- AV Equipment Upgrade for Split Conference Rooms
- Solicitation number
- N6426726Q5012
About this file
This document is a Government Furnished Equipment (GFE) and Contractor Furnished Equipment (CFE) list for Team Submarine Conference Room Upgrades under the Program Executive Office Command, Launch and Sustained Support (PEO CLB) TANC Split project, Revision 17, dated July 20, 2026.
The document specifies upgrades for two conference rooms (4W-334 and 4W-333) located in Building 201 at the Warship Nautical Yard (WNY). Both rooms currently support NGEN/Leidos x015AX Dual 65" self-contained classified IP VTC with Crestron UC-SB1-CAM web camera capability. The GFE inventory to be retained and reused includes one Samsung QB85N-N 85" Large Screen Display and one Belkin F1DN104MOD-BA-4 KVM switch with host and console cables per room. The CFE items to be procured and installed include one Samsung QB65N-N 65" Large Screen Display, one Crestron DMPS3-4K-350-C digital media processor, one Crestron TS-1070-GV-B-S touch screen, one Crestron UC-SB1-CAM webcam, one 19" half-rack equipment cabinet (21 RU), three JBL Control 26CT speakers, one Surge X SEQ-1U power sequencer, installation hardware package (per SOW 3.1.1), and custom "Meeting in Progress" signage (per SOW 3.9) for each room. The integrator is responsible for complete installation and integration of all conference room components including audio, video, control systems, and supporting infrastructure while retaining the existing Belkin KVM switch.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1. Team Submarine Conference Room Upgrades - PEO CLB TANC Split GFE-CFE Lists and Summary of Upgrades Rev 17
Room
Count
WNY
Building Room
VTC/Web Conferencing
Support Reused Equipment (GFE) List New Equipment (CFE) List Summary of Integrator Upgrades
1 201 4W-334
NGEN/Leidos x015AX Dual
65" Self-contained Classified
IP VTC. Crestron UC-SB1-
CAM Web Cam.
1 - Samsung QB85N-N 85" LSD
(BNE), 1 - Belkin F1DN104MOD-BA-
4 with host and console cables
1 - Samsung QB65N-N 65" LSD (BNE) 1 -
Crestron DMPS3-4K-350-C (BN) 1 -
Crestron TS-1070-GV-B-S (BN) 1 -
Crestron UC-SB1-CAM (BNE) 1 - 19" Half-rack equipment cabinet, 21 RU 3 - JBL
Control 26CT (BNE) 1 - Surge X SEQ-1U
(BNE) 1 - Installation Hardware Package
(SOW 3.1.1) 1 - Custom "Meeting in
Progress" signage (SOW 3.9)
Integrator: Install integrated conference room including Crestron DMPS3 and TS-1070, Surge X SEQ-1U, 19" Half-rack equipment cabinet 21 RU, JBL Control 26CT, 65" and 85" class large screen displays, Crestron UC-SB1-CAM below 85" class LSD, and Custom
"Meeting in Progress" signage using the Installation Hardware Package. Retain and reuse one Belkin F1DN104MOD-BA-4 with host and console cables.
2 201 4W-333
NGEN/Leidos x015AX Dual
65" Self-contained Classified
IP VTC. Crestron UC-SB1-
CAM Web Cam.
1 - Samsung QB85N-N 85" LSD
(BNE), 1 - Belkin F1DN104MOD-BA-4 with host and console cables
1 - Samsung QB65N-N 65" LSD (BNE) 1 -
Crestron DMPS3-4K-350-C (BN) 1 -
Crestron TS-1070-GV-B-S (BN) 1 -
Crestron UC-SB1-CAM (BNE) 1 - 19" Half-rack equipment cabinet, 21 RU 3 - JBL
Control 26CT (BNE) 1 - Surge X SEQ-1U
(BNE) 1 - Installation Hardware Package
(SOW 3.1.1) 1 - Custom "Meeting in
Progress" signage (SOW 3.9)
Integrator: Install integrated conference room including Crestron DMPS3 and TS-1070, one Surge X SEQ-1U, 19" Half-rack equipment cabinet 21 RU, JBL Control 26CT, 65" and 85" class large screen displays, Crestron UC-SB1-CAM below 85" class LSD, and Custom
"Meeting in Progress" signage using the Installation Hardware Package. Retain and reuse one Belkin F1DN104MOD-BA-4 with host and console cables.