Attachment 7 - CD-03.pdf
PDF 2 MB Posted
- Attached to
- Crane Lake Dam Rehabilitation
- Solicitation number
- 12445526Q0047
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a construction details drawing for the Crane Lake Dam Rehabilitation project located in the Mark Twain National Forest, Potosi-Fredericktown Ranger District, prepared by the United States Department of Agriculture Forest Service Eastern Region.
The drawing provides technical specifications for two critical construction details: a typical anchor trench and a batten bar detail. The anchor trench design includes a round-edged trench with 1.5-foot minimum dimensions, backfill with 4000 psi concrete or non-erodible compacted soil, and HydroTurf CS geosynthetic lining material. The batten bar detail specifies installation of a 4" x 2" stainless steel batten bar with 3/8" x 31" stainless steel anchor bolts, 2" x 2" closed cell neoprene sponge (SC42-M), neoprene adhesive, and caulking. The drawing notes specify that HydroTurf CS material must achieve intimate contact with trench walls and bottoms with all wrinkles and imperfections removed, that the geosynthetic must terminate at a minimum of 3/4 of the trench bottom width, and that anchor trenches in rock may require dental treatment per Supplemental Specifications Section 628. Spacing requirements for stainless steel nuts and washers are referenced in Supplemental Specifications Section 603, and adequate energy dissipation and erosion control measures are required at downstream terminations per the Engineer of Record.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.5'
1.5'
CAULKING
14" x 2" STAINLESS STEEL BATTEN BAR
12" x 2" CLOSED CELL
NEOPRENE SPONGE
SC42-M
SS NUT
AND WASHER
SPACING PER
SUPPLEMENTAL
SPECIFICATIONS
SECTION 603
STAINLESS STEEL ANCHOR BOLT
8" x 3
1"
NEOPRENE ADHESIVE
HYDROBINDER INFILL
â â
HYDROTURF CS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/ 2/
2:
R O
B
ER
TC
O
N A
W A
Y C
PR
O
JE
C
TS
\S A
LE
M
-P O
TO
SI
-F R
ED
ER
IC
K
TO
W
N \C
R A
N E
LA
K
E\ D
R A
W
IN
G S\
C R
A N
E D
ES
IG
N
-3 0-
R
O
TA
TE
D
A N
D T
A
PE
R
ED
.D W
G
R09
EASTERN REGION
CRANE LAKE
DAM
REHABILITATION
MARK TWAIN NATIONAL
FOREST
POTOSI-FREDERICKTOWN
RANGER DISTRICT
CONSTRUCTION DETAILS
RKC
RKC
JD
TYPICAL ANCHOR TRENCH BATTEN BAR DETAIL
ANCHOR TRENCHES IN ROCK MAY REQUIRE
DENTAL TREATMENT SEE SUPPLEMENTAL
SPECIFICATIONS SECTION 628.
File details come from the government source that posted it. Updated .