This is a detailed pricing schedule for the USCGC KENNEBEC (WLIC-160B) Drydock Availability in FY2026, prepared by the US Coast Guard. The comprehensive spreadsheet contains 69 line items for various vessel maintenance and inspection services, including hull plating testing, propulsion shaft work, tank cleaning and preservation, rudder assembly services, and temporary support services. Each line item is structured with a unit price of $0.00, quantity of 1 job, and an extended price of $0.00, suggesting this is a preliminary or template pricing document.
The related federal contract opportunity is a solicitation (Number 70Z08525QIBCT0024) for a fixed firm-price definitive contract for a vessel homeported in Coast Guard District 5, Virginia. Key requirements include requesting drawings by 8 AM PST on 10 November 2025, coordinating site visits with specific Coast Guard personnel, and vendors must be certified by the Joint Certification Program to access export-controlled documents. Potential vendors must contact Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil for additional information, with the solicitation aimed at awarding the contract based on initial submissions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC KENNEBEC (WLIC-160B) DRYDOCK AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | $0.00 | JOB | 1 | $0.00 |
| D-002 | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | JOB | 1 | $0.00 |
| D-003 | Hull Plating, U/W Body, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-004 | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | JOB | 1 | $0.00 |
| D-005 | Hull Plating, Freeboard, Ultrasonic Testing | $0.00 | JOB | 1 | $0.00 |
| D-006 | U/W Body, Preserve, 100 percent | $0.00 | JOB | 1 | $0.00 |
| D-007 | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-008 | Appendages, U/W, Leak Test | $0.00 | JOB | 1 | $0.00 |
| D-009 | Propulsion Shaft Rope Guards, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-010 | Appendages, U/W, Internal, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-011 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-012 | Voids, Non-Accessible, Leak Test | $0.00 | JOB | 1 | $0.00 |
| D-013 | Voids, Non-Accessible, Internal Surfaces, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-014 | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-015 | Tanks, Potable Water, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-016 | Tanks, Ballast, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-017 | Propulsion Shaft Seals (Inflatable), Overhaul and Inflatable Renewal | $0.00 | JOB | 1 | $0.00 |
| D-018 | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-019 | Propulsion Shaft Coating, Renew | $0.00 | JOB | 1 | $0.00 |
| O-020 | Propulsion Shafting, Straighten | $0.00 | JOB | 1 | $0.00 |
| D-021 | Mechanical Shaft Seal Assemblies, Renew | $0.00 | JOB | 1 | $0.00 |
| D-022 | Propulsion Shafting, Optical or Laser Alignment Check | $0.00 | JOB | 1 | $0.00 |
| D-023 | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | JOB | 1 | $0.00 |
| D-024 | Propulsion Shaft Bearings, External, Renew | $0.00 | JOB | 1 | $0.00 |
| D-025 | Propulsion Stern Tube Bearings, Renew | $0.00 | JOB | 1 | $0.00 |
| D-026 | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-027 | Propeller s, Clean And Inspect | $0.00 | JOB | 1 | $0.00 |
| D-028 | Propeller s, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-029 | Propeller, Minor Repairs and Reconditioning, Perform | $0.00 | JOB | 1 | $0.00 |
| D-030 | Keel Coolers, Clean, Inspect and Hydro | $0.00 | JOB | 1 | $0.00 |
| D-031 | Fathometer Transducer, Renew | $0.00 | JOB | 1 | $0.00 |
| D-032 | Sea Strainers, Duplex, All Sizes, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-033 | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-034 | Rudders, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-035 | Rudder Stock Bearings Clearances, Check | $0.00 | JOB | 1 | $0.00 |
| D-036 | Rudder Stock Housing, Lower, Renew | $0.00 | JOB | 1 | $0.00 |
| D-037 | Rudder Stock Housing, Upper, Renew | $0.00 | JOB | 1 | $0.00 |
| D-038 | Rudder Stock, Rebuild | $0.00 | JOB | 1 | $0.00 |
| D-039 | Hull Fittings (Mooring and Towing), Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-040 | Spuds, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-041 | Spud Wells, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-042 | Spud Wells, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-043 | Sewage Holding Tanks, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| O-044 | Tanks (Sewage Holding), Preserve, Partial | $0.00 | JOB | 1 | $0.00 |
| O-045 | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 1 | $0.00 |
| O-046 | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 1 | $0.00 |
| O-047 | Accessible Void(s), Preserve, Partial, | $0.00 | JOB | 1 | $0.00 |
| O-048 | Tanks, MP Fuel Service, Preserve, Partial | $0.00 | JOB | 1 | $0.00 |
| O-049 | Tanks, MP Fuel Storage and Overflow, Preserve, Partial | $0.00 | JOB | 1 | $0.00 |
| O-050 | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 1 | $0.00 |
| D-051 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System | $0.00 | JOB | 1 | $0.00 |
| D-052 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | JOB | 1 | $0.00 |
| D-053 | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | JOB | 1 | $0.00 |
| D-054 | Drydock | $0.00 | JOB | 1 | $0.00 |
| D-055 | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 |
| D-056 | Temporary Messing and Berthing, Provide | $0.00 | JOB | 1 | $0.00 |
| D-057 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 |
| D-058 | Bilges, Inspect | $0.00 | JOB | 1 | $0.00 |
| O-059 | Bilges, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-060 | Boat Davit Winch, Shrink Wrap | $0.00 | JOB | 1 | $0.00 |
| D-061 | Buoy and Cargo Handling Crane, Shrink Wrap | $0.00 | JOB | 1 | $0.00 |
| D-062 | Compartment Insulation, General, Renew | $0.00 | JOB | 1 | $0.00 |
| D-063 | Piping Insulation, Renew | $0.00 | JOB | 1 | $0.00 |
| D-064 | System Piping, Renew | $0.00 | JOB | 1 | $0.00 |
| D-065 | Forward PW Tank Repair | $0.00 | JOB | 1 | $0.00 |
| D-066 | Deck Covering (Interior Wet/Dry), Renew | $0.00 | JOB | 1 | $0.00 |
| D-067 | Gooseneck Ventilation, Renew | $0.00 | JOB | 1 | $0.00 |
| D-068 | Deck Drain, Repair | $0.00 | JOB | 1 | $0.00 |
| D-069 | Stern Bulwark Repair | $0.00 | JOB | 1 | $0.00 |
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $500.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
(6/23/2025)_x000D_ Draft-3 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate