED SOLID.

6. PROVIDE 24" LAP SPLICE FOR #5 BARS AND 16" LAP SPLICE FOR #4 BARS.

MAXIMUM

HEIGHT

BAR SIZE AND SPACING EACH MAT

#5 @ 24" OC15'-6"

WALL

THICKNESS VERTICAL

HORIZONTAL

(SEE NOTE 4)

#4 @ 24" OC

OPEN END BLOCK

BREAK SHELL FOR

FLOW OF GROUT, TYP

INTERSECTION

BARS SHALL MATCH

HORIZ WALL OR

BOND BEAM REINF

(1) #5 VERT BAR

(1) #5 VERT BAR

S E

E S

C H

E D

T

Y P

L A

P S

P L

IC

E

NOTES:

1. TYPICAL VERTICAL REINFORCING AND GROUT NOT

SHOWN FOR CLARITY.

2. DETAIL ASSUMES CORNER IS CONSTRUCTED IN

RUNNING BOND WITH UNITS INTERLOCKED.

BEND CORNER

BARS AROUND

VERT REINF

DETAIL IS REQD WHERE

INDICATED HEAD JOINT

IS CONT FULL HEIGHT.

WHERE ALTERNATE

JOINT LOCATION OCCUR,

SEE TYPICAL CORNER

REINF DETAIL

SLAB ON STEEL

DECK SEE PLAN

BOND BEAM

WITH (2) #5 CONT

PL1/4"x7" x CONT WITH 1/2"Ø x 4" HSA @ 16" OC

NOTE:

1. CONTRACTOR TO COORDINATE ACCESS HOLE FOR

GROUT POUR WITH ENGINEER.

SLAB ON STEEL DECK - SEE PLAN

STEEL BEAM - SEE PLAN

PL3/8"x7" x (bf + 1") WITH (2) 1/2"Ø x 4" HSA

BOND BEAM WITH

(2) #5 CONT

CMU WALL

SEE PLAN

(2) 3/4"Ø NELSON CJL REDUCED-

BASE THREADED STUD ANCHORS.

PROVIDE LSL HOLES IN BEAM

FLANGE PARALLEL TO WEB

INFILL BEAM POCKET

AFTER BEAM IS INSTALLED

IN SHADED AREA, FILL ALL CORES IN

WALL WITH GROUT.

MIN AT CORNER CONDITION: 1'-4",

EACH WAY

U

O N

B O

N D

B E

A M

1'-4" MIN1'-4" MIN

SECTION A

A

3/16

CONT L4x4x5/16

BOND BEAM W/

(2) #5, EXTEND 2'

BEYOND BEAM

POCKET

SLAB ON STEEL DECK

SEE PLAN

L5x5x3/8 x CONT WITH

5/8"Ø HILTI KWIK BOLT TZ

ANCHORS @ 24" OC WITH

4" MIN EMBED

BOND BEAM

WITH (2) #5 CONT

EL (SEE PLAN)

T.O. SLAB

CMU WALL

SEE PLAN

HSA @ 12" OC, TYP

CMU WALL, SEE PLAN

AND SCHEDULE

L6x3 1/2x5/16 (LLV) x CONT W/

5/8"Ø HILTI KWIK BOLT TZ

@ 24" OC MAX INTO DECK

FLUTES WITH 3 3/4" EMBED

EACH SIDE OF WALL.

GROUT SOLID

TYP

1 3/4"

TYP

1 3/4"

5/8"Ø HILTI KWIK BOLT TZ

ANCHORS @ 24" OC W/ 4"

MIN EMBED STAGGER ON

OPPOSITE SIDES OF WALL

(E) SLAB ON STEEL

DECK - SEE PLAN

(E) CMU WALL

SEE PLAN

STEEL BEAM

SEE PLAN

SEE TYP SHEAR

CONNECTION

DETAILS 3/S500

/2

/2

1 1/2" 9"

1 1/2"

(6) 3/4"Ø x 5" HILTI

KWIK BOLT 3

CL OF PLATE &

BEAM

SECTION A

PL3/4"

A

ANCHORS TO BE

INSTALLED IN

SOLID GROUTED

CELLS, VIF

3/16

CONT L4x4x5/16

SLAB ON STEEL

DECK - SEE PLAN

SECTION A

T Y

P

TYP

8"

M A

X

O

C

TYP

2'-0"

2'-0" OC MAX

TYP

#5 DOWEL AND EPOXY

TO (E) CMU W/ HILTI

HY-200, 8" EMBED

(E) 8" CMU WALL

CMU INFILL TO MATCH

EXISTING MATERIAL &

LAYOUT. CUT UNITS AS

REQUIRED & GROUT

SOLID

A

E Q

E Q

CMU WALL

SEE PLAN

(E) CONC BEAM/GRADE

BEAM - SEE PLAN

AT SIM: NEW SLAB

ON GRADE PER

PLAN. SEE 5/S300

EL (SEE PLAN)

T.O. (E) CONC

DOWEL AND EPOXY TO (E) CONC

W/ HILTI HY-200, 5" EMBED.

DOWEL SPACING TO MATCH CMU

VERTICAL BARS, SEE SCHEDULE.

(VIF)

1'-0"

CMU WALL

SEE PLAN

(E) CONC

SEE PLAN

DOWEL AND EPOXY TO (E) CONC

W/ HILTI HY-200, 5" EMBED.

DOWEL SPACING TO MATCH CMU

VERTICAL BARS, SEE SCHEDULE.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

Compass Consulting Group 3401 enterprise Parkway Suite 301 Beachwood, OH 44122 619-925-1647

PROFESSIONAL SEAL:

VA Caribbean Health Care System 10 Calle Casia San Juan Puerto Rico

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

ARCHITECT:

CB DESIGN GROUP

11720 BELTSVILLE DR.

SUITE 350

CALVERTON, MD 20705

443-388-7351

CONSULTANT:

Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456

CONSULTANT:

IMEG

15 Sunnen Drive Suite 104 St. Louis, MO 63143 314-951-2522

12/11/2023

672-21-700

WALLEWHANPOT

EHRM INFRASTRUCTURE UPGRADE

SAN JUAN PR

BID DOCUMENTS SUBMISSION

MASONRY DETAILS

S400

-2

-7

S

/2

/2

.p d f

1" = 1'-0"

EXPOSED LINTEL AT EXISTING WALL

1 3/4" = 1'-0"

CONCEALED LINTEL

AT EXISTING WALL

2 12" = 1'-0"

CMU WALL

REINFORCING SCHEDULE

3 3/4" = 1'-0"

CMU WALL

INTERSECTION DETAIL

3/4" = 1'-0"

ROOF DECK

BEARING AT CMU WALL

5 3/4" = 1'-0"

TYPICAL BEAM BEARING ON CMU

6 3/4" = 1'-0"

SLAB ON DECK

BEARING AT CMU WALL

7 3/4" = 1'-0"

CMU WALL BRACING TO DECK/SLAB

3/4" = 1'-0"

BEAM CONNECTION AT (E) CMU

9 3/4" = 1'-0"

CMU INFILL ELEVATION

10 3/4" = 1'-0"

CMU BEARING ON

(E) CONCRETE DETAIL

11 3/4" = 1'-0"

CMU BELOW (E)

CONCRETE DETAIL

1 ADDENDUM 01 06/11/2024