Sol_140P3022R0028_Amd_0004.pdf
PDF 95 KB Posted
- Solicitation number
- 140P3022R0028
About this file
This is a contract modification amending solicitation number 140P3022R0028 issued by the National Park Service for repair and maintenance services at Turkey Run Park in Washington DC. The modification extends the response deadline to October 31, 2022 at 12:00 PM Eastern time, incorporates updated pricing schedules and plans, and removes unnecessary attachments. The work includes replacing guardrails and resurfacing Turkey Run Road, and optionally resurfacing several park parking lots over a one-year period. Bidders should carefully review the updated solicitation sections and wage determinations prior to submitting a response.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P3022R0028 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PCR
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting
09/25/20220004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/25/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
National Park Service (NPS) - National Capital Area (NCA) - George Washington Memorial
Parkway (GWMP): Repair Turkey Run Park Road, Parking Lot Pavement and Guardrails
The purpose of Amendment 0002 is to:
A. Extend the Closing Date and Time to Monday, October 31, 2022 by no later then 12:00 PM
Eastern.
B. Incorporate Updated Section C-M - Amendment 4 - Continuation Sheets
C. Incorporate updated Attachment 1 - Bid Schedule - Amendment 0004
D. Incorporate updated Attachment 3 - Amend 4 - Turkey Run Plans - Updated 9.20.2022
E. Incorporate updated Attachment 4 - Amend 4 - Paving Special Contract Requirements -
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Brian McCabe
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P3022R0028/0004
Updated 9.20.2022
F. Incorporate update Attachment 7 - DB Wage
Determinations DC20220001 09022022
G. Remove the requirements of the original
Attachments 5 and 6 as they are no longer required.
All Contractor are advised to carefully review and read Section K-M prior to submission of their proposal.
All other original terms and conditions remain unchanged as a result of Amendment 0004.
Period of Performance: 11/04/2022 to 11/03/2023
Change Item 00001 to read as follows(amount shown is the obligated amount):
00001 Schedule A - Replace Guardrails and Asphalt
Concrete Pavement on Turkey Run Road
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Change Item 00002 to read as follows(amount shown is the obligated amount):
00002 Schedule B - Parking Lot C-1
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Change Item 00003 to read as follows(amount shown is the obligated amount):
00003 Schedule C - Parking Lot C-2
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P3022R0028/0004
Change Item 00004 to read as follows(amount shown is the obligated amount):
00004 Schedule D - Parking Lot B
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Change Item 00005 to read as follows(amount shown is the obligated amount):
00005 Schedule E - HQ Parking Lot A
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Change Item 00006 to read as follows(amount shown is the obligated amount):
00006 Schedule F - Parking Lot D-2 - US Park Police
(Option Line Item)
160 Days After Award
Product/Service Code: Z1QA
Product/Service Description: MAINTENANCE OF
RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Add Item 00007 as follows:
00007 Schedule G - D2 Parking Lot - Optional Item (May be selected in lieu of Schedule F)
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P3022R0028/0004
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Add Item 00008 as follows:
00008 Schedule H - Turkey Run Road - Partial Full Depth
Replacement as Detailed in Drawing G-101 -
Optional Item
(Option Line Item)
160 Days After Award
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)