This document contains mechanical schedules for USDA/APHIS Containment Facility Building 6403 at Moore Air Base, Edinburg, Texas (Coffman Project #212431). The schedules detail specifications for HVAC equipment, controls, and related systems required for the facility's operation.
Air handling units (AHU-5 through AHU-12) manufactured by Enviro-Tec are specified with varying capacities ranging from 800 to 1,000 CFM, featuring 208V single-phase motors, cooling coils with 4-6 rows at 10-12 FPI, and stainless steel condensate pans with MERV 13 filters. An energy recovery ventilator (ERV-1) by Greenheck with 2,230-3,230 CFM supply capacity includes heat recovery core, chilled water cooling, electric resistance heating, and dehumidification capabilities. Exhaust fans (EF-3 through EF-12) provide general and specialty exhaust functions including fume hood exhaust (1,200 CFM at 4 inches WC), ranging from 1/10 to 3 HP motors at 120V or 208V. Two identical York air-cooled chillers (CHLR-1 and CHLR-2) each provide 67.25 tons of cooling capacity with 236.5 kW output, using R454B refrigerant with dual independent circuits, 208V three-phase power at 424 MCA, and integrated condenser controls. A Fulton steam boiler (B-1) rated for 100-600 MBh input provides 200 lb/hr steam output at 80 PSI for autoclave and lab operations. Four chilled water pumps (CHWP-1 through CHWP-4) including redundant secondary loop pumps operate at 100 GPM with 12% propylene glycol. Glycol feeder (GF-1), expansion tank (ET-1), buffer tank (BT-1), and air separator (AS-1) support the chilled water system. Air control valves (SCV-1 through SCV-7 and ECV-1 through ECV-7) with fast-acting actuators maintain room pressurization for laboratory and autoclave spaces. All equipment includes electrical requirements, unit weights, and manufacturer specifications; seismic design category is A with importance factor 1.0. Vibration control requirements and flexible connections are noted for rotating equipment and vibration-sensitive units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0184-0005.pdf | ||
| Attachment 2 to addendum 3_specs.pdf | ||
| Attachment 1 to addendum 3_dwgs.pdf | ||
| 12639526Q0184-0004.pdf | ||
| First asbestos test results.pdf | ||
| A04_Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184-0003.pdf | ||
| USDA Building 6403 RFI Log.xlsx | XLSX spreadsheet | |
| Attachment 1 to Addendum 2_specs.pdf | ||
| 12639526Q0184-0002.pdf | ||
| RFIs and Responses.docx | DOCX document | |
| USDA_Building_6403_RFI_Log.xlsx | XLSX spreadsheet | |
| 12639526Q0184-0001.pdf | ||
| Attachemnt 2 to Addendum 1_Specs.pdf | ||
| Attachment 1 to Addendum 1_Drawings.pdf | ||
| 6403 Bldg Ronovation Walkthrough Sign In Sheet.pdf | ||
| Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184.docx | DOCX document | |
| Attachment 4_Federal Construction Wage Rates_Hidalgo County.txt | TXT text file | |
| Attachment 2_Specifications.pdf | ||
| Attachment 3_Drawings.pdf | ||
| Attachment 1_Statement of Work.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR HANDLING UNIT SCHEDULE
TAG
MANUFACTURER/
MODEL
SUPPLY FAN DUCT HEATER COOLING COIL
UNIT POWER REQMTS UNIT
WT.
(LBS)
REMARKSCOOLING
CFM
MIN OA
CFM
ESP
("WC)
TSP
("WC)
MOTOR DATA
TOTAL KW
POWER REQMTS
FLUID
TOTAL
MBh
SENS.
MBh
ROWS/
FPI
EAT (F) LAT (F) APD
(IN WC)
FLOW
(GPM)
EWT
(F)
LWT
(F)
WPD
(FT)HP RPM FLA VOLTS Ø DB WB DB WB VOLTS Ø MCA MOCP
AHU-5
ENVIRO-TEC/
CDVB16
800 155 .5 - (2) 1/3 - 5.6 5 208 1 12% PG 36 18 4/12 78 67 52.0 51.6 - 5.2 40 55 5.23 208 1 37 40 192 1, 2, 3, 5
AHU-6
ENVIRO-TEC/
CDVB16
1000 260 .5 - (2) 1/3 - 5.6 5 208 1 12% PG 36 18 4/10 77 64 51.9 50.9 - 5.3 40 55 11.75 208 1 37 40 192 1, 2, 3, 5
AHU-7
ENVIRO-TEC/
CDVB10
850 150 .5 - 1/3 - 2.8 3 208 1 12% PG 18 12 4/10 76 62 56.4 53.9 - 2.8 40 55 3.31 208 1 33.6 35 147 1, 2, 3, 5
AHU-8
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-9
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-10
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-11
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-12
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
1. CONDENSATE PAN SHALL BE STAINLESS STEEL, CONDENSATE SHALL BE ROUTED TO NEAREST FLOOR DRAIN.
2. UNIT SHALL HAVE 2" MERV 13 FILTERS.
3. UNIT IS VERTICAL AIR HANDLING UNIT.
4. (NOT USED).
5. CONNECT OUTSIDE AIR DUCTWORK INTO RETURN AS SHOWN ON PLANS. BALANCE OUTSIDE AIR DAMPER TO MATCH MIN OA CFM LISTED IN THE SCHEDULE.
ENERGY RECOVERY VENTILATOR
TAG LOCATION SERVES
MANUFACTURER/
MODEL
SUPPLY FAN EXHAUST FAN ENERGY RECOVERY MODULE DUCT HEATER COOLING COIL UNIT ELECTRICAL
REQUIREMENTS
SUPPLY AIR FILTERS
SIZE (WxLxH)
UNIT
WT.
(LBS)
REMARKS
TOTAL CFM ESP
(IN. WC)
MOTOR DATA
TOTAL CFM ESP
(" WC)
MOTOR DATA SUMMER WINTER
CAPACITY
(KW)
EAT
(°F)
LAT
(°F)
FLUID
TOTAL
CAPACITY
(MBH)
SENS.
CAPACITY
(MBH)
EWT
(°F)
LWT
(°F)
FLOW
(GPM)
EAT
DB/WB
(°F)
LAT
DB/WB
(°F)
BHP HP RPM DRIVE BHP HP RPM DRIVE OAT
DB/WB (°F)
LAT
DB/WB (°F)
TOTAL
EFF %
OAT
DB (°F)
LAT
DB (°F)
TOTAL
EFF %
VOLTS Ø MCA MOCP # TYPE SIZE (IN)
ERV-1 OUTSIDE LAB/AUTOCLAVE AIR
GREENHECK/
RVC-65-PH-CW-1-A1
2230-3230 3.5 4.80 5 1750 DIRECT 1990-2790 2.5 1.80 3 1165 DIRECT 82.9/78.9 78.2/72.3 73.5 36.5 43.8 80 28.7 51.8 77 12% PG 287.5 126.3 40 55 39.2 78.2/72.3 46.5/46.5 208 3 129 150 2 (1) MERV 8
(1) MERV 13
16x20x2 68"x197"x73" 4175 1,2,3
1. 100% OUTSIDE AIR AND EXHAUST UNIT WITH HEAT RECOVERY CORE.
2. UNIT TO BE SUPPLIED WITH CHILLED WATER COOLING AND ELECTRIC RESISTANCE HEATING.
3. UNIT TO BE SUPPLIED WITH DEHUMIDIFICATION CAPABILITIES.
4. EXHAUST FILTERS NOT INTEGRAL TO UNIT. SEE FILTER HOUSING SCHEDULE.
5. UNIT INLET AND OUTLET CONNECTIONS SHALL MATCH LOCATIONS SHOWN ON DRAWINGS.
SPECIALTY EXHAUST LABORATORY EQUIPMENT CONNECTION SCHEDULE
TAG EQUIPMENT SERVES SERVED BY MANUFACTURER / MODEL LENGTH (FT) TYPE EXHAUST
CONN. (IN)
S.P. AT COLLAR
(IN. WG.)
DESIGN CFM SASH
OPENING (IN)
UNIT POWER
REQUIREMENTS REMARKS
VOLTS Ø FLA
FH-1 FUME HOOD LAB #1 EF-12 BY OTHERS - - - - 1180 - - - - 1,2
1. NEW FUME HOOD PROVIDED BY OWNER AND INSTALLED BY DIVISION 23 CONTRACTOR.
2. THE LOCAL APHIS PROGRAM WILL HIRE THE FUME HOOD CERTIFIER. G.C. TO COORDINATE WITH THE SCHEDULE.
FAN SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
DESCRIPTION FAN PERFORMANCE MOTOR ELECTRICAL
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKS
TYPE DRIVE FLOW
(CFM)
ESP
(" WC)
SPEED
(RPM)
NOISE
(SONES)
BHP
HP VOLTS Ø FLA
EF-3
GREEN HOUSE
GENERAL EXHAUST
GREENHECK/
SQ-140HP-VG
IN LINE
CENTRIFUGAL
DIRECT 500 2 2200 15.9 0.40 1 120 1 10.40 68 1, 2, 3
EF-4
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-5
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-6
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-7
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-8
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-9 ELEC. ROOM
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 300 0.25 1059 4.3 0.02 1/10 120 1 1.38 64 1, 2
EF-10 BOILER ROOM
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 300 0.25 1059 4.3 0.02 1/10 120 1 1.38 64 1, 2
EF-11
AUTO CLAVE
& VH-1
GREENHECK/
USF-6
UTILITY UP
BLAST
DIRECT 600 2 2319 16.9 0.34 1/2 120 1 - 133 1, 2
EF-12 FUME HOOD
GREENHECK/
VEKTOR-H-12
FUME
EXHAUST
DIRECT 1200 4 3571 - 1.65 3 208 3 - 485 2, 4, 5
1. PROVIDE FAN WITH MOTORIZED DAMPER FOR INSTALLATION AT BUILDING ENVELOPE.
2. PROVIDE WITH 0-10VDC CONTROL MODULE.
3. PROVIDE ROOF CAP FOR EXTERIOR PENETRATION. SEE ROOF CAP SCHEDULE.
4. FAN TO BE LINKED TO SWITCH ON FUME HOOD (FH-1). FAN TO BE ENERGIZED WHEN FUME HOOD IS TURNED ON.
5. FAN TO BE SELECTED WITH SIDE WALL INLET.
DIFFUSER AND GRILLE SCHEDULE
TAG SYSTEM MFR MODEL MATERIAL DESCRIPTION FACE SIZE
(IN)
NECK
SIZE (IN)
MAX CFM REMARKS
1S SUPPLY AIR PRICE SCD STEEL T-BAR MOUNTED SQUARE DIFFUSER 24x24 8Ø 280 1,3
2S SUPPLY AIR PRICE SCD STEEL SURFACE MOUNTED SQUARE DIFFUSER 12x12 8Ø 250 2,3
3S SUPPLY AIR PRICE ASCD ALUM. SURFACE MOUNTED SQUARE DIFFUSER 12x12 8Ø 250 2,3
4S NOT USED
5S SUPPLY AIR PRICE 510 STEEL SURFACE MOUNTED RECTANGULAR DIFFUSER 8x6 8x6 180 2,3
6S SUPPLY AIR PRICE 510 STEEL SURFACE MOUNTED RECTANGULAR DIFFUSER 12x8 12x8 400 2,3
7S SUPPLY AIR PRICE 510 STEEL SURFACE MOUNTED RECTANGULAR DIFFUSER 20x16 20x16 1040 2,3
1R RETURN AIR PRICE 530 STEEL T-BAR MOUNTED RECTANGULAR GRILLE 24x12 24x12 535 1,3
2R RETURN AIR PRICE 530 STEEL SURFACE MOUNTED SQUARE GRILLE 12x12 12x12 240 2,3
3R RETURN AIR PRICE 530 STEEL SURFACE MOUNTED SQUARE GRILLE 24x16 24x16 1000 2,3
1E EXHAUST AIR PRICE 530 STEEL T-BAR MOUNTED RECTANGULAR GRILLE 24x12 24x12 530 1,3
2E EXHAUST AIR PRICE 530 STEEL SURFACE MOUNTED RECTANGULAR GRILLE 8x8 8x8 130 2,3
3E EXHAUST AIR PRICE 530 STEEL SURFACE MOUNTED RECTANGULAR GRILLE 16x12 16x12 475 2,3
4E EXHAUST AIR PRICE 530 STEEL SURFACE MOUNTED RECTANGULAR GRILLE 18x14 18x14 640 2,3
5E EXHAUST AIR PRICE 530 STEEL SURFACE MOUNTED RECTANGULAR GRILLE 24x16 24x16 1000 2,3
6E EXHAUST AIR PRICE 630 ALUM. SURFACE MOUNTED SQUARE GRILLE 8x8 8x8 160 2,3
7E EXHAUST AIR PRICE 630 ALUM. SURFACE MOUNTED SQUARE GRILLE 12x12 12x12 360 2,3
1. LAY-IN BORDER TYPE FOR T-BAR CEILING.
2. SURFACE MOUNT BORDER TYPE FOR HARD-LID CEILING OR DIRECT DUCT MOUNTING.
3. PROVIDE GRILLE/DIFFUSER WITH FILTER FRAME. CONTRACTOR TO FIELD INSTALL MESH 80 SCREEN ON GRILLE/DIFFUSER.
ROOF HOOD SCHEDULE
TAG LOCATION SERVES MANUFACTURER/MODEL TYPE AIRFLOW
(CFM)
THROAT SIZE
(IN)
THROAT AREA
(SF)
THROAT
VELOCITY
(FPM)
PRESS
DROP
(IN WC)
UNIT
WT.
(LBS)
REMARKS
RC-5 ROOF AHU-5
GREENHECK/
GRSI
INTAKE 155 8 0.37 419 0.028 7 1
RC-6 ROOF AHU-6
GREENHECK/
GRSI
INTAKE 260 8 0.37 703 0.028 7 1
RC-7 ROOF AHU-7
GREENHECK/
GRSI
INTAKE 150 8 0.37 405 0.028 7 1
RC-8 ROOF AHU-8
GREENHECK/
GRSI
INTAKE 100 8 0.37 270 0.013 7 1
1. PROVIDE ROOF CAP WITH INSECT SCREEN.
2. PROVIDE ROOF CAP WITH GPF ROOF CURB OR EQUIVALENT.
VENTILATION HOOD SCHEDULE
TAG MFR
EXHAUST
MODEL
LENGTH WIDTH HEIGHT
CFM
VELOCITY MOUNTING HOOD VENT OUTLET OUTLET WEIGHT
FUNCTION (IN) (IN) (IN) (FPM) HEIGHT MATERIAL MATERIAL LOCATION SIZE (LBS) NOTES
VH-1 GREENHECK TYPE II HOOD GD1 48 18 12 300 50 84" 430 STAINLESS STEEL SINGLE WALL SS TOP 12" RND 70 1
1. PROVIDE WITH CONDENSATE DRAIN ON LEFT SIDE AND 3" REAR AIR SPACE.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:3
:0
P
M
10/17/2025
PJTM
DJP
212431
M-701
MECHANICAL
SCHEDULES
FINAL TURNOVER
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
2 08/19/26 ADDENDUM #2
10-14-25
AIR-COOLED CHILLER SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
COMPRESSOR CAPACITY
CIRCUIT
COND.
TEMP.
FLUID FLOW
(GPM)
EWT
(F)
LWT
(F)
WPD
(FT)
EER
KW/
TON
AMBIENT
(F)
REF.
UNIT
WT.
(LBS)
SIZE
LxWxH
UNIT POWER REQUIREMENTS
REMARKS
QUANTITY TYPE COOLING
(TONS)
OUTPUT
(kW) VOLTS Ø MCA MOCP
CHLR-1 OUTSIDE
BLDG 6403 AIR
HANDLING UNITS
YORK/
YLAA0089SJ17XF
6 SCROLL 67.25 236.5 2 140 12% PG 100 55 40 7.18 7.3 1.541 112 R454B 4,517 116"x89"x90" 208 3 424 450 1-11
CHLR-2 OUTSIDE
BLDG 6403 AIR
HANDLING UNITS
YORK/
YLAA0089SJ17XF
6 SCROLL 67.25 236.5 2 140 12% PG 100 55 40 7.18 7.3 1.541 112 R454B 4,517 116"x89"x90" 208 3 424 450 1-11
1. PROVIDE WITH UNIT MOUNTED REPLACEABLE CORE FILTER DRIERS AND MOISTURE SENSORS (SIGHT GLASS) FOR EACH CIRCUIT.
2. PROVIDE INTEGRATED CONDENSER CONTROLS WITH ABILITY TO CYCLE UP TO 7 INDIVIDUAL CONDENSER FANS ON EACH REFRIGERATION CIRCUIT.
3. PROVIDE INTEGRATED AMBIENT AIR TEMPERATURE MONITORING AND FLOATING HEAD PRESSURE CONTROLS BASED ON INDIVIDUAL FAN CYCLING.
4. PROVIDE FACTORY-INSTALLED LOW AND HIGH SIDE OVER PRESSURE RELIEF VALVES.
5. PROVIDE WITH MINIMUM LOADING CONTROL DOWN TO 10% CAPACITY.
6. PROVIDE WITH SUCTION SERVICE VALVES.
7. PROVIDE WITH NON-FUSED DISCONNECT.
8. PROVIDE WITH BACNET COMMUNICATION OPTION.
9. PROVIDE WITH CHILLED WATER FLOW SWITCH.
10. PRIMARY PUMPS ARE SEPERATE FROM CHILLER AND SHOWN ON PUMP SCHEDULE.
11. PROVIDE WITH TWO INDEPENDENT REFRIGERANT CIRCUITS.
STEAM BOILER SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
MIN.
INPUT
(MBh)
MAX.
INPUT
(MBh)
REQ'D
OUTPUT
(lb/hr)
CONNECTIONS (IN) GAS INLET
SUPPLY
(IN WC)
UNIT POWER
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKS
WATER DRAIN RELIEF
FUEL
GAS
HPS @
80PSI
HPS @
20PSI
GAS
VENT VOLTS Ø FLA
B-1 BOILER ROOM 111
AUTO CLAVE/
LAB STEAM
FULTON/
VSRT-15
100 600 200 1 3 3/4 1 1 3/4 6 3 120 1 27 3850 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
1. PROVIDE WITH CARBON STEEL FEEDWATER SYSTEM.
2. PROVIDE WITH BLOWDOWN TANK WITH THERMOSTATIC COOLING KIT.
3. PROVIDE WITH CALCITE FILTER.
4. PROVIDE WITH PREHEAT KIT.
5. BOILER TO BE PROVIDED AS PACKAGED SKID FROM FACTORY WITH EXTERNAL EQUIPMENT PREPIPED AND WIRED.
6. TRIM STEAM OUT OF BOILER DOWN TO 80 PSI. TAP 20 PSI LINE OFF OF PIPING TO PREHEAT KIT FOR LOWER PRESSURE EQUIPMENT.
7. PROVIDE BOILER WITH INTEGRAL CONTROLS. CONNECT BOILER TO BUILDING DDC AND MOORE AIR BASE NIAGRA BAS SYSTEM.
8. CO DETECTION IN BOILER ROOM PROVIDED IN LOCATIONS SHOWN ON ENLARGED PLAN.
9. PROVIDE WITH ASME CSD-1 CONTROLS AND COMPLIANT BOILER SHUTOFF SWITCH. SEE PLANS FOR SWITCH LOCATION.
10. SEE DETAIL 04/A-565 FOR BOILER FLUE ROOF PENETRATION.
PUMP SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
TYPE FLOW
(GPM)
HEAD
(FT)
HP
PUMP
SPEED
(RPM)
UNIT POWER
REQUIREMENTS
UNIT
WT.
(LBS)
FLUID REMARKS
VOLTS Ø FLA
CHWP-1 MECH YARD
CHILLER
PRIMARY LOOP
TACO/
2009D
INLINE 100 30 2 1160 208 3 - 275
12% PROPYLENE
GLYCOL
CHWP-2 MECH YARD
CHILLER
PRIMARY LOOP
TACO/
2009D
INLINE 100 30 2 1160 208 3 - 275
12% PROPYLENE
GLYCOL
CHWP-3 MECH YARD
CHILLED WATER
SECONDARY LOOP
TACO/
2007D
INLINE 100 50 3 1760 208 3 - 200
12% PROPYLENE
GLYCOL
1, 2, 3
CHWP-4 MECH YARD
CHILLED WATER
SECONDARY LOOP
TACO/
2007D
INLINE 100 50 3 1760 208 3 - 200
12% PROPYLENE
GLYCOL
1, 2, 3
1. PROVIDE PUMPS WITH SUPPORT STAND.
2. CHILLED GLYCOL PUMPS OPERATE ON DEMAND FROM CHILLER. PUMPS ARE REDUNDANT.
3. PUMPS WITH VFDS SHALL BE BALANCED BETWEEN 55-60HZ. VFD SHALL NOT BE USED TO MANUALLY OR AUTOMATICALLY BALANCE THE SYSTEM.
GLYCOL FEEDER SCHEDULE
TAG LOCATION SERVES MANUFACTURER/ MODEL
TANK
CAPACITY
(GAL)
CONN
(IN)
UNIT POWER
REQUIREMENTS FLUID
UNIT
WT.
(LBS)
REMARKS
HP VOLTS Ø
GF-1 ELECTRICAL 113
CHILLED WATER
LOOP
AXIOM/
DMF300
17 1/2 - 120 1
12% PROPYLENE
GLYCOL
150 1,2
1. FEEDER LOOP SHALL BE CARBON STEEL RATED FOR 100 PSI AND 180°F.
2. PROVIDE WITH PAINTED STEEL STAND AND BACNET COMMUNICATIONS CARD (READ/WRITE).
EXPANSION/BUFFER TANK SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
TYPE
SYSTEM
VOLUME
(GAL)
LOW
TEMP. (F)
HIGH
TEMP. (F)
REQ'D VOLUME (GAL) MAX WORKING
PRESS. (PSIG)
CONN.
SIZE (IN)
UNIT
WT.
(LBS)
FLUID REMARKS
TANK ACCEPTANCE
ET-1 MECH YARD
CHILLED
WATER LOOP
TACO/
CBX84-125
BLADDER
EXPANSION
575 40 115 22 12 32 3/4 205
12% PROPYLENE
GLYCOL
BT-1 MECH YARD
CHILLED
WATER LOOP
TACO/
BTH0300F4-150NN
- 575 40 115 300 - - 3 3322
12% PROPYLENE
GLYCOL
1. CHARGE TANKS TO SPECIFIED PRESSURE PRIOR TO FILLING THE PIPING SYSTEM. RECORD CHARGE PRESSURE ON TANK.
AIR SEPARATOR SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
TYPE PIPE SIZE
(IN)
FLOW
(GPM)
WPD (FT)
UNIT
WT.
(LBS)
FLUID REMARKS
AS-1 MECH YARD
CHILLED
WATER LOOP
TACO/
4903AD-125
AIR/DIRT 3 100 0.8 85
12% PROPYLENE
GLYCOL
1. ASME STAMPED 150 PSI AT 240° F
VIBRATION CONTROL
ITEM / TAG ISOLATOR REQUIREMENTS CONNECTIONS
AIR-COOLED CHILLER (TYP.) NR FLEXIBLE PIPE CONNECTIONS
INLINE PUMP (TYP.) NR EXPANSION JOINT CONNECTION
EXPANSION TANK / ET-1 NR NR
BUFFER TANK / BT-1 NR NR
AIR SEPARATOR / AS-1 NR NR
GLYCOL FEEDER / GF-1 NR NR
ENERGY RECOVERY UNIT / ERV-1 NR FLEXIBLE DUCT AND PIPE CONNECTIONS
AIR HANDLING UNIT (TYP.) NR FLEXIBLE DUCT AND PIPE CONNECTIONS
AIR CURTAIN (TYP.) NR NR
ROOF CAP (TYP.) NR NR
AIR CONTROL VALVE (TYP.) NR NR
INLINE EXHAUST FAN / EF-3 NR FLEXIBLE DUCT CONNECTIONS
ROOF EXHAUST FAN (TYP.) NR NR
FUME EXHAUST FAN / EF-12 NR FLEXIBLE DUCT CONNECTIONS
FUME HOOD / FH-1 NR NR
BOILER / B-1 NR NR
VENTILATION HOOD / VH-1 NR NR
SEISMIC DESIGN CRITERIA
SEISMIC DESIGN CATEGORY = A
SITE CLASS = D
RISK CATEGORY = II
BUILDING SEISMIC IMPORTANCE FACTOR, I = 1.0
DESIGN SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS (0.2 SECOND), Sds = 0.04
DESIGN SPECTRAL RESPONSE ACCELERATION AT 1-SECOND PERIOD, Sd1 = 0.016
NOTES
NR = NOT REQUIRED
TYP. = REFERS TO ALL EQUIPMENT OF THAT TYPE, SPECIFIC TAGS NOT LISTED
AIR CONTROL VALVE SCHEDULE
TAG SERVES MANUFACTURER/ MODEL MATERIAL SIZE ORIENTATION
DUCT HEATER AIRFLOW
FAIL
POSITION
CONTROL
TYPE
ELECTRICAL
REMARKS
TAG TYPE
MIN FLOW
CFM
CAPACITY
(KW)
MAX
CFM
MIN
CFM
APD
(" WC)
Ø VOLTAGE
SCV-1 LAB #1 SUPPLY
ANTEC/
VV
GALVANIZED
STEEL
114 HORIZONTAL EDH-1 SCR 700 9 1200 400 0.12 IN PLACE VARIABLE 1 208 1, 2
ECV-1 LAB #1 EXHAUST
ANTEC/
VV
GALVANIZED
STEEL
112 VERTICAL - - - - 600 0 0.12 OPEN VARIABLE - - 1, 2
SCV-2 LAB #2 SUPPLY
ANTEC/
VV
GALVANIZED
STEEL
112 HORIZONTAL EDH-2 SCR 400 4.5 600 400 0.12 IN PLACE VARIABLE 1 208 1, 2
ECV-2 LAB #2 EXHAUST
ANTEC/
VV
GALVANIZED
STEEL
112 VERTICAL - - - - 600 0 0.12 OPEN VARIABLE - - 1, 2
SCV-3 LAB #3 SUPPLY
ANTEC/
VV
GALVANIZED
STEEL
112 HORIZONTAL EDH-3 SCR 400 4.5 600 400 0.12 IN PLACE VARIABLE 1 208 1, 2
ECV-3 LAB #3 EXHAUST
ANTEC/
VV
GALVANIZED
STEEL
112 VERTICAL - - - - 600 0 0.12 OPEN VARIABLE - - 1, 2
SCV-4 AUTOCLAVE SUPPLY
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL - - - - 600 0 0.12 IN PLACE VARIABLE - - 1, 3
ECV-4
AUTOCLAVE GENERAL
EXHAUST
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL - - - - 100 0 0.12 OPEN VARIABLE - - 1, 3
SCV-5 WOMEN'S DRESSING/TR
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL EDH-5 SCR 250 2 250 0 0.12 IN PLACE VARIABLE 1 208 1, 3
ECV-5 WOMEN'S DRESSING/TR
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL - - - - 250 0 0.12 OPEN CONSTANT - - -
SCV-6 MEN'S DRESSING/TR
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL EDH-6 SCR 250 2 250 0 0.12 IN PLACE VARIABLE 1 208 1, 3
ECV-6 MEN'S DRESSING/TR
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL - - - - 280 0 0.12 OPEN CONSTANT - - -
SCV-7 PASSAGE/VEST
ANTEC/
VV
GALVANIZED
STEEL
108 HORIZONTAL - - - - 130 0 0.12 IN PLACE CONSTANT - - -
ECV-7 CORRIDOR
ANTEC/
VV
GALVANIZED
STEEL
112 HORIZONTAL - - - - 560 0 0.12 OPEN CONSTANT - - -
1. AIR CONTROL VALVE PROVIDED WITH NECESSARY CONTROL MODULE TO MEASURE AND ADJUST TO MAINTAIN SET ROOM PRESSURIZATION.
2. VALVE SHALL BE PROVIDED WITH FAST ACTING ACTUATOR CAPABLE OF CLOSING WITHIN 2 SECONDS OF SIGNAL.
3. VALVE SHALL BE PROVIDED WITH STANDARD ACTUATOR.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:3
:0
P
M
10/17/2025
PJTM
DJP
212431
M-702
MECHANICAL
SCHEDULES
FINAL TURNOVER
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
2 08/19/26 ADDENDUM #2
10-14-25
| Sheets |
| M-701 - MECHANICAL SCHEDULES |
| M-702 - MECHANICAL SCHEDULES |
File details come from the government source that posted it. Updated .