Attachment_3_-_Amend_4_-_Turkey_Run_Plans_-__Updated_9_20_2022_0004.pdf
PDF 12 MB Posted
- Solicitation number
- 140P3022R0028
About this file
This federal solicitation requests proposals for repair work on the Turkey Run Park Road and parking lot pavement within the George Washington Memorial Parkway. The National Park Service is seeking contractors to resurface and rehabilitate asphalt surfaces throughout the park, replacing damaged areas and applying a new wearing course. Interested offerors should attend the pre-bid meeting on August 4th and submit any questions by August 11th. Proposals are due in accordance with the solicitation instructions detailed in Sections K through M. The work must be completed by November 15, 2022. This project aims to restore and improve the infrastructure within the National Capital Area park system.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
N
COVER SHEET
TURKEY RUN PARK
ARLINGTON VA
VA
310527 AND
317902
G-001
VA NA
BMJ
INDEX TO SHEETS
SHEET NUMBER DESCRIPTION
G-001
G-101
C-101
C-102
C-301
E157-04
E414-01
E609-01
E634-01
E634-03
COVER SHEET
GENERAL SITE PLAN
SITE PLAN
SITE PLAN
TYPICAL CROSS SECTIONS
FIBER ROLL
CRACK SEALING
CONCRETE CURB
PAVEMENT MARKINGS - SIGNS
PAVEMENT MARKINGS - STRIPING
E634-05 PAVEMENT MARKINGS - PARKING LOT
ET 617-61 GUARDRAIL TERMINAL SECTION SBT-FAT
617-60 GUARDRAIL - SBTA
ET 635-6 TEMPORARY TRAFFIC CONTROL
PAVEMENT MARKINGS AT USPP D2 PARKING LOTATTACHMENT 1
SPECIFICATIONS:
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS", FP-14.
SCOPE OF WORK:
THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT
REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN ACCORDING TO THE
CONTRACT PLANS AND SPECIFICATIONS. THE GENERAL SCOPE OF WORK
INCLUDES: (1) MILL AND RESURFACE TURKEY RUN PARK RD FROM TURKEY RUN
LOOP ROAD TO HEADQUARTERS PARKING LOT; (2) GUARDRAILS REPLACEMENT
ALONG TURKEY RUN ROAD; (3) FULL-DEPTH PAVEMENT REPAIR AND MILL AND
RESURFACE OF PARKING LOT C-1; (4) FULL-DEPTH PAVEMENT REPAIR OF PARKING
LOT D-2; (5) CRACK SEAL AND PLACE THIN ASPHALT OVERLAY AT PARKING LOTS
C-2, B, AND GWMP HQ ; (6) INSTALL CONCRETE CURB AT C-1 PARKING LOT; (7)
APPLY PERMANENT PAVEMENT MARKINGS TO ALL NEW PAVED AREAS; (8)
TEMPORARY MAINTENANCE OF TRAFFIC DURING CONSTRUCTION; (6)
CONSTRUCTION QUALITY CONTROL TESTING ; (7) OTHER WORK AS DESCRIBED IN
THE CONTRACT DOCUMENTS.
REQUIRED MITIGATION:
(1) NO VEGETATION OR LANDSCAPE FEATURES SHALL BE CLEARED OR REMOVED AS PART OF THIS
PROJECT WITHOUT PRIOR APPROVAL FROM GWMP RESOURCE MANAGEMENT; (2) ANY
REPLACEMENTS OR REPAIRS SHALL BE DONE SO IN KIND; (3) ANY PARK INFRASTRUCTURE
IMPACTED DURING REHABILITATION ACTIVITIES, INCLUDING BUT NOT LIMITED TO PAVED AND
UNPAVED ROADWAYS, WALKWAYS, TURF, SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS
UPON COMPLETION OF THE PROJECT; (4) ROADWAY TREATMENTS SHALL BE CONFINED TO THE
PAVEMENT AREA. NO TREATMENT PRODUCT SHALL BE ALLOWED TO MIGRATE BEYOND ROADWAY
GRAVEL SHOULDERS; (5) IN THE EVENT THAT ARTIFACTS ARE ACCIDENTALLY DISCOVERED DURING
CONSTRUCTION WORK, WORKERS ON-SITE WILL NOTIFY THE PROJECT LEADER AND GWMP
CULTURAL RESOURCE MANAGEMENT IMMEDIATELY AND WORK STOPPED UNTIL THE SITE CAN BE
EXAMINED OR OTHERWISE DETERMINED OKAY TO PROCEED WITH CONSTRUCTION WORK.
100% PLANS 06-14-21
C-201 EROSION AND SEDIMENT CONTROL PLAN
C-202 EROSION AND SEDIMENT CONTROL PLAN
C-203 EROSION AND SEDIMENT CONTROL NARRATIVE
E157-2 TEMPORARY INLET PROTECTION
REV 1 - E&SC 08-08-22
1 ADDED SHEETS C-201 - C-203
1 ADDED SHEET E157-2
REV 2 09-20-222
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SILVER
AutoCAD SHX Text
SPRING
AutoCAD SHX Text
BETHESDA
AutoCAD SHX Text
SUITLAND
AutoCAD SHX Text
ANNADALE
AutoCAD SHX Text
MCLEAN
AutoCAD SHX Text
CHEVY
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
GREENBELT
AutoCAD SHX Text
NEW
AutoCAD SHX Text
CAROLLTON
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
DISTRICT OF COLUMBIA
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
DISTRICT OF COLUMBIA
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
POTOMAC R.
AutoCAD SHX Text
ANACOSTIA
AutoCAD SHX Text R.
AutoCAD SHX Text
WASHINGTON D.C.
AutoCAD SHX Text
GEORGE WASHINGTON
AutoCAD SHX Text
MEMORIAL PARKWAY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CLARA BARTON
AutoCAD SHX Text
PARKWAY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
VISITOR CENTER
AutoCAD SHX Text
PARK HEADQUARTERS
AutoCAD SHX Text
PICNIC AREA
AutoCAD SHX Text V.C.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
COUNTY LINE
AutoCAD SHX Text
STATE LINE
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
MT. VERNON
AutoCAD SHX Text
FORT HUNT
AutoCAD SHX Text
BELLE
AutoCAD SHX Text
HAVEN
AutoCAD SHX Text
DYKE
AutoCAD SHX Text
MARSH
AutoCAD SHX Text
WAYNEWOOD BLVD.
AutoCAD SHX Text
ALEXANDRIA
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
KING ST.
AutoCAD SHX Text
DUKE ST.
AutoCAD SHX Text
GREEN ST.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DISTRICT OF COLUMBIA
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
DISTRICT OF
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
NAVY AND MARINE
AutoCAD SHX Text
MEMORIAL
AutoCAD SHX Text
GREAT
AutoCAD SHX Text
FALLS
AutoCAD SHX Text
PARK
AutoCAD SHX Text
JONES
AutoCAD SHX Text
POINT
AutoCAD SHX Text
LIGHTHOUSE
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
GEORGETOWN
AutoCAD SHX Text
OLD
AutoCAD SHX Text
PIKE
AutoCAD SHX Text
POTOMAC RIVER
AutoCAD SHX Text
FORT
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
FORT MARCY
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
PRINCE
AutoCAD SHX Text
GEORGES CO.
AutoCAD SHX Text
FAIRFAX CO.
AutoCAD SHX Text
FAIRFAX CO. VIRGINIA
AutoCAD SHX Text
ARLINGTON CO. VIRGINIA
AutoCAD SHX Text
CITY OF ALEXANDRIA
AutoCAD SHX Text
FAIRFAX CO.
AutoCAD SHX Text
MONTGOMERY CO.
AutoCAD SHX Text MacARTHUR
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text MacARTHUR
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
GEORGETOWN
AutoCAD SHX Text
WASHINGTON D.C.
AutoCAD SHX Text
ALEXANDRIA
AutoCAD SHX Text
TO ROCKVILLE,
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
FALLS CHURCH,
AutoCAD SHX Text
VIRGINIA &
AutoCAD SHX Text
AutoCAD SHX Text TO McLEAN, AutoCAD SHX Text
VIRGINIA &
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
HILLCREST
AutoCAD SHX Text
HEIGHTS,
AutoCAD SHX Text
MARYLAND
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TO
AutoCAD SHX Text
RIVERSIDE
AutoCAD SHX Text
PARK
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
DAINGERFIELD
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
PARKWAY
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
FACILITY
AutoCAD SHX Text
ARLINGTON CO.
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
CITY
AutoCAD SHX Text
OF
AutoCAD SHX Text
ALEXANDRIA
AutoCAD SHX Text
GRAVELLY
AutoCAD SHX Text
POINT
AutoCAD SHX Text
LBJ
AutoCAD SHX Text
GROVE
AutoCAD SHX Text
THEODORE ROOSEVELT ISLAND
AutoCAD SHX Text
NETHERLANDS
AutoCAD SHX Text
CARILLON AND
AutoCAD SHX Text
U.S. MARINE
AutoCAD SHX Text
CORPS WAR
AutoCAD SHX Text
MEMORIAL
AutoCAD SHX Text
TURKEY
AutoCAD SHX Text
RUN
AutoCAD SHX Text
PARK
AutoCAD SHX Text
CLARA
AutoCAD SHX Text
BARTON
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
GLEN
AutoCAD SHX Text
ECHO
AutoCAD SHX Text
PARK
AutoCAD SHX Text
CLAUDE MOORE
AutoCAD SHX Text
COLONIAL
AutoCAD SHX Text
FARM
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL
AutoCAD SHX Text
PARKWAY, CLARA BARTON PARKWAY
AutoCAD SHX Text
ARLINGTON
AutoCAD SHX Text
MEMORIAL
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
GEORGE WASHINGTON
AutoCAD SHX Text
MEMORIAL PARKWAY
AutoCAD SHX Text
CLARA BARTON
AutoCAD SHX Text
PARKWAY
AutoCAD SHX Text
ARLINGTON
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
MARINA
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
SAILING MARINA
AutoCAD SHX Text
BOAT LAUNCH
AutoCAD SHX Text
SCALE OF KILOMETERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VIRGINIA & MARYLAND
AutoCAD SHX Text
DISTRICT OF COLUMBIA
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
PROJECT LOCATION
D2 PARKING LOT
D
PA
R
KI
N
G L
O T
HQ PARKING LOT
B PARKING LOT
C-2 PARKING LOT
TURKEY RUN ROAD
TURKEY RUN ROAD
C-1 PARKING LOT
GWMP PKWY NB
TURKEY RUNLOOP ROAD
GWMP PKWY SB
E E
E
E E
E E
E
E
EE
E
E
E
E E
E
E
E
EE
EE
E
E
E
E
SAN
SAN
SAN
SAN
SA
N
SAN
SA
N
W
W
W
W
W
W
SA
N
SAN
SA
N
SA
N
W W
W
W
W
W W
W W
W W
SAN
SAN
SAN
W
D2 PARKING LOT
D
PA
R
KI
N
G L
O T
HQ PARKING LOT
B PARKING LOT
C-2 PARKING LOT
TURKEY RUN ROAD
TURKEY RUN ROAD
C-1 PARKING LOT
GWMP PKWY NB
TURKEY RUNLOOP ROAD
GWMP PKWY SB
E E
E
E E
E E
E
E
EE
E
E
E
E E
E
E
E
EE
EE
E
E
E
E
SAN
SAN
SAN
SAN
SA
N
SAN
SA
N
W
W
W
W
W
W
SA
N
SAN
SA
N
SA
N
W W
W
W
W
W W
W W
W W
SAN
SAN
SAN
W
50+63
1+
2+00
3+00 4+00
5+00
6+
7+
8+00 9+00
10+00
11+00 12+00 13+00
14+00
15+00
16+00
17+00
18+00 19+00 20+00
21+00
+0
+0
+0
25+00 26+00
27+00 28+00
+0
30+00
31+00
32+00
33+00
+0
+0
36+00 37+00
38+00 39+00 40+00 41+00 42+00
43+00
+0
+0
+0
+0
48+00
49+00
50+00
D2 PARKING LOT
D
PA
R
KI
N
G L
O T
E E
E E
E E
E
E
E
E
E
E
SA
N
SA
N
W W
W
W W
W
SAN
D2 PARKING LOT
D
PA
R
KI
N
G L
O T
E E
E E
E E
E
E
E
E
E
E
SA
N
SA
N
W W
W
W W
W
SAN
48+00
TURKEY RUN ROAD
C-1 PARKING LOT
TURKEY RUN ROAD
C-1 PARKING LOT
1+
2+00
3+00 4+00
5+00
6+
7+
8+00 9+00
10+00
11+00 12+00 13+00
LEGEND:
ROAD REPAIR (DETAIL F3 AND E3 ON SHEET C-301)
PARKING LOT REPAIR (DETAIL D3 ON SHEET C-301)
MILL AND RESURFACE (DETAIL D7 AND E7 ON SHEET C-301)
PREVENTIVE MAINTENANCE (DETAIL C-3 ON SHEET C-301)
CONTRACTOR'S LIMIT OF DISTURBANCE
FILTER FIBER
WATER LINE
SANITARY SEWER LINE
ELECTRICAL LINE
NA
BMJ
ARLINGTON VIRGINIA
310527 AND
317902
CONTRACT SCHEDULES:
G-101
SHEET C-101
SHEET C-102
N
00 100' 200'
GENERAL SITE PLAN
TURKEY RUN PARK
SF
NA
GENERAL NOTES:
1. THE EXISTING CONDITIONS DEPICTED ARE TRACED OVER 2019
FAIRFAX COUNTY AERIAL PHOTOGRAPHY. THE CONTRACTOR SHALL
VERIFY THE EXISTING CONDITIONS.
2. THE EXACT LIMITS OF GUARDRAIL REPAIR WILL BE DETERMINED IN
THE FIELD AFTER THE KICK-OFF MEETING.
3. RESET ALL EXISTING MANHOLE RIMS AND INLET GRATES TO NEW
FINISHED GRADE.
SCHEDULE LOCATION
A TURKEY RUN ROAD
B C-1 PARKING LOT
C C-2 PARKING LOT
D B PARKING LOT
E HQ PARKING LOT
F D2 PARKING LOT
W
SAN
E
INSET A SHEET C-102
100% PLANS 06-14-21
G D2 PARKING LOT - PARTIAL FULL DEPTH REPAIR AND MILL AND RESURFACE
H TURKEY RUN ROAD - FULL DEPTH REPAIR APPROX STA 1+00 TO STA 10+00
INSET B
SHEET G-101
INSET B
SCHEDULE H
SCHEDULE H - ROADWAY FULL DEPTH
REPAIR APPROX. STA 1+00 TO STA 10+00
INSET C
SHEET G-101
INSET C
SCHEDULE G2
REV 2 09-20-222
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
G
C-2 PARKING LOT
TURKEY RUN ROAD
C-1 PARKING LOT
TURKEY RUNLOOP ROAD
E
E
E E
E
EE
E
E
E
EE
E
E
E
E
E
E
E
E
E
SA
N
SAN
SAN
SAN
SAN
SA
N
SAN
SAN
SAN
SAN
SA
N
SA
N
SAN
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
1+
2+00
3+00
4+00
5+00
6+
7+
8+00 9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00 19+00
20+00
21+00
+0
+0
+0
25+00
NOTES:
1. THE EXISTING CONDITIONS DEPICTED ARE TRACED OVER 2019 FAIRFAX
COUNTY AERIAL PHOTOGRAPHY. THE CONTRACTOR SHALL VERIFY THE
EXISTING CONDITIONS.
2. PROTECT ALL STORM WATER INLETS WITHIN THE LIMITS OF DISTURBANCE
PER DETAIL E157-04.
3. ADD NEW CONCRETE CURB PER DETAIL E609-01.
4. CONTRACTOR MUST RECEIVE COR APPROVAL ON THE INITIAL LAYOUT OF THE
PARKING LOT PAVEMENT MARKINGS PRIOR TO THE PLACEMENT OF THE
PERMANENT PAVEMENT MARKING. REFER TO DETAIL E634-05 FOR PAVEMENT
MARKING LAYOUT.
5. CREATE 26 PARKING SPOTS ON EACH SIDE OF THE ISLAND (TOTAL OF 52
SPOTS). CREATE 46 PARKING SPOTS. CONTRACTOR MUST RECEIVE
APPROVAL ON THE INITIAL LAYOUT PRIOR TO THE PLACEMENT OF THE
PERMANENT PAVEMENT MARKING.
6. APPLY DOUBLE SOLID YELLOW STRIPING FOR CENTERLINE PER DETAIL
E634-03.
7. APPROXIMATE LOCATION OF UNDERGROUND UTILITIES ARE SHOWN ON THE
PLANS. CONTRACTOR MUST LOCATE AND MARK ANY UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION TO AVOID ANY DAMAGES TO
UNDERGROUND UTILITIES. CONTRACTOR IS RESPONSIBLE TO REPAIR ANY
DAMAGE TO UNDERGROUND UTILITIES TO ITS PRE-CONSTRUCTION
CONDITIONS. REFER TO THE CONTRACT SPECIFICATIONS SECTION 107.02.
8. CONTRACTOR MUST USE TYPE H PERMANENT PAVEMENT MARKING AT ALL
LOCATIONS PER CONTRACT SPECIFICATIONS (FP-14).
M
AT
C H
L
IN
E O
N S
H
EE
T C
-1
00 50' 100'
N
NA
NBM
ARLINGTON VIRGINIA
C-101
SITE PLAN
TURKEY RUN PARK
NA
SEE NOTE 3
CREATE 46 PARKING SPOTS.
SEE NOTE 4
CREATE A TOTAL OF 52 PARKING
SPOTS (26 ON EACH SIDE OF ISLAND).
SEE NOTE 4
SEE NOTES 4 AND 6
310527 AND
317902
100% PLANS 06-14-21
SAW CUT ASPHALT
CLEAN EDGE
SEE NOTE 3
SAW CUT ASPHALT
CLEAN EDGE
INSET B
SHEET G-101 2
REV 2 09-20-222
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
PA
R
KI
N
G L
O T
HQ PARKING LOT
B PARKING LOT
TURKEY RUN ROAD
E E
E E
E E
E
E
E
E
E
E
E
E
E
EE
E E
E
E
EE
E
E
E
E
E
E E
E
E E
E
E
E
EE
E E
E
EEEE
E
E
E
E
E
E
E
E E
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
W
W
W
W
W
W
W
W
WW
W
W
W
W
SA
N
SA
N
SAN
SAN
SAN
SAN
SA
N
SA
N
W W
W W
W
W
W
W
W
W
W
W
W
W
W W W W
W
W W
W
W
W
W W
W
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN W
W W W W
W50+63
+0
25+00 26+00
27+00
28+00
+0
30+00
31+00
32+00
33+00
+0
+0
36+00
37+00
38+00 39+00 40+00 41+00 42+00
43+00
+0
+0
+0
+0
48+00
49+00
50+00
E E
E E
E E
E E
E E
SA
N
SA
N
SA
N
SA
N
SAN
SA
N
W W
W W
W W
W W
NOTES:
1. CONTRACTOR MUST ENSURE THE GATE TO D2 PARKING LOT
OPERATES SMOOTHLY UPON THE COMPLETION OF THE
PAVING OPERATIONS.
2. CONTRACTOR MUST REMOVE AND RESET THE RAMPS TO
THE SHEDS AS DIRECTED BY THE COR FOR THE PAVING
OPERATIONS.
N
M
AT
C H
L
IN
E O
N S
H
EE
T C
-1
00 50' 100'
CONTRACTOR'S STAGING AND
STORAGE AREA (3,200 SF)
NA
NBM
ARLINGTON VIRGINIA
C-102
SITE PLAN
TURKEY RUN PARK
NA
CREATE 40 HEAD-ON PARKING
SPOTS. SEE NOTE 4 ON SHEET
C-101.
CREATE 22 HEAD-ON PARKING
SPOTS. SEE NOTE 4 ON SHEET
C-101.
CREATE PARKING SPOTS THAT
MATCHES ATTACHMENT 1 LAYOUT.
SEE NOTE 4 ON SHEET C-101.
310527 AND
317902
MATCH LINE ON INSET A
(SHEET C-102)
MATCH LINE ON SHEET C-102
00 20' 40'
INSET A
SEE NOTE 1
SEE NOTE 2
100% PLANS 06-14-21
CREATE 30 HEAD-ON PARKING
SPOTS. SEE NOTE 4 ON SHEET
C-101.
INSET C
SHEET G-101 2
REV 2 09-20-222
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
C-2 PARKING LOT
TURKEY RUN ROAD
C-1 PARKING LOT
TURKEY RUNLOOP ROAD
E
E
E E
E
EE
E
E
E
EE
E
E
E
E
E
E
E
E
E
SA
N
SAN
SAN
SAN
SAN
SA
N
SAN
SAN
SAN
SAN
SA
N
SA
N
SAN
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
1+
2+00
3+00
4+00
5+00
6+
7+
8+00 9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00 19+00
20+00
21+00
+0
+0
+0
25+00
M
AT
C H
L
IN
E O
N S
H
EE
T C
-1
00 50' 100'
N
NA
NBM
ARLINGTON VIRGINIA
C-201
EROSION AND SEDIMENT CONTROL PLAN
TURKEY RUN PARK
NA
310527 AND
317902
REV 1 - E&SC 08-08-22
IP
IP
IP
IP
IP
IP
EROSION AND SEDIMENT CONTROL LEGEND:
3.05 SILT FENCE SF SF
E157-04 STORM DRAIN INLET PROTECTION IP IP
NOTES:
1. SEE EROSION AND SEDIMENT CONTROL NARRATIVE ON SHEET C-203.
2. PROTECT ALL STORM WATER INLETS WITHIN THE LIMITS OF DISTURBANCE
PER DETAIL E157-04.
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
PA
R
KI
N
G L
O T
HQ PARKING LOT
B PARKING LOT
TURKEY RUN ROAD
E E
E E
E E
E
E
E
E
E
E
E
E
E
EE
E E
E
E
EE
E
E
E
E
E
E E
E
E E
E
E
E
EE
E E
E
EEEE
E
E
E
E
E
E
E
E E
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
W
W
W
W
W
W
W
W
WW
W
W
W
W
SA
N
SA
N
SAN
SAN
SAN
SAN
SA
N
SA
N
W W
W W
W
W
W
W
W
W
W
W
W
W
W W W W
W
W W
W
W
W
W W
W
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN W
W W W W
W50+63
+0
25+00 26+00
27+00
28+00
+0
30+00
31+00
32+00
33+00
+0
+0
36+00
37+00
38+00 39+00 40+00 41+00 42+00
43+00
+0
+0
+0
+0
48+00
49+00
50+00
SF
SF SF SF
E E
E E
E E
E E
E E
SA
N
SA
N
SA
N
SA
N
SAN
SA
N
W W
W W
W W
W W
N
M
AT
C H
L
IN
E O
N S
H
EE
T C
-1
00 50' 100'
NA
NBM
ARLINGTON VIRGINIA
C-202
EROSION AND SEDIMENT CONTROL PLAN
TURKEY RUN PARK
NA
310527 AND
317902
MATCH LINE ON SHEET C-102
00 20' 40'
INSET A
REV 1 - E&SC 08-08-22
APPROX. END OF SF
APPROX. START OF SF
IP
IP
IP
IP
IP
IP
IP
IP
IP
SF
SF
SF
SF
IP
EROSION AND SEDIMENT CONTROL LEGEND:
3.05 SILT FENCE SF SF
E157-04 STORM DRAIN INLET PROTECTION IP IP
NOTES:
1. SEE EROSION AND SEDIMENT CONTROL NARRATIVE ON SHEET C-203.
2. PROTECT ALL STORM WATER INLETS WITHIN THE LIMITS OF DISTURBANCE
PER DETAIL E157-04.
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
EROSION AND SEDIMENT CONTROL NARRATIVE:
PROJECT DESCRIPTION:
THE SITE IS ON THE TURKEY RUN PARK IN FAIRFAX COUNTY, VIRGINIA. THE INTENT OF THE
PROJECT IS TO IMPLEMENT FULL-DEPTH PAVEMENT REPAIR OF THE TURKEY RUN PARK RD,
PARKING LOTS C-1 AND D-2; CRACK SEAL AND PLACE THIN ASPHALT OVERLAY AT PARKING
LOTS C-2, B, AND GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) HEADQUARTERS (HQ);
INSTALL CONCRETE CURB AT C-1 PARKING LOT; AND APPLY PERMANENT PAVEMENT
MARKINGS TO ALL NEW PAVED AREAS. ALL ITEMS ARE TO BE REPLACED IN KIND AND NO
CHANGES TO THE ELEVATION OR LAND USE COVERAGE ARE TO OCCUR.
EXISTING SITE CONDITIONS:
THE EXISTING SITE IS A HEAVILY WOODED PARK WITH PAVED PARKING LOTS AND ROAD.
THERE ARE 2 BUILDINGS ON SITE: GWMP HQ IS LOCATED NEAR THE HQ PARKING LOT AND
THE UNITED STATES PARK POLICE IS LOCATED NEAR LOT D2 AS SHOWN ON THE PLANS. THE
EXISTING TOPOGRAPHY IS NOT SHOWN BECAUSE THIS PROJECT IS A ROUTINE MAINTENANCE
IMPROVEMENTS TO THE PAVEMENT SERVING TURKEY RUN PARK AND NOT CHANGES TO THE
LAND USE WILL OCCUR.
ADJACENT PROPERTIES:
THE TURKEY RUN PARK IS BOUNDED BY THE POTOMAC RIVER TO THE NORTH, GEORGE
WASHINGTON MEMORIAL PARKWAY TO THE SOUTH AND HEAVY WOODED PARK LANDS TO THE
EAST AND WEST.
OFF-SITE AREAS:
SELECT FILL MATERIALS SHALL CONSIST OF AN APPROVED MATERIAL, FREE OF ORGANIC
MATTER, ROCKS OR COBBLES GREATER THAN 4 INCHES OR DEBRIS. THE SELECT FILL TO BE
USED FOR THIS PROJECT SHALL MEET THE GRADATION REQUIREMENT OF AN AGGREGATE
BASE, GRADING C OR D. FILL MATERIAL SHALL NOT BE OBTAINED FROM AREAS OF
EXCAVATION WITHIN THE SITE. UNSUITABLE MATERIAL SHALL BE HAULED FROM THE SITE
AND DISPOSED OF IN AN APPROVED MANNER. STOCKPILES SHALL NOT BE ALLOWED ON THE
SITE.
SOILS:
NOT APPLICABLE. THIS PROJECT DOES NOT ANTICIPATE ANY SOIL DISTURBANCE.
CRITICAL AREAS:
NOT APPLICABLE. THERE ARE NO CRITICAL AREAS ON OR ADJACENT TO THIS SITE.
EROSION AND SEDIMENT CONTROL MEASURES:
THE EROSION AND SEDIMENT CONTROLS PROPOSED ARE SHOWN ON THE EROSION AND
SEDIMENT CONTROL PLAN. ALL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED IN
ACCORDANCE WITH THE CURRENT STANDARDS AND SPECIFICATIONS OF THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK. A COPY OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK SHALL BE KEPT AVAILABLE ON SITE AT ALL TIMES.
1. SILT FENCE (SF), SPEC 3.05: SILT FENCE SHALL BE PROVIDED AS SHOWN TO
PREVENT SEDIMENT FROM LEAVING THE SITE.
2. INLET PROTECTION (IP), USDOT FHWA DETAIL E 157-04: INLET PROTECTION SHALL
BE PROVIDED FOR EXISTING INLETS AS SHOW ON THE PLANS.
MANAGEMENT STRATEGIES/SEQUENCE OF CONSTRUCTION:
1. CONTRACTOR SHALL FOLLOW ALL APPLICABLE EROSION AND SEDIMENT CONTROL
MINIMUM STANDARDS.
2. CONSTRUCTION WILL BE SEQUENCED SO THAT EACH WORK SEGMENT WILL BE
COMPLETED IN ONE WORK DAY.
3. INSPECT ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
TO ENSURE IT IS WORKING PROPERLY.
4. AFTER RECONSTRUCTION AND RESURFACING OF PAVEMENT, THE TEMPORARY
EROSION AND SEDIMENT CONTROLS SHALL BE CLEANED UP AND REMOVED.
PERMANENT STABILIZATION:
THE DISTURBED AREAS SHALL BE STABILIZED TO MATCH THE PRE-CONSTRUCTION
CONDITION. FOR GRASSY AREAS THE PROJECT SHALL USE SEED AND MULCH AND FOR THE
PAVED AREAS THE PROJECT SHALL USE ASPHALT CONCRETE TO PERMANENTLY STABILIZE.
MAINTENANCE OF ESC MEASURES:
THE ESC ,MEASURES ARE LIMITED TO INLET PROTECTION AND SILT FENCE FOR THIS
PROJECT. THERE WILL BE A FULL-TIME INSPECTOR ON-SITE TO ENSURE FUNCTIONING INLET
PROTECTION AND SILT FENCE AT ALL TIMES.
CALCULATIONS FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES:
NOT APPLICABLE. THERE ARE NO ESC MEASURES THAT REQUIRE CALCULATIONS FOR THIS
PROJECT.
STORMWATER MANAGEMENT CONSIDERATIONS:
NOT APPLICABLE. THERE WILL BE NO CHANGES TO THE EXISTING HYDROLOGY AND
HYDRAULICS OF THE PROJECT SITE.
SPECIFICATIONS/DETAIL DRAWINGS FOR EROSION AND SEDIMENT CONTROL MEASURES:
DETAILS ARE PROVIDED IN THIS PLAN SET.
SPECIFICATIONS FOR STORMWATER AND STORMWATER MANAGEMENT STRUCTURES:
NOT APPLICABLE. THIS ITEM IN NOT APPLICABLE AS THERE WILL BE NO STORMWATER
MANAGEMENT STRUCTURES USED IN THE PROJECT.
PROPERTY LINES AND EASEMENTS:
NOT APPLICABLE. ALL WORK SHALL BE DONE WITHIN THE LIMITS OF NATIONAL PARK SERVICE
AND THE PROJECT IS ONLY REPLACING NATIONAL PARK SERVICE PAVEMENT SECTION.
LIMITS OF CLEARING AND GRADING:
NOT APPLICABLE. THIS PROJECT DOES NOT INCLUDE ANY CLEARING AND GRADING.
PROTECTION OF AREAS NOT BEING CLEARED:
NOT APPLICABLE. THIS PROJECT DOES NOT INCLUDE ANY CLEARING AND GRADING.
EXISTING AND FINAL CONTOURS
NOT APPLICABLE. THE ELEVATION INFORMATION IS NOT SHOWN AS THERE WILL BE NO
CHANGE TO GRADE.
ADEQUATE CONVEYANCES:
NOT APPLICABLE. NO STORMWATER MANAGEMENT FACILITY WILL BE CONSTRUCTION TO BE
EVALUATED FOR CONVEYANCE ADEQUACY. THE INLET PROTECTION WILL ONLY BE USED
WHICH PROVIDES ADEQUATE STORMWATER CONVEYANCE THROUGH OUT THE PROJECT.
CALCULATIONS FOR PERMANENT STORMWATER CONVEYANCES:
NOT APPLICABLE. THERE WILL BE NO PERMANENT STORMWATER CONVEYANCE MEASURES
BUILT AS PART OF THIS PROJECT.
DIRECTION OF FLOW FOR CONVEYANCES:
NOT APPLICABLE. THE STORMWATER FLOW DIRECTION DOES NOT CHANGE AS PART OF THIS
PROJECT AND THE FLOW WILL BE TOWARDS THE EXISTING INLETS. THEREFORE, IT IS NOT
SHOWN ON THE PLANS.
STORM DRAIN PROFILES:
NOT APPLICABLE. THE SCOPE OF WORK IN THIS PROJECT DOES NOT INCLUDE ANY IMPACT
TO THE EXISTING STORMWATER CONVEYANCE SYSTEM. THEREFORE, STORM DRAIN
PROFILES ARE NOT DEPICTED ON THE PLANS.
00 50' 100'
N
NA
NBM
ARLINGTON VIRGINIA
C-203
EROSION AND SEDIMENT CONTROL NARRATIVE
TURKEY RUN PARK
NA
310527 AND
317902
REV 1 - E&SC 08-08-22
VESCH MINIMUM STANDARDS (MS-19)
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE
MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR
THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN
ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST
EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF
ARMORED BY NONERODIBLE COVER MATERIALS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE
MATERIAL SHALL BE PROVIDED.
14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
16.a. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
16.b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
16.c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.
16.d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
16.e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
16.f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO
INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO
PREVENT FURTHER EROSION AND SEDIMENTATION.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW
RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN
ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
1. CONTRACTOR SHALL APPLY TEMPORARY SEEDING OR OTHER TEMPORARY STABILIZATION TO ALL DENUDED
AREAS WHICH WILL REMAIN DORMANT FOR LINGER THAN 14 DAYS.
2. NOT APPLICABLE
3. NOT APPLICABLE.
4. CONTRACTOR SHALL ESTABLISH PERIMETER CONTROLS PRIOR TO ANY CONSTRUCTION ACTIVITY.
5. NOT APPLICABLE
6. NOT APPLICABLE
7. NOT APPLICABLE
8. NOT APPLICABLE
9. NOT APPLICABLE
10. CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING INLETS WITHIN THE LIMITS OF
DISTURBANCE PER DETAIL E157-04..
11. NOT APPLICABLE
12. NOT APPLICABLE
13. NOT APPLICABLE
14. NOT APPLICABLE
15. NOT APPLICABLE
16. NOT APPLICABLE
17. CONTRACTOR SHALL SWEEP THE ROAD DAILY WITHIN THE PROJECT AREA.
18. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES FOLLOWING
FINAL STABILIZATION AND PRIOR TO PROJECT CLOSE OUT.
19. NOT APPLICABLE
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
SEPARATION - STABILIZATION
GEOTEXTILE, CLASS 2, TYPE E
4-INCH OF TOP SOIL AND
TURF ESTABLISHMENT (TYP.)
8-INCH AGGREGATE BASE, GRADING C OR D (TYP.)
2-INCH GACP, 12" NMSA, 0.3 TO <3 MILLION ESAL (PLACE IN 1 LIFT) (TYP.), PG 64-22
2-INCH GACP, 3 8" NMSA, 0.3 TO <3 MILLION ESAL (TYPE IV PAVEMENT ROUGHNESS) (TYP.), PG 64-22
TACK COAT
SUBGRADE
8-INCH AGGREGATE BASE, GRADING C OR D
2-INCH GACP, 12" NMSA, 0.3 TO <3 MILLION ESAL (PLACE IN 1 LIFT), PG 64-22
2-INCH GACP, 12" NMSA, 0.3 TO <3 MILLION ESAL (PLACE IN 1 LIFT), PG 64-22
TACK COAT
SUBGRADE (TYP.)
6-INCH (NOTE 1)
GENERAL NOTES:
1. EXTEND AGGREGATE BASE BEYOND THE ASPHALT
PAVEMENT AS SHOWN ON THE DETAIL.
2. THE PROPOSED PAVEMENT MUST MATCH THE EXISTING
GRADES ALONG THE ROADWAY, SHOULDER, AND
PARKING LOT PROFILES AND CROSS SECTIONS.
3. ASPHALT PAVEMENT MILLING SHALL BE PER STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY SECTION 413.
EXISTING ASPHALT CONCRETE PAVEMENT
4.75-MM NOMINAL MAXIMUM SIZE
AGGREGATE, 3 4-INCH DEPTH (MIN.), PG 64-22
TACK COAT
2.00%2.00%
2.00% 2.00%
SUBGRADE
8-INCH AGGREGATE BASE, GRADING C OR D
FIRST LIFT (BINDER COURSE)
SECOND LIFT (SURFACE COURSE)
EXISTING
BASE
EXISTING ASPHALT
PAVEMENT SAW CUT AND
APPLY TACK COAT
18-INCH
SEPARATION - STABILIZATION
GEOTEXTILE, CLASS 2, TYPE E (TYP.)
SEPARATION - STABILIZATION
GEOTEXTILE, CLASS 2, TYPE E
NOTES:
1. CONTRACTOR MUST SEAL PAVEMENT CRACKS
ACCORDING TO DETAIL C3 BEFORE APPLYING DETAIL
E414-01.
EXISTING SUBGRADE
EXISTING BASE
EXISTING ASPHALT CONCRETE PAVEMENT
MILL 2" AND RESURFACE WITH 2-INCH GACP, 12"
NMSA, 0.3 TO <3 MILLION ESAL (PLACE IN 1 LIFT), PG
64-22
TACK COAT
EXISTING SUBGRADE
EXISTING BASE
EXISTING ASPHALT CONCRETE PAVEMENT
MILL 2" AND RESURFACE WITH 2-INCH GACP, 3 8"
NMSA, 0.3 TO <3 MILLION ESAL (TYPE IV PAVEMENT
ROUGHNESS) (TYP.), PG 64-22
TACK COAT
Scale: 1:1
SUPERELEVATED ROADWAY FULL-DEPTH REPAIR F3
Scale: 1:1
TYPE II PAVEMENT PRESERVATION TREATMENTC3
Scale: 1:1
NEW PAVEMENT TO EXISTING PAVEMENT JOINC7
Scale: 1:1
PARKING LOT FULL-DEPTH REPAIR D3
Scale: 1:1
CROWNED ROADWAY FULL-DEPTH REPAIR E3
NA
NBM
ARLINGTON VIRGINIA
C-301
TYPICAL CROSS SECTIONS
TURKEY RUN PARK
NA
310527 AND
317902
100% PLANS 06-14-21
Scale: 1:1
MILL AND RESURFACE - PARKING LOTD7
Scale: 1:1
MILL AND RESURFACE - ROADWAYE7
REV 2 09-20-222
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY DIVISION
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PM
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
GEORGE WASHINGTON MEMORIAL PARKWAY
AutoCAD SHX Text
NAT'L CAPITAL
AutoCAD SHX Text
PMIS:
AutoCAD SHX Text
STATUS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text F
1 ADDED SHEET ET 157-2
617-60
STANDARD
REG STATE PROJECT
SHEET NO.
REG STATE PROJECT
U.S. CUSTOMARY STANDARD
SHEET
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
STATE
SHEET
NO.
TOTAL
SHEETS
PROJECT
F
S ta n D r a w
\s t6
.d g n
U
S C u s to m a r y
S e p
:4
A
M
STANDARD APPROVED FOR USE 3/1990
REVISED: 4/1994 6/2005
STEEL-BACKED TIMBER GUARDRAIL
TYPE A & TYPE B
Attachment A USE FOR PAVEMENT MARKINGS AT THE USPP D2 PARKING LOT
| TURU-Plans-11x17 - FullSet - V4.pdf |
| TURU-Plans-11x17 - FullSet - V3 |
| TURU-Plans-11x17 - FullSet - V2 |
| TURU-Plans-11x17 - FullSet |
| Binder2 |
| _Binder1 |
| E157-04 - Fiber Roll |
| E414-01 - Crack Sealing |
| E609-01 - Curbs |
| E634-01 - Pavement Marking - Signs |
| E634-03 - Pavement Marking |
| E634-05 - Pavement Markings - Parking Lot |
| ET617-61 - SBT-FAT |
| ST61760 - SBTA |
| FLH Standard Drawings |
| (M)617-60: Steel-backed Timber Guardrail, Type A and Type B |
| US Customary |
ET635-06 - Lane Closure with Flaggers
Attachment 1 - 11X17
| COV-G-001.pdf |
| Sheets and Views |
| G-001 |
| G-101.pdf |
| Sheets and Views |
| G-101 |
| C-301.pdf |
| Sheets and Views |
| C-301 |
| C-102.pdf |
| Sheets and Views |
| C-102 |
| C-101.pdf |
| Sheets and Views |
| C-101 |
| C-203.pdf |
| Sheets and Views |
| C-203 |
| C-202.pdf |
| Sheets and Views |
| C-202 |
| C-201.pdf |
| Sheets and Views |
| C-201 |
| Region: |
| State: |
| Project: |
| 617-60t: |
| Sheets: |
| 617-60a: |
| State1: |
| Project1: |
| 617-60w: |
| State2: |
| Project2: |
| NPS: |
File details come from the government source that posted it. Updated .