This document appears to be a set of Demolition and General Plan Notes related to a federal contract opportunity. The key details are:
The scope of work includes general construction, infrastructure upgrades, and reconfiguration/renovation of existing spaces across multiple buildings at a VA facility in San Juan, Puerto Rico. The infrastructure upgrades cover electrical, HVAC, communications, physical security, and fiber backbone systems. The project also includes data center WAN updates and hazardous material abatement. Specific buildings impacted are Buildings 1, 2, 10, 19, 20, 26, 29, 30, 40, 50, 51, 52, 53, 54, and 60. The solicitation number is 36C77624B0012 and it is being issued by the VA Technology Acquisition Center in Austin. The document details demolition and construction notes, including requirements for partition walls, slab work, window treatments, and coordination with mechanical/electrical systems.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
S
CSS
W
S K1
C S
S
T
H T
1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES
TO BE REMOVED.
2. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK
NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE
MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.
3. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE
CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE
FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN IF ACTUAL CONDITIONS DIFFER
FROM THESE SHOWN ON THE DRAWINGS.
4. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR
ADDITIONAL INFORMATION RELATED TO EXTENT OF DEMOLITION.
5. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT
NOTED ON THE DEMOLITION PLANS.
6. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR
SHALL PROPERLY DISPOSE OF ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON
SITE.
7. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS,
HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO
BE ABANDONED IN PLACE.
8. CONC. SLAB PATCHES MUST BE FLUSHED WITH REMAINING SURFACES TO PERMIT
APPLICATION OF FINISHES. PROVIDE WELDED WIRE MESH IN PATCH AREAS LARGER THAN
(4) FOUR SQUARE FEET.
9. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AD CLEANED TO
PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE
RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL
FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL
DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED
CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK.
BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL MEETING
STRUCTURAL REQUIREMENTS FOR NEW WORK.
GENERAL DEMOLITION NOTES
10. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO
TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM
FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS,
ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE
SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH
CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED
SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.
11. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW
WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.
12. CONTRACTOR TO VERIFY PARTITION CONSTRUCTION MEETS FIRE RATING REQUIREMENTS.
IF EXISTING PARTITIONS DO NOT MEET FIRE RATING. THE PARTITION SHALL BE DEMOLISHED
AND THEN CONSTRUCTED TO MEET FIRE RATING CONSTRUCTION.
13. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN
REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES
PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL CONDITIONS.
14. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS
BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR
OTHER CONDITIONS. NO WALLS SHALL BE TERMINATED WITH EXPOSED OPEN CELLS OR
DAMAGED MASONRY UNITS.
15. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY
TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN
BE PATCHED IN TO MATCH. ALL NEW MASONRY WORK SHALL BE TOOTHED IN.
16. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.
17. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.)
WITH STRUCTURAL DWGS. EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH
STRUCTURAL REQUIREMENTS AND COORDINATED WITH ALL NEW WORK.
18. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED
BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING
ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING
CONDITIONS SHOWN TO REMAIN SHALL BE RESTORED TO NEW WORK CONDITION AT NO
ADDITIONAL COST TO THE OWNER.
20. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE
CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER.
PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE
FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.
21. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT,
ADHESIVES, FASTENERS, AND ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE
SURFACES THAT THEY COVER.
22. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH
EXISTING.
23. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS
PERMITTED. REMOVE ALL ORIGINAL CONCEALED CEILINGS WHERE ENCOUNTERED.
24. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED
PRIOR TO APPLICATION OF FINISHES.
25. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR
DEMOLITION WORK.
26. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED
OTHERWISE.
27. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL,
ELECTRICAL AND PLUMBING PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED
TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS,
CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS
FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION.
REPAIR AND PATCH ANY AREAS DAMAGED DURING REMOVAL WORK.
1. REFER TO SHEET AE300 FOR WALL TYPES AS REFERENCED ON PLANS WITH THE DIAMOND SYMBOL.
2. TYPICAL GYPSUM BOARDS/STUD WALL PARTITION TO BE TYPE A3 UNLESS INDICATED OTHERWISE BY
WALL TYPE SYMBOLS, WALL SECTIONS OR OTHER DETAILS.
3. UNLESS NOTED OTHERWISE, WALLS MUST EXTEND TO THE ROOF OR FLOOR DECK ABOVE AND BE
SEALED IN ACCORDANCE WITH THE WALL TERMINATION DETAILS. REFER TO THE CODE STUDY PLAN FOR IDENTIFICATION OF ALL SMOKE AND FIRE WALL CONDITIONS. PERIMETER CORRIDOR AND LOBBY
WALLS MUST BE BUILT TO RESIST THE PASSAGE OF SMOKE.
4. CONTRACTOR TO FIELD VERIFY AND CORRECT IF NECESSARY THAT ALL BOUNDING EXISTING AND /OR NEW WALLS OF RENOVATED AND / OR NEW TRs CLOSE UP TO STRUCTURE ABOVE.
5. DIMENSIONS ON PLANS ARE FROM FACE OF MASONRY TO FACE OF MASONRY, FACE OF MASONRY TO
FACE OF GYPSUM BOARD OR FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
6. COLUMN GRID LINES ARE FOR REFERENCE ONLY, REFER TO STRUCTURAL DRAWINGS FOR COLUMN
LOCATIONS.
7. FEC - INDICATES A FIRE EXTINGUISHER WITH A RECESSED CABINET. FE - INDICATES A FIRE
EXTINGUISHER WITH A WALL MOUNTING BRACKET.
8. UNLESS SPECIFICALLY INDICATED OTHERWISE, THE SAME WALL TYPE NEXT TO A DOOR OR OPENING
TO CONTINUE OVER THE DOOR OR OPENING.
9. PLAN LOCATION OF DOORS AND FRAMES RELATIVE TO THE PLANE OF THE WALL IS DIAGRAMMATIC ONLY. REFER TO THE REFERENCED JAMB AND HEAD CONDITION DETAILS TO DETERMINE ACTUAL
PLACEMENT OF DOOR AND FRAME.
10. CONTRACTOR TO VERIFY THAT THE PARTITION MEETS FIRE RATING CONSTRUCTION REQUIREMENTS. IF EXISTING PARTITIONS DO NOT MEET THE FIRE RATING REQUIREMENTS, THEN THE PARTITION SHALL BE
DEMOLISHED AND CONSTRUCTED TO MEET THE FIRE RATING REQUIREMENT.
11. TYPICAL TR ROOM RACK TO BE LIMITED TO 500LBS ONLY, AND SHOULD NOT BE USED FOR STORAGE OR
OFFICE SPACE.
12. TYPICAL ADD NEW SIGNAGE AT THE NEW ROOMS, REFER TO SHEET GI300 FR SIGNAGE INFORMATION
AND SCHEDULE.
13. IN ROOMS WHERE EXISTING FINISHES ARE BEING REMOVED, PROVIDE NEW FINISHES REQUIRED ON ROOM FINISH SCHEDULE (REFER TO SHEET AE301). PREP NEW AND EXISTING WALLS TO RECEIVE NEW
FINISH AND NEW BASE. PREP SLABS TO RECEIVE NEW FLOORING.
GENERAL PLAN NOTES
WALL AND DOOR TO REMAIN /
EXISTING CONDITION
FLOOR PLAN LEGEND
WALL AND DOOR TO BE
DEMOLISHED
NEW WORK PARTITION /
NEW WORK DOOR
A3
D#
NEW WORK KEYNOTE
DEMO KEYNOTE
NEW WORK PARTITION
XX-XX FINISH TAG
DEMO PARTITION NEW PARTITION
IN-02.03
ROOM SIGNAGE -
SEE GI300
3' CLEARENCE AROUND
THE RACKS
ICRA PARTITION
CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION OR
PERFORMANCE OF OTHER WORK.
PATCHING: FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL
CONDITIONS AFTER INSTALLATION OF OTHER WORK.
REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-
SITE, UNLESS INDICATED TO BE SALVAGED OR REMOVED AND RE-INSTALLED.
SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER READY
AND REUSE.
REMOVE AND RE-INSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR
REUSE,AND RE-INSTALL THEM WHERE INDICATED.
EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND
THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVE AND SALVAGED, OR REMOVES
AND RE-INSTALLED.
DEFINITIONS
JANITOR
3107.1
UTLITIES SHAFT
#2
EXISTING SERVICE
ELVATOR
EXISTING SERVICE
ELEVATOR
EXISTING STAIR
#2
EXISTING CHASE
EXISTING
ELECTRICAL
CLOSET
3000.4
3000.4
3100.4
3107.2
3000.3
SHELL SPACE
FUTURE
COMPUTER ROOM
491 SF
DATA CENTER
3100.4
IN-02.03
IN-02.03
IN-02.03
5 5 5 5 5 5 5 5
.4
3100.3
A3
F3F1
F1
F3
ALIGN
ALIGN
F3
F1F1
F3
F3F3F3
7' - 2"
6'
6' - 3"
117 SF
STORAGE ROOM
3100.4a
1' - 0" 2' - 1 5/8"
A3
82 SF
FIRE PROTECTION
ROOM
3100.4b
3100.4b
13' - 0"
6'
/4
A3
A3
4'
/2
8'
/8
14' - 6 1/4"
437 SF
HOT AISLE
3100.4c
649 SF
COLD AISLE
3100.4d
1'
2'
4'
/2
A3
1'
1'
9'
/4
1' - 1" 1' - 1"
2'
/4
/4
F3
2' - 3 1/4" 1' - 1"
ALIGN
8'
/4
/4
A L
IG
N
A L
IG
N
1. ICRA BARRIERS ARE NOT SHOWN ON NEW WORK PLANS FOR CLARITY. ICRA BARRIERS
SHALL REMAIN IN PLACE UNTIL NEW WORK IS COMPLETE.
NEW WORK PLAN NOTE
A
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Submission:
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CONSULTANT:
Compass Consulting Group 3401 enterprise Parkway Suite 301 Beachwood, OH 44122 619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 King ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
VA Caribbean Health Care System 10 Calle Casia San Juan Puerto Rico
CONSULTANT:
Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456
CONSULTANT:
IMEG
15 Sunnen Drive Suite 104 St. Louis, MO 63143 314-951-2522
-2
-7
-A
E b
/0
/2
.p d f
12 / 11 / 2023
672-21-700
JSKJ
EHRM INFRASTRUCTURE UPGRADE
SAN JUAN PR
BID DOCUMENTS SUBMISSION
BUILDING 01 - MAIN BUILDING - THIRD
FLOOR ENLGARED PLANS - NEW
WORK
01-AE103b
N
SITE KEY PLAN
TRUE NORTH
1/4" = 1'-0"A10
BUILDING 01 - THIRD FLOOR - RM 3100 NEW WORK PLAN
KEYNOTES - PLAN
1 NEW DOOR AND FRAME, SEE DOOR SCHEDULE
2 NEW PARTITION, SEE WALL TYPE
3 NEW FLOOR FINISH TO BE ANTI STATIC
4 PATCH AND REPAIR FLOORING FINISH WHERE NEW WORK IS ADJACENT TO EXISTING.
5 STAINLESS STEEL SECURITY MESH AT ALL WINDOWS. APPLY BLACK OUT FILM (BF-01) TO
WINDOWS PRIOR TO INSTALLATION, SEE FINISH SCHEDULE.
6 IN-FILL EXISTING OPENING WITH NEW PARTITION TO MATCH EXISTING PARTITION TYPE
7 RE-INSTALL EXISTING TV ON NEW PARTITION WALL
8 NEW FUR OUT PARTITION WALL ON EXISTING WALL. SEE WALL TYPE
9 RE-INSTALL EXISTING SLIDING DOOR
10 NEW FUR OUT PARTITION AROUND EXISTING COLUMN. SEE WALL TYPE
11 NEW FLOOR SLAB. SEE STRUCTURAL DRAWINGS
12 NEW PARAPIT ROOF AT 1ST FLOOR
13 NEW PARTITION TO BE BUILT ON TOP OF CONCRETE LEDGE
14 RE-INSTALL EXISTING DOUBLE DOORS
15 COLD AND HOT CONTAINER WALL SYSTEM - BASIS OF DESIGN: SUBZERO
16 COLD AND HOT DATA CONTAINER SYSTEM DOUBLE DOORS - BASIS OF DESIGN: SUBZERO
17 CONTRACTOR TO VERIFY THAT THE EXISTING WALL IS CONSTRUCTED AS A 1-HOUR RATED
WALL AND THAT IT RUNS TO THE DECK ABOVE WITH ALL PENETRATIONS FIRESTOPPED
18 NEW BUTTON LOCATION FOR AUTOMATIC ENTRY DOOR
19 IF THE DOOR SWINGS TOWARDS A WALL HAVE THE PLYWOOD START 6" CLEAR FROM THE
DOOR SWING.
20 NEW CONCTRETE SLAB ON TOP OF EXISTING BEAM TO BE LEVEL
21 NEW PARTITION WALLS AT THE METAL GRATE SIDE IS TO GO DOWN TO EXISTING SLAB BELOW
22 NO ELETRICAL OR SWITCH BOXES SHALL BE ALLOWED ON THIS WALL
23 15 X 15 ACCESS DOOR PANEL FOR DRAINAGE PIPE
24 NEW POURED IN PLACE TOPPING SLAB TO BE LEVELED
25 APPLY BLACK OUT FILM (BF-01) TO WINDOWS PRIOR TO INSTALLATION, SEE FINISH SCHEDULE.
26 CONTINUE EXISTING PARTITION TO THE UNDERSIDE OF METAL DECK TO ENCLOSE THE NEW
TR ROOM
27 PATCH AND REPAIR WALL TO MATCH EXISTING
28 NEW MOP SINK WITH NEW TILE BACK SPLASH WALL, AND RELOCATED EXISTING MOP RACK
29 NEW 1" PLASTER FINISH PAINT COLOR TO MATCH EXISTING
30 NEW 5"W X 6"H CONCRETE PLANTER BED CURB
31 NEW SIDEWALK IN-FILL TO BE ADDED BACK TO EXISTING SIDEWALK AS DIMENSION ON PLAN U.N.O.
32 REMOVE EXISTING TRASH CHUTE DOOR AND IN-FILL WITH 2HR RATED WALL.
# REVISION DATE
1 ADDENDUM 01 06/11/2024