Attachment 1 - Schedule of IItems.pdf

PDF 287 KB Posted

Attached to
Crane Lake Dam Rehabilitation
Solicitation number
12445526Q0047
Issued by

About this file

This document is a Schedule of Items (Section B) for the Crane Lake Dam Rehabilitation project located in the Potosi-Fredericktown Springs Ranger District, Mark Twain National Forest, State of Missouri.

The base estimate includes 20 line items encompassing mobilization and demobilization, construction surveying and staking, contractor quality control, sampling and testing, soil erosion and sediment control, clearing and grubbing, removal of existing concrete structures, excavation and embankment (5,200 cubic yards), modular retaining walls (380 square feet), engineered turf (4,540 square yards), reinforced subgrade work (548 square yards), minor concrete structures including NRCS baffle riser, impact basin, and anchor trench (993 linear feet), under drains including toe drains (390 linear feet) and drainage layer (811 square yards), horizontal drains with reinforced concrete pressure pipe (155 linear feet), and turf establishment (1 acre). All base estimate line items are priced on a lump-sum (LS) basis with the exception of excavation and embankment, which is estimated at 5,200 cubic yards. The document also includes one optional bid item for a permanent spillway with rockery and void-filled riprap, comprising eight line items with quantities including 34,200 cubic yards of spillway grading, 600 tons of Class 3 riprap, 880 tons of rockery, and 1.5 acres of permanent turf establishment. Bidders are required to provide unit prices and total prices for all line items in both the base and optional estimates.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Crane Lake Dam Rehabilitation Section B

Pg. 1

SECTION B SCHEDULE OF ITEMS

CRANE LAKE DAM REHABILITATION

POTOSI-FREDERICKTOWN SPRINGS RANGER DISTRICT

MARK TWAIN NATIONAL FOREST

STATE OF MISSOURI

BASE ESTIMATE

FP-14

Section

Pay Item Description Estimated

Qty Unit Total Price

151 Mobilization and Demobilization 1 LS $_______________________________

152 Construction Surveying & Staking 1 LS $_______________________________

153 Contractor Quality Control 1 LS $_______________________________

Sampling & Testing - Including but not limited to: Supplemental Specifications 204.15, FP-14 Table 208-1, FP-14 Table 209-1, FP-14 Table 302-1 & FP-14 Table 552-9)

1 LS

155 Schedules for Construction Contracts 1 LS

157 Soil Erosion and Sediment Control and Lake Drawdown 1 LS $_______________________________

201 Clearing and Grubbing 1 LS $_______________________________

203 Removal of Structures & Obstructions (Removal/Recycling of Existing Concrete Structures)

1 LS

204 Excavation & Embankment 5,200 CY LS $_______________________________

255 Modular Retaining (MSE) Walls 380 SF LS $_______________________________

261 Engineered Turf 4,540 SY LS $_______________________________

302 Reinforced Subgrade at Dam Crest

548 SY LS

601 Minor Concrete Structures (NRCS Baffle Riser)

1 LS

601 Minor Concrete Structures (NRCS Impact Basin)

1 LS

601 Minor Concrete Structures (Anchor Trench)

993 LF LS

605 Under Drains (Toe Drains) 390 LF LS $_______________________________

605 Under Drains (Drainage Layer) 811 SY LS $_______________________________

Pg. 2

Section

Pay Item Description Estimated

Qty Unit Total Price

610 Horizontal Drains (30” Reinforced Conc Pressure Pipe with filter drain and concrete cradle)

155 LF LS

625 Turf Establishment 1 ACRE LS $_______________________________

TOTAL BASE BID ESTIMATE $_______________________________

Pg. 3

OPTIONAL BID ITEM 1 ESTIMATE (PERMANENT SPILLWAY WITH ROCKERY

AND VOID FILLED RIPRAP)

Section

Pay Item Description Estimated

Qty Unit Unit Price

Total Price

152 Construction Surveying & Staking 1 LS $_________ $_________

153 Contractor Quality Control 1 LS $_________ $_________

Sec 204 Excavation & Embankment Sampling & Testing (Per FP-14 Table 204-1)

1 LS $_________ $_________

204 Excavation & Embankment (Spillway grading)

34,200 CY $_________ $_________

207 Earthwork Geosynthetics (Filter Fabric on Outfall Channel Drop Structures)

80 SY

251 Riprap, Class 3 (VFR) 600 TON $_________ $_________

252 Rockery (Outfall Channel Drop Structures)

880 TON $_________ $_________

625 Permanent Turf Establishment 1.5 AC $_________ $_________

OPTIONAL ITEM 1 ESTIMATE $________