This is a Statement of Work for construction services to renovate Building 6403, an Arthropod Quarantine (AQ) Facility at Moore Air Base in Edinburg, Texas. The facility is a high-security containment lab operated by USDA-APHIS-PPQ that supports biological control programs, insect strain development, and invasive species testing. The scope includes major renovation and upgrades to mechanical, electrical, and plumbing systems, as well as interior finish improvements across multiple functional areas including laboratories, environmental growth chambers, greenhouses, decontamination facilities, and support spaces.
The contractor shall furnish all labor, materials, and equipment required to execute work per design documents prepared by Coffman Engineers dated October 17, 2025. Preconstruction services include attending a pre-bid meeting, conducting field investigation and site survey, submitting itemized proposals with construction schedules for base bid and alternates, participating in post-award meetings, and providing shop drawings and submittals for approval. Construction phase services require participation in progress meetings, two-week look-ahead and look-back schedules with progress photos, code compliance analysis, regular submittal documentation, compliance with all applicable federal, state, and local building codes and environmental regulations, and training for facility users. The contractor must submit a code analysis addressing occupancy classifications, fire resistance ratings, egress, fire suppression systems, structural and seismic design, and sediment/erosion control. The project schedule requires 14 days for shop drawing review, 5 days notice to proceed, 120 days for construction, and 14 days for closeout. Key project contacts include Contracting Officer Jim Roloff, Engineering Project Manager Gordon Limbaugh, and Facility Manager Gabriel Lopez. All submittals must be distributed electronically to the contracting officer, facility manager, designer of record, engineering project manager, and plant protection and quarantine representatives. The project must coordinate with other ongoing construction at Moore Air Base, including NWS facility development and hangar repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0184-0005.pdf | ||
| Attachment 2 to addendum 3_specs.pdf | ||
| Attachment 1 to addendum 3_dwgs.pdf | ||
| 12639526Q0184-0004.pdf | ||
| First asbestos test results.pdf | ||
| A04_Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184-0003.pdf | ||
| Attachment 2 to Addendum 2_drawings.pdf | ||
| USDA Building 6403 RFI Log.xlsx | XLSX spreadsheet | |
| Attachment 1 to Addendum 2_specs.pdf | ||
| 12639526Q0184-0002.pdf | ||
| RFIs and Responses.docx | DOCX document | |
| USDA_Building_6403_RFI_Log.xlsx | XLSX spreadsheet | |
| 12639526Q0184-0001.pdf | ||
| Attachemnt 2 to Addendum 1_Specs.pdf | ||
| Attachment 1 to Addendum 1_Drawings.pdf | ||
| 6403 Bldg Ronovation Walkthrough Sign In Sheet.pdf | ||
| Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184.docx | DOCX document | |
| Attachment 4_Federal Construction Wage Rates_Hidalgo County.txt | TXT text file | |
| Attachment 2_Specifications.pdf | ||
| Attachment 3_Drawings.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
For
Construction Services Renovate Building 6403 Containment Lab at Moore Air Base June 24, 2026
1.0 CONTRACT PROJECT:
1.1 Title: Renovation of building 6403 Moore Air Base
1.2 Location: USDA-APHIS-PPQ Containment Lab
Building 6403
22675 N Moorefield Rd.
Moore Air Base
Edinburg, TX 78541
1.3 Project Background: The Science and Technology (S&T) Mission Lab’s Arthropod Quarantine (AQ) Facility is a high security containment facility intended to support biological control programs, new insect strain developments, and invasive species testing. The facility consists of an AQ office, receiving lab, identification lab, three laboratories, three main hallways, twelve walk-in environmental growth chambers (EGCs), two EGC walkways, a headhouse/potting area adjacent to five separately controlled greenhouses, extended greenhouse foyer, a pot and clothing washing area, storage area, lunchroom, emergency exit room, secured-access exterior autoclave room, interior autoclave room, separate male & female dressing rooms with showers, bathrooms, ante-room, sign-in room, and foyer. The facility needs major renovation. The project will upgrade mechanical, electrical, and plumbing systems and refresh interior finishes.
1.4 Project Description: Contractor shall furnish and install all labor, materials, and equipment to perform all work stated in the final contract documents prepared by Coffman Engineers: drawings, dated October 17, 2025, and specifications, dated October 17, 2025.
1.5 Project Data: The following information and design criteria are available for the contractor’s use and compliance:
· Design Documents (Drawings and Specifications) prepared by Coffman Engineers, dated October 17, 2025.
· APHIS 5170.1 APHIS Policy for Planning, Designing, and Constructing Modernized Laboratory Facilities https://www.aphis.usda.gov/sites/default/files/aphis-5170-1-laboratory-design-guidelines.pdf
· ARS Facilities Design Standards http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf
· Executive Order (EO) 13717 – Establishing a Federal Earthquake Risk Management Standard:
http://www.nehrp.gov/pdf/EO13717.pdf
· APHIS Environmental Protection Program:
http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf
· Advanced Metering (all utility meters, water, gas, steam, electricity, etc.)
http://energy.gov/eere/femp/downloads/federal-building-metering-guidance-usc-8253e-metering-energy-use
· Preferred Biobased Products found at http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx
· Recommended Recycled-Content Construction Material found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct
· Designated Green Products for Federal Procurement (see separate Excel Spreadsheet: All_Green_Products_07-09.xls).
· USDA Green Purchasing Affirmative Procurement Program: http://greening.usda.gov/gpapp08.pdf
· USDA Sustainable Buildings Implementation Plan http://www.dm.usda.gov/emd/docs/SustainableBuildingsImpPlan.pdf
1.6 Attachments to this Statement of Work: The following attachments are provided for the Contractor’s use and compliance:
· USDA Guidance on Electric Metering.pdf
· All_Green_Products_07-09.xls
· USDA Sustainable Building Implementation Plan
· 2025.10.17 FTO Design Manual
· 2025.10.17 FTO Drawings
2.0 PROJECT CONTACTS:
2.1 Contracting Officer (CO):
Jim Roloff
USDA, APHIS, ASD
250 Marquette Ave
Minneapolis, MN 55401-2329
Tel. No.: 612-336-3223
James.G.Roloff@usda.gov
2.2 Engineering Project Manager (EPM):
Gordon Limbaugh
USDA, APHIS, ASD, ESB
1400 Independence Ave Suite 2616-A
SW Washington DC 20250
Cell: 202-652-5692 gordon.limbaugh@usda.gov
2.3 APHIS PPQ Facilities Manager (FM):
Gabriel Lopez
USDA APHIS PPQ – Moore Air Base
22675 N. Moorefield Rd, Bldg 6407
Edinburg, TX 78541
Phone: 956-205-7608
Cell: 956-207-9594 gabriel.lopez@usda.gov
2.4 Designer of Record (DOR), Coffman Engineers:
Traci Hanegan
Coffman Engineers
10 N. Post Street, Suite 500
Spokane, WA, 99201
509-328-2994 traci.hanegan@coffman.com
2.5 Program Project Manager (PPM) for Moore Air Base:
Ralph “Randy” O’Neal
Facility Operations Specialist
USDA, APHIS, PPQ Field Operations Raleigh, North Carolina 27606
Office (919) 855-7363
Mobile (919) 559-6152
Email: Ralph.w.oneal@usda.gov 2.6 PPQ Safety & Occupational Health Specialist
Heather Schneider
Safety and Occupational Health Manager
USDA APHIS PPQ Field Operations
2150 Centre Ave. Bldg. B
Fort Collins, CO 80526
Office: 970-494-7090
Cell: 970-291-1615
Email: Heather.Schneider@usda.gov 2.7 PPQ Supervisory Maintenance Mechanic Javier Caltzontzint
USDA, APHIS, PPQ FO
22675 North Moorefield Rd, Bldg 6415
Edinburg, TX 78541
Phone: 956-205-7734
Cell: 956-330-1145 javier.caltzontzint@usda.gov 2.8 PPQ Project Manager (PM):
Mandy Radloff
Program Specialist
608-479-1824 mandy.radloff@usda.gov
3.0 SCOPE OF SERVICES:
3.1 Preconstruction Phase Services: The Contractor shall provide all professional services necessary for the accomplishment of the contract project as described in this Statement of Work and per the Design Documents developed by Coffman Engineers. If clarification is required for items identified in this SOW and per the Design Documents, it should be brought to the attention of EPM. The Contractor shall provide Preconstruction Phase Services for the following tasks marked by an "X".
[X] Participate in the Pre-Bid Meeting at the construction site. Date TBD
[X] Participate in Field Investigation and Site Survey to confirm existing conditions.
[X] Provide an itemized proposal and proposed construction schedule for the base bid and add alternates.
[X] Participate in the post award meeting.
[X] Provide shop drawings, product data submittals, QC and Safety Plan submission for review and approval
[X] Provide submittal register for review and approval
3.2 Construction Phase Services: Construction Services shall be performed strictly as required by the rules, regulations, standards, codes, ordinances and laws of Local, State and Federal Governments and all other authorities that have legal jurisdiction over the site.
[X] Participate in construction progress meetings with the Project Team.
[X] Notify the CO, COR, PPM and EPM two weeks prior to final inspection for coordination.
[X] Record deficiencies during final inspection and provide Punch List to COR, DOR and EPM.
[X] Obtain warranties and turn over to CO.
[X] Provide training to users per the specifications.
[X] Provide written certification to the CO that the project was constructed in compliance with design documents and is ready for final acceptance.
[X] Transfer as-built information to record CADD drawings and PDF format.
Furnish record drawings and specifications as follows:
Two half size sets of prints and electronic files to FM, PPM and EPM.
4.0 OTHER PROJECT REQUIREMENTS:
4.1 Field Investigation and Site Survey: The contractor shall coordinate, schedule, and conduct site investigations with the PPQ FM.
4.2 Compliance with Building Codes: In accordance with Public Law 100-678, Federal Agencies must comply with National Building Codes, Local Building Codes, and Zoning Ordinances.
4.3 Code Analysis: The Contractor shall submit a code analysis indicating compliance with applicable codes and environmental permitting. The topics for the code analysis are applicable codes, occupancy classifications, type of construction, fire resistance ratings, interior finishes, flame spread, and smoke develop ratings, egress, fire suppression, fire detection and alarm systems, combustible and flammable liquids, compressed gas storage, structural live loads and dead loads, wind loads, seismic design, frost depth, and sediment/erosion control.
4.4 Submittals: The Contractor shall provide product data submittals including manufacturing specifications to the CO for distribution to the DOR, EPM, COR and CIC for review and approval prior to incurring costs.
4.5 Regular Progress Meetings: Regular Progress Meetings: USDA will hold regular progress meetings (cadence to be determined) to track construction progress. The Contractor shall be in attendance and shall prepare a two-week look ahead and two-week look back along with progress photos for each progress meeting.
4.6 Meeting Minutes for meeting other than Biweekly Progress Meetings: The Contractor shall document and distribute all project meeting minutes. A copy of all meeting minutes shall be included in each progress submission. The meeting minutes need only record the date, time, location, attendees, major issues discussed, and conclusions reached.
4.7 Construction Scheduling Requirements: The contractor shall ensure that their work does not interfere with any other ongoing construction at Moore Air Base. There is expected to be construction on the new NWS production facility at the north end of Moore Air Base, and addons to the NWS dispersal facility on the south end, as well as hangar repairs and support infrastructure for the NWS construction.
4.8 Cost Proposal and Schedule: Based upon this SOW, the Contractor shall prepare an itemized proposal, reflecting a complete breakdown of prices to complete this project. A lump sum proposal without the required breakout is unacceptable.
5.0 PROJECT SCHEDULE SUBMITTAL: The schedule provided indicates project requirements for each submission and review stage. It is provided for negotiation with the Contractor for setting contract time requirements for meeting contract submissions and construction deadlines. A minimum of 10 working days for review time will be required by the Government.
(Working days)
Shop Drawings, Product Data Submittals
14 days
Notice to Proceed for Construction within 5 days
Construction Period
120 days
Close out/ Warranty
14 days
6.0 SUBMITTAL DISTRIBUTION:
Itemized Proposal and Schedule for Base Bid and Add Alternates (Electronic)
Contracting Officer (Jim Roloff):
Product Data Submittals and Shop Drawings (Electronic)
Contracting Officer (Jim Roloff)
Facility Manager/COR (Gabriel Lopez)
Designer of Record (Coffman Engineers)
Engineering Project Manager (Gordon Limbaugh)
Plant Protection & Quarantine (Randy O’Neil)
Warranty and Final Closeout Documents (Electronic)
Contracting Officer (Jim Roloff)
Facility Manager/COR (Gabriel Lopez)
Designer of Record (Coffman Engineers)
Engineering Project Manager (Gordon Limbaugh)
Plant Protection & Quarantine (Randy O’Neil)
PAGE
File details come from the government source that posted it. Updated .