GI300.pdf
PDF 296 KB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction San Juan Federal contract opportunity
- Solicitation number
- 36C77624B0012
About this file
This document appears to be a set of General Notes for a federal construction project. The key details are:
The construction work includes general construction, infrastructure upgrades, reconfiguring and renovating existing spaces for the EHRM (Electronic Health Record Modernization) project at the VA Caribbean Health Care System in San Juan, Puerto Rico. The infrastructure upgrades cover electrical, HVAC, communications, physical security, and fiber optic network improvements across multiple buildings on the campus. The work may also impact roads, walkways, grading, drainage, and other utilities. Hazardous material abatement is also included. The solicitation number is 36C77624B0012, and the federal agency is the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The document provides detailed General Notes on construction requirements, coordination, signage, access to concealed areas, and references to applicable VA design standards and manuals.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR CONDITIONS
ON THE JOB.
2. SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE SHOULD BE DIRECTED TO THE
ARCHITECT DURING THE BID PERIOD.
3. ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID CONFLICTS IN THE FIELD.
5. ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTES SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR FUNCTION
ELSEWHERE IN THE BUILDING.
6. WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
7. ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
8. FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL".
CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER INSTALLATION OF
THE NEW WORK.
9. SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
10. IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
11. IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK
CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
12. WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
13. IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS.
ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL
BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
14. EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
16. CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR
ANCHORING.
17. ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
18. ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF DEVICES
SHOWN PRIOR TO PREPARING SUBMITTALS.
19. ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
20. SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION.
CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION OF THE WORK.
22. PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
23. PATCH ALL HOLES IN FLOORS, WALLS AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
24. UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC". IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE / DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
25. THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION PRIOR TO SUBMITTING A BID AMOUNT IF THERE SHOULD APPEAR TO BE A DISCREPANCY BETWEEN DRAWINGS AND/OR THE SPECIFICATIONS. OTHERWISE, THE MOST STRINGENT (TYPICALLY THE MOST EXPENSIVE) REQUIREMENT SHALL APPLY AT
THE DISCRETION OF THE COR.
26. ABOVE-CEILING COORDINATION – PRIOR TO PERFORMING ANY ABOVE-CEILING WORK, CONTRACTOR, WORKING WITH ALL SUB-CONTRACTORS, SHALL CREATE DRAWINGS THAT SHOW COORDINATION OF ALL ABOVE-CEILING WORK ITEMS WITH EXISTING CONDITIONS AND PROPOSED CEILINGS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE SEQUENCES OF INSTALLATION TO ENSURE THAT ABOVE-CEILING ITEMS CAN FIT ABOVE THE CEILING HEIGHTS INDICATED ON THE REFLECTED CEILING PLAN(S). CONTRACTOR SHALL BRING ALL PERCEIVED CONFLICTS TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR RESOLUTION PRIOR TO THE START OF THE WORK. CONFLICTS RESULTING FROM INACCURATE COORDINATION DRAWINGS AND / OR FAILURE TO IDENTIFY CONFLICTS PRIOR TO INSTALLATION OF THE WORK SHALL BE CORRECTED / ADJUSTED AT THE CONTRACTOR’S EXPENSE AND SHALL RESULT IN
NO ADDITIONAL COST TO THE GOVERNMENT.
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. NFPA 101: LIFE SAFETY CODE - 2021
10. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
11. NFPA 70: NATIONAL ELECTRICAL CODE
12. ASHRAE 62.1: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
13. ASHRAE 90.1: ENERGY STANDARD FOR BUILDINGS
14. VA NATIONAL CAD STANDARD APPLICATION GUIDE
15. NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 & 900)
16. VA MASTER SPECIFICATIONS
17. NEC NATIONAL ELECTRICAL CODE - 2020
18. VA SUSTAINABLE DESIGN MANUAL
19. INTERNATIONAL BUILDING CODE (IBC) - 2021
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING
SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE START OF THE
PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND
LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS,
UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS. PROPOSED
AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING
FONT, GRAPHICS, CONSTRUCTION, DETAILS, MATERIALS AND COLORS.
2. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.
3. DO NOT SCALE DRAWINGS.
4. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG-18-10 FOR
ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS
NOTED IN SCHEDULE.
5. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN".
6. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE, THE EXISTING MESSAGE
SHALL REMAIN UNCHANGED, U.N.O.
7. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. REFERENCE
ALL DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.
8. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN
SIGN LIMITS.
VA SIGNAGE DESIGN MANUAL (PG 18-10)
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE SPECIFICATIONS
WEBSITE : https://www.cfm.va.gov/til/dManual.asp
SIGNAGE:
THESE ARE THE SPECIFIC SECTIONS OF SIGNAGE THAT ARE LOCATED IN THE VA SIGNAGE
DESIGN MANUAL. EACH SECTION CONTAINS VISUAL ILLISTRATIONS AND SPECIFICATIONS FOR
THE SIGNS THAT ARE USED AT THE VA FACILITIES, AND ARE INHERENTLY GRAPHICAL IN NATURE.
• INTRODUCTION
• 1.1 - PLANNING A SIGNAGE SYSTEM
• 1.2 - FUNDAMENTALS OF WAYFINDING
• 1.3 - SIGNAGE AND WAYFINDING TECHNOLOGY
• 2.1 - INTERIOR SIGNAGE GUIDELINES
• 2.2 - CODE AND LIFE SAFETY SIGNAGE GUIDELINES
• 2.3 - MANDATORY VA POLICY AND DIRECTIVE SIGNAGE GUIDELINES
• 2.4 - SPECIALTY SIGNAGE GUIDELINES
• 2.5 - EXTERIOR SIGNAGE GUIDELINES
• 2.6 - PARKING STRUCTURE SIGNAGE GUIDELINES
• 2.7 - NATIONAL CEMETERY ADMINISTRATION GUIDELINES
• 3.1 - INTERIOR SIGNAGE DRAWINGS
• 3.2 - CODES AND LIFE SAFETY SIGNAGE DRAWINGS
• 3.3 - MANDATORY VA POLICY AND DIRECTIVE SIGNAGE DRAWINGS
• 3.4 - SPECIALTY SIGNAGE DRAWINGS
• 3.5 - EXTERIOR SIGNAGE DRAWINGS
• 3.6 - PARKING STRUCTURE SIGNAGE DRAWINGS
• 3.7 - NATIONAL CEMETERY ADMINISTRATION SIGNAGE DRAWINGS
• 4.1 - DESIGN ELEMENTS
• 4.2 - WAYFINDNG MAPS
• 4.3 - VHA STANDARDIZED DEPARTMENT NOMENCLATURE
• 4.4 - ROOM RENUMBERING
• 4.5 - FREQUENTLY ASKED QUESTIONS (FAQ)
• 4.6 - EXAMPLE PHOTOS
• 4.7 - SIGN INDEX
• 4.8 - GLOSSARY
MANDATORY POLICY SIGN DESIGNATIONS
EACH SIGN IN THE PROGRAM GUIDE HAS BEEN GIVEN A SPECIFIC SIGN TYPE NUMBER
DESIGNATION. THIS DESIGNATION PROVIDES A COMMON DESCRIPTION THAT CAN BE
REFERENCED WHNE PROGRAMMING A SITE AND ORDERING SIGNS. THE FOLLOWING
EXAMPLAINS HOW THE SIGN TYPE DESIGNATIONS ARE DERIVED:
IN-02.03 A
I
N
.03
A
DESIGNATES AN INTERIOR SIGN.
IDENTIFIES THE SIGN IN NON-ILLUMINATED.
TWO DIGIT NUMBER IDENTIFIES A PARTICULAR SIGN TYPE FAMILY.
THE TWO DIGIT NUMBER, FOLLOWING THE PERIOD, IDENTIFIES A SPECIFIC
SIGN WITHIN THE SIGN FAMILY
THE LETTER DESIGNATES A SPECIFIC SIGN CONFIGURATION, VERSION
AND / OR LAYOUT FOR GRAPHICS
NOTE:
EACH SIGN SHALL MATCH CAMPUS EXISTING DESIGN
2"
5'
TYP. MOUNTING ELEVATION
9"
1/ 2"
1/
4" 3/
8"
3"
3/4"
9"
6"
3/4"
3/ 4"
3/ 4"
3/ 8"
ACCESS TO EXISTING CONCEALED AREA NOTES:
1. THE WORK OF THIS CONTRACT MAY REQUIRE PARTIAL REMOVAL OR DISASSEMBLY OF
EXISTING CEILINGS AND/OR WALLS FOR ACCESS TO SPACES WHERE NEW ITEMS ARE
REQUIRED TO BE INSTALLED OR EXISTING ITEMS ARE REQUIRED TO BE
DEMOLISHED. EXAMPLES INCLUDE TELECOMMUNICATIONS, PLUMBING, ELECTRICAL,
MECHANICAL, FIRE PROTECTION, STRUCTURAL, ETC. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THOROUGHLY REVIEWING THE CONSTRUCTION DOCUMENTS AND FOR
DETERMINING THE EXTENT OF REMOVAL OR DISASSEMBLY WORK NECESSARY TO
PERFORM THE WORK OF THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS.
2. THE CONTRACTOR SHALL FIELD-VERIFY AND DOCUMENT THE EXISTING CONDITIONS OF
CEILING OR WALL SURFACES TO BE REMOVED OR DISASSEMBLED PRIOR TO BEGINNING
THE WORK.
3. THE CONTRACTOR SHALL CAREFULLY REMOVE, OR DISASSEMBLE, EACH EXISTING
CEILING OR WALL SURFACE IN A MANNER THAT MINIMIZES DAMAGE TO ADJACENT
EXISTING SURFACES.
4. AFTER THE WORK HAS BEEN COMPLETED, THE CONTRACTOR SHALL REPLACE, PATCH,
AND FINISH THE EXISTING SURFACE TO THE CONDITION IT WAS IN PRIOR TO REMOVAL.
A
/8
/4
/8
/2
/4
-1
/2
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Submission:
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
CONSULTANT:
Compass Consulting Group 3401 enterprise Parkway Suite 301 Beachwood, OH 44122 619-925-1647
ARCHITECT:
CB DESIGN GROUP
421 King ST
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
VA Caribbean Health Care System 10 Calle Casia San Juan Puerto Rico
CONSULTANT:
Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456
CONSULTANT:
IMEG
15 Sunnen Drive Suite 104 St. Louis, MO 63143 314-951-2522
-2
-7
G I3
.p d f
12 / 11 / 2023
672-21-700
JSKJ
EHRM INFRASTRUCTURE UPGRADE
SAN JUAN PR
BID DOCUMENTS SUBMISSION
GENERAL NOTES
GI300
REFERENCES GENERAL NOTES
VA PHYSICAL SECURITY COMPLIANCE
IN ORDER TO PROVIDE AN APPROPRIATE BLAST RESISTANT DESIGN IN ACCORDANCE WITH THE
VA PHYSICAL SECURITY DESIGN MANUAL, THE CONTRACTOR, SUBCONTRACTORS, AND VENDORS
MAY REQUIRE THE BLAST PRESSURES AND IMPULSES VALUES CALCULATED BY THE A/E TEAM'S
STRUCTURAL BLAST ENGINEER. THE CONTRACTOR, SUBCONTRACTOR, AND VENDORS CAN
SUBMIT A REQUEST TO THE VA CFM THROUGH THE VA COR. IF THE REQUEST IS APPROVED, THE
VA WILL DIRECT THE A/E TEAM STRUCTURAL BLAST ENGINEER TO PROVIDE THE COMPUTER
PRESSURE AND IMPULSE (WHICH ARE BASED ON THE SPECIFIC CONDITIONS OF THE PROJECT
SUCH AS STANDOFF DISTANCE, BUILDING GEOMETRY, OR OTHER FACTORS) TO THE VENDOR.
WITHOUT THE COMPUTED VALUES, THE PRESSURE AND IMPULSE VALUES IN THE DATA
DEFINITIONS DOCUMENT ALONE ARE NOT SUFFICIENT TO PROVIDE A COMPLIANT DESIGN.
MEDICAL WASTE NOTES
SIGNAGE GENERAL NOTES
SIGNAGE REFERENCE
SIGNAGE SYMBOL LEGEND
6" = 1'-0"C16
SIGNAGE ROOM NUMBER ID
6" = 1'-0"A16
SIGNAGE PRIMARY ROOM ID
ACCESS TO EXISTING CONCEALED
AREA NOTES
# REVISION DATE
1 ADDENDUM 01 06/11/2024
File details come from the government source that posted it. Updated .