AE500.pdf

PDF 466 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction San Juan Federal contract opportunity
Solicitation number
36C77624B0012
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document appears to be a set of detailed construction drawings for an infrastructure upgrade project at the VA Caribbean Health Care System in San Juan, Puerto Rico. The drawings provide specifications for new concrete footings, slabs, walls, roofing, and other building elements across multiple facilities on the campus. Key details include the use of CMU walls, metal decking, rigid insulation, EPDM membrane, and other building materials and components.

The related federal contract opportunity is solicitation 36C77624B0012 issued by the Department of Veterans Affairs Technology Acquisition Center Austin for the "EHRM Infrastructure Upgrades Construction San Juan" project. The work includes general construction, infrastructure upgrades, and reconfiguration/renovation of existing spaces across multiple buildings on the campus. The project scope covers electrical, HVAC, communications, physical security, and fiber infrastructure improvements. The solicitation is open to full and open competition.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction San Juan, newest first.
File Type Posted
36C77624B0012 0004.pdf PDF
AE302.pdf PDF
Clarifications to Technical Questions 7-17-24.pdf PDF
014535.pdf PDF
283100 Fire Detection and Alarm.pdf PDF
VASJ iSTAR Controller COMM ROOMS Inventory Jun 28 2024.xls XLS spreadsheet
Electrical_Addendum01.pdf PDF
GI300.pdf PDF
Structural_Addendum01.pdf PDF
Technology_Addendum01.pdf PDF
Technical Questions - FINAL - San Juan - 6-28-24.pdf PDF
01-AE103b.pdf PDF
VACHS San Juan Geotehcnical Engineering Report on Sobsoil Exploration .pdf PDF
VASJ APC COMM ROOM Controller Inventory Jun 28 2024.xls XLS spreadsheet
36C77624B0012 0003.pdf PDF
Fig 2 Borings Logs Location-Soil Report 2010.pdf PDF
GI103.pdf PDF
Mechanical_Addendum01.pdf PDF
36C77624B0012 0002.pdf PDF
Site Visit Sign-in Sheet - San Juan 5-14-24.pdf PDF
36C77624B0012 0001.pdf PDF
36C77624B0012 - 4-25-24.pdf PDF
ATTACHMENT 2 - Specifications Vol 2.pdf PDF
ATTACHMENT 5 - Drawings Vol 1 - Part 3.pdf PDF
ATTACHMENT 8 - Drawings Vol 2 - Part 1.pdf PDF
ATTACHMENT 12 - CFD Analysis Report.pdf PDF
ATTACHMENT 13 - Pre-Construction Risk Assessment.pdf PDF
ATTACHMENT 3 - Drawings Vol 1 - Part 1.pdf PDF
ATTACHMENT 4 - Drawings Vol 1 - Part 2.pdf PDF
ATTACHMENT 9 - Drawings Vol 2 - Part 2.pdf PDF
ATTACHMENT 14 - Brand Name Justification - San Juan.pdf PDF
ATTACHMENT 15 - DOL Prevailing Wage Resource Book.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 17 - Site Visit Instructions.pdf PDF
ATTACHMENT 11 - Hazmat Report.pdf PDF
ATTACHMENT 1 - Specifications Vol 1.pdf PDF
ATTACHMENT 6 - Drawings Vol 1 - Part 4.pdf PDF
ATTACHMENT 7 - Drawings Vol 1 - Part 5.pdf PDF
ATTACHMENT 10 - Drawings Vol 2 - Part 3.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Level 1

0' - 0"

CONCRETE FOOTING - SEE

STRUC. DWGS

4" CONCRETE SLAB - SEE

STRUC. DWGS

2" PERFORATED PVC PIPE

WITH FOR DRAINAGE

WATER PROOF MEMBRANE

TO EXTEND FROM TOP OF

WALL TO 1'-0" OF FOOTING

2"

1'

1'-0" DEEP IN-FILL OF GRAVEL

1/2" EXPANSION JOINT

3/4" PLASTER FINISH

PAINT COLOR TO MATCH

EXISTING EXTERIOR

METAL MESH TO BE FASTEN

TO CMU

2"

EXTERIOR LATEX PAINT TO BE

PAINTED OVER THE MEMBRANE

FROM TOP OF FOOTING TO

SECOND CMU COURSE

PLASTER WEEP SCREED TO

BE ELEVATED 2" ABOVE

GRADE

CONCRETE SLAB TO

HAVE A FLOOR FINISH -

SEE FINISH SCHEDULE

RUBBER WALL BASE -

SEE FINISH SCHEDULE

PARTITION FUR OUT -

SEE ENLARGED PLAN

FOR WALL TYPE

8 X 8 X 16 CMU WALL - SEE

STRUC. DWGS

3/4" FIRE RATED

PLYWOOD TO BE FAST

TO FUR OUT WALL

METAL DOWNSPOUT

1/2" SS DOWEL W/ SEALENT

AROUND PENTRATION

THROUGH FLASHING

GROUT FILL FOR DOWEL

ANCHORAGE AND FLASH

SUPPORT

METAL MESH ANCHOR TO

CMU WALL

8 X 8 X 16 CMU WALL - SEE

STRUC. DWGS

1/2" ROOF EXPANSION

JOINT

PARTITION FUR OUT -

SEE ENLARGED PLAN

FOR WALL TYPE

3/4" PLASTER FINISH PAINT

COLOR TO MATCH EXISTING

EXTERIOR

SEALANT

SLOPED CONCRETE

METAL DECK ROOF -

SEE STRUC. DWGS

3 1/2" RIGID

INSULATION

ROOF BOARD

EPDM MEMBRANE

METAL FLASHING

"J" CASING BEAD W/ SEALANT

CONCRETE COPING

W/ DRIP EDGE

METAL SRUPPER AND

DOWNSPOUT

BOND BEAM - SEE STRUC.

DWGS

STEEL PLATE W/ ANCHOR

THREADED BOLT - SEE

STRUC. DWGSSTEEL BEAM - SEE

STRUC. DWGS

CANT STRIP

SCREW FASTENER W/

RUBBER WASHER

ANCHOR TO NEW WALL

BOND BEAM - SEE STRUC.

DWGS

Level 2

14' - 0"

EXISTING 2ND FLOOR SLAB

EXISTING 2ND FLOOR WALL

ANGLE STEEL PLATE W/

ANCHOR BOLTS TO THE

UNDERSIDE OF SLAB AND

NEW CMU WALL - SEE

STRUC. DWGS

IN-FILL W/ SOLID GROUT

8 X 8 X 16 CMU WALL - SEE

STRUC. DWGS

SLOPED CONCRETE

METAL DECK ROOF - SEE

STRUC. DWGS

STEEL BEAM - SEE

STRUC. DWGS

PARTITION FUR OUT - SEE

ENLARGED PLAN FOR

WALL TYPE

PARTITION FUR OUT - SEE

ENLARGED PLAN FOR

WALL TYPE

EXISTING CEILING

STEEL PLATE W/ ANCHOR

THREADED BOLT - SEE

STRUC. DWGS

2" SOLID CONCRETE TOP

1/2" ROOF EXPANSION

JOINT

1/2"1/4" / 1'-0"

BOND BEAM - SEE

STRUC. DWGS

BOND BEAM - SEE

STRUC. DWGS

Level 1

0' - 0"

EXISTING SLAB

EXISTING GRADE BEAM

PARTITION FUR OUT - SEE

ENLARGED PLAN FOR WALL

TYPE

8 X 8 X 16 CMU - SEE

STRUC. DWGS

EXISTING DOWLS - SEE

STRUC. DWGS

RUBBER WALL BASE - SEE

FINISH SCHEDULE

3/4" FIRE RATED PLYWOOD TO

BE FAST TO FUR OUT WALL

PARTITION FUR OUT - SEE

ENLARGED PLAN FOR WALL TYPE

4" CONCRETE SLAB - SEE

STRUC. DWGS

1/2" EXPANSION

JOINT

CONCRETE SLAB TO

HAVE A FLOOR FINISH -

SEE FINISH SCHEDULE

RUBBER WALL BASE -

SEE FINISH SCHEDULE

NEW DOWL TO BE PLACED NEXT

TO EXISTING FOR NEW CMU

WALL - SEE STRUC. DWGS

Level 1

0' - 0"

1'

3/4" PLASTER FINISH

PAINT COLOR TO MATCH

EXISTING EXTERIOR

METAL MESH TO BE FASTEN

TO CMU

PLASTER WEEP SCREED TO

BE ELEVATED 2" ABOVE

GRADE

8 X 8 X 16 CMU WALL - SEE

STRUC. DWGS

EXISTING PATIO SLAB

1/2" EXPANSION JOINT

EXTERIOR LATEX PAINT TO BE

PAINTED OVER THE MEMBRANE

FROM TOP OF FOOTING TO

SECOND CMU COURSE

CONCRETE FOOTING - SEE

STRUC. DWGS

WATER PROOF MEMBRANE

TO EXTEND FROM TOP OF

WALL TO 1'-0" OF FOOTING

4" CONCRETE SLAB - SEE

STRUC. DWGS

1/2" EXPANSION JOINT

CONCRETE SLAB TO

HAVE A FLOOR FINISH -

SEE FINISH SCHEDULE

RUBBER WALL BASE -

SEE FINISH SCHEDULE

PARTITION FUR OUT -

SEE ENLARGED PLAN

FOR WALL TYPE

3/4" FIRE RATED

PLYWOOD TO BE FAST

TO FUR OUT WALL

2"

Level 2

14' - 0"

3 1/2"

1/4" / 1'-0"

SLOPED CONCRETE METAL

DECK ROOF - SEE STRUC.

DWGS

3 1/2" RIGID INSULATION

ROOF BOARD

EPDM MEMBRANE TO BE

WRAPPED OVER THE NEW

PARTITION

3"

PARTITION FUR OUT -

SEE ENLARGED PLAN

FOR WALL TYPE

EXISTING BEAM

EXISTING EXTERIOR

PLASTER ROOF

PLASTER WEEP SCREED

TO BE ELEVATED 3" ABOVE

FINISHED ROOF

REMOVE 1/2" LAYER OF

EXISTING PLASTER AND

ADD NEW ANGLE BEAD

FOR NEW CONTINUOUS

PLASTER FINISH TO MATCH

EXISTING PAINT COLOR

STEEL BEAM - SEE

STRUC. DWGS

CANT STRIP

METAL MESH TO BE

FASTEN TO PARTITION

A

/8

/4

/8

/2

/4

-1

/2

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Submission:

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

CONSULTANT:

Compass Consulting Group 3401 enterprise Parkway Suite 301 Beachwood, OH 44122 619-925-1647

ARCHITECT:

CB DESIGN GROUP

421 King ST

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

VA Caribbean Health Care System 10 Calle Casia San Juan Puerto Rico

CONSULTANT:

Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456

CONSULTANT:

IMEG

15 Sunnen Drive Suite 104 St. Louis, MO 63143 314-951-2522

-2

-7

A E

.p d f

12 / 11 / 2023

672-21-700

JSKJ

EHRM INFRASTRUCTURE UPGRADE

SAN JUAN PR

BID DOCUMENTS SUBMISSION

ENLARGED DETAILS

AE500

1 1/2" = 1'-0"A4

NEW FOOTING AND WALL FOUNDATION DETAIL (TYPICAL)

1 1/2" = 1'-0"E4

NEW PARAPET DETAIL AT DOWNSPOUT (TYPICAL)

1 1/2" = 1'-0"E10

BUILDING 10 - NEW WALL AND ROOF

SLOPE DETAIL AT OVER HANG

1 1/2" = 1'-0"A10

NEW SLAB AND FOOTING DETAIL

AT EXISTING FOUNDATION (TYPICAL)

1 1/2" = 1'-0"A15

BUILDING 10 - NEW FOOTING, SLAB, AND

WALL DETAIL AT EXISTING SLAB PATIO

1 1/2" = 1'-0"E15

BUILDING 10 - NEW ROOF AND PLASTER WALL WITH

EXISTING PLASTER OVER HANG ROOF

# REVISION DATE

1 ADDENDUM 01 06/11/2024

File details come from the government source that posted it. Updated .