Attachment_10_-_Subcontracting_Percentage_Worksheet_v1_2.docx
DOCX document 99 KB Posted
- Solicitation number
- 140P3022R0028
About this file
This document provides a subcontracting percentage worksheet for a landscape maintenance contract opportunity with the National Park Service National Capital Region. The solicitation number is 140P3019R0015 and the prime contractor and potential subcontractor are to provide direct labor, fringe benefits, and G&A percentages to calculate the subcontracting labor cost percentage. A pre-bid meeting was held on July 19th, 2022 and questions must be received by close of business on August 11th, 2022. The contractor is advised to review sections K-L-M of the solicitation for required submission documents and instructions. The subcontracting percentage worksheet outlines the calculation to determine what portion of the contract work will be performed by the potential subcontractor based on direct labor, fringe benefits, and overhead costs.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
NATIONAL CAPITAL REGION
1100 Ohio Drive S.W.
Washington, D.C., 20242
NPS-National Capital Region Solicitation: 140P3019R0015 – Landscape Maintenance Page 2 of 2
19 July 2022
SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET
PRIME CONTRACTOR: _________________________
SUBCONTRACTOR: ___________________________
To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you.
a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
e) Next, using the formula below, calculate the subcontracting labor percentage.
____(D)____
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
NPS-National Capital Region Page 1 of 1
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $100.00 $75.00
FRINGE BENEFITS $100.00 $75.00
SUB TOTAL (A)$200 (B)$150
LABOR G&A** @ 10.00% $20.00 10.00% $15.00
TOTAL LABOR COST (C)$220 (D)$165
Subcontracting Labor Percentage 42.86% image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .