Attachment 1 to addendum 3_dwgs.pdf
PDF 2 MB Posted
- Attached to
- Renovate Building 6403 Containment Lab
- Solicitation number
- 12639526Q0184
About this file
These are architectural and mechanical engineering design drawings for the USDA/APHIS Containment Facility Building 6403 at Moore Air Base, Edinburg, Texas (Coffman Project #212431). The documents represent final turnover construction documents comprising general notes, demolition plans, floor plans, reflected ceiling plans, mechanical zone plans, mechanical plans, control diagrams, and equipment schedules for a comprehensive HVAC and building systems retrofit project.
The project scope includes replacement of air-cooled chillers, chilled water pumps, and all ductwork; removal and replacement of building DDC controls; relocation of mechanical equipment including steam and heating systems throughout the facility; installation of new air handling units (AHU-5 through AHU-12), energy recovery ventilators, exhaust fans, and specialty laboratory equipment connections; and comprehensive ductwork routing with volume dampers, grilles, and diffusers. The mechanical systems feature sophisticated controls including lead-lag chiller operation, dehumidification capabilities, greenhouse purge mode sequencing, and building automation system integration with the Moore Air Base Niagara system. The project encompasses multiple zones serving laboratory spaces, equipment rooms, greenhouses, and support areas with specific temperature, humidity, and airflow requirements. Contractor responsibilities include site verification, coordination of all trades, protection of existing finishes, compliance with applicable codes, and provision of detailed submittals for mechanical unit anchorage and system integration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0184-0005.pdf | ||
| Attachment 2 to addendum 3_specs.pdf | ||
| 12639526Q0184-0004.pdf | ||
| First asbestos test results.pdf | ||
| A04_Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184-0003.pdf | ||
| Attachment 2 to Addendum 2_drawings.pdf | ||
| USDA Building 6403 RFI Log.xlsx | XLSX spreadsheet | |
| Attachment 1 to Addendum 2_specs.pdf | ||
| 12639526Q0184-0002.pdf | ||
| RFIs and Responses.docx | DOCX document | |
| USDA_Building_6403_RFI_Log.xlsx | XLSX spreadsheet | |
| 12639526Q0184-0001.pdf | ||
| Attachemnt 2 to Addendum 1_Specs.pdf | ||
| Attachment 1 to Addendum 1_Drawings.pdf | ||
| 6403 Bldg Ronovation Walkthrough Sign In Sheet.pdf | ||
| Attachment 5_Price Schedule for Add Alternates.docx | DOCX document | |
| 12639526Q0184.docx | DOCX document | |
| Attachment 4_Federal Construction Wage Rates_Hidalgo County.txt | TXT text file | |
| Attachment 2_Specifications.pdf | ||
| Attachment 3_Drawings.pdf | ||
| Attachment 1_Statement of Work.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT GENERAL NOTES
A.
B.
a.
b.
c.
d.
e.
f.
g.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
ALL WORK SHOWN ON THESE DRAWINGS IS TO BE BY THE CONTRACTOR UNLESS
INDICATED OTHERWISE. CONTRACTOR TO VISIT SITE PRIOR TO BIDDING TO BECOME
FAMILIAR WITH EXISTING CONDITIONS.
DIMENSIONING:
DO NOT SCALE DRAWINGS - DIMENSIONS ON DRAWINGS WILL TAKE
PRECEDENCE OVER SCALED DIMENSIONS
LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE DRAWINGS UNLESS
NOTED OTHERWISE
REFER TO ENLARGED PLANS FOR DIMENSIONS, CASEWORK, MATERIALS AND
WALL TYPES, UNLESS OTHERWISE SHOWN
ALL DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH ALL OF THE
WORK OF ALL TRADES
ALL NEW WALLS ARE DIMENSIONED FROM FACE OF STUD/MASONRY TO FACE
OF STUD/MASONRY UNLESS NOTED OTHERWISE
DIMENSIONS FROM EXISTING WORK ARE FROM FINISHED FACE OF WALLS OR
ITEMS
ALL DIMENSIONS SHALL BE VERIFIED & COORDINATED WITH ALL OF THE WORK
OF ALL TRADES.
THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE
DRAWINGS AND AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ALL DISCREPANCIES,
OMISSIONS AND CONFLICTS BEFORE BIDDING. THE CONTRACTOR SHALL VISIT THE SITE
AND BE KNOWLEDGEABLE OF CONDITIONS THEREON. HE OR SHE SHALL INVESTIGATE,
VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT AND SHALL
NOTIFY THE ARCHITECT OF ANY SITE CONDITIONS REQUIRING MODIFICATION BEFORE
PROCEEDING WITH THE WORK.ANY DETAILS, SYSTEMS, OR MATERIALS
(ARCHITECTURAL, ENGINEERING, ETC.) WHICH ARE PROPOSED TO BE CHANGED MUST
FIRST BE REVIEWED BY THE ARCHITECT, PRIOR TO BIDDING- NO SUBSTITUTIONS OR
DEVIATIONS FROM THE CONTRACT DOCUMENTS WILL BE ALLOWED WITHOUT PRIOR
WRITTEN APPROVAL FROM THE ARCHITECT AFTER BIDS ARE RECEIVED.
DIFFERING TRADE CONTRACTORS TO COORDINATE ALL BUILT-IN FIXTURES /
EQUIPMENT AND SUPPLY ALL NECESSARY INFORMATION FOR CUT-OUTS TO BE
PERFORMED.
THE ARCHITECTURAL AND ENGINEERING DRAWINGS ARE OF EQUAL IMPORTANCE IN
DEFINING THE WORK OF THE CONTRACT DOCUMENTS, HOWEVER, ALL ENGINEERING
DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR(S) AND SUB-CONTRACTOR(S) TO COORDINATE
WORK WITH THE ARCHITECTURAL DRAWINGS PRIOR TO PROCEEDING WITH THE
INSTALLATION OF ANY MECHANICAL, PLUMBING, LOW VOLTAGE, OR ELECTRICAL WORK.
ANY DISCREPANCY BETWEEN THE ARCHITECTURAL AND ENGINEERING DRAWINGS AND
SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR
CLARIFICATION PRIOR TO BIDDING- ANY WORK INSTALLED IN CONFLICT WITH THE
ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE AND AT NO ADDITIONAL EXPENSE TO THE OWNER OR
ARCHITECT.
NOTES ARE NOT INTENDED TO BE STRICTLY LIMITED TO THE AREAS IDENTIFIED AND
SHALL APPLY ELSEWHERE AS APPLICABLE. ALL NOTES AND TYPICAL DETAILS ARE TO
BE REVIEWED AND APPLIED TO RELATED BUILDING COMPONENTS. DETAILS MARKED
"TYPICAL" SHALL APPLY IN ALL SIMILAR CASES UNLESS OTHERWISE NOTED ON THE
DRAWINGS. NOTES MAY APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND
MATERIALS; NOTES ON ANY ONE SHEET ARE TO BE APPLIED TO RELATED DRAWING
SHEETS AND DETAILS. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE
SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE
DETERMINED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
CONTACT BETWEEN DISSIMILAR METALS SHALL BE PROTECTED TO PREVENT GALVANIC
CORROSION.
FASTENERS USED IN PRESSURE TREATED WOOD SHALL HAVE THE APPROPRIATE
FACTORY COATINGS TO PREVENT CORROSION DUE TO MOISTURE AND / OR THE
WOOD'S CHEMICAL PRESERVATIVES.
CONTRACTOR TO MAINTAIN BUILDING EGRESS AT ALL TIMES DURING CONSTRUCTION.
ALL CONSTRUCTION DEBRIS SHALL BE PROMPTLY REMOVED FROM PREMISES AND
DISPOSED OF OR RECYCLED IN AN APPROPRIATE AND LEGAL MANNER.
PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED
FOR MECHANICAL AND PLUMBING EQUIPMENT AND DEVICES. ACCESS PANELS
LOCATED IN FINISHED AREAS SHALL BE FACTORY FINISHED OR FIELD PAINTED TO
MATCH ADJACENT SURFACES.
NOTIFY THE DESIGNER OF RECORD OF ANY PRODUCTS THAT ARE DISCONTINUED OR
ARE NO LONGER AVAILABLE. ALL PRODUCT SUBSTITUTIONS SHALL ONLY BE APPROVED
BY THE DESIGNER, AND SHALL BE ACCOMPANIED WITH COST DATA SHOWING THE
POTENTIAL SAVINGS TO THE OWNER.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DELIVERY OF LONG LEAD
TIME PRODUCTS TO ENSURE THAT THE PROJECT IS COMPLETED ON SCHEDULE.
ELECTRICAL (SUB-) CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS
INCLUDING INTERIOR ELEVATIONS. PROVIDE ADEQUATE POWER AND DATA OUTLETS
FOR ALL REFRIGERATORS, FREEZERS, MICROWAVES, COFFEE MACHINES, ICE
MACHINES, ETC. AT LOCATIONS WHERE DEVICES SHOWN ON DRAWINGS. IF
CONFLICT/ISSUES ARISE BETWEEN THESE DRAWINGS AND ELECTRICAL DRAWINGS,
COORDINATE BETWEEN ARCHITECT AND ELECTRICAL ENGINEER BEFORE BIDDING
PROJECT.
ALL ELECTRICAL BOXES, CONTROL BOXES, TECHNOLOGY BOXES, FIRE EXTINGUISHER
CABINETS, ETC. SHALL BE OFFSET SO AS NOT TO ALIGN IN PARTITIONS WITH FIRE AND /
OR STC RATINGS.
PLUMBING AND MECHANICAL (SUB-) CONTRACTORS ARE RESPONSIBLE FOR
REVIEWING ALL DRAWINGS INCLUDING INTERIOR ELEVATIONS. PROVIDE ADEQUATE
SUPPLY, DRAINING, COOLING, ETC FOR ALL REFRIGERATORS, FREEZERS,
MICROWAVES, COFFEE MACHINES, ICE MACHINES, ETC. AT LOCATIONS WHERE
DEVICES SHOWN ON DRAWINGS. IF CONFLICT/ISSUES ARISE BETWEEN THESE
DRAWINGS AND ELECTRICAL DRAWINGS, COORDINATE BETWEEN ARCHITECT AND
MECHANICAL ENGINEER BEFORE BIDDING PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND CONTINUOUS
MAINTENANCE OF ALL WORK INCLUDING NEW AND EXISTING EQUIPMENT FROM
DAMAGE AND SHALL PROTECT THE OWNERS' PROPERTY FROM DAMAGE OR LOSS BY
DUST, DIRT, WATER, THEFT, FIRE OR ANY OTHER PHYSICAL DAMAGE IN CONNECTION
WITH THE CONTRACT. WORK SHALL BE COMPLETED DURING OCCUPANCY BY THE
OWNER AND PHASED IN A MANNER AS AGREED TO IN WRITING AND PHASING
DOCUMENTATION. ANY AREA OF WORK IN NEED OF ACCESS BY THE CONTRACTOR
BEYOND PHASED SCOPE AREA IS SHALL BE INFORMED TO THE OWNER PRIOR TO
INITIATION OF WORK INVOLVED.
THE ARCHITECT SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE,
HANDLING, REMOVAL, DISPOSAL, OR EXPOSURE OF PEOPLE TO HAZARDOUS
MATERIALS IN ANY FORM, INCLUDING BUT NOT LIMITED TO ASBESTOS PRODUCTS,
POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES.
THE CONTRACTOR AND ALL SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT
INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER PORTIONS OF THE
CONTRACT DOCUMENTS.
REFER TO ARCHITECTURAL, DEMOLITION & ENGINEERING DRAWINGS FOR ADDITIONAL
GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS.
DURING THE COURSE OF THE PROJECT, THE CONTRACTOR SHALL BE SOLELY AND
COMPLETELY RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE
WORK. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, OR OTHER
DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY. THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS. THE OWNER
AND/OR THE ARCHITECT EXERCISE NO CONTROLS OVER THE SAFETY OR ADEQUACY
OF ANY EQUIPMENT, BUILDING COMPONENTS, SCAFFOLDING, FORMS OR OTHER WORK
AIDS USED IN OR ABOUT THE PROJECT, OR IN THE SUPERINTENDING OF THE SAME.
THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS FROM ANY AND
ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT. THE OWNER AND/OR ARCHITECT ARE NOT RESPONSIBLE
FOR SAFETY IN, ON OR ABOUT THE PROJECT SITE, NOR FOR COMPLIANCE BY THE
APPROPRIATE PARTY OF ANY REGULATIONS RELATING THERETO.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO TAKE EVERY MEASURE
NECESSARY TO COMPLY WITH ANY OWNER DUST CONTROL ORDINANCE.
CONTRACTOR TO PROVIDE OWNER PROJECT MANAGER AND CONTRACT ENGINEER
WITH ACCESS TO ALL WORK ON THE JOBSITE AT ALL TIMES; INCLUDING THE
NECESSARY SAFETY EQUIPMENT FOR ACCESS AND/OR ANY LADDERS, LIFTS,
SCAFFOLDING, ETC. NEEDED FOR ACCESS.
CONTRACTOR TO VERIFY IN FIELD EXISTING EQUIPMENT AND COORDINATE WITH
OWNER BEST PRACTICE IN PROTECTING EQUIPMENT FROM DAMAGE DURING WORK.
PROJECT SUMMARY
THE USDA CONTAINMENT BUILDING 6403 AT MOORE AIR BASE HAS
AGING EQUIPMENT AND BUILDING COMPONENTS IN NEED OF
REPLACEMENT. THE BUILDING LABORATORY SPACES REQUIRE
MODIFICATIONS TO FLOOR AREA, CABINETRY, AND VENTILATION FOR
OPERATIONAL REQUIREMENTS.
THE ITEMS TO BE INCLUDED IN THE BASE BID VS ALTERNATES ARE
IDENTIFIED THROUGHOUT THE BID DOCUMENTS AND LISTED HERE:
BASE BID:
FACILITY
REPLACE AIR-COOLED CHILLERS, CHILLED WATER PUMPS, AND
FACILITY CHILLED WATER PIPING.
REMOVE ALL 12 AIR HANDLING UNITS, REPLACE WITH 8 NEW.
REMOVE AND REPLACE ALL DUCTWORK, GRILLES, REGISTERS,
DIFFUSERS, AND OUTSIDE AIR ROOF CAPS.
REMOVE ALL 10 EXHAUST FANS, REPLACE WITH 8 NEW.
REPLACE ALL BUILDING DDC CONTROLS.
REPLACE STEAM BOILER SYSTEM INCLUDING STEAM AND
CONDENSATE PIPING THROUGHOUT FACILITY. RELOCATE THE
EXISTING FEEDWATER TREATMENT SYSTEM WITHIN THE
MECHANICAL ROOM.
REMOVE ABANDONED MECHANICAL PIPING THROUGHOUT THE
FACILITY (VACUUM AND RO WATER PIPING).
REPLACE ACOUSTIC CEILING TILE AND LIGHTING IN OCCUPIED
SPACES THROUGHOUT THE FACILITY, EXCEPT FOR THE 4 ROOMS
IDENTIFIED AS ALTERNATE 01.
REPLACE THE BUILDING ROOFING TO INCLUDE ROOF SOFFITS
AND GUTTERS. INSTALL NEW FALL PROTECTION RAIL ALONG
ROOF PERIMETER.
DOOR MODIFICATIONS AND REPLACEMENTS, DOOR HARDWARE
REPLACEMENTS, ACCESS CONTROL MODIFICATIONS TO INCLUDE
DOOR INTERLOCKS.
REMODEL ENTRY AND BATHROOM TO INCLUDE NEW FLOOR
LAYOUT, PLUMBING FIXTURES, DOOR LOCATIONS, CEILINGS,
FLOORS, AND LIGHTING.
INSTALL NEW AIR CURTAINS AT LABORATORY ACCESS POINTS.
LABS
REMODEL LABORATORY 114 AND INFILL EXISTING EMERGENCY
EXIT. INSTALL NEW FUME HOOD AND EMERGENCY SHOWER WITH
FLOOR DRAIN.
INSTALL NEW ENERGY RECOVERY MAKEUP AIR HANDLING UNIT
TO SERVE LABORATORY SPACES INCLUDING EXTERIOR
DUCTWORK, AIR CONTROL VALVES, AND DUCT HEATERS.
REPLACE FLOORING IN LAB ROOMS AND HEAD HOUSE.
REPLACE CASEWORK AND MODIFY ELECTRICAL IN LABORATORY
ROOMS 114, 101, AND 107. REPLACE SINKS AND INSTALL NEW
POINT-OF-USE INSTANT WATER HEATERS.
HEADHOUSE
INSTALL HOOD AND FAN OVER AUTOCLAVE
NEW FLOOR SINK AND DRAINAGE PIPING NEAR AHU-12. NEW RO
PIPE AND FAUCET TO HEADHOUSE SINK AND NEW DRINKING
FOUNTAIN/ BOTTLE FILLER.
ALTERNATE 01:
REPLACE FLOORING AND WALL BASE.
REFINISH TEST ROOM 108, TEST INTAKE 109, AUTOCLAVE 110B
AND PASSAGEWAY 110C WALLS AND DOOR FRAMES COMPLETE.
REPAIR DAMAGED CEILING IN TEST ROOM 108 PRIOR TO
RE-FINISHING.
REPLACE LIGHTING AND LIGHTING CONTROLS.
ALTERNATE 02:
DEMO EXTERIOR ELECTRICAL PANEL ‘GREENHOUSE’ AND
ELECTRICAL METER. SEE ELECTRICL DRAWING FOR
REQUIREMENTS.”
REPAINT ENTIRE FACILITY EXTERIOR MASONRY WALLS, SILLS,
HOLLOW METAL DOORS AND FRAMES. PROVIDE RE-FINISH PAINT
TO METAL FASCIA TRIM, GUTTERS, DOWNSPOUTS AND NEW
UTILITY RAILING AS NEEDED TO MATCH PRE-FINISH COLOR.
ALTERNATE 03:
REPAIR SIX ENVIRONMENTAL GROWTH CHAMBERS TO INCLUDE
NEW CONTROLS, PUMP STANDS, AND CONNECTIONS TO NEW
CHILLED WATER AND STEAM/CONDENSATE PIPING.
ALTERNATE 04:
REMOVE EXISTING FLUSH SOLID-CORE WD DOOR, WD FRAME AND
DOOR HARDWARE AT SOUTH WALL OF MAINTENANCE 105 AND
RE-INSTALL DOOR AND DOOR HARDWARE WITH NEW HM FRAME
AT NORTH WALL. INFILL WALL OPENING AND FINISH BOTH SIDES
TO MATCH ADJACENT.
PROJECT CONTAINMENT NOTES
THIS FACILITY IS A CONTAINMENT FACILITY. THERE ARE ADDITIONAL SEALING
REQUIREMENTS TO PREVENT THE ESCAPE OF INSECTS FOR ALL ROOMS EXCEPT RM
227 ELECTRICAL, RM 111 BOILER RM, RM 112 BREAK ROOM AND RM 116 STORAGE.
PIPE AND CONDUIT PENETRATIONS
CORE DRILLED OPENINGS: ANNULAR SPACE MUST BE PACKED WITH
FIRESTOP OR MINERAL WOOL BACKING MATERIAL.
SEALANT APPLICATION: APPLY A CONTINUOUS 1/4-INCH BEAD OF
SILICONE AROUND THE ENTIRE PIPE-TO-WALL INTERFACE ON THE
CLEAN SIDE.
ESCUTCHEON PLATES: INSTALL STAINLESS STEEL SPLIT-PLATES OVER
PENETRATIONS AND SEAL THE INNER AND OUTER RIMS. FILL THE
ENTIRE INTERIOR CAVITY OF THE PLATE WITH RTV SILICONE BEFORE
PRESSING IT FLUSH AGAINST THE DRYWALL, FORCING THE SEALANT TO
COMPRESS TIGHTLY AROUND THE PIPE.
ELECTRICAL OUTLETS AND SWITCHES
GASKET BACKING: INSTALL MOLDED RUBBER OR NEOPRENE (NOT
CLOSED-CELL FOAM) GASKETS BEHIND THE ELECTRICAL BOX AND
DEVICE FACEPLATES BEFORE SCREWING THEM TO THE WALL.
FACEPLATE SEALING: CAULK THE OUTER PERIMETER OF THE WALL
PLATE WITH CLEAR OR WHITE SILICONE. SEAL ALL FOUR SIDES FOR
AIRTIGHT CONTAINMENT.
CONDUIT SEALS: SEAL CONDUITS WITH EXPANDING FOAM OR SEALING
COMPOUND AT THE BOX AFTER WIRING HAS BEEN PULLED AND PRIOR
TO MOUNTING DEVICES.
LIGHT FIXTURES
FIXTURES: PROVIDE SEALED AND GASKETED LIGHTING FIXTURES, WITH
A MINIMUM RATING ISO 8.
HOUSING-TO-CEILING SEAL: APPLY A CLEANROOM GRADE, NEUTRAL-
CURE SILICONE AROUND THE PERIMETER FLANGE OF THE LIGHT
FIXTURE WHERE IT MEETS THE CEILING GRID OR DRYWALL.
ACCESS PANELS: ADD GASKETS TO ALL ACCESS PANEL SCREWS,
WHERE NOT ALREADY PROVIDED BY MANUFACTURER, FOR FIXTURE
AND LIGHTING CONTROL DEVICES INCLUDING REMOTE BALLASTS,
POWER PACKS AND RELAYS, OCCUPANCY SENSORS, ETC.
THERMOSTATS AND SENSORS
WALL MOUNTS: MOUNT TEMPERATURE, HUMIDITY, AND PRESSURE
SENSORS OVER A CLOSED-CELL GASKET PAD.
WIRE ACCESS: SEAL THE HOLE WHERE LOW-VOLTAGE WIRES
PENETRATE THE DRYWALL BEHIND THE THERMOSTAT USING PUTTY OR
CAULK.
PERIMETER BEADING: RUN A NEAT BEAD OF WHITE OR CLEAR SILICONE
AROUND THE SENSOR BODY WHERE IT TOUCHES THE WALL.
JOINTS AND CORNERS
JOINTS WALL-TO-CEILING/WALL: SEAL ALL VERTICAL AND HORIZONTAL
DRYWALL AND CEILING JOINTS WITH A SMOOTH, CONCAVE BEAD OF
STRUCTURAL SILICONE.
WALL-TO-WALL JOINTS: SEAL ALL VERTICAL AND HORIZONTAL DRYWALL
JOINTS WITH A SMOOTH, CONCAVE BEAD OF STRUCTURAL SILICONE.
FLOOR-TO-WALL AND CORNER TRANSITIONS
FLOOR-TO-WALL RUBBER BASE: INSTALL BASE 1/8 ” ABOVE FLOOR
MATERIAL. SEAL WITH CONTINUOUS BEAD OF POLY URETHANE
SEALANT AT TOP AND BOTTOM. APPLY A 100% SOLID, CONTINUOUS
BED OF ADHESIVE TO THE BACK OF THE BASE MATERIAL. DO NOT SPOT-
APPLY ADHESIVE.
FLOOR-TO-WALL TILE BASE: SEAL WITH CONTINUOUS BEAD OF POLY
URETHANE SEALANT AT TOP. APPLY A 100% SOLID, FULL BED OF
ADHESIVE TO THE BACK OF THE BASE MATERIAL. DO NOT SPOT-APPLY
ADHESIVE.
CASEWORK/COUNTERS: RUN A CONTINUOUS BEAD OF HIGH-
MOVEMENT POLYURETHANE SEALANT ALONG BOTH THE TOP
BACKSPLASH (COUNTER-TO-DRYWALL) AND ALONG CASEWORK EDGES
(BASE-TO-FLOOR/WALL) TO TRAP ANY PESTS TRAVELING INSIDE THE
WALL CAVITIES.
COVE BASE SEALING: STANDARD VINYL COVE BASE CREATES A
HOLLOW INSECT RUNWAY BEHIND THE WALL. AND IS NOT PERMITTED IN
CONTAINMENT AREAS. YOU MUST USE AN INTEGRAL POURED EPOXY
COVE OR A SEALED SOLID STRAIGHT RESILIENT BASE.
ADHESIVE STANDARD: APPLY A 100% SOLID, CONTINUOUS BED OF
ADHESIVE TO THE BACK OF THE BASE MATERIAL. DO NOT SPOT-APPLY
ADHESIVE.
TOP AND BOTTOM BEADS: RUN A CONTINUOUS BEAD OF HIGH-
MOVEMENT POLYURETHANE SEALANT ALONG BOTH THE TOP LIP (BASE-
TO-DRYWALL) AND THE BOTTOM LIP (BASE-TO-FLOOR) TO TRAP ANY
PESTS TRAVELING INSIDE THE WALL CAVITIES.
DATA AND LOW-VOLTAGE
CABLE BUNDLES: BUNDLED WIRES INSIDE CONDUITS CREATE
MINIATURE TUNNELS FOR INSECTS. SEPARATE THE WIRES SLIGHTLY AT
THE CONDUIT OPENING AND PACK THE SPACES BETWEEN INDIVIDUAL
STRANDS WITH NON-HARDENING DUCT-SEALING PUTTY.
HVAC, VENTS, AND RETURNS
SUPPLY AND EXHAUST GRILLES: SEE DRAWING NOTES FOR MESH
SCREENS AND FILTERS. APPLY SILICONE SEALANT AROUND FRAMES OF
ALL GRILLES.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
COORDINATE ALL DEMOLITION WORK WITH NEW WORK PLANS.
DO NOT COMMENCE DEMOLITION WORK IN ANY AREA UNTIL ALL
UTILITIES HAVE BEEN CAPPED, PLUGGED, DISCONNECTED, OR
OTHERWISE MADE SAFE FOR WORK TO PROCEED.
DO NOT CUT OR DRILL EXISTING FLOOR JOISTS, BEAMS,
COLUMNS, OR OTHER STRUCTURAL ELEMENTS, UNLESS
SPECIFICALLY INDICATED IN DRAWINGS. VERIFY ALL
STRUCTURE LOCATIONS PRIOR TO COMMENCEMENT OF WORK.
CONTRACTOR IS RESPONSIBLE FOR REPAIR OF ALL SURFACES
AFFECTED BY DEMOLITION OR NEW WORK CARRIED OUT BY ALL
TRADES. REFER MECHANICAL-PLUMBING-ELECTRICAL
DRAWINGS TO VERIFY ALL LOCATIONS WHERE WORK OCCURS.
CONTRACTOR IS TO PAINT ALL WALL SURFACES AFFECTED BY
DEMOLITION OR NEW WORK UNLESS OTHER FINISH IS
INDICATED: REPAINT-REFINISH IS TO RUN FROM CORNER-TO-
CORNER OF AFFECTED WALL UNLESS OTHER LIMIT FOR
REFINISH IS SHOWN.
WHERE EXISTING EQUIPMENT, PIPING, DUCTS, & SIMILAR ITEMS
ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL BE
COMPLETE, INCLUDING BUT NOT LIMITED TO, ANCHORS,
HANGERS, FOUNDATIONS & ACCESSORIES AFTER REMOVAL.
REPAIR, MAKE SMOOTH, MATCH ADJACENT SURFACES AND
PREP FOR NEW FINISH TREATMENT AT ALL LOCATIONS WHERE
DEMOLITION HAS OCCURRED.
REMOVE EXISTING FLOORING MATERIAL & BASE IN AREAS
SCHEDULED TO RECEIVE NEW FINISHES UNLESS OTHERWISE
INDICATED. PATCH AND/OR REPAIR DAMAGED WALL MATERIALS
TO PROVIDE SUITABLE SUBSTRATE FOR NEW BASE. REFER TO
LIST OF ALTERNATES FOR ADDITIONAL INFORMATION.
ALL FLOORS SHALL BE LEVEL AND FREE OF IRREGULARITIES TO
ASSURE CONSISTENT FLOOR HEIGHT.
PROTECT ALL EXISTING FINISHES, EQUIPMENT, FURNITURE AND
FURNISHINGS TO REMAIN ON SITE FROM DAMAGE BY
DEMOLITION AND NEW WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL DAMAGE TO EXISTING CONSTRUCTION,
EQUIPMENT AND FURNITURE THAT NEEDS TO REMAIN ON-SITE.
DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY
SYSTEMS. DO NOT CLOSE OR BLOCK EGRESS TO ANY EXIT, AND
PROVIDE TEMPORARY SIGNAGE FOR EXIT AND BUILDING
EGRESS.
PROVIDE TEMPORARY PROTECTION TO EXTERIOR WALLS
DURING REMOVAL OF EXTERIOR DOOR AND FRAMES,
MECHANICAL AND PLUMBING PENETRATIONS.
PROVIDE TEMPORARY ROOF PROTECTION DURING REMOVAL OF
EXISTING ROOF SYSTEM AND EXTERIOR SOFFITS FOR
REPLACEMENT, NEW AND EXISTING ROOF OPENINGS FOR
MECHANICAL AND PLUMBING PENETRATIONS OR PATCHING,
AND OTHER ROOF INSTALLATIONS.
PROVIDE FIRE STOPPING INSULATION, CAULKING, OR FIRESTOP
SYSTEM AS REQUIRED TO MAINTAIN EXISTING FIRE RATINGS
OF HORIZONTAL OR VERTICAL ASSEMBLIES.
ALL WORK AREAS SHALL BE CLEANED DAILY, AND
CONSTRUCTION MATERIALS SCHEDULED FOR DEMOLITION AND
NOT INDICATED TO BE SALVAGED OR REUSED SHALL BE
PROMPTLY REMOVED FROM PREMISES.
ALL CONTRACTORS ARE RESPONSIBLE FOR FOLLOWING
OWNER’S REGULATIONS FOR USE OF THE SITE AND BUILDING
ACCESS. CONTRACTORS ARE TO COORDINATE WITH OWNER ’S
CONSTRUCTION MANAGER FOR WORK SCHEDULING AND AREAS
OF THE SITE THAT MAY BE OCCUPIED BY OWNER DURING
CONSTRUCTION.
SALVAGE FIRE ALARM AND SAFETY DEVICES, BUILDING
TECHNOLOGY OR SECURITY DEVICES, WALL MOUNTED
FURNISHINGS, FIRE EXTINGUISHERS, SIGNAGE, OR ANY OTHER
WALL/CEILING EQUIPMENT OR FURNISHINGS ON SURFACES
AFFECTED BY WORK. INSPECT ALL SALVAGED MATERIALS
PRIOR TO STORAGE OR REINSTALLATION. MINOR DAMAGE
REQUIRING PAINT TOUCH-UP TO BE COMPLETED BEFORE
REINSTALLATION. SALVAGE MATERIALS OR EQUIPMENT NOT
REINSTALLED ARE TO BE HANDED OVER TO OWNER.
PROVIDE TEMPORARY FIRE EXTINGUISHERS ON SITE AS
NECESSARY FOR FIRE SAFETY.
PORTIONS OF THE EXISTING BUILDING MATERIALS CONTAIN
ASBESTOS (ACM). CONTRACTOR TO COORDINATE MATERIALS
SCHEDULED FOR REMOVAL OR IMPACTED BY THE WORK WITH
THE ATTACHED HAZARDOUS MATERIALS SURVEY TO
DETERMINE MATERIALS THAT REQUIRE ABATEMENT AND/OR
SPECIAL HANDLING PROCEDURES. REFER TO ABATEMENT
SPECIFICATIONS FOR ALL ABATEMENT REQUIREMENTS.
COORDINATE ABATEMENT METHODS WITH ALL NEW FINISHES
TO ENSURE MANUFACTURERS' REQUIREMENTS ARE
FOLLOWEDE AND WARRANTIES FOR ALL NEW INSTALLATIONS
ARE NOT AFFECTED.
DEMOLITION GENERAL NOTES
www.coffman.comwww.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
9/ 2/
2:
:2
PM
10/17/2025
HENRY
HIGHFIELD
8050.07
G-001
GENERAL NOTES
FINAL TURNOVER
REV DATE DESCRIPTION
01 8/12/26 ADDENDUM 1
03 ADDENDUM 39/02/26
LABORATORY
#3
VESTIBULE
100A
LABORATORY
#2
MAINTENANCE
MECH/ELEC
106EGC 6
EGC6
EGC 5
EGC5
EGC 4
EGC4
EGC 3
EGC3
EGC 2
EGC2
EGC 1
EGC1
EGC 9
EGC9
EGC 8
EGC8
EGC 7
EGC7
TEST ROOM
TEST INTAKE
STORAGE
BREAK RM
EGC 10
EGC10
EGC 11
EGC11
EGC 12
EGC12
PASSAGE
C103
PASSAGE
C104
HEADHOUSE
MAIN
LABORATORY
#1
ELECTRICAL
AUTOCLAVE
110B
PASSWAY
110C
BOILER
ROOM
VEST
C105
SERVICE
PASSAGE
GH 5
GH 4
GH 3
GH 2
GH 1
CORRIDOR
C101
PASSAGE
103A
VEST
100B
MECH
103B
EVS
104C
A-211
D01
D02
D02
D02
D02 D02D02 D02D02
D04
D05 D05
D03
OFFICE
7'-8 1/2" 3'-4" D05
A-211
A-211
D04 D04
D11
D11 D11
D10 D06 D06D06 D06
D06
D06
D06
D06
D06D06
D06
D06
D06
D12
D11
D02
D07
D13
D03D03
D10 D10D10
D06
D06
102A 104A
102B 104B
D06
D06D14D14
D07
ABOVE STOREFRONT
D13
D07
D02 D15
D01
D02
D02
D03 D03
D02 D02
D03
D02
D03
D04
D18
D11
D04
D20
D20
D03
CORR
C102
D07
D18
D08
D16
D17
D17
D21
PROJECT BASE BID AREA, UNO
ALTERNATE #01:
REPLACE FLOORING AND WALL
BASE
REPLACE LIGHTING
REPAINT TEST ROOM 108, TEST
INTAKE 109, AUTOCLAVE 110B AND
PASSAGEWAY 110C
REPAIR DAMAGED CEILING PRIOR
TO REPAINTING
REFER TO MEP DRAWINGS FOR
ADDITIONAL INFORMATION
D22 D22 D22 D22 D22 D22
D22
D12 D12 D12
D02
D07
D07
D12
D12
D12
D12
D23
D02
D02
D02
D02
D21 D11 D21
D09D09D09 D09
D09
D09
D12D12
D23
D23
D23
D23 D40
D40
D06
D06
D06
D06
D06 03 www.coffman.comwww.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
9/ 1/
:2
8:
P M
10/17/2025
HENRY
HIGHFIELD
8050.07
AD101
DEMOLITION FLOOR
PLAN
FINAL TURNOVER
GENERAL NOTES
DRAWING NOTES
PLAN LEGEND
EXISTING
DEMOLITION
ALTERNATE #01 - SCOPE AREA AS SHOWN IN
PLAN - REFER TO SHEET G-001
ALTERNATE #03 - SCOPE AREA AS SHOWN IN
PLAN - REFER TO SHEET G-001
REMOVE EXISTING FLOOR FINISH AND
CEILING FINISH TO FULL EXTENTS
REMOVE DOOR, FRAME AND HARDWARE
OPENING COMPLETE. INFILL WITH WALL TO
MATCH ADJACENT. REFER TO SHEET A-561.
3/16" = 1'-0"AD101
01 FIRST FLOOR PLAN - DEMOLITION
D01 REMOVE WALL COMPLETE
D02 REMOVE DOOR, FRAME AND HARDWARE.
D03 REMOVE WALL AREA TO EXTENTS SHOWN. COORDINATE
OPENING WITH NEW WORK.
D04 REMOVE COUNTERTOP, CASEWORK AND ALL COMPONENTS
COMPLETE
D05 REMOVE COUNTERTOP AND CASEWORK ISLAND
D06 REMOVE WALL BASE AND FLOOR FINISH TO SUBSTRATE
BELOW.
D07 PATCH AND REPAIR EXISTING WALL TO RECEIVE NEW FINISH
D08 REMOVE DOOR AND HARDWARE. FRAME TO REMAIN
EXISTING IN PLACE.
D09 REMOVE WINDOW STOOL
D10 REMOVE SHOWER HEAD, CONTROL AND ALL COMPONENTS
COMPLETE. CAP DRAIN PIPE.
D11 REMOVE PLUMBING FIXTURES - REFER TO PLUMBING DWGS
D12 REMOVE MECHANICAL EQUIPMENT - REFER TO MECHANICAL
DWGS
D13 PATCH AND REPAIR EXISTING WALL TO RECEIVE NEW FINISH
D14 REMOVE TOILET PARTITIONS AND ALL COMPONENTS
COMPLETE.
D15 PROVIDE TEMPORARY PROTECTION AT EXTERIOR WALL.
D16 REMOVE PLYWOOD WINDOW INFILL
D17 EXISTING COUNTERTOP, BASE AND WALL CABINETS TO
REMAIN UNDISTURBED
D18 REMOVE MECH CLOSET WALLS AND PLYWOOD BASE
FRAMING COMPLETE.
D20 REMOVE EMERGENCY SHOWERS AND ALL COMPONENTS
COMPLETE. REFER TO PLUMBING DWGS.
D21 EXISTING SINK TO REMAIN UNDISTURBED
D22 REFER TO MECHANICAL DWGS THIS AREA
D23 REFER TO ELECTRICAL DWGS THIS AREA
D30 REMOVE EXIST MODIFIED BIT ROOF SYSTEM INCLUDING
MEMBRANE, INSULATION, FLASHING AND ANY DAMAGED
COMPONENTS OF EXISTING ROOF DECK COMPLETE FOR
REPLACEMENT. COORDINATE WITH SPEC AND NEW ROOF
REPLACEMENT.
D31 REMOVE GUTTER FOR REPLACEMENT. EXISTING
DOWNSPOUTS TO REMAIN AND BE RE-ATTACHED TO NEW
GUTTER SYSTEM
D32 REMOVE METAL FASCIA AT PERIMETER FOR REPLACEMENT
D33 REMOVE ROOF FLASHING AT PERIMETER FOR
REPLACEMENT
D34 PATCH EXISTING ROOF DECK WHERE PIPING OR DUCTWORK
IS REMOVED, TYP. COORDINATE EXTENT OF PATCHING WITH
NEW WORK.
D36 FIVE EXISTING GREENHOUSE UNITS ROOF STRUCTURE TO
REMAIN UNDISTURBED.
D37 EXISTING ROOF SCUPPER
D38 EXISTING ROOF CANT
D39 REMOVE AND REPLACE 4X PT WD SUPPORTS FOR NEW
REFRIGERANT PIPING SUPPORTS. COORDINATE ROOF
WORK WITH MECHANICAL CONTRACTOR.
D40 ALTERNATE 04 - ROOM 105. REMOVE EXISTING DOOR AND
FRAME. NEW OPENING FOR NEW DOOR TO PASSAGE A103A.
NN
SCALE: 3/16"=1'-0"
4' 12'8'
PLANTRUE
A. REFER TO SHEET G-001 FOR PROJECT, DEMOLITION
GENERAL NOTES, BASE BID AND ALTERNATE
ADDITIONAL INFORMATION.
REV DATE DESCRIPTION
01 8/12/26 ADDENDUM 1
03 ADDENDUM 39/02/26
A-211
A-211
A-211
DC01DC01
DC01DC01 DC01
DC01DC01
DC10
DC05
DC01DC01
NO CEILING
THIS AREA
NO CEILING
THIS AREA
DC08
DC08
DC08
N O
C
EI
LI
N
G
W O
R K
TH
IS
AR
EA
DC01
DC05DC05
DC05DC05
DC05DC05
DC01DC01 DC01DC01
DC01DC01
DC05D05
DC07
DC10
DC06
DC08
DC06DC06
DC08
D01
D01
DC08 D01
BOILER
ROOM
DC10
PASSWAY
110C
AUTOCLAVE
110B
TEST INTAKE
TEST ROOM
LABORATORY
#3
LABORATORY
#2
VEST
100B
PASSAGE
103A
MAINTENANCE
EGC 6
EGC6
EGC 5
EGC5
EGC 4
EGC4
MECH/ELEC
106 EGC 3
EGC3
EGC 2
EGC2
EGC 1
EGC1
EGC 12
EGC12
EGC 11
EGC11
EGC 10
EGC10
EGC 9
EGC9
EGC 8
EGC8
EGC 7
EGC7
STORAGE
BREAK RM
PASSAGE
C103
PASSAGE
C104
MAIN
LABORATORY
#1
HEADHOUSE
ELECTRICAL
DC10
SERVICE
PASSAGE
GH 5
GH 4
GH 3
GH 2
GH 1
DC10
DC10
DC10
VEST
C105
CORR
C102
CORRIDOR
C101
VESTIBULE
100A
MECH
103B
EVS
104C
OFFICE
WOMEN'S
SHOWER
MEN'S
SHOWER
MEN'S
RESTROOM
WOMEN'S
RESTROOM
PROJECT BASE BID AREA, UNO
ALTERNATE #01:
REPLACE FLOORING AND WALL BASE
REPLACE LIGHTING
REPAINT TEST ROOM 108, TEST
INTAKE 109, AUTOCLAVE 110B AND
PASSAGEWAY 110C
REPAIR DAMAGED CEILING PRIOR TO
REPAINTING
REFER TO MEP DRAWINGS FOR
ADDITIONAL INFORMATION
DC08
DC08DC08DC08
DC08
NO CEILING
THIS AREA
DC10
EXIST NO
CEILING
DC10
DC07
DC07
DC05 03
DC05
DC05 03
DC05
03DC0503
www.coffman.comwww.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
9/ 1/
:2
5:
P M
10/17/2025
HENRY
HIGHFIELD
8050.07
AD111
DEMOLITION
REFLECTED CEILING
PLAN
FINAL TURNOVER
DRAWING NOTES
3/16" = 1'-0"AD111
01 REFLECTED CEILING PLAN - DEMOLITION
GENERAL NOTES
DC01 REMOVE SUSPENDED CEILING GRID, TILE, BATT
INSULATION AND ALL ACCESSORIES COMPLETE
DC05 REMOVE GYPSUM BD CEILING COMPLETE
DC06 REMOVE PARTIAL GYPSUM BD CEILING AREA AS
SHOWN
DC07 EXISTING CEILING TO REMAIN
DC08 REMOVE SOFFIT PANELS AND ALL COMPONENTS
COMPLETE
DC10 PATCH, REPAIR AND INFILL CEILING
PENETRATIONS AS NEEDED AT INSULATION,
MECHANICAL, PLUMBING OR ELECTRICAL
REMOVAL OR MODIFICATIONS.
PLAN LEGEND
EXISTING
DEMOLITION
ALTERNATE #01 - SCOPE AREA AS SHOWN IN
PLAN - REFER TO SHEET G-001
ALTERNATE #03 - SCOPE AREA AS SHOWN IN
PLAN - REFER TO SHEET G-001
REMOVE EXISTING FLOOR FINISH AND
CEILING FINISH TO FULL EXTENTS
REMOVE DOOR, FRAME AND HARDWARE
OPENING COMPLETE. INFILL WITH WALL TO
MATCH ADJACENT. REFER TO SHEET A-561.
NN
16'4' 8'
SCALE: 1/8"=1'-0"
PLANTRUE
A. REFER TO SHEET G-001 FOR PROJECT, DEMOLITION
GENERAL NOTES, BASE BID AND ALTERNATE
ADDITIONAL INFORMATION.
REV DATE DESCRIPTION
03 ADDENDUM 3
matthews Snapshot
LABORATORY #2
WOMEN'S DRESSING
102A
MAINTENANCE
MEN'S DRESSING
104A
LABORATORY #3
PASSAGE
103A
VESTIBULE
100A
OFFICE
MAIN LABORATORY #1
EGC 6
EGC6
EGC 5
EGC5
EGC 4
EGC4
EGC 12
EGC12
EGC 11
EGC11
EGC 10
EGC10
MECH/ELEC
BREAK RM
STORAGE
EGC 3
EGC3
EGC 2
EGC2
EGC 1
EGC1
EGC 7
EGC7
EGC 8
EGC8
EGC 9
EGC9
TEST ROOM
TEST INTAKE
HEADHOUSE
115ELECTRICAL
SERVICE PASSAGE
GH 5
GH 4
GH 3
GH 2
GH 1
BOILER ROOM
PASSWAY
110C
AUTOCLAVE
110B
MECH
103B VEST
100B
EVS
104C
PASSAGE
C103
PASSAGE
C104
VEST
C105
CORRIDOR
C101
ZONE 16
ZONE 2 ZONE 3
ZONE 13
ZONE 15
ZONE 1
ZONE 14
ZONE 8 ZONE 9 ZONE 10 ZONE 11 ZONE 12
DPT
EDH-2
T
EDH-5
DP- + DP+ -
DP
T
EDH-3
T
AHU-5
TAHU-7
TAHU-6
DP- +
DP- +
T
EDH-1
T
AHU-12
T
AHU-11
T
AHU-10
T
AHU-9
T
AHU-8
DP- +1
3 TYP.
ZONE 4
ZONE 19
ZONE 18
ZONE 17
T
EDH-6
ZONE 5
ZONE 7
ZONE 6
H H H H H
H
H
ECV-1
ECV-2
H
H
WOMEN'S TR
102B
MEN'S TR
104B
H
ECV-3
H
H
ECV-4
ECV-6ECV-5
ECV-1
T
GENERAL NOTES
A. VERIFY THERMOSTAT PLACEMENT WITH OWNER PRIOR TO
ROUGH-IN. COORDINATE PLACEMENT WITH ELECTRICAL
CONTRACTOR AND LIGHT SWITCH LOCATIONS. THERMOSTAT
SHALL BE AT SAME ELEVATION AS LIGHT SWITCHES (BETWEEN
30"-48" AFF).
B. ALL BUILDING DDC IS REPLACED IN THE SCOPE OF THIS PROJECT.
COORDINATE INTEGRATION OF NEW BUILDING DDC WITH CAMPUS
NIAGARA SYSTEM. OPERATOR WORKSTATION WILL BE IN THE
FACILITY BUILDING AT MOORE AIR BASE. LOCATE NEW
TEMPERATURE SENSORS AND CONTROLLERS AS NECESSARY TO
PROVIDE A FULL AND COMPLETE SYSTEM. CONTROLS
CONTRACTOR SHALL BE RESPONSIBLE FOR LOW-VOLTAGE
WIRING. COORDINATE WITH DIVISION 26 FOR TRANSFORMERS.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:1
:4
P M
10/17/2025
PJTM
DJP
212431
M-100
MECHANICAL ZONE
PLAN
FINAL TURNOVER
3/16" = 1'-0"
MECHANICAL ZONE PLAN NN
PLANTRUE
SCALE: 3/16"=1'-0"
4' 12'8'
KEY NOTES
1 NO TEMPERATURE CONTROL IN THIS AREA. PRESSURIZATION
AND AIRFLOW CONTROL ONLY, MAKEUP AIR IS PROVIDED BY
ERV-1.
2 NOT USED.
3 SEE 7/M-502 FOR DP SENSOR INSTALLATION DETAIL.
4 ECV-1 SHALL CONTROL TO MAINTAIN A MINIMUM OF -0.05" WC AS
MEASURED AT EACH PRESSURE SENSOR.
5 INSTALL MAIN BUILDING DDC CONTROL PANEL IN THIS ROOM.
6 ROOM DOES NOT HAVE THERMAL CONTROL. SIDE WALL EXHAUST
FAN IS EXISTING TO REMAIN.
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
3 09/02/26 ADDENDUM #3
10-14-25
LABORATORY #2
WOMEN'S TR
102B
WOMEN'S DRESSING
102A
MAINTENANCE
MEN'S DRESSING
104A
LABORATORY #3
MEN'S TR
104B
PASSAGE
103A
VESTIBULE
100A
OFFICE
MAIN LABORATORY #1
EGC 6
EGC6
EGC 5
EGC5
EGC 4
EGC4
EGC 12
EGC12
EGC 11
EGC11
EGC 10
EGC10
MECH/ELEC
BREAK RM
STORAGE
EGC 3
EGC3
EGC 2
EGC2
EGC 1
EGC1
EGC 7
EGC7
EGC 8
EGC8
EGC 9
EGC9
TEST ROOM
TEST INTAKE
HEADHOUSE
ELECTRICAL
GH 5
GH 4
GH 3
GH 2
GH 1
BOILER ROOM
PASSWAY
110C
AUTOCLAVE
110B
MECH
103B
VEST
100B
EVS
104C
(N)CHLR-1
(N)CHLR-2
(N) BT-1
(E) CONDENSER FOR
EGC UNITS TYP.
DN TO AHU-6
(N) VH-1
12x12 UP
TO EF-11
(N) B-1
(N L)
A
IR
C
O M
P R
E S
S O
R
(NL) WATER
TRAETMENT
(N) ERV-1
12"ø SA/EA UP
1S
6E
1S
12"ø SA/EA UP
3S
3S
5S
30x20
30x20 SUPPLY
UP TO ROOF
x1 x1 x1
6S
6S
6S
14ø SA UP
4E
1S
1S
1S
UP TO
RC-7
2S
12x10 EA UP
6ø UP
TO RC-8
6ø UP 6ø UP 6ø UP
6ø UP
8x8
1R
1R
1R
16ø EA UP
TO EF-12
(E) DRY-1
(E) DRY-2
(E) DRY-3
(E) DRY-4
(E) DRY-5
FH-1
6x6
1S
1S
1S
1S
1S
(N) AHU-8
16x12
16x12
(N) AHU-9
16x12
16x12
16x12
16x12
16x12
16x12
16x12
16x12
(N) AHU-10 (N) AHU-11 (N) AHU-12
(N) AHU-5
(N) AHU-6
(N) AHU-7
UP TO EF-9
3E
1S
8ø 8ø 8ø x1
8ø
12ø10ø
8ø
3E
3R
2E
4E
7S
3R
2E
4E
7S
3R
2E
4E
7S
3R
2E
4E
7S
3R
2E
4E
7S
3R
6ø
8ø
8ø EA UP
10ø SA UP
8ø
8ø
12ø 12ø
8ø
EXHAUST
AIR UP
TO EF-10
ø
2R 1006ø
16x12
10ø
0'-6" THICK CONCRETE HOUSEKEEPING
PAD ON EXISTING SLAB ON GRADE WITH
#4 AT 12" ON CENTER, EACH WAY.
1'-0" THICK CONCRETE HOUSEKEEPING PAD
WITH #4 AT 12" ON CENTER, EACH WAY, TOP
AND BOTTOM. EMBED SLAB 6" INTO
EXISTING GRADE.
1'-0" THICK CONCRETE HOUSEKEEPING
PAD WITH #4 AT 12" ON CENTER, EACH
WAY, TOP AND BOTTOM. EMBED SLAB
6" INTO EXISTING GRADE.
7 9
12ø EA UP
7E
6E
7E
10"ø SA UP 10"ø SA UP10"ø EA UP ø10ø
6ø
10ø
8ø
8ø
6ø
6ø
(E) WALL LOUVER
TO REMAIN
(E) WALL LOUVER
TO REMAIN
ø ø ø
6ø
TYP.
8ø ø ø
6x
6x
6x
6x
6x
12x10 12x8 10x8 8x8(N) HF-2
(N) EF-3
ø 8ø
8ø
M M M M M
8"ø UP TO RC-6
3R
8"ø UP TO RC-5/DN
TO AHU-5
LV-1 LV-2 LV-3 LV-4 LV-5
20x20
EXHAUST
DISCHARGE
UP TO ROOF
OA
INTAKE
EDH-2
SCV-2
SCV-5
EDH-5
ECV-6
ECV-5
SCV-7
SCV-6
EDH-6
EDH-1
SCV-1
SCV-3
EDH-3
SCV-4
ECV-4
TYP.
10x10 UP TO
ROOF FAN,
TYP. 5
SA DN TO AHU,
TYP. 5
26x16 EXHAUST
FROM ROOF
8ø
8ø8ø
ECV-1
ECV-3
ECV-2
x2 x1
AC-1 AC-2
AC-3
3S
6E
7E
6E
3S x1 x1 x1 x1 x1 x1
5S
6x6
5S
5S
5S
8x x1 ø
5S
5S
6S
6S
6S ø
6S
2E
6ø
2E
2E
12ø 12ø
6ø
8ø
1E
10ø
12"ø EA UP
ECV-7
(E)
FUME
HOOD
6" EA UP
M-503
(ABOVE)
2' - 0"
CO
(N) GF-1
(N) ET-1
(E) TRANSFER
GRILLE
GENERAL HVAC NOTES
A. MAINTAIN ACCESS TO ALL DAMPERS FOR MAINTENANCE
PURPOSES. PROVIDE ACCESS PANELS WHERE NECESSARY.
B. PROVIDE VOLUME DAMPERS ON ALL SUPPLY, RETURN, AND
EXHAUST BRANCH DUCT TAKEOFFS IN ADDITION TO THOSE
SHOWN. PROVIDE REMOTE DAMPER OPERATORS IN HARD LID
CEILINGS WHERE DAMPERS ARE NOT ACCESSIBLE.
C. 80 MESH (0.180MM MAXIMUM OPENING) SCREENS REQUIRED ON
ALL EXHAUST, RETURN, AND SUPPLY GRILLES/DIFFUSERS.
D. CONTRACTOR TO FIELD LOCATE NEW ROOF PENETRATIONS
BETWEEN EXISTING ROOF JOISTS. WOOD JOISTS ARE ASSUMED
TO RUN PLAN NORTH TO SOUTH, CONTRACTOR VERIFY. ASSUMED
MAX JOIST SPACING = 2'-0", NOTIFY EOR IF GREATER. ADD 2x6
SOUTHERN PINE #2 AROUND NEW OPENINGS AND BETWEEN
EXISTING JOIST. ATTACH EACH END OF NEW 2x6 MEMBERS WITH
SIMPSON LU26 FACE-MOUNTED JOIST HANGERS.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:1
:4
P M
10/17/2025
PJTM
DJP
212431
M-101
MECHANICAL PLAN
FINAL TURNOVER
3/16" = 1'-0"
MECHANICAL PLAN
KEY NOTES
1 BOILER TO BE PROVIDED AS PACKAGED SKIDS WITH ALL
EQUIPMENT PRE-PIPED AND WIRED. CONTRACTOR TO MODIFY AS
NEEDED TO GET THROUGH DOOR. CONNECT NEW FLUE VENT
PIPING TO NEW ROOF CAP.
2 INSTALL RELOCATED AIR COMPRESSOR AND WATER TREATMENT
ON NEW HOUSEKEEPING PAD(S).
3 NEW FUME HOOD IS OWNER PROVIDED, CONTRACTOR
INSTALLED. COORDINATE FUME HOOD WITH OWNER AND INSTALL
IN THE LOCATION IDENTIFIED ON THE PLANS. DUCTWORK SHALL
BE STAINLESS STEEL AND BE INSTALLED PER MANUFACTURERS
SPECIFICATIONS.
4 OUTSIDE AIR DUCT DOWN FROM ROOF. INSTALL BALANCING
DAMPER IN RISER ACCESSIBLE FROM ROOM. OUTSIDE AIR TAP
INTO FIELD FABRICATED RETURN PLENUM.
5 ROUTE DUCTS IN CEILING ABOVE VH-1.
6 EXHAUST DUCTWORK IN HIGH HUMIDITY LOCATIONS TO BE G-90
GALVANIZED STEEL.
7 HOUSEKEEPING PADS SHALL EXTEND 6" MINIMUM BEYOND THE
MECHANICAL UNIT SUPPORTED. ALL CONCRETE SHALL BE
NORMAL WEIGHT WITH MINIMUM 28-DAY COMPRESSIVE
STRENGTH OF 4000 PSI, 4" MAX SLUMP, 5-7% AIR ENTRAINMENT,
AND 1" MAX AGGREGATE. CONCRETE SPECIAL INSPECTIONS AND
TESTS OF CONCRETE PER IBC TABLE 1705.3 ARE NOT REQUIRED.
CONCRETE REINFORCING SHALL BE ASTM A615 GRADE 60. CLEAR
CONCRETE COVER OF 3" FROM REINFORCING SHALL BE
PROVIDED WHEN CONCRETE IS CAST AGAINST EARTH AND 2"
FOR ALL OTHER CONDITIONS, UNO. WHERE EXTERIOR
HOUSEKEEPING PADS BEAR ON SOIL, SOIL SHALL BE INORGANIC
UNDISTURBED SOIL OR 6" OF CONTROLLED COMPACTED FILL.
8 CONTRACTOR SHALL PROVIDE A DEFERRED SUBMITTAL
DETAILING ANCHORAGE OF MECHANICAL UNITS TO
HOUSEKEEPING PADS. CALCULATIONS AND DETAILS SHALL BE
STAMPED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE
OF TEXAS.
9 WHERE NEW EXTERIOR HOUSEKEEPING PADS OCCUR ON
EXISTING SLAB AND CONFLICT WITH EXISTING HOUSEKEEPING
PADS, REMOVE THE EXISTING SLAB ON GRADE AND HOUSE
KEEPING PAD WITHIN THE NEW HOUSEKEEPING PAD EXTENT.
PROVIDE NEW HOUSEKEEPING PAD PER PLAN NOTES. WHERE
EXTERIOR NEW HOUSEKEEPING PADS DO NOT INTERFERE WITH
EXISTING HOUSEKEEPING PADS, CONTRACTOR OPTION TO ADD
0'-6" THICK CONCRETE HOUSEKEEPING PAD TO THE EXISTING
SLAB ON GRADE WITH #4 BARS AT 12" OC, CENTERED, EACH WAY,
AND #4 DOWEL AND EPOXY AT 2'-0" OC MAX (4" EMBED), IN LIEU
OF NEW HOUSEKEEPING PAD SPECIFIED ON PLAN.
10 AIR CONTROL VALVES TO BE MOUNTED IN HORIZONTAL DUCT.
SEE M-602 FOR MORE DETAIL.
11 POSITION GRILLE BLADES AT 45 DEGREE ANGLE TOWARDS
NORTH WALL OF LAB.
12 INSTALL AIR CURTAINS OVER ACCESS DOORS INTO
LABORATORY. INTERLOCK AIR CURTAIN WITH DOOR OPERATION.
13 EXTEND DUCT TO PROVIDE REQUIRED CLEARANCE FROM ERV
OUTSIDE AIR INTAKE. SEE M110 FOR CONTINUATION.
14 CONTRACTOR TO ADJUST DOUBLE DEFLECTION GRILLE SO THAT
THE AIR IS SPLIT AND AIMED AWAY FROM THE FACE OF THE FUME
HOOD ON THE OPPOSITE WALL. THE INTENT IS TO AVOID ANY AIR
CURRENTS GREATER THAN 50FPM AT THE FUME HOOD SASH TO
AVOID CURRENTS THAT WILL DRAW AIR BACK OUT OF THE FUME
HOOD AND COMPROMISE ITS PERFORMANCE.
15 INSTALL BOILER EMERGENCY SHUTOFF SWITCH AND CARBON
MONOXIDE SENSORS ON WALL.
16 FLUE VENT PIPING TO BE TYPE B VENT CONSTRUCTION. SEE
SPECIFICATION 235100 BREECHINGS, CHIMNEYS, AND STACKS.
17 JOISTS ARE ASSUMED TO BE 2X12 JOISTS SPANNING 10'-0" MAX
PLAN NORTH TO SOUTH, CONTRACTOR FIELD VERIFY AND NOTIFY
EOR IF DIFFERENT. ASSUMED EXISTING MAXIMUM JOIST SPACING
= 2'-0" OC, NOTIFY EOR IF GREATER.
NN
PLANTRUE
SCALE: 3/16"=1'-0"
4' 12'8'
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
M
SEE 3/M-502
DECOUPLING PIPE
CONNECTIONS FOR
TEMPORARY CHILLER
CHS TO BLDG 6403
CHR FROM BLDG 6403
(N) CHLR-1 (N) CHLR-2
(N) ET-1
(N) AS-1
(N) GF-1
(N) CHWP-4(N) CHWP-3
(N) BT-1
GRADE
END OF LINE
PRESSURE
N.O. N.O.
N.C.
N.C.
N.O.
N.O.
M M
M
FLOW CONTROL
VALVE, TYP.
3" CHS
3" CHR
3" CHS
3" CHR
3" CHS
3" CHR
3" CHS
3" CHR
3" CHR
3" CHR
3/4" CHR
CHILLED WATER PLANT SEQUENCE OF OPERATIONS:
A. ON A CALL FOR COOLING, LEAD CHILLER PRIMARY PUMP (CHWP-1/2) WILL ENABLE AND RUN AT CONSTANT SPEED FOR 2 MINUTES (ADJ.) PRIOR TO ENABLING CHILLER. CHILLERS AND PUMPS WILL OPERATE IN LEAD/LAG UNLESS ONE CHILLER IS UNABLE TO MEET SETPOINT. DURING NORMAL OPERATIONS, THE LEAD SHALL OPERATE 80% OF THE TIME AND THE LAG CHILLER SHALL OPERATE 20% OF THE TIME: ONCE A WEEK, TOTALIZE RUN TIMES OF EACH
CHILLER/PUMP TO DETERMINE IF 80/20 OPERATION SPLIT IS MAINTAINED.
B. AFTER THE PUMP HAS BEEN RUNNING FOR MORE THAN 2 MINUTES (ADJ), ENABLE THE CHILLER, AND SET THE CHILLED WATER SUPPLY TEMPERATURE SETPOINT TO 44°F (ADJ). IF THE OUTSIDE AIR TEMPERATURE FALLS BELOW 34°F (ADJ), DISABLE THE CHILLER. IF THE LEAD CHILLER IS UNABLE TO MEET SETPOINT AFTER 10 MIN. (ADJ.) OF OPERATION AT 100% CAPACITY, THE LAG CHILLER WILL ENABLE TO PROVIDE SUPPLEMENTARY COOLING.
C. ALARMS REPORTED AT THE EMCS WORKSTATION:
1. CHILLER ALARM
D. SECONDARY SYSTEM PUMPS CHWP-3/4:
1. UPON A CALL FOR COOLING, TURN ON THE LEAD SECONDARY CHILLED WATER PUMP. MODULATE THE PUMP TO MAINTAIN AN END OF LINE PRESSURE OF 5 PSI (ADJ). IF THE CHILLER IS DISABLED, WAIT 10 MINUTES (ADJ), THEN TURN OFF THE PUMP. IF THE LEAD PUMP FAILS, LOCK OUT THE LEAD PUMP AND ENABLE THE LAG PUMP. IF A PUMP IS LOCKED OUT, IT SHALL ONLY BE UNLOCKED AT THE WORKSTATION BY AN OPERATOR. WHEN THE LEAD PUMP IS UNLOCKED, THE LAG PUMP SHALL TURN OFF AFTER THE LEAD PUMP PROVES TO BE RUNNING. DURING NORMAL OPERATIONS, THE LEAD PUMP SHALL OPERATE 80% OF THE TIME AND THE LAG PUMP SHALL OPERATE 20% OF THE TIME:
ONCE A WEEK, TOTALIZE RUN TIMES OF EACH PUMP TO DETERMINE IF 80/20 OPERATION SPLIT IS MAINTAINED. THIS REDUCES THE LIKELIHOOD OF BOTH PUMPS REACHING END OF LIFE NEAR THE SAME TIME.
2. IF A PUMP IS LOCKED OUT IT SHALL BECOME THE LAG PUMP REGARDLESS OF RUNTIME. WHEN SWITCHING PUMPS, RUN BOTH PUMPS UNTIL THE NEW LEAD PUMP PROVES TO BE RUNNING, THEN TURN OFF THE NEW LAG PUMP. IF A PUMP IS COMMANDED TO RUN AND THE STATUS SWITCH INDICATES NO FLOW AFTER A 30 SECOND DELAY (ADJ), A PUMP FAILURE ALARM WILL BE GENERATED, AND THE LAG PUMP WILL BE GIVEN A START COMMAND.
3. THREE-WAY BYPASS VALVES (AT UNITS INDICATED ON PLANS) SHALL MODULATE INVERSELY TO THE ASSOCIATED CHILLED WATER CONTROL VALVE TO MAINTAIN THE MINIMUM FLOW REQUIRED THROUGH THE CHILLED WATER SECONDARY PUMP. AS THE ASSOCIATED CHILLED WATER CONTROL VALVE CLOSES, THE THREE-WAY BYPASS VALVE SHALL OPEN PROPORTIONALLY TO MAINTAIN MINIMUM SYSTEM FLOW.
E. ALARMS REPORTED AT THE EMCS WORKSTATION:
1. PUMP FAILURES OF CHWP-01 OR CHWP-02
F. GLYCOL FEEDER
1. WHEN ENABLED, ENABLE GLYCOL FEEDER PUMP TO MAINTAIN THE DIFFERENTIAL PRESSURE SETPOINT. IF DIFFERENTIAL PRESSURE EXCEEDS A HIGH LIMIT, DISABLE THE PUMP AND SEND AN ALARM TO THE BAS.
2. ALARMS REPORTED AT THE ECMS WORKSTATION:
i. GLYCOL CIRCULATION PUMP FAILURES
ii. HIGH DIFFERENTIAL PRESSURE
iii. GLYCOL LOW LEVEL
G. POINTS TO BE MONITORED THROUGH MAB NIAGRA SYSTEM
1. CHLR-1 SUPPLY TEMP
2. CHLR-2 SUPPLY TEMP
3. CHWP-1 STATUS
4. CHWP-4 STATUS
5. CHLR-1 STATUS
6. CHLR-2 STATUS
7. CHLR-1 ALARM
8. CHLR-2 ALARM
9. BUILDING SUPPLY TEMP
VFD
AI
BACNET
DO
AO
START/STOP
SPEED
HERTZ
HAND/AUTO
FAULT
CURRENT
VFD
AI
BACNET
DO
AO
START/STOP
SPEED
HERTZ
HAND/AUTO
FAULT
CURRENT
BACNET
DO
AO
ENABLE/DISABLE
SETPOINT
TEMPERATURES
HERTZ
HAND/AUTO
FAULT
PRESSURES
FLOW SWITCH
BACNET
DO
AO
ENABLE/DISABLE
SETPOINT
TEMPERATURES
HERTZ
HAND/AUTO
FAULT
PRESSURES
FLOW SWITCH
(N) CHWP-2(N) CHWP-1
AO
AI
BACNET
HERTZ
HAND/AUTO
FAULT
CURRENT AI
BACNET
HERTZ
HAND/AUTO
FAULT
CURRENT
DI
LOW LEVEL
ALARM
AO
AO
CHILLED WATER
SUPPLY TEMPERATURE
PRIMARY LOOP
T
AI
T
AI
CHILLED WATER
RETURN TEMPERATURE
PRIMARY LOOP
T AI
T
AI
CHILLED WATER
RETURN TEMPERATURE
SECONDARY LOOP
CHILLED WATER
SUPPLY TEMPERATURE
SECONDARY LOOP
DPAI
STATUS STATUS
DO START/
STOP
DO START/
STOP
DO ENABLE/DISABLE
AO SETPOINT
3 3
TYPICAL AIR HANDLING UNIT
A. THE SYSTEM SHALL BE AUTOMATICALLY STARTED OR STOPPED BY THE BAS.
B. UPON A SIGNAL TO START THE UNIT, THE OUTSIDE AIR SHALL MODULATE OPEN BEFORE THE FAN STARTS. THE DAMPER SHALL BE CONTROLLED BY THE BAS.
C. FAN IS ENABLED TO RUN AT CONSTANT VOLUME WHILE THE BUILDING IS OCCUPIED.
1. FAN WILL RE-CIRCULATE AIR WITHIN ZONE AND INTRODUCE OUTSIDE AIR. AHU-8,9,10,11 & 12 WORK IN TANDEM WITH EF-3, WHICH IS ALWAYS ON, EVEN IN PURGE
MODE. AHUS 8, 9, 10, 11, & 12 SHOULD SHUT DOWN WHEN GREENHOUSE IS IN PURGE MODE.
D. AHU SHALL MODULATE SUPPLY AIR TEMPERATURE TO MAINTAIN ZONE THERMAL SETPOINT.
1. UPON A CALL FOR COOLING, THE CHILLED WATER VALVE WILL SLOWLY MODULATE OPEN TO MAINTAIN THE ZONE TEMPERATURE SETPOINT.
2. UPON A CALL FOR HEATING, THE ELECTRIC RESISTANCE HEATER SHALL MODULATE TO MAINTAIN THE ZONE TEMPERATURE SETPOINT. COOLING COIL SHALL BE
FULLY CLOSED.
E. DEHUMIDIFICATION MODE SHALL BE ENABLED IF THE ZONE HUMIDITY RISES ABOVE RH SETPOINT (55% ADJ.) CHILLED WATER VALVE IS TO BE CONTROLLED BASED ON SUPPLY HUMIDITY AND THE ELECTRIC REHEAT IS CONTROLLED BASED ON SUPPLY TEMPERATURE.
1. COOLING COIL IS TO MODULATE DISCHARGE AIR TEMPERATURE TO 49°F (ADJ.) TO REMOVE ADDITIONAL MOISTURE CONTENT FROM THE AIR.
2. ELECTRIC REHEAT COIL WILL MODULATE TO PROVIDE 55°F (ADJ.) SUPPLY AIR AT 80% (ADJ.) RELATIVE HUMIDITY.
3. DEHUMIDIFICATION MODE WILL CANCEL IF OUTSIDE AIR TEMPERATURE IS LESS THAN 55°F (ADJ.), OR IF SUPPLY AIR RELATIVE HUMIDITY IS LESS THAN 60% (ADJ.)
WITH THE REHEAT DISABLED FOR 15 MINUTES (ADJ.).
F. FAILURE MODES:
1. ALARM ALL FAILURES AT THE BAS STATION. ADDITIONAL ALARMS REPORTED:
i. DIRTY FILTER
ii. HIGH ZONE HUMIDITY FOR MORE THAN 5 MINUTES (ADJ.)
iii. SUPPLY AIR RH ABOVE 89% FOR MORE THAN 5 MINUTES (ADJ.)
iv. SUPPLY AIR TEMPERATURE ABOVE OR BELOW SETPOINT FOR MORE THAN 5 MINUTES (ADJ.)
v. HIGH WATER LEVEL IN UNIT DRIP PAN
2. FAN SHALL FAIL IN THE OFF POSITION. OUTSIDE AIR DAMPER SHALL FAIL CLOSED.
AIR HANDLING UNIT CONTROL DIAGRAM
TYPICAL ALL
AHU-X
MERV 13
FILTER
C
C
AI
T
MA TEMP
LS
DIC
H
S
C H
R
M
AIFILTER
DP
AO
CHILLED WATER
2-WAY VALVE
DI
AO
START/STOP
STATUS/ALARM
SPEED
DO
DI
DI
ENABLE/DISABLE
STATUS/ALARM
AIRFLOW PROVING SWITCH
AO
SCR
CONTROL
PANEL
ELECTRIC
HEATER
CONDENSATE
LEVEL
ALARM
ECM
CAPACITY
AIT SUPPLY TEMP
ROOF
M
DO
RETURN
AIR
SUPPLY
AIR
AI SUPPLY RHH
ZONE RH
AI ZONE TEMPT
H AI
T
AI
DISCHARGE
AIR TEMP
AI SA FLOW
AI
T
RA TEMP
AI TOA TEMP
PT DO
ADJ ADJUSTABLE
AFMS AIR FLOW MEASURING STATION
AI ANALOG INPUT
ALM ALARM
AO ANALOG OUTPUT
AVG AVERAGE/AVERAGING
B BOILER
BAS BUILDING AUTOMATION SYSTEM
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CH CHILLER
CS CURRENT SWITCH
CT CURRENT TRANSDUCER/
COOLING TOWER
DDC DIRECT DIGITAL CONTROL
DI DIGITAL INPUT
DEM DIGITAL ENERGY MONITOR
DMPR DAMPER
DO DIGITAL OUTPUT
DPT DIFFERENTIAL PRESSURE TRANSDUCER
DPS DIFFERENTIAL PRESSURE SWITCH
DX DIRECT EXPANSION
EA EXHAUST AIR
EF EXHAUST FAN
EH ELECTRIC HEATER
ES END SWITCH
F FAN
HPS HIGH PRESSURE SWITCH
HX HEAT EXCHANGER
LPS LOW PRESSURE SWITCH
LTD LOW TEMPERATURE DETECTOR
M MOTORIZED ACTUATOR
NO NORMALLY OPEN
NC NORMALLY CLOSED
OA OUTSIDE AIR
OCC OCCUPANCY
P PRESSURE/PUMP
RA RETURN AIR
RE RELAY
RF RETURN FAN
RFP REMOTE FIELD PANEL
RH RELATIVE HUMIDITY
SA SUPPLY AIR
SC STEAM COIL
SD SMOKE DETECTOR
T TEMPERATURE
TEC TERMINAL EQUIPMENT CONTROLLER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VLV VALVE
XFMR TRANSFORMER
CONTROLS ABBREVIATIONS AND LEGEND
S
R
M
OR
AIR FLOW MEASURING
STATION
CURRENT SENSOR
DAMPER - BACKDRAFT
DAMPER - OPPOSED
DAMPER - PARALLEL
DDC CONTROL POINT
MOTOR ACTUATOR
ELECTRICAL FEEDERS
END SWITCH
HUMIDIFIER
INLET VANES
MOTOR
MANUAL MOTOR STARTER
COMBINATION MOTOR
STARTER
PILOT TUBE
SWITCH - SENSOR
SENSOR
SENSOR WITH SUN SHIELD
SOLENOID
STRAP-ON SENSOR
RELAY
RIGID SENSOR
VALVE 2-WAY
VALVE 3-WAY
(COMMON IS SOLID)
WELL SENSOR
WHIP SENSOR
VORTEX FLOW SENSOR
LS LIQUID SENSOR
PI PRESSURE INSTRUMENT
PS PRESSURE SWITCH
PT PRESSURE TRANSDUCER
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:1
:4
P M
10/17/2025
PJTM
DJP
212431
M-601
MECHANICAL
DIAGRAMS
FINAL TURNOVER
CHILLED WATER CONTROL DIAGRAM
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
PT
AI
PT
AI
FILTER PRE-FILTER
MANUAL SHUTOFF
DAMPER, TYP.
M
DO
OPEN
CLOSE
HF-2
ECM
AO
DO
DI
AI
SETPOINT
START/STOP
STATUS
CURRENT
T
H
AI
AI
SPACE TEMP
SPACE HUMIDITY
LV-X
M
DO
OPEN/
CLOSE
ECM
AO
DO
DI
AI
SETPOINT
START/STOP
STATUS
CURRENT
EF-3
GH (TYP.)
EA
PURGE MODE IS TURNED ON AND OFF AT THE BAS BY THE
USER. NOTE THAT PURGE MODE DOES NOT INCLUDE
HEPA FILTRATION.
WHEN A GREENHOUSE GOES INTO PURGE MODE THE
FOLLOWING SEQUENCE SHALL OCCUR:
1. OPEN THE LOUVER.
2. OPEN EF-X DAMPER
2. TURN ON EF-X
3. TURN OFF AHU-X
WHEN PURGE MODE IS TURNED OFF THE REVERSE SHALL
OCCUR.
AHU-8,9,10,11, & 12
(EF-4, 5, 6, 7, & 8)
DO
OPEN
CLOSE
M
DO
OPEN
CLOSE
ECM
AO
DO
DI
AI
SETPOINT
START/STOP
STATUS
CURRENT
EF-9 & 10
SYSTEM AUTO START/STOP BY BAS,
GENERAL EXHAUST ENABLED, DAMPER
OPEN WHEN ON, CLOSED WHEN OFF.
EF-10 ON WHENEVER OUTSIDE AIR TEMP IS
ABOVE 70F (ADJ.)
EF-9 ON WHEN ROOM TEMP EXCEEDS 80F.
M
3 RSAFETY RELAY
SAFETY RELAY
BACNET
80 PSI STEAM TO
AUTOCLAVE
20 PSI STEAM
TO BUILDING
P
AI
P
AI
FAULT
B-1
SEQUENCE OF OPERATION
1. BOILER SHALL ALWAYS BE ENABLED UNLESS IT IS SHUT
DOWN FOR LONG TERM
2. BOILER SHALL OPERATE TO MAINTAIN STEAM PRESSURE
USING FACTORY CONTROLS.
3. DDC SYSTEM SHALL MONITOR BOILER STATUS.
4. BOILER SHALL DISABLE BURNERS WHEN MEASURED LEVEL
OF CO RISES ABOVE 50 PPM. CARBON MONOXIDE
DETECTOR SHALL DISABLE BURNERS UPON LOSS OF
POWER TO THE DETECTOR.
5. CSD-1 SWITCH TO DISABLE BOILER UPON ACTIVATION.
DISTATUS
CO
R
120V
XFMR
24V AC
ROOM CARBON
MONOXIDE SENSOR
DIALARM
R
ES
EMERGENCY BOILER
SHUTOFF SWITCH
(LOCATED IN BOILER ROOM
NEAR ENTRY DOOR)
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA/APHIS
CONTAINMENT FACILITY
BUILDING 6403
MOORE AIR BASE
EDINBURG, TEXAS
COFFMAN PROJECT # 212431
/1
/2
:1
:4
P M
10/17/2025
PJTM
DJP
212431
M-603
MECHANICAL
DIAGRAMS
FINAL TURNOVER
NTS
GREENHOUSE EXHAUST CONTROL DIAGRAM
NTS
GENERAL EXAHUST
12" = 1'-0"
STEAM BOILER CONTROL DIAGRAM
REV DATE DESCRIPTION
1 08/12/26 ADDENDUM #1
AIR HANDLING UNIT SCHEDULE
TAG
MANUFACTURER/
MODEL
SUPPLY FAN DUCT HEATER COOLING COIL
UNIT POWER REQMTS UNIT
WT.
(LBS)
REMARKSCOOLING
CFM
MIN OA
CFM
ESP
("WC)
TSP
("WC)
MOTOR DATA
TOTAL KW
POWER REQMTS
FLUID
TOTAL
MBh
SENS.
MBh
ROWS/
FPI
EAT (F) LAT (F) APD
(IN WC)
FLOW
(GPM)
EWT
(F)
LWT
(F)
WPD
(FT)HP RPM FLA VOLTS Ø DB WB DB WB VOLTS Ø MCA MOCP
AHU-5
ENVIRO-TEC/
CDVB16
800 155 .5 - (2) 1/3 - 5.6 5 208 1 12% PG 36 18 4/12 78 67 52.0 51.6 - 5.2 40 55 5.23 208 1 37 40 192 1, 2, 3, 5
AHU-6
ENVIRO-TEC/
CDVB16
1000 260 .5 - (2) 1/3 - 5.6 5 208 1 12% PG 36 18 4/10 77 64 51.9 50.9 - 5.3 40 55 11.75 208 1 37 40 192 1, 2, 3, 5
AHU-7
ENVIRO-TEC/
CDVB10
850 150 .5 - 1/3 - 2.8 3 208 1 12% PG 18 12 4/10 76 62 56.4 53.9 - 2.8 40 55 3.31 208 1 33.6 35 147 1, 2, 3, 5
AHU-8
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-9
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-10
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-11
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
AHU-12
ENVIRO-TEC/
VDD12
1000 100 .5 1.2 1/2 1385 2.49 5 208 1 12% PG 24 18 6/12 76 60 53.3 51.0 0.66 3.4 40 55 .86 208 1 36.3 40 333 1, 2, 3, 5
1. CONDENSATE PAN SHALL BE STAINLESS STEEL, CONDENSATE SHALL BE ROUTED TO NEAREST FLOOR DRAIN.
2. UNIT SHALL HAVE 2" MERV 13 FILTERS.
3. UNIT IS VERTICAL AIR HANDLING UNIT.
4. (NOT USED).
5. CONNECT OUTSIDE AIR DUCTWORK INTO RETURN AS SHOWN ON PLANS. BALANCE OUTSIDE AIR DAMPER TO MATCH MIN OA CFM LISTED IN THE SCHEDULE.
ENERGY RECOVERY VENTILATOR
TAG LOCATION SERVES
MANUFACTURER/
MODEL
SUPPLY FAN EXHAUST FAN ENERGY RECOVERY MODULE DUCT HEATER COOLING COIL UNIT ELECTRICAL
REQUIREMENTS
SUPPLY AIR FILTERS
SIZE (WxLxH)
UNIT
WT.
(LBS)
REMARKS
TOTAL CFM ESP
(IN. WC)
MOTOR DATA
TOTAL CFM ESP
(" WC)
MOTOR DATA SUMMER WINTER
CAPACITY
(KW)
EAT
(°F)
LAT
(°F)
FLUID
TOTAL
CAPACITY
(MBH)
SENS.
CAPACITY
(MBH)
EWT
(°F)
LWT
(°F)
FLOW
(GPM)
EAT
DB/WB
(°F)
LAT
DB/WB
(°F)
BHP HP RPM DRIVE BHP HP RPM DRIVE OAT
DB/WB (°F)
LAT
DB/WB (°F)
TOTAL
EFF %
OAT
DB (°F)
LAT
DB (°F)
TOTAL
EFF %
VOLTS Ø MCA MOCP # TYPE SIZE (IN)
ERV-1 OUTSIDE LAB/AUTOCLAVE AIR
GREENHECK/
RVC-85-PH-CW-1-A1
2230-3230 3.5 4.80 5 1750 DIRECT 1990-2790 2.5 1.80 3 1165 DIRECT 82.9/78.9 78.2/72.3 73.5 36.5 43.8 80 28.7 51.8 77 12% PG 287.5 126.3 40 55 39.2 78.2/72.3 46.5/46.5 208 3 129 150 2 (1) MERV 8
(1) MERV 13
16x20x2 68"x197"x73" 4175 1,2,3,4,5,6
1. 100% OUTSIDE AIR AND EXHAUST UNIT WITH HEAT RECOVERY CORE.
2. UNIT TO BE SUPPLIED WITH CHILLED WATER COOLING AND ELECTRIC RESISTANCE HEATING.
3. UNIT TO BE SUPPLIED WITH DEHUMIDIFICATION CAPABILITIES.
4. EXHAUST FILTERS NOT INTEGRAL TO UNIT. SEE FILTER HOUSING SCHEDULE.
5. UNIT INLET AND OUTLET CONNECTIONS SHALL MATCH LOCATIONS SHOWN ON DRAWINGS.
6. PROVIDE UNIT WITH A PRESSURE TRANSDUCER FOR EACH AIRSTREAM TO MONITOR AIRFLOW.
SPECIALTY EXHAUST LABORATORY EQUIPMENT CONNECTION SCHEDULE
TAG EQUIPMENT SERVES SERVED BY MANUFACTURER / MODEL LENGTH (FT) TYPE EXHAUST
CONN. (IN)
S.P. AT COLLAR
(IN. WG.)
DESIGN CFM SASH
OPENING (IN)
UNIT POWER
REQUIREMENTS REMARKS
VOLTS Ø FLA
FH-1 FUME HOOD LAB #1 EF-12 BY OTHERS - - - - 1180 - - - - 1,2
1. NEW FUME HOOD PROVIDED BY OWNER AND INSTALLED BY DIVISION 23 CONTRACTOR.
2. THE LOCAL APHIS PROGRAM WILL HIRE THE FUME HOOD CERTIFIER. G.C. TO COORDINATE WITH THE SCHEDULE.
FAN SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
DESCRIPTION FAN PERFORMANCE MOTOR ELECTRICAL
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKS
TYPE DRIVE FLOW
(CFM)
ESP
(" WC)
SPEED
(RPM)
NOISE
(SONES)
BHP
HP VOLTS Ø FLA
EF-3
GREEN HOUSE
GENERAL EXHAUST
GREENHECK/
SQ-140HP-VG
IN LINE
CENTRIFUGAL
DIRECT 500 2 2200 15.9 0.40 1 120 1 10.40 68 1, 2, 3
EF-4
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-5
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-6
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-7
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-8
GREEN HOUSE
PURGE
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 550 0.25 1413 6.3 0.05 1/10 120 1 1.38 64 1, 2
EF-9 ELEC. ROOM
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 300 0.25 1059 4.3 0.02 1/10 120 1 1.38 64 1, 2
EF-10 BOILER ROOM
GREENHECK/
G-090-VG
ROOF
CENTRIFUGAL
DIRECT 300 0.25 1059 4.3 0.02 1/10 120 1 1.38 64 1, 2
EF-11
AUTO CLAVE
& VH-1
GREENHECK/
USF-6
UTILITY UP
BLAST
DIRECT 600 2 2319 16.9 0.34 1/2 120 1 - 133 1, 2
EF-12 FUME HOOD
GREENHECK/
VEKTOR-H-12
FUME
EXHAUST
DIRECT 1200 4 3571 - 1.65 3 208 3 - 485 2, 4, 5
1. PROVIDE FAN WITH MOTORIZED DAMPER FOR INSTALLATION AT BUILDING ENVELOPE.
2. PROVIDE WITH 0-10VDC CONTROL MODULE.
3. PROVIDE ROOF CAP FOR EXTERIOR PENETRATION. SEE ROOF CAP SCHEDULE.
4. FAN TO BE LINKED TO SWITCH ON FUME HOOD (FH-1). FAN TO BE ENERGIZED WHEN FUME HOOD IS TURNED ON.
5. FAN TO BE SELECTED WITH SIDE WALL INLET.
DIFFUSER AND GRILLE SCHEDULE
TAG SYSTEM MFR MODEL MATERIAL DESCRIPTION FACE SIZE
(IN)
NECK
SIZE (IN)
MAX CFM REMARKS
1S SUPPLY AIR PRICE SCD STEEL T-BAR MOUNTED SQUARE DIFFUSER 24x24 8Ø 280 1,3
2S SUPPLY AIR PRICE SCD STEEL SURFACE MOUNTED SQUARE DIFFUSER 12x12 8Ø 250 2,3
3S SUPPLY AIR PRICE ASCD ALUM. SURFACE MOUNTED SQUARE DIFFUSER 12x12 8Ø 250 2,3
4S NOT USED
5S SUPPLY AIR PRICE 510 STEEL SURFACE MOUNTED RECTANGULAR DIFFUSER 8x6 8x6 180 2,3
6S SUPPLY AIR PRICE 510 STEEL SURFACE MOUNTED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .