This document is a Cost Sheet Attachment for a state and local government contract opportunity for Elevator Repair and Maintenance Services in the Bay Area region of California. The contract requires Preventive Maintenance services on gearless, geared, and hydraulic elevators for two state-owned buildings - the 402 Ronald M. George State Building in San Francisco and the 602 Elihu Harris Building in Oakland. The contract also includes Foreseeable Repair Services and Unforeseeable Repair Services for the elevator equipment. The total bid amount for the 5-year contract term is $180,000 for the 402 Ronald M. George State Building, while the 602 Elihu Harris Building has a $0 bid amount.

The Cost Sheet details the per-service rates, equipment quantities, and annual totals for Preventive Maintenance, Foreseeable Repairs, and Unforeseeable Repairs. Parts and labor rates are provided, with a 0% markup on parts. The contract will be awarded to the responsive and responsible bidder who submits the lowest total bid amount. This contract opportunity is part of solicitation 23-189492 issued by the California Facilities Management Division.

View the file

Other files

File Type Posted
Attachment_11_Cost_Sheet_-_Bay_Area.xlsx XLSX spreadsheet
23-189492_IFB_Addendum_6.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum4changes.docx DOCX document
189492.FMD.Elevator_MaintenancewithAddendum7changes.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum1changes.docx DOCX document
IFB_23-189492_Q_and_A_.docx DOCX document
23-189492_IFB_Addendum_1.docx DOCX document
Addendum6MapColoParking1.pdf PDF
23-189492_IFB_Addendum_9.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum3changes.docx DOCX document
23-189492_IFB_Addendum_5.docx DOCX document
Attachment_10_Cost_Sheet_-_Sacramento_Area_(Addendum_7).xlsx XLSX spreadsheet
23-189492.FMD.Elevator_MaintenancewithAddendum8changes.docx DOCX document
23-189492_IFB_Addendum_3.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum6changes.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum9changes.docx DOCX document
23-189492_IFB_Addendum_8.docx DOCX document
23-189492.FMD.Elevator_Maintenance_IFB.docx DOCX document
23-189492_IFB_Addendum_2.docx DOCX document
23-189492_IFB_Addendum_4.docx DOCX document
Attachment_10_Cost_Sheet_-_Sacramento_Area.xlsx XLSX spreadsheet
23-189492.FMD.Elevator_MaintenancewithAddendum5changes.docx DOCX document
23-189492.FMD.Elevator_MaintenancewithAddendum2changes.docx DOCX document
23-189492_IFB_Addendum_7.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Cost Sheet

ATTACHMENT 11
PLEASE NOTE:

The summary cost sheet is included for evaluation purposes only; it will not be included in the final contract.

COST SHEET INSTRUCTIONS:

This Excel workbook is designed for Bidders to input their information in the designated (white) cells and formulas will automatically calculate totals. All other cells are locked to prevent accidential overwriting of formulas.

Bidders will NOT enter totals on this Summary Cost Sheet tab. The Summary Cost Sheet will automatically calculate totals from each Building's Cost Sheet located on this Excel Workbook Tabs 11-A through 11-B.

Bidders need to enter the following information onto each Building's Cost Sheet tab included on this Excel workbook:

- Table 1 Preventive Maintenance (Rates)

- Table 2 Foreseeable Repairs Services (Normal Business Hourly Rate, # of Technician Hours, and Parts Replacement Amount)

- Table 3 Unforeesable Repairs (Hourly Rates and Parts Markup Percentage)

After entering all the information as specified above, Bidders must print out a hardcopy of the entire workbook (must include each tab of the Excel workbook) to include with their bid submission.

SUMMARY COST SHEET
Bay Area
The Total Bid Amount identified on the Cost Sheet Summary on Attachments
11-A through 11-B are summarized below:
(A)(B)(C)(D)
COST SHEETBUILDING # AND NAMEADDRESSTOTAL COST
11-A402Ronald M. George State Building455 Golden Gate Avenue, San Francisco$ 180,000.00
11-B602Elihu Harris Building1515 Clay Street, Oakland$ - 0

TOTAL CONTRACT LOCATION BID AMOUNT (Sum of Column D) $ 180,000.00

11-A (402)

ATTACHMENT11-A
COST SHEET
(402)Ronald M. George State Building
1. Preventive Maintenance
Description(A)(B)(C)(D)
Service/MaintenanceFrequency of ServiceRate# of Equipment# of times per yearAnnual Total Calculated Amount (A x B x C)
Gearless Elevators1Monthly$ - 0212$ - 0
Geared Elevator1Monthly$ - 0112$ - 0
Testing as specified in Exhibit A Section 8.F.7 & Section 8.F.8 - Annual, No Load1Annually$ - 031$ - 0
Fire Recall Testing as specified in Exhibit A Section 8.F.7.g1Monthly$ - 0312$ - 0
Housekeeping as specified in Exhibit A Section 8.F.101Quarterly$ - 034$ - 0
Semi-Annually$ - 032$ - 0
Weekly Incident Report as specified in Exhibit A Section 8.F.11.f1Weekly$ - 0352$ - 0
Geared ElevatorsMonthly$ - 01012$ - 0
HydraulicMonthly$ - 0312$ - 0
Testing as specified in Exhibit A Section 8.F.7 & Section 8.F.8 - Annual, No LoadAnnually$ - 0131$ - 0
Fire Recall Testing as specified in Exhibit A Section 8.F.7.gMonthly$ - 01312$ - 0
Housekeeping as specified in Exhibit A Section 8.F.10Quarterly$ - 0134$ - 0
Semi-Annually$ - 0132$ - 0
Weekly Incident Report as specified in Exhibit A Section 8.F.11.fWeekly$ - 01352$ - 0
ANNUAL TOTAL
(Sum of Column D)1$ - 0
ANNUAL TOTAL
(Sum of Column D)$ - 0
Calculated Preventive Maintenance Subtotal (Annual Total x 4)1$ - 0
Calculated Preventive Maintenance Subtotal (Annual Total x 5)$ - 0
Service/MaintenanceFrequency of ServiceRate# of Equipment# of times per contract term
Full Load, full speed test
(as specified in Exhibit A Section 8.F.7.c)Once per 5 year term$ - 0161$ - 0
Preventive Maintenance Total (Sum of Calculated Preventive Maintenance Subtotal + Full Load/Full Speed test)$ - 0
1 Table 1:Preventative Maintenance. Rows 1-7 idenitfy 3 existing elevators that will only require preventative maintenance services for 4 years, as these 3 elevators are under warranty through August, 31, 2025.
2. Foreseeable Repairs Services1
(A)(B)(C)(D)(E)
TYPEDescription
(Remove and Replace)Normal Business Hourly Rate2# of Technician Hours for RepairCalculated Labor Amount
(A x B)Parts Replacement Amount3Total Combined Replacement Amount

(C + D)

Door Operator$ - 00$ - 0$ - 0$ - 0
Door Interlock$ - 00$ - 0$ - 0$ - 0
Signal Fixture$ - 00$ - 0$ - 0$ - 0
Car Operating Panel (COP)$ - 00$ - 0$ - 0$ - 0
Geared & GearlessEntrance Door Landing$ - 00$ - 0$ - 0$ - 0
Elevator Door$ - 00$ - 0$ - 0$ - 0
Ventilation Fan$ - 00$ - 0$ - 0$ - 0
Breaker$ - 00$ - 0$ - 0$ - 0
Hydraulic Pump$ - 00$ - 0$ - 0$ - 0
Main Valve$ - 00$ - 0$ - 0$ - 0
Tank Unit/Power Unit$ - 00$ - 0$ - 0$ - 0
Piston$ - 00$ - 0$ - 0$ - 0
HydraulicDoor Operator$ - 00$ - 0$ - 0$ - 0
Door Interlock$ - 00$ - 0$ - 0$ - 0
Signal Fixture$ - 00$ - 0$ - 0$ - 0
Car Operating Panel (COP)$ - 00$ - 0$ - 0$ - 0
Entrance Door Landing$ - 00$ - 0$ - 0$ - 0
Elevator Door$ - 00$ - 0$ - 0$ - 0
Ventilation Fan$ - 00$ - 0$ - 0$ - 0
Breaker$ - 00$ - 0$ - 0$ - 0
GeneralDiamond Plate Wall Paneling (per car)$ - 00$ - 0$ - 0$ - 0
Total Foreseeable Repairs (Sum of Column E)$ - 0
1 Table 2: Foreseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service, but shall be used should these services become necessary during the term of the Agreement.
2 Table 2: The State will pay the Foreseeable Repair Services at the fixed price specified as the Total Combined Replacement Amount (Column E) based on the calculations with the Normal Business Hourly Rate. Should FMD require that the repairs be performed outside of normal business hours, the Foreseeable Repairs Normal Business Hourly Rate (Column A) shall be replaced by the applicable Per Hourly Rate from Table 3 Unforeseeable Repair Services to calculate the Total Combined Replacement Amount (Column E). The State will not pay a separate hourly rate and/or parts replacement amount.
3 Table 2: The Parts Replacement Amount (column D) in the Foreseeable Repair Services (Table 2) are all inclusive, including tax, mark up, etc. The Parts Replacement is included in the Total Combined Replacement Amount and will not be paid separately.
3. Unforeseeable Repairs1
Description(A)(B)(C)
Type of Service
Hourly Labor TypePer Hourly Rate2Estimated # of Technician Hours for RepairAnnual Calculated Amount

(A x B)

Normal Business Hours as identified in Exhibit A, Scope of Work, Section 5.A.1.$ - 080$ - 0
Weekday Outside of Normal Business Hours as identified in Exhibit A, Scope of Work, Section 5.A.1.$ - 020$ - 0
Weekend Emergency Labor Rate (Requires response as identified in Exhibit A, Scope of Work Section 11.B)$ - 015$ - 0
Holiday Emergency Labor Rate (Requires response as identified in Exhibit A, Scope of Work Section 11.B)$ - 015$ - 0
Parts Allowance$ 36,000.00
Parts Markup30%$36,000.00$ - 0
ANNUAL TOTAL (Sum of Column C)$ 36,000.00
CALCULATED UNFORESEEABLE REPAIR SERVICES TOTAL (Annual Total x 5)$ 180,000.00
1 Table 3: Unforeseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service, but shall be used should these services become necessary during the term of the Agreement.
2 Table 3: Unforeseeable Repair Services is for one (1) Service Technician. Should the Contractor require more than one (1) Service Technician to perform services, approval must be obtained by the Facilities Management Division (FMD) Contract Administrator or FMD Designated Representative prior to commencement of service.
3 Table 3: Any Unforeseeable Repair Services requiring an unforeseeable repair part shall require actual receipt for the part when invoicing FMD. A Purchase Order or Purchase Estimate is not to be used in place of a receipt.
COST SHEET SUMMARY
(A)(B)
TableBid Amount
1PREVENTIVE MAINTENANCE TOTAL
(Sum of Calculated Preventive Maintenance Subtotal + Full Load/Full Speed test)$ - 0
2Foreseeable Repair Services
CALCULATED FORESEEABLE REPAIR SERVICES TOTAL$ - 0
3Unforseeable Repair Services
CALCULATED UNFORSEEABLE REPAIR SERVICES TOTAL (Annual Total x 5)$ 180,000.00
Total Bid Amount
(Sum of Column B)$ 180,000.00
NOTES:
The State will not pay for fees not listed on Exhibit B, Attachment 1, Cost Sheet (i.e., travel, freight, trip, tax, and/or fuel surcharges, etc.).
Contractor shall be responsible for supplying miscellaneous materials (i.e., grease, lubrications, gloves, etc.) incidental to service, including safety materials needed or required to perform service, at no additional charge to the State.
Each building shall be invoiced separately for services/repairs provided to each building in accordance with Exhibit A, Attachment 1, Conveyance Equipment Description.

11-B (602)

ATTACHMENT11-B
COST SHEET
(602)Elihu Harris Building
1. Preventive Maintenance
Description(A)(B)(C)(D)
Service/MaintenanceFrequency of ServiceRate# of Equipment# of times per yearAnnual Total Calculated Amount (A x B x C)
Gearless ElevatorsMonthly$ - 0912$ - 0
Geared ElevatorsMonthly$ - 0612$ - 0
HydraulicMonthly$ - 0212$ - 0
Testing as specified in Exhibit A Section 8.F.7 & Section 8.F.8 - Annual, No LoadAnnually$ - 0171$ - 0
Fire Recall Testing as specified in Exhibit A Section 8.F.7.gMonthly$ - 01712$ - 0
Housekeeping as specified in Exhibit A Section 8.F.10Quarterly$ - 0174$ - 0
Semi-Annually$ - 0172$ - 0
Weekly Incident Report as specified in Exhibit A Section 8.F.11.fWeekly$ - 01752$ - 0
ANNUAL TOTAL
(Sum of Column D)$ - 0
Calculated Preventive Maintenance Subtotal (Annual Total x 5)$ - 0
Service/MaintenanceFrequency of ServiceRate# of Equipment# of times per contract term
Full Load, full speed test
(as specified in Exhibit A Section 8.F.7.c)Once per 5 year term$ - 0171$ - 0
Preventive Maintenance Total (Sum of Calculated Preventive Maintenance Subtotal + Full Load/Full Speed test)$ - 0
2. Foreseeable Repairs Services1
(A)(B)(C)(D)(E)
TYPEDescription
(Remove and Replace)Normal Business Hourly Rate2# of Technician Hours for RepairCalculated Labor Amount
(A x B)Parts Replacement Amount3Total Combined Replacement Amount

(C + D)

Door Operator$ - 00$ - 0$ - 0$ - 0
Door Interlock$ - 00$ - 0$ - 0$ - 0
Signal Fixture$ - 00$ - 0$ - 0$ - 0
Car Operating Panel (COP)$ - 00$ - 0$ - 0$ - 0
Geared & GearlessEntrance Door Landing$ - 00$ - 0$ - 0$ - 0
Elevator Door$ - 00$ - 0$ - 0$ - 0
Ventilation Fan$ - 00$ - 0$ - 0$ - 0
Breaker$ - 00$ - 0$ - 0$ - 0
Hydraulic Pump$ - 00$ - 0$ - 0$ - 0
Main Valve$ - 00$ - 0$ - 0$ - 0
Tank Unit/Power Unit$ - 00$ - 0$ - 0$ - 0
Piston$ - 00$ - 0$ - 0$ - 0
HydraulicDoor Operator$ - 00$ - 0$ - 0$ - 0
Door Interlock$ - 00$ - 0$ - 0$ - 0
Signal Fixture$ - 00$ - 0$ - 0$ - 0
Car Operating Panel (COP)$ - 00$ - 0$ - 0$ - 0
Entrance Door Landing$ - 00$ - 0$ - 0$ - 0
Elevator Door$ - 00$ - 0$ - 0$ - 0
Ventilation Fan$ - 00$ - 0$ - 0$ - 0
Breaker$ - 00$ - 0$ - 0$ - 0
GeneralDiamond Plate Wall Paneling (per car)$ - 00$ - 0$ - 0$ - 0
Total Foreseeable Repairs (Sum of Column E)$ - 0
1 Table 2: Foreseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service, but shall be used should these services become necessary during the term of the Agreement.
2 Table 2: The State will pay the Foreseeable Repair Services at the fixed price specified as the Total Combined Replacement Amount (Column E) based on the calculations with the Normal Business Hourly Rate. Should FMD require that the repairs be performed outside of normal business hours, the Foreseeable Repairs Normal Business Hourly Rate (Column A) shall be replaced by the applicable Per Hourly Rate from Table 3 Unforeseeable Repair Services to calculate the Total Combined Replacement Amount (Column E). The State will not pay a separate hourly rate and/or parts replacement amount.
3 Table 2: The Parts Replacement Amount (column D) in the Foreseeable Repair Services (Table 2) are all inclusive, including tax, mark up, etc.. The Parts Replacement is included in the Total Combined Replacement Amount and will not be paid separately.
3. Unforeseeable Repairs1
Description(A)(B)(C)
Type of Service
Hourly Labor TypePer Hourly Rate2Estimated # of Technician Hours for RepairAnnual Calculated Amount

(A x B)

Normal Business Hours as identified in Exhibit A, Scope of Work, Section 5.A.1.$ - 0280$ - 0
Weekday Outside of Normal Business Hours as identified in Exhibit A, Scope of Work, Section 5.A.1.$ - 060$ - 0
Weekend Emergency Labor Rate (Requires response as identified in Exhibit A, Scope of Work Section 11.B)$ - 040$ - 0
Holiday Emergency Labor Rate (Requires response as identified in Exhibit A, Scope of Work Section 11.B)$ - 015$ - 0
Parts Allowance$ 100,000.00
Parts Markup30%$100,000.00$ - 0
ANNUAL TOTAL (Sum of Column C)$ 100,000.00
CALCULATED UNFORESEEABLE REPAIR SERVICES TOTAL (Annual Total x 5)
1 Table 3: Unforeseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service, but shall be used should these services become necessary during the term of the Agreement.
2 Table 3: Unforeseeable Repair Services is for one (1) Service Technician. Should the Contractor require more than one (1) Service Technician to perform services, approval must be obtained by the Facilities Management Division (FMD) Contract Administrator or FMD Designated Representative prior to commencement of service.
3 Table 3: Any Unforeseeable Repair Services requiring an unforeseeable repair part shall require actual receipt for the part when invoicing FMD. A Purchase Order or Purchase Estimate is not to be used in place of a receipt.
COST SHEET SUMMARY
(A)(B)
TableBid Amount
1PREVENTIVE MAINTENANCE TOTAL
(Sum of Calculated Preventive Maintenance Subtotal + Full Load/Full Speed test)$ - 0
2Foreseeable Repair Services
CALCULATED FORESEEABLE REPAIR SERVICES TOTAL$ - 0
3Unforseeable Repair Services
CALCULATED UNFORSEEABLE REPAIR SERVICES TOTAL (Annual Total x 5)$ - 0
Total Bid Amount
(Sum of Column B)$ - 0
NOTES:
The State will not pay for fees not listed on Exhibit B, Attachment 1, Cost Sheet (i.e., travel, freight, trip, tax, and/or fuel surcharges, etc.).
Contractor shall be responsible for supplying miscellaneous materials (i.e., grease, lubrications, gloves, etc.) incidental to service, including safety materials needed or required to perform service, at no additional charge to the State.
Each building shall be invoiced separately for services/repairs provided to each building in accordance with Exhibit A, Attachment 1, Conveyance Equipment Description.