This document is a Supplemental Specifications for Construction (FP-14) issued by the Forest Service, US Department of Agriculture for the Crane Lake Dam Rehabilitation project located in the Potosi-Fredericktown Ranger District of the Mark Twain National Forest in Missouri.
The specifications establish detailed requirements for dam rehabilitation construction work including water level drawdown, material removal and recycling, installation of new conduits and control structures, and embankment armoring using HydroTurf CS system with penetrating catalyzed silicate concrete treatment. Key work components include: unclassified excavation and earthfill placement with Class A, B, or C compaction requirements; installation of reinforced concrete pressure pipe (ASTM C361-22 Class A) with gasket joints and filter materials; batten bar anchoring using stainless steel fasteners; water control gates (aluminum or stainless steel) with hoisting equipment; rock surface preparation and dental concrete/mortar treatment; and synthetic turf installation with cementitious infill (Hydrobinder) and surface sealing. The specifications require contractors to control lead-contaminated aggregate sourcing from specified Missouri counties through visual inspection and lead testing (maximum 100 PPM) using ASTM standard methods, with sampling requirements ranging from 3-10 samples based on material quantity. Foundation preparation, moisture control during placement, compaction testing, and curing procedures are specified with detailed acceptance criteria. All work must comply with Federal Acquisition Regulations (FAR), Forest Service Acquisition Regulations (FSAR), and applicable safety standards including OSHA requirements. The document includes extensive technical references to ASTM standards, ACI guidelines, and manufacturer specifications for materials and installation procedures throughout the project scope.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRANE LAKE DAM REHABILITATION – MTNF POTOSI-FREDERICKTOWN RANGER DISTRICT
Project Number – Issue Date – Revision Number
Section 03 49 01 p.1 v.22343
FP-14 SUPPLEMENTAL SPECIFICATIONS FOR CRANE LAKE
DAM REHABILITATION
PREFACE
PREFACE_WO_08_25_2022
DELETE ALL BUT THE FIRST PARAGRAPH AND ADD THE FOLLOWING:
THE FOREST SERVICE, US DEPARTMENT OF AGRICULTURE HAS ADOPTED FP-14 WITH
THE FOLLOWING SUPPLEMENTAL SPECIFICATION FOR CONSTRUCTION IMPROVEMENTS
TO CRANE LAKE.
101 - TERMS¸ FORMAT¸ AND DEFINITIONS
101.01_NATIONAL_9_15_2016
ADD THE FOLLOWING PARAGRAPH TO SUBSECTION 101.01:
101.01 MEANING OF TERMS.
DELETE ALL REFERENCES TO THE TAR (TRANSPORTATION ACQUISITION REGULATIONS) IN THE
SPECIFICATIONS.
101.03_NATIONAL_4_7_2015
ADD THE FOLLOWING TO SUBSECTION 101.03:
101.03 ABBREVIATIONS.
ADD THE FOLLOWING:
(A) ACRONYMS.
AGAR — AGRICULTURE ACQUISITION REGULATIONS
FSAR — FOREST SERVICE ACQUISITION REGULATIONS
MSHA — MINE SAFETY AND HEALTH ADMINISTRATION
NESC — NATIONAL ELECTRICAL SAFETY CODE
(F) MISCELLANEOUS UNIT ABBREVIATIONS.
MP — MILEPOST LOCATION
PPM — PARTS PER MILLION VOLUMES
STA STATION LOCATION
p.2 v.22343
101.04_NATIONAL_9_5_2018
MAKE THE FOLLOWING CHANGES TO SUBSECTION 101.04:
DELETE THESE DEFINITIONS AND REPLACE THE FOLLOWING:
BID SCHEDULE — THE SCHEDULE OF ITEMS.
BRIDGE — A STRUCTURE, INCLUDING SUPPORTS, ERECTED OVER A DEPRESSION OR AN OBSTRUCTION
SUCH AS WATER ALONG A ROAD, A TRAIL, OR A RAILWAY AND HAVING A DECK FOR CARRYING TRAFFIC
OR OTHER LOADS.
CONTRACTOR — THE INDIVIDUAL OR LEGAL ENTITY CONTRACTING WITH THE GOVERNMENT FOR
PERFORMANCE OF PRESCRIBED WORK. IN A TIMBER SALE CONTRACT, THE CONTRACTOR IS THE
“PURCHASER”.
CULVERT — ANY STRUCTURE WITH A BOTTOM, REGARDLESS OF FILL DEPTH, DEPTH OF INVERT BURIAL, OR PRESENCE OF HORIZONTAL DRIVING SURFACE, OR ANY BOTTOMLESS (NATURAL CHANNEL)
STRUCTURE WITH FOOTINGS THAT WILL NOT HAVE WHEEL LOADS IN DIRECT CONTACT WITH THE TOP
OF THE STRUCTURE.
DRAWINGS — (PUBLIC WORKS CONTRACTS) DESIGN SHEETS OR FABRICATION, ERECTION, OR
CONSTRUCTION DETAILS SUBMITTED TO THE CO BY THE CONTRACTOR ACCORDING TO FAR CLAUSE
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. ALSO REFERS TO SUBMISSIONS AND
SUBMITTALS.
NOTICE TO PROCEED — (PUBLIC WORKS CONTRACTS) WRITTEN NOTICE TO THE CONTRACTOR TO
BEGIN THE CONTRACT WORK.
RIGHT-OF-WAY — A GENERAL TERM DENOTING (1) THE PRIVILEGE TO PASS OVER LAND IN SOME
PARTICULAR LINE (INCLUDING EASEMENT, LEASE, PERMIT, OR LICENSE TO OCCUPY, USE, OR TRAVERSE
PUBLIC OR PRIVATE LANDS), OR (2) REAL PROPERTY NECESSARY FOR THE PROJECT, INCLUDING
ROADWAY, BUFFER AREAS, ACCESS, AND DRAINAGE AREAS.
SOLICITATION— (PUBLIC WORKS CONTRACTS) THE COMPLETE ASSEMBLY OF DOCUMENTS (WHETHER
ATTACHED OR INCORPORATED BY REFERENCE) FURNISHED TO PROSPECTIVE BIDDERS.
ADD THE FOLLOWING DEFINITIONS:
ADJUSTMENT IN CONTRACT PRICE — “EQUITABLE ADJUSTMENT,” AS USED IN THE FEDERAL
ACQUISITION REGULATIONS, OR “CONSTRUCTION COST ADJUSTMENT,” AS USED IN THE TIMBER SALE
CONTRACT, AS APPLICABLE.
CHANGE — “CHANGE” MEANS “CHANGE ORDER” AS USED IN THE FEDERAL ACQUISITION
REGULATIONS, OR “DESIGN CHANGE” AS USED IN THE TIMBER SALE CONTRACT.
FOREST SERVICE — THE UNITED STATES OF AMERICA, ACTING THROUGH THE FOREST SERVICE, U.S.
DEPARTMENT OF AGRICULTURE.
NEAT LINE — A LINE DEFINING THE PROPOSED OR SPECIFIED LIMITS OF AN EXCAVATION OR
STRUCTURE.
p.3 v.22343
PIONEER ROAD — TEMPORARY CONSTRUCTION ACCESS BUILT ALONG THE ROUTE OF THE PROJECT.
PROTECTED STREAMCOURSE — A DRAINAGE SHOWN ON THE PLANS OR TIMBER SALE AREA MAP THAT
REQUIRES DESIGNATED MITIGATION MEASURES.
ROAD ORDER — AN ORDER AFFECTING AND CONTROLLING TRAFFIC ON ROADS UNDER FOREST SERVICE
JURISDICTION. ROAD ORDERS ARE ISSUED BY A DESIGNATED FOREST OFFICER UNDER THE AUTHORITIES
OF 36 CFR, PART 260.
SHOP DRAWINGS — (TIMBER AND STEWARDSHIP CONTRACTS) REFERRED TO AS “DRAWINGS” IN FP-14, INCLUDES DRAWINGS, DIAGRAMS, LAYOUTS, SCHEMATICS, DESCRIPTIVE LITERATURE, ILLUSTRATIONS, LISTS OR TABLES, PERFORMANCE AND TEST DATA, AND SIMILAR MATERIALS FURNISHED BY PURCHASER
TO EXPLAIN IN DETAIL SPECIFIC PORTIONS OF THE WORK REQUIRED BY THE CONTRACT.
102 - BID¸ AWARD¸ AND EXECUTION OF CONTRACT
102.00_NATIONAL_9_15_2016
DELETE SECTION 102 IN ITS ENTIRETY.
103 - SCOPE OF WORK
103.00_NATIONAL_9_15_2016
DELETE SECTIONS 103.02, 103.03, 103.04, 103.05.
ADD THE FOLLOWING TO SECTION 103.01.
THE WORK SHOWN IN THE PLANS AND SPECIFICATIONS INCLUDE THE FOLLOWING:
BASE BID – MAKE IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS DURING
CONSTRUCTION WHILE ENSURING NO ADDITIONAL HUMAN OR ENVIRONMENTAL DOWNSTREAM RISK;
CLEAR AND REMOVE UPPER LAYER OF MATERIAL CONSIDERED ORGANIC AND UNSUITABLE
EMBANKMENT FILL AND WASTE ONSITE; REMOVE AND RECYCLE PORTIONS OF EXISTING CONCRETE
STRUCTURES; INSTALLATION OF A NEW CONDUIT, LEVEL CONTROL STRUCTURE, AND APPURTENANCES;
REGRADING AND INSTALLATION OF HYDROTURF CS WITH PENETRATING CATALYZED SILICATE
CONCRETE TREATMENT ARMORING OF THE SPILLWAY AND DAM EMBANKMENT.
104 - CONTROL OF WORK
DELETE SUBSECTIONS 104.01, 104.02, AND 104.04.
104.06_NATIONAL_9_16_2016
ADD THE FOLLOWING AS SUBSECTION 104.06:
104.06 USE OF ROADS BY CONTRACTOR.
THE CONTRACTOR IS AUTHORIZED TO USE ROADS UNDER THE JURISDICTION OF THE FOREST SERVICE
FOR ALL ACTIVITIES NECESSARY TO COMPLETE THIS CONTRACT, SUBJECT TO THE LIMITATIONS AND
AUTHORIZATIONS DESIGNATED IN THE ROAD ORDER(S) OR DESCRIBED IN THE CONTRACT, WHEN SUCH p.4 v.22343
USE WILL NOT DAMAGE THE ROADS OR NATIONAL FOREST RESOURCES, AND WHEN TRAFFIC CAN BE
ACCOMMODATED SAFELY. CONTRACTOR SHALL MAINTAIN THE ROADWAYS USED TO ACCESS THE
WORK FOR THE DURATION OF THE CONTRACT. PULVERIZED CONCRETE (WITH REINFORCING
REMOVED) FROM DEMOLISHED CONCRETE STRUCTURES MAY BE USED AS SURFACING MATERIAL FOR
MAINTENANCE, ACCESS ROADS, TEMPORARY ACCESS ROADS AND AS REINFORCED SUBGRADES UNDER
SURFACE MATERIAL.
105 - CONTROL OF MATERIAL
105.05_NATIONAL_6_29_2020
105.05 USE OF MATERIAL FOUND IN THE WORK.
DELETE 105.05 (A) AND (B) AND THE LAST SENTENCE OF THE SECOND
PARAGRAPH AND SUBSTITUTE THE FOLLOWING:
MATERIALS PRODUCED OR PROCESSED FROM GOVERNMENT LANDS IN EXCESS OF THE QUANTITIES
REQUIRED FOR PERFORMANCE OF THIS CONTRACT ARE THE PROPERTY OF THE GOVERNMENT. PLACE
EXCESS MATERIAL SAFELY AT GOVERNMENT-APPROVED LOCATION, AT NO ADDITIONAL COST TO
GOVERNMENT.
TRAINING WALLS AND OTHER CONCRETE STRUCTURES DESIGNATED FOR PARTIAL OR COMPLETE
REMOVAL MAY BE PULVERIZED ON-SITE TO DIMENSIONS NOT EXCEEDING 75% OF THE SPECIFIED PRE-
COMPACTION LAYER THICKNESS AND UTILIZED AS SUBBASE FOR ACCESS ROAD MAINTENANCE, ALL
PROTRUDING REINFORCEMENT IS CUT NEAR FLUSH AND REMOVED. EXISTING REMOVED REBAR WILL
BE CONSIDERED PROPERTY OF CONTRACTOR AND WILL BE REMOVED FROM GOVERNMENT LANDS.
ADD THE FOLLOWING AS SUBSECTION 105.07:
105.07 LEAD FREE AGGREGATE & ROCK.
ANY STONE SOURCED FROM ANY THE FOLLOWING COUNTIES IN SOUTHEAST MISSOURI WILL NEED TO
BE TESTED: CRAWFORD, DENT, SHANNON, WASHINGTON, IRON, REYNOLDS, MADISON, ST. FRANCOIS, ST. GENEVIEVE, AND BOLLINGER COUNTIES. IF STONE IS SOURCED FROM A COUNTY NOT LISTED, IT
WILL NOT HAVE TO BE TESTED, HOWEVER CONTRACTOR MUST PROVIDE TICKETS OR INVOICES THAT
CLEARLY SHOW WHERE THOSE MATERIALS WERE SOURCED FROM.
MATERIALS FROM THESE AREAS SHOULD BE VISUALLY INSPECTED TO ENSURE THAT NO HAZARDOUS
MINERALIZATION IS PRESENT. MINERALIZATION INCLUDING GALENA, SPHALERITE, AND CHALCOPYRITE
SHOULD NOT BE PRESENT IN ANY MATERIALS PLACED ON NATIONAL FOREST SYSTEMS LANDS.
AGGREGATE AND/OR RIP RAP THAT DOES NOT CONTAIN MATERIAL IN THE <2MM FRACTION (PASSES A
#10 SIEVE) MAY ONLY NEED TO BE SUBJECT TO VISUAL INSPECTION. AGGREGATE AND/OR RIP RAP THAT
CONTAINS MATERIAL IN THE <2MM FRACTION (PASSES A #10 SIEVE) WILL NEED TO BE SAMPLED TO
ENSURE THAT THE MATERIAL DOES NOT EXCEED 100 PARTS PER MILLION (PPM) FOR LEAD (PB). THE
METHODS AND EQUIPMENT USED FOR SAMPLING MATERIALS WILL VARY WITH THE FORM AND
CONSISTENCY OF THE MATERIALS TO BE SAMPLED. SAMPLES COLLECTED USING THE SAMPLING
PROTOCOLS LISTED BELOW WILL BE CONSIDERED BY THE AGENCY TO BE REPRESENTATIVE OF THE
MATERIAL. SAMPLING OR SCREENING RESULTS SHOULD BE PROVIDED IN WRITING TO THE
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO ANY MATERIAL BEING DELIVERED.
p.5 v.22343
CORE OR SCOOP SAMPLING - ASTM STANDARD E1727
ALL EXTRACTION AND ANALYTICAL METHODS MUST FOLLOW THE SW-846 COMPENDIUM OR XRF
SCREENING - UNE-EN ISO 13196
NUMBER OF SAMPLES REQUIRED, BASED ON QUANTITY REQUIRED IN THE SCHEDULE OF ITEMS
TONS # OF SAMPLES/ SCREENINGS
0-100 3
101-500 5
501-1000 10
106 - ACCEPTANCE OF WORK
106.01_NATIONAL_7_18_2017
DELETE SUBSECTION 106.01 AND REPLACE WITH THE FOLLOWING:
106.01 CONFORMITY WITH CONTRACT REQUIREMENTS.
FOLLOW THE REQUIREMENTS OF FAR CLAUSE 52.246-12 INSPECTION OF CONSTRUCTION.
REFERENCES TO STANDARD TEST METHODS OF AASHTO, ASTM, GSA, AND OTHER RECOGNIZED
STANDARD AUTHORITIES REFER TO THE METHODS IN EFFECT ON THE DATE OF SOLICITATION FOR BIDS.
PERFORM ALL WORK TO THE LINES, GRADES, CROSS-SECTIONS, DIMENSIONS, AND PROCESSES OR
MATERIAL REQUIREMENTS SHOWN ON THE PLANS OR SPECIFIED IN THE CONTRACT.
INCORPORATE MANUFACTURED MATERIALS INTO THE WORK ACCORDING TO THE MANUFACTURER’S
RECOMMENDATIONS OR TO THESE SPECIFICATIONS, WHICHEVER IS MORE STRICT.
PLAN DIMENSIONS AND CONTRACT SPECIFICATION VALUES ARE THE VALUES TO BE STRIVED FOR AND
COMPLIED WITH AS THE DESIGN VALUES FROM WHICH ANY DEVIATIONS ARE ALLOWED. PERFORM
WORK AND PROVIDE MATERIAL THAT IS UNIFORM IN CHARACTER AND REASONABLY CLOSE TO THE
PRESCRIBED VALUE OR WITHIN THE SPECIFIED TOLERANCE RANGE. THE PURPOSE OF A TOLERANCE
RANGE IS TO ACCOMMODATE OCCASIONAL MINOR VARIATIONS FROM THE MEDIAN ZONE THAT ARE
UNAVOIDABLE FOR PRACTICAL REASONS.
WHEN STANDARD MANUFACTURED ITEMS ARE SPECIFIED (SUCH AS FENCE, WIRE, PLATES, ROLLED
SHAPES, PIPE CONDUITS, ETC., THAT ARE IDENTIFIED BY GAUGE, UNIT MASS, SECTION DIMENSIONS, ETC.), THE IDENTIFICATION WILL BE CONSIDERED TO BE NOMINAL MASSES OR DIMENSIONS. UNLESS
SPECIFIC CONTRACT TOLERANCES ARE NOTED, ESTABLISHED MANUFACTURING TOLERANCES WILL BE
ACCEPTED.
THE GOVERNMENT MAY INSPECT, SAMPLE, OR TEST ALL WORK AT ANY TIME BEFORE FINAL
ACCEPTANCE OF THE PROJECT. WHEN THE GOVERNMENT TESTS WORK, COPIES OF TEST REPORTS ARE
FURNISHED TO THE CONTRACTOR UPON REQUEST. GOVERNMENT TESTS MAY OR MAY NOT BE
p.6 v.22343
PERFORMED AT THE WORK SITE. IF CONTRACTOR TESTING AND INSPECTION IS VERIFIED BY THE
GOVERNMENT, THE CONTRACTOR’S RESULTS MAY BE USED BY THE GOVERNMENT TO EVALUATE WORK
FOR ACCEPTANCE. DO NOT RELY ON THE AVAILABILITY OF GOVERNMENT TEST RESULTS FOR PROCESS
CONTROL.
ACCEPTABLE WORK CONFORMING TO THE CONTRACT WILL BE PAID FOR AT THE CONTRACT UNIT BID
PRICE. FOUR METHODS OF DETERMINING CONFORMITY AND ACCEPTING WORK ARE DESCRIBED IN
SUBSECTIONS 106.02 TO 106.05 INCLUSIVE. THE PRIMARY METHOD OF ACCEPTANCE IS SPECIFIED IN
EACH SECTION OF WORK. HOWEVER, WORK MAY BE REJECTED AT ANY TIME IT IS FOUND BY ANY OF
THE METHODS NOT TO COMPLY WITH THE CONTRACT.
REMOVE, REPAIR, OR REPLACE WORK THAT DOES NOT CONFORM TO THE CONTRACT, OR TO
PREVAILING INDUSTRY STANDARDS WHERE NO SPECIFIC CONTRACT REQUIREMENTS ARE NOTED.
REMOVING, REPAIRING, OR REPLACING WORK; PROVIDING TEMPORARY TRAFFIC CONTROL; AND ANY
OTHER RELATED WORK TO ACCOMPLISH CONFORMITY WILL BE AT NO COST TO THE GOVERNMENT.
(A) DISPUTING GOVERNMENT TEST RESULTS. IF THE ACCURACY OF GOVERNMENT TEST RESULTS IS
DISPUTED, PROMPTLY INFORM THE CO. IF THE DISPUTE IS UNRESOLVED AFTER REASONABLE STEPS
ARE TAKEN TO RESOLVE THE DISPUTE, FURTHER EVALUATION MAY BE OBTAINED BY WRITTEN
REQUEST. INCLUDE A NARRATIVE DESCRIBING THE DISPUTE AND A PROPOSED RESOLUTION
PROTOCOL THAT ADDRESSES THE FOLLOWING:
1. SAMPLING METHOD.
2. NUMBER OF SAMPLES.
3. SAMPLE TRANSPORT.
4. TEST PROCEDURES.
5. TESTING LABORATORIES.
6. REPORTING.
7. ESTIMATED TIME AND COSTS, AND
8. VALIDATION PROCESS.
IF THE EVALUATION REQUIRES ADDITIONAL SAMPLING OR TESTING BE PERFORMED, MUTUALLY AGREE
WITH THE GOVERNMENT ON WITNESSING PROCEDURES AND ON SAMPLING AND TESTING BY A THIRD
PARTY LABORATORY. USE A THIRD PARTY LABORATORY ACCREDITED BY THE AASHTO ACCREDITATION
PROGRAM. PROVIDE PROOF OF THE LABORATORY’S ACCREDITATION FOR THE TEST PROCEDURES TO BE
USED. DO NOT USE THE SAME LABORATORY THAT PRODUCED THE DISPUTED GOVERNMENT TEST
RESULTS OR THAT PRODUCED THE TEST RESULTS USED AS A BASIS FOR THE DISPUTE.
THE CO WILL REVIEW THE PROPOSED RESOLUTION PROTOCOL AND MAY MODIFY IT BEFORE FINAL
APPROVAL AND EXECUTION.
p.7 v.22343
THE GOVERNMENT WILL USE THE APPROVED RESOLUTION PROTOCOL TEST RESULTS TO DETERMINE
THE VALIDITY OF THE DISPUTED TESTING. IF THE GOVERNMENT TEST RESULTS ARE VALIDATED, THE
CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND PERFORMING
THE RESOLUTION PROTOCOL. IF THE GOVERNMENT TEST RESULTS ARE NOT VALIDATED, THE
GOVERNMENT WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DEVELOPING AND
PERFORMING THE RESOLUTION PROTOCOL. IF THE VALIDITY OF THE GOVERNMENT TEST RESULTS
CANNOT BE DETERMINED, THE CONTRACTOR AND GOVERNMENT WILL EQUALLY SHARE ALL COSTS
ASSOCIATED WITH DEVELOPING AND CARRYING OUT THE RESOLUTION PROTOCOL.
(B) ALTERNATIVES TO REMOVING AND REPLACING NON-CONFORMING WORK. AS AN ALTERNATIVE
TO REMOVAL AND REPLACEMENT, THE CONTRACTOR MAY SUBMIT A WRITTEN REQUEST TO:
1. HAVE THE WORK ACCEPTED AT A REDUCED PRICE, OR
BE GIVEN PERMISSION TO PERFORM CORRECTIVE MEASURES TO BRING THE WORK
INTO CONFORMITY.
THE REQUEST MUST CONTAIN SUPPORTING RATIONALE AND DOCUMENTATION. INCLUDE REFERENCES
OR DATA JUSTIFYING THE PROPOSAL BASED ON AN EVALUATION OF TEST RESULTS, EFFECT ON SERVICE
LIFE, VALUE OF MATERIAL OR WORK, QUALITY, AESTHETICS, AND OTHER TANGIBLE ENGINEERING BASIS.
THE CO WILL DETERMINE DISPOSITION OF THE NONCONFORMING WORK.
106.02_NATIONAL_10_23_2016
DELETE SUBSECTION 106.02 AND REPLACE WITH THE FOLLOWING:
106.02 VISUAL INSPECTION.
ACCEPTANCE IS BASED ON VISUAL INSPECTION OF THE WORK FOR COMPLIANCE WITH THE SPECIFIC
CONTRACT REQUIREMENTS. USE PREVAILING INDUSTRY STANDARDS IN THE ABSENCE OF SPECIFIC
CONTRACT REQUIREMENTS OR TOLERANCES.
107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
107.05_NATIONAL_7_18_2017
DELETE SUBSECTION 107.05.
108 - PROSECUTION AND PROGRESS
108.00_NATIONAL_9_16_2016
DELETE SECTION 108 IN ITS ENTIRETY.
p.8 v.22343
109 - MEASUREMENT AND PAYMENT
109.01_NATIONAL_2_22_2019
DELETE THE THIRD PARAGRAPH AND TABLE 109-1 OF SUBSECTION 109.01 AND
REPLACE WITH THE FOLLOWING:
109.01 MEASUREMENT OF WORK.
TAKE MEASUREMENTS AS DESCRIBED IN SUBSECTION 109.02 UNLESS OTHERWISE MODIFIED BY THE
MEASUREMENT SUBSECTION OF THE SECTION CONTROLLING THE WORK BEING PERFORMED. TABLE
109-1 INDICATES THE ACCURACY REQUIRED FOR QUANTITIES OF THE VARIOUS PAY UNITS USED IN THE
SCHEDULE OF ITEMS. USE THIS GUIDE TO DETERMINE THE DECIMAL PLACEMENT IN THE FINAL
PAYMENT.
TABLE 109-1
DECIMAL ACCURACY OF QUANTITIES FOR FINAL PAYMENT
PAY ITEM LEVEL OF
PRECISION
LINEAR FOOT 1
EXCEPTION--TIMBER, STEEL, AND CONCRETE PILES 0.1
STATION 0.1
MILE 0.01
SQUARE FOOT 0.1
SQUARE YARD 0.1
EACH 1
ACRE 0.01
GALLON 1
M-GALS. 0.1
CUBIC YARD 1
EXCEPTION--STRUCTURE EXCAVATION,
SHEATHING
MATERIALS: BEDDING, BED COURSE, AND
BACKFILL
MATERIALS; GABIONS;
0.1
EXCEPTION--CONCRETE; MASONRY 0.01
POUND 1
TON 0.1
EXCEPTION--CALCIUM CHLORIDE,
SODIUM CHLORIDE, HYDRATED LIME,
BITUMINOUS MATERIALS, PAVEMENTS,
BED COURSE MATERIALS
0.01
HOUR 0.1
MFBM 0.01
STATION YARD 1
CUBIC YARD MILE 1
TON MILE 1
p.9 v.22343
ADD THE FOLLOWING SENTENCE TO SUBSECTION 109.02(B):
109.02 MEASUREMENT TERMS AND DEFINITIONS.
(B) CONTRACT QUANTITY.
CONTRACT QUANTITIES WILL BE ADJUSTED ONLY WHEN THERE ARE ERRORS IN THE ORIGINAL
DESIGN OF 15% OR MORE.
109.00_NATIONAL_9_16_2016
DELETE SUBSECTIONS 109.06, 109.07, 109.08, AND 109.09:
157 - SOIL EROSION AND SEDIMENT CONTROL
DELETE SUBSECTION 157.03 AND REPLACE WITH THE FOLLOWING:
157.03 SOIL EROSION, SEDIMENT CONTROL, AND DEWATERING PLAN.
REVIEW CONSTRUCTION PLANS AND THEN DEVELOP A SOIL EROSION, SEDIMENT CONTROL AND
DEWATERING PLAN. THE FOLLOWING CONCEPT IS PROVIDED AS A GUIDE AND SHOULD NOT
SUPERSEDE THE CONTRACTOR PREFERRED MEANS AND METHODS OF CONSTRUCTION. THE
CONTRACTOR CAN PRESENT OTHER METHODS IN THE PLAN.
THE PLAN MUST BE APPROVED BY THE COR 20-DAYS PRIOR TO LAND DISTURBANCE ACTIVITIES. MAJOR
OPERATIONS CONSIDERED IN PLAN THAT REQUIRE DETAILED EROSION AND SEDIMENT CONTROL SHALL
INCLUDE:
A. LAKE DRAWDOWN METHODS AND PROCEDURES TO DROP WATER LEVELS
B. DISPOSAL OF CLEARING AND GRUBBING MATERIAL (PER SECTION 203.05 (A) OR (C) ONLY)
C. WATER LEVEL CONTROL METHODS AND PROCEDURES TO MAINTAIN POOL ELEVATIONS DURING
CONSTRUCTION WHEN OUTLETS ARE NOT OPERATIONAL AND BASE FLOWRATES ARE ENTERING
THE LAKE
D. METHODS AND PROCEDURES TO ENSURE SAFE PASSAGE OF STORMWATER DURING RAINFALL
EVENTS UP TO A 100-YEAR STORM EVENT
E. TEMPORARY ACCESS/STREAM CROSSING
F. EXCAVATION & EMBANKMENT FOR CONDUIT AND SPILLWAY INSTALLATION
G. ROCK SAWING/BREAKING AND TREATMENT
H. POLLUTION PREVENTION AT STAGING AREAS
THE PLAN SHALL INCLUDE EROSION CONTROL AND SEDIMENT BMPS TO BE UTILIZED DURING ALL
OPERATIONS OF LAND DISTURBANCE NOT CONTAINED WITHIN THE INTERIOR BOUNDARY OF THE
NORMAL POOL ELEVATION.
THE LAKE MAY BE DRAWN DOWN TO AN ELEVATION OF 855.6 (EST) BY BREACHING THE EXISTING
COFFER DAM UPSTREAM OF THE STOPLOG GATE AND REMOVING THE REMAINING STOPLOGS AND/OR
CONCRETE (3--4’) THAT REMAIN IN THE STOPLOG CHUTE.
p.10 v.22343
THE LAKE MAY BE FURTHER DRAWN DOWN BY MEANS OF SIPHON OR PUMP (1). IF A SIPHON IS UTILIZED
IT WILL REQUIRE 3-STAGES OF OPERATION. THE MAXIMUM SIPHON SIZE IS 12” IN DIAMETER. PEAK
DRAWDOWN FLOWRATES MUST DROP WATER SURFACE NO MORE THAN 1-FT PER DAY TO ENSURE
UPSTREAM DAM SLOPE STABILITY. DRAWDOWN OPERATIONS SHALL MINIMIZE SEDIMENT REMOVAL
FROM THE LAKE. DISCHARGE WATER SHALL HAVE A TOTAL SETTLEABLE SOLIDS (TSS) LESS THAN OR
EQUAL TO 2.5 ML/L/HR. TESTING OF SETTLEABLE SOLIDS SHALL OCCUR WHEN REQUESTED BY COR TO
VERIFY PERFORMANCE OF EROSION AND SEDIMENT CONTROL MEASURES.
(1) DRAWDOWN LEVEL IS VARIABLE BASED ON CONTRACTOR’S CONSTRUCTION MEANS.
UTILIZATION OF TEMPORARY COFFER DAMS OR SIMILAR MEANS TO REDUCE THE DRAWDOWN
LEVEL IS ACCEPTABLE. THE ESTIMATED BOTTOM OF BASIN IS 836’. MAINTAINING A 10’
MINIMUM WATER DEPTH IS DESIRABLE TO AVOID AQUATIC ORGANISM MORTALITY.
DISCHARGE POINT TO DOWNSTREAM CHANNEL MUST BE AT LEAST 10-FT DOWNSTREAM OF THE TOE
OF THE DAM. THIS DISCHARGE POINT WILL BE IN SOLID ROCK AND WILL NOT REQUIRE EROSION
CONTROL OTHER THAN SEDIMENT REMOVAL, IF APPLICABLE. CONSIDER PROPERLY DESIGNED
SEDIMENT FILTER BAGS (FP-14 713.19 SEDIMENT FILTER BAGS) OR OTHER MEANS IF THE SIPHON/PUMP
IS PICKING UP SEDIMENT.
DELETE SUBSECTION 157.04
201 – CLEARING AND GRUBBING
MODIFY SUBSECTION 201.01 TO ADD THE FOLLOWING:
PRIMARY CLEARING LIMITS INCLUDE THE EXISTING DAM EMBANKMENT. SECONDARY LIMITS SHALL
EXTEND TO AND INCLUDE ANY ACCESS ROADWAYS, LAYDOWN AND STORAGE/STAGING AREAS AS
REQUIRED TO COMPLETE THE WORK.
MODIFY SUBSECTION 201.06 TO ADD THE FOLLOWING:
ALL MATERIALS REMOVED FROM THE CLEARED AND GRUBBED AREAS EXCEPT RUBBISH OR NONWOODY
MATERIAL SHALL BE BURIED OR BURNED AT AREAS DESIGNATED OR APPROVED BY THE COR. ALL
DISPOSAL METHODS SHALL BE IN ACCORDANCE WITH FOREST POLICY. BURNING SHALL BE
ACCOMPLISHED AT SUCH TIMES AND MANNER AS TO MINIMIZE THE ANNOYANCE OR DISCOMFORT OF
THE INHABITANTS OF THE AREA AND NOT CREATE NUISANCE CONDITIONS. BURIED MATERIAL SHALL
HAVE A MINIMUM EARTHFILL COVER OF NOT LESS THAN 3 FEET. THE COVER SHALL BE PLACED IN TWO
LIFTS WITH EACH LIFT COMPACTED BY TRAVERSING THE ENTIRE SURFACE WITH ONE TREAD TRACK OF
THE MATERIAL PLACEMENT EQUIPMENT. THE TOP LIFT SHALL BE MOUNDED AT LEAST 6 INCHES HIGHER
THAN THE SURROUNDING UNDISTURBED AREA TO PREVENT UNSIGHTLY DEPRESSIONS AFTER
SETTLEMENT. THE FINISHED SURFACE OF THE DISPOSAL AREA SHALL BE UNIFORMLY GRADED TO
PREVENT PONDING OF WATER. LOCATIONS FOR BURYING OR BURNING MATERIALS SHALL BE
DESIGNATED BY COR AND SHOULD BE AS CLOSE TO CLEARING AND GRUBBING LOCATION AS
REASONABLY POSSIBLE.
p.11 v.22343
203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
DELETE SUBSECTION 203.01 AND REPLACE WITH THE FOLLOWING:
203.01
THIS WORK CONSISTS OF REMOVING THE EXISTING SPILLWAY WALLS AND APPURTENANCES.
DELETE SUBSECTION 203.03 AND REPLACE WITH THE FOLLOWING:
203.03
THE CONTRACTOR SHALL DISPOSE OF ALL SALVAGED MATERIAL.
MODIFY SUBSECTION 203.04 TO ADD THE FOLLOWING:
203.04 REMOVING MATERIAL
(b) GENERAL – STRUCTURES BEING MODIFIED OR DESIGNATED TO BE REMOVED TO AN ELEVATION
BELOW FINISHED GRADE DO NOT REQUIRE SAW CUTTING
204 – EXCAVATION AND EMBANKMENT
DELETE SUBSECTION 204.01 AND REPLACE WITH THE FOLLOWING:
204.01 THIS WORK CONSISTS OF EXCAVATION AND THE CONSTRUCTION OF EARTH EMBANKMENTS, OTHER
EARTHFILLS, AND EARTH BACKFILLS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS.
DELETE SUBSECTION 204.02 AND REPLACE WITH THE FOLLOWING:
204.02 DEFINITIONS AND REFERENCES
EARTHFILL IS COMPOSED OF NATURAL EARTH MATERIALS THAT CAN BE PLACED AND COMPACTED BY
CONSTRUCTION EQUIPMENT OPERATED CONVENTIONALLY.
EARTH BACKFILL IS COMPOSED OF NATURAL EARTH MATERIAL PLACED AND COMPACTED IN CONFINED
SPACES OR ADJACENT TO STRUCTURES (INCLUDING PIPES) BY HAND TAMPING, MANUALLY DIRECTED
POWER TAMPERS OR VIBRATING PLATES, OR THEIR EQUIVALENT.
UNCLASSIFIED EXCAVATION IS DEFINED AS THE EXCAVATION OF ALL MATERIALS ENCOUNTERED, INCLUDING ROCK MATERIALS, REGARDLESS OF THEIR NATURE OR THE MANNER IN WHICH THEY ARE
REMOVED.
ASTM D422 - STANDARD TEST METHOD FOR PARTICLE-SIZE ANALYSIS OF SOILS (GRAIN SIZE WITH
HYDROMETER)
ASTM D698 - STANDARD TEST METHODS FOR LABORATORY COMPACTION CHARACTERISTICS OF SOIL
USING STANDARD EFFORT (12,400 FT-LBF/FT3).
ASTM D1556 – STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE SAND-CONE METHOD.
p.12 v.22343
ASTM D2216 - STANDARD TEST METHOD FOR LABORATORY DETERMINATION OF WATER (MOISTURE)
CONTENT OF SOIL AND ROCK BY MASS.
ASTM D2487 – STANDARD PRACTICES FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES
(UNIFIED SOIL CLASSIFICATION SYSTEM)
ASTM D2922 - STANDARD TEST METHOD FOR DENSITY OF SOIL AND SOIL-AGGREGATE IN-PLACE BY
NUCLEAR METHODS (SHALLOW DEPTH).
ASTM D2937 - STANDARD TEST METHOD FOR DENSITY OF SOIL IN-PLACE BY THE DRIVE-CYLINDER
METHOD TEST.
ASTM D4318 - STANDARD TEST METHODS FOR LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF
SOILS.
DELETE SUBSECTION 204.03 AND REPLACE WITH THE FOLLOWING:
204.03 EXCAVATION AND MATERIALS
EXCAVATIONS MUST COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
CONSTRUCTION INDUSTRY STANDARDS SUBPART P, EXCAVATIONS, TRENCHING, AND SHORING (29 CFR
PT. 1926). ALL EXCAVATIONS MUST BE COMPLETED AND MAINTAINED IN A SAFE AND STABLE
CONDITION THROUGHOUT THE TOTAL CONSTRUCTION PHASE. STRUCTURE AND TRENCH EXCAVATIONS
MUST BE COMPLETED TO THE SPECIFIED ELEVATIONS AND TO THE LENGTH AND WIDTH REQUIRED TO
SAFELY INSTALL, ADJUST, AND REMOVE ANY FORMS, BRACING, OR SUPPORTS NECESSARY FOR THE
INSTALLATION OF THE WORK. EXCAVATIONS OUTSIDE THE LINES AND LIMITS SHOWN ON THE
DRAWINGS OR SPECIFIED HEREIN ARE REQUIRED TO MEET SAFETY REQUIREMENTS AND MUST BE THE
RESPONSIBILITY OF THE CONTRACTOR IN CONSTRUCTING AND MAINTAINING A SAFE, STABLE
EXCAVATION.
EXCAVATION SHALL BE UNCLASSIFIED.
ALL FILL/BORROW MATERIAL MUST BE OBTAINED FROM THE TOP, FRONT OR NEAR SIDES OF THE
EXISTING EMBANKMENT DAM. THE SELECTION, BLENDING, ROUTING, AND DISPOSITION OF MATERIAL
IN THE VARIOUS FILLS MUST BE SUBJECT TO APPROVAL BY THE CO/COR.
FILL MATERIALS MUST CONTAIN NO FROZEN SOIL, SOD, BRUSH, ROOTS, OR OTHER PERISHABLE
MATERIAL. ROCK PARTICLES LARGER THAN TWO-THIRDS OF THE SPECIFIED PRE-COMPACTION LAYER
DEPTH FOR EACH TYPE OF FILL MUST BE REMOVED, OR REDUCED IN SIZE, PRIOR TO COMPACTION OF
THE FILL.
DELETE SUBSECTION 204.04 AND REPLACE WITH THE FOLLOWING:
204.04 FOUNDATION PREPARATION
THE TYPES OF MATERIAL USED IN THE VARIOUS FILLS MUST BE AS LISTED AND DESCRIBED IN THE
SPECIFICATIONS AND DRAWINGS. FOUNDATIONS FOR EARTHFILL MUST BE STRIPPED TO REMOVE
VEGETATION AND OTHER UNSUITABLE MATERIAL OR MUST BE EXCAVATED AS SPECIFIED.
p.13 v.22343
EXCEPT AS OTHERWISE SPECIFIED, EARTH FOUNDATION SURFACES MUST BE GRADED TO REMOVE
SURFACE IRREGULARITIES AND MUST BE SCARIFIED PARALLEL TO THE AXIS OF THE FILL OR OTHERWISE
ACCEPTABLY SCORED AND LOOSENED TO A MINIMUM DEPTH OF 2 INCHES. THE MOISTURE CONTENT
OF THE LOOSENED MATERIAL MUST BE CONTROLLED AS SPECIFIED FOR THE EARTHFILL AND THE
SURFACE MATERIAL OF THE FOUNDATION MUST BE COMPACTED AND BONDED WITH THE FIRST LAYER
OF EARTHFILL AS SPECIFIED FOR SUBSEQUENT LAYERS OF EARTHFILL.
EARTH ABUTMENT SURFACES MUST BE FREE OF LOOSE, UNCOMPACTED EARTH IN EXCESS OF 2 INCHES
IN DEPTH NORMAL TO THE SLOPE AND MUST BE AT SUCH A MOISTURE CONTENT THAT THE EARTHFILL
CAN BE COMPACTED AGAINST THEM TO PRODUCE A GOOD BOND BETWEEN THE FILL AND THE
ABUTMENTS.
ROCK FOUNDATION AND ABUTMENT SURFACES MUST BE CLEARED OF ALL LOOSE MATERIAL BY HAND
OR OTHER EFFECTIVE MEANS AND MUST BE FREE OF STANDING WATER WHEN FILL IS PLACED UPON
THEM. OCCASIONAL ROCK OUTCROPS IN EARTH FOUNDATIONS FOR EARTHFILL, EXCEPT IN DAMS AND
OTHER STRUCTURES DESIGNED TO RESTRAIN THE MOVEMENT OF WATER, MUST NOT REQUIRE SPECIAL
TREATMENT IF THEY DO NOT INTERFERE WITH COMPACTION OF THE FOUNDATION AND INITIAL LAYERS
OF THE FILL OR THE BOND BETWEEN THE FOUNDATION AND THE FILL.
FOUNDATION AND ABUTMENT SURFACES MUST BE NO STEEPER THAN ONE HORIZONTAL TO ONE
VERTICAL UNLESS OTHERWISE SPECIFIED. TEST PITS OR OTHER CAVITIES MUST BE FILLED WITH
COMPACTED EARTHFILL CONFORMING TO THE SPECIFICATIONS FOR THE EARTHFILL TO BE PLACED
UPON THE FOUNDATION.
DELETE SUBSECTION 204.05 AND REPLACE WITH THE FOLLOWING:
204.05 FOUNDATION PREPARATION
THE TYPES OF MATERIAL USED IN THE VARIOUS FILLS MUST BE AS LISTED AND DESCRIBED IN THE
SPECIFICATIONS AND DRAWINGS. FOUNDATIONS FOR EARTHFILL MUST BE STRIPPED TO REMOVE
VEGETATION AND OTHER UNSUITABLE MATERIAL OR MUST BE EXCAVATED AS SPECIFIED.
DELETE SUBSECTION 204.06 AND REPLACE WITH THE FOLLOWING:
204.06 PLACEMENT
EARTHFILL MUST NOT BE PLACED UNTIL THE REQUIRED EXCAVATION AND FOUNDATION PREPARATION
HAVE BEEN COMPLETED AND THE FOUNDATION HAS BEEN INSPECTED AND APPROVED BY THE CO/COR.
EARTHFILL MUST NOT BE PLACED UPON A FROZEN SURFACE NOR HAVE SNOW, ICE, OR FROZEN
MATERIAL INCORPORATED IN THE EARTHFILL MATRIX.
EARTHFILL MUST BE PLACED IN APPROXIMATELY HORIZONTAL LAYERS. THE THICKNESS OF EACH LAYER
BEFORE COMPACTION MAY BE DETERMINED BY SOILS TESTING AND ONSITE TRIALS TO ACHIEVE 95%
MAXIMUM DRY DENSITY BUT MUST NOT EXCEED THE THICKNESS SPECIFIED IN FIGURE 23-2.
UNLESS OTHERWISE SPECIFIED ON THE PLANS OR APPROVED BY THE CO/COR BASED ON ONSITE
TESTING AND TECHNICIAN CONFIRMATION, COMPACTION REQUIREMENTS FOR EACH LAYER OF FILL
MATERIAL ARE AS SHOWN IN TABLE 1.
p.14 v.22343
HAND-COMPACTED EARTH BACKFILL MUST BE PLACED IN LAYERS WHOSE THICKNESS BEFORE
COMPACTION DOES NOT EXCEED THE MAXIMUM THICKNESS SPECIFIED FOR LAYERS OF EARTH BACKFILL
COMPACTED BY MANUALLY DIRECTED POWER TAMPERS.
PLACE EARTH BACKFILL IN A MANNER THAT PREVENTS DAMAGE TO THE STRUCTURES AND ALLOWS THE
STRUCTURES TO ASSUME THE LOADS FROM THE EARTH BACKFILL GRADUALLY AND UNIFORMLY. THE
HEIGHT OF THE EARTH BACKFILL ADJACENT TO A STRUCTURE MUST BE INCREASED AT APPROXIMATELY
THE SAME RATE ON ALL SIDES OF THE STRUCTURE.
MEET THE FOLLOWING ADDITIONAL REQUIREMENTS FOR EARTHFILL AND EARTH BACKFILL IN DAMS, LEVEES, AND OTHER STRUCTURES DESIGNED TO RESTRAIN THE MOVEMENT OF WATER.
A) THE DISTRIBUTION OF MATERIALS THROUGHOUT EACH ZONE MUST BE ESSENTIALLY UNIFORM
AND THE EARTHFILL FREE FROM LENSES, POCKETS, STREAKS, OR LAYERS OF MATERIAL
DIFFERING SUBSTANTIALLY IN TEXTURE, MOISTURE CONTENT, OR GRADATION FROM THE
SURROUNDING MATERIAL. ZONE EARTHFILLS MUST BE CONSTRUCTED CONCURRENTLY UNLESS
OTHERWISE SPECIFIED.
B) SCARIFIED THE SURFACE OF EACH LAYER PARALLEL TO THE AXIS OF THE FILL TO AT MINIMUM A
DEPTH OF 2 INCHES BEFORE THE NEXT LAYER IS PLACED.
C) THE TOP SURFACE OF EMBANKMENTS MUST BE MAINTAINED APPROXIMATELY LEVEL DURING
CONSTRUCTION WITH TWO EXCEPTIONS: A CROWN OR CROSS-SLOPE OF ABOUT 2 PERCENT
MUST BE MAINTAINED TO ENSURE EFFECTIVE DRAINAGE, OR AS OTHERWISE SPECIFIED FOR
DRAINFILL OR SECTIONAL ZONES.
D) CONSTRUCT DAM EMBANKMENTS IN CONTINUOUS LAYERS FROM ABUTMENT TO ABUTMENT
EXCEPT WHERE OPENINGS TO FACILITATE CONSTRUCTION OR TO ALLOW THE PASSAGE OF
STREAMFLOW DURING CONSTRUCTION ARE SPECIFICALLY AUTHORIZED IN THE CONTRACT.
E) EMBANKMENTS BUILT AT DIFFERENT LEVELS AS DESCRIBED UNDER PARAGRAPHS C OR D ABOVE
MUST BE CONSTRUCTED SO THAT THE SLOPE OF THE BONDING SURFACES BETWEEN
EMBANKMENTS IN PLACE AND EMBANKMENTS TO BE PLACED IS NOT STEEPER THAN 3 FEET
HORIZONTAL TO 1 FOOT VERTICAL. THE BONDING SURFACE OF THE EMBANKMENT IN PLACE
MUST BE STRIPPED OF ALL MATERIAL NOT MEETING THE REQUIREMENTS OF THIS
SPECIFICATION AND MUST BE SCARIFIED, MOISTENED, AND RECOMPACTED WHEN THE NEW
EARTHFILL IS PLACED AGAINST IT. THIS ENSURES A GOOD BOND WITH THE NEW EARTHFILL AND OBTAINS THE SPECIFIED MOISTURE CONTENT AND DENSITY AT THE CONTACT OF THE IN-PLACE
AND NEW EARTHFILLS.
p.15 v.22343
Figure 23-2: Compaction class Grading Characteristics of Soil Fill Material
Appropriate Compaction Classes
Maximum Layer Thickness (Before Compaction)
% > no. 4 % fines
(passing #200) tamping roller (in) pneum.
roller (in) vibrating roller (in)
40,000 lb track trctr (in)
0 -35 Over 5 A 9 9 --- ---
Under 5 A 9 12 24 --- B, C --- 18 30 12
35-65
25-50 A 9 12 24 --- B, C 9 18 24 ---
5-25 A --- 12 24 --- B, C --- 18 24 ---
Under 5 B, C --- 24 24 18
Over 65 Over 5 B, C --- 18 24 --- Under 5 B, C --- 24 24 18
NOTE: TABULATED VALUES ARE UPPER LIMITS. ACTUAL MAXIMUM LAYER THICKNESS FOR
UNIFORM COMPACTION OF A GIVEN SOIL MATERIAL MAY BE SUBSTANTIALLY LOWER.
MAXIMUM SIZE OF ROCK OR ROCK FRAGMENTS SHOULD NOT EXCEED TWO-THIRDS OF THE
LAYER THICKNESS PRIOR TO COMPACTION. SOIL PLASTICITY SHOULD BE A CONSIDERATION.
p.16 v.22343
DELETE SUBSECTION 204.07 AND REPLACE WITH THE FOLLOWING:
204.07 CONTROL OF MOISTURE CONTENT
DURING PLACEMENT AND COMPACTION OF EARTHFILL AND EARTH BACKFILL, THE MOISTURE CONTENT
OF THE MATERIAL BEING PLACED MUST BE MAINTAINED WITHIN THE SPECIFIED RANGE.
THE MOISTURE CONTENT OF THE FILL MATRIX AT THE TIME OF COMPACTION MUST BE NEITHER LESS
THAN 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT NOR MORE THAN 2 PERCENT ABOVE
OPTIMUM MOISTURE CONTENT.
THE MOISTURE CONTENT OF THE FILL MATERIAL MUST BE MAINTAINED WITHIN THE LIMITS REQUIRED
TO: (1) PREVENT BULKING OR DILATANCY OF THE MATERIAL UNDER THE ACTION OF THE HAULING OR
COMPACTING EQUIPMENT, (2) PREVENT THE ADHERENCE OF THE EARTHFILL MATERIAL TO THE TREADS
AND TRACKS OF THE EQUIPMENT, AND (3) ENSURE THE CRUSHING AND BLENDING OF THE SOIL CLODS
AND AGGREGATIONS INTO A REASONABLY HOMOGENEOUS MASS.
p.17 v.22343
THE APPLICATION OF WATER TO THE EARTHFILL MATERIAL MUST BE ACCOMPLISHED AT THE BORROW
AREAS INSOFAR AS PRACTICABLE. WATER MAY BE APPLIED BY SPRINKLING THE MATERIAL AFTER
PLACEMENT ON THE EARTHFILL, IF NECESSARY. OBTAIN A UNIFORM MOISTURE DISTRIBUTION BY
DISKING.
MATERIAL THAT IS TOO WET WHEN DEPOSITED ON THE EARTHFILL MUST EITHER BE REMOVED OR
DRIED TO THE SPECIFIED MOISTURE CONTENT PRIOR TO COMPACTION.
IF THE TOP SURFACE OF THE PRECEDING LAYER OF COMPACTED EARTHFILL OR A FOUNDATION OR
ABUTMENT SURFACE IN THE CONTACT ZONE WITH THE EARTHFILL BECOMES TOO DRY TO PERMIT
SUITABLE BOND, IT MUST EITHER BE REMOVED OR SCARIFIED AND MOISTENED BY SPRINKLING TO AN
ACCEPTABLE MOISTURE CONTENT BEFORE PLACEMENT OF THE NEXT LAYER OF EARTHFILL.
DELETE SUBSECTION 204.08 AND REPLACE WITH THE FOLLOWING:
204.08 COMPACTION
EARTHFILL. EARTHFILL MUST BE COMPACTED ACCORDING TO THE FOLLOWING REQUIREMENTS FOR
THE CLASS OF COMPACTION SPECIFIED:
CLASS A COMPACTION. COMPACT EACH LAYER OF EARTHFILL AS NECESSARY TO PROVIDE THE
DENSITY OF THE EARTHFILL MATRIX NOT LESS THAN 95% MAXIMUM DRY DENSITY THE
EARTHFILL MATRIX IS DEFINED AS THE PORTION OF THE EARTHFILL MATERIAL FINER THAN THE
MAXIMUM PARTICLE SIZE ALLOWED IN THE REFERENCE COMPACTION TEST METHOD SPECIFIED
(ASTM D698 OR ASTM D1557).
CLASS B COMPACTION. COMPACT EACH LAYER OF EARTHFILL TO A MASS DENSITY NOT LESS
THAN 95% MAXIMUM DRY DENSITY.
CLASS C COMPACTION. COMPACT EACH LAYER OF EARTHFILL BY THE SPECIFIED NUMBER OF
PASSES OF THE TYPE AND WEIGHT OF ROLLER OR OTHER EQUIPMENT SPECIFIED OR BY AN
EQUIVALENT APPROVED METHOD. EACH PASS MUST CONSIST OF AT LEAST ONE PASSAGE OF
THE ROLLER WHEEL OR DRUM OVER THE ENTIRE SURFACE OF THE LAYER.
EARTH BACKFILL. COMPACT EARTH BACKFILL ADJACENT TO STRUCTURES TO A DENSITY EQUIVALENT TO
THAT OF THE SURROUNDING IN-PLACE EARTH MATERIAL OR ADJACENT REQUIRED EARTHFILL OR EARTH
BACKFILL. COMPACTION MUST BE ACCOMPLISHED BY HAND TAMPING OR MANUALLY DIRECTED
POWER TAMPERS, PLATE VIBRATORS, WALK-BEHIND, MINIATURE, OR SELF-PROPELLED ROLLERS.
UNLESS OTHERWISE SPECIFIED, HEAVY EQUIPMENT, INCLUDING BACKHOE-MOUNTED POWER TAMPERS
OR VIBRATING COMPACTORS, AND MANUALLY DIRECTED VIBRATING ROLLERS MUST NOT BE OPERATED
WITHIN 3 FEET OF ANY STRUCTURE. TOWED OR SELF-PROPELLED VIBRATING ROLLERS MUST NOT BE
OPERATED WITHIN 5 FEET OF ANY STRUCTURE. COMPACTION BY MEANS OF DROP WEIGHTS
OPERATING FROM A CRANE OR HOIST IS NOT PERMITTED.
HEAVY EQUIPMENT. THE PASSAGE OF HEAVY EQUIPMENT WILL NOT BE ALLOWED:
A. OVER CAST-IN-PLACE CONDUITS WITHIN 14 DAYS AFTER PLACEMENT OF THE CONCRETE
B. OVER CRADLED OR BEDDED PRECAST CONDUITS WITHIN 7 DAYS AFTER PLACEMENT OF THE
CONCRETE CRADLE OR BEDDING
p.18 v.22343
C. OVER ANY TYPE OF CONDUIT UNTIL THE BACKFILL HAS BEEN PLACED ABOVE THE TOP
SURFACE OF THE STRUCTURE TO A HEIGHT EQUAL TO ONE-HALF THE CLEAR SPAN WIDTH
OF THE STRUCTURE OR PIPE OR 3 FEET, WHICHEVER IS GREATER.
COMPACTING ADJACENT TO STRUCTURES. COMPACTING OF EARTH BACKFILL ADJACENT TO
STRUCTURES MUST NOT BE STARTED UNTIL THE CONCRETE HAS ATTAINED THE STRENGTH SPECIFIED IN
SECTION J FOR THIS PURPOSE. THE STRENGTH IS DETERMINED BY COMPRESSION TESTING OF TEST
CYLINDERS CAST BY THE CONTRACTOR'S QUALITY CONTROL PERSONNEL FOR THIS PURPOSE AND CURED
AT THE WORKSITE IN THE MANNER SPECIFIED IN ASTM C31 FOR DETERMINING WHEN A STRUCTURE
MAY BE PUT INTO SERVICE.
PLACEMENT INTERVAL AGAINST CONCRETE. WHEN THE REQUIRED STRENGTH OF THE CONCRETE IS
NOT SPECIFIED AS DESCRIBED ABOVE, COMPACTION OF EARTH BACKFILL ADJACENT TO STRUCTURES
MUST NOT BE STARTED UNTIL THE FOLLOWING TIME INTERVALS SHOWN IN FIGURE 23-1 HAVE
ELAPSED AFTER PLACEMENT OF THE CONCRETE.
Figure 23-1 Time interval before placing backfill Structure Time interval
(days) Vertical or near-vertical walls with earth loading on one side only 14 Walls backfilled on both sides simultaneously 7 Conduits and spillway risers, cast-in-place (with inside forms in place)
Conduits and spillway risers, cast-in-place (inside forms removed) 14 Conduits, pre-cast, cradled 2 Conduits, pre-cast, bedded 1 Cantilever outlet bents (backfilled both sides simultaneously) 3
DELETE SUBSECTION 204.09 AND REPLACE WITH THE FOLLOWING:
204.09 REWORKING OR REMOVAL AND REPLACEMENT OF DEFECTIVE EARTHFILL
EARTHFILL PLACED AT DENSITIES LOWER THAN THE SPECIFIED MINIMUM DENSITY OR AT MOISTURE
CONTENTS OUTSIDE THE SPECIFIED ACCEPTABLE RANGE OF MOISTURE CONTENT, OR OTHERWISE NOT
CONFORMING TO THE REQUIREMENTS OF THE SPECIFICATIONS MUST BE REWORKED TO MEET THE
REQUIREMENTS OR REMOVED AND REPLACED BY ACCEPTABLE EARTHFILL. THE REPLACEMENT
EARTHFILL AND THE FOUNDATION, ABUTMENT, AND EARTHFILL SURFACES UPON WHICH IT IS PLACED
MUST CONFORM TO ALL REQUIREMENTS OF THIS SPECIFICATION FOR FOUNDATION PREPARATION, APPROVAL, PLACEMENT, MOISTURE CONTROL, AND COMPACTION.
DELETE SUBSECTION 204.10 AND REPLACE WITH THE FOLLOWING:
204.10 TESTING
DURING THE COURSE OF THE WORK, THE CONTRACTOR MUST PERFORM QUALITY CONTROL TESTS, AS
APPLICABLE, TO IDENTIFY EARTHFILL AND EARTH BACKFILL MATERIALS; DETERMINE THE REFERENCE
MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT IF BELIEVED TO DIFFER FROM THOSE
PROVIDED WITHIN THE SOILS REPORT, SUBSECTION 206; AND DOCUMENT THAT THE MOISTURE
p.19 v.22343
CONTENT OF MATERIAL AT THE TIME OF COMPACTION AND THE DENSITY OF EARTHFILL AND EARTH
BACKFILL IN PLACE CONFORM TO THE REQUIREMENTS OF THIS SPECIFICATION.
DETERMINING REFERENCE MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT. UNLESS TESTED
OTHERWISE, THE REFERENCE MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT ARE PROVIDED
WITHIN THE SOILS REPORT, SUBSECTION 206
DOCUMENTING SPECIFICATION CONFORMANCE. IN-PLACE DENSITIES OF EARTHFILL AND EARTH
BACKFILL REQUIRING CLASS A COMPACTION MUST BE MEASURED IN ACCORDANCE WITH SUBSECTION
204.15 AND ASTM D1556, D2167, D2937, D6938, OR D8167. MOISTURE CONTENTS OF EARTHFILL AND
EARTH BACKFILL AT THE TIME OF COMPACTION MUST BE MEASURED IN ACCORDANCE WITH ASTM
D2216, D4643, OR D6938. VALUES OF MOISTURE CONTENT DETERMINED BY ASTM D2216 ARE
CONSIDERED THE TRUE VALUE OF THE SOIL MOISTURE. VALUES OF MOISTURE CONTENT DETERMINED
BY ASTM D4643 OR D6938 MUST BE VERIFIED BY COMPARISON TO VALUES OBTAINED BY ASTM D2216.
VALUES OF IN-PLACE DENSITY AND MOISTURE CONTENT DETERMINED BY THESE TESTS MUST BE
COMPARED TO THE MINIMUM DENSITY AND MOISTURE CONTENT RANGE SPECIFIED WITHIN THE SOILS
REPORT, SUBSECTION 206.
DOCUMENTATION OF TESTING SHALL BE PROVIDED TO THE CO/COR UPON REQUEST AND NO LESS
THAN WEEKLY.
CORRECTION FOR OVERSIZE PARTICLES. IF THE MATERIALS TO BE USED FOR EARTHFILL OR EARTH
BACKFILL CONTAIN MORE THAN 5 PERCENT BY DRY WEIGHT OF OVERSIZE ROCK PARTICLES (PARTICLES
LARGER THAN THOSE ALLOWED IN THE SPECIFIED COMPACTION TEST AND METHOD), CORRECTIONS
FOR OVERSIZE PARTICLES MUST BE MADE USING THE APPROPRIATE PROCEDURES EXPLAINED IN ASTM
D4718.
DELETE SUBSECTIONS 204.11 – 2004.14
MODIFY SUBSECTION 204.15 AS FOLLOWS:
204.15 ACCEPTANCE
IN-PLACE COMPACTION AND MOISTURE CONTENT TESTS:
A EMBANKMENT FILL: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 2,500 SQ. FT.
B. PIPE INSTALLATION: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 30 LF OF PIPE TO
A DEPTH OF 2’ ABOVE THE PIPE.
DELETE SUBSECTION 204.16 AND REPLACE WITH THE FOLLOWING:
204.16 MEASUREMENT
EXCAVATION AND EMBANKMENT WILL NOT BE MEASURED FOR PAYMENT. ESTIMATED QUANTITIES
ARE PROVIDED IN THE PLANS AND DO NOT ACCOUNT FOR PIPING, MINOR STRUCTURES, DEMOLITION
OF TRAINING WALLS, OR CLEARING AND GRUBBING. BIDDERS ARE RESPONSIBLE FOR PERFORMING
INVESTIGATIONS, SURVEYS, AND OBTAINING INFORMATION NECESSARY TO CONFIRM EXISTING
CONDITIONS AND QUANTITIES.
p.20 v.22343
205 – ROCK BLASTING
ROCK BLASTING IS NOT ALLOWED.
206 - RESERVED
DELETE “RESERVED” AND REPLACE WITH “BORING LOG AND LABORATORY
TESTING” AND ADD THE FOLLOWING:
206.01 SUBSURFACE TESTING REPORT
THE FOLLOWING SUBSURFACE TESTING REPORT AND LABORATORY TESTING IS PROVIDED FOR THE
CONTRACTOR’S USE:
p.21 v.22343 p.22 v.22343 p.23 v.22343 p.24 v.22343 p.25 v.22343 p.26 v.22343 p.27 v.22343 p.28 v.22343 p.29 v.22343 p.30 v.22343 p.31 v.22343 p.32 v.22343 p.33 v.22343 p.34 v.22343 p.35 v.22343 p.36 v.22343 p.37 v.22343 p.38 v.22343
261 – REINFORCED SOIL SLOPES
REPLACE THE WORDS REINFORCED SOIL SLOPES WITH “ENGINEERED TURF”
WHERE USED THROUGHOUT THIS SECTION.
SUBSECTION 261.02:
DELETE REFERENCE TO REINFORCEMENT GEOTEXTILE AND GEOGRID AND ADD THE FOLLOWING
REFERENCES AND DEFINITIONS:
A. SECTION INCLUDES REFERENCES AND DEFINITIONS RELATED TO:
1. HYDROTURF® CS PRODUCT
2. STRUCTURED GEOMEMBRANE COMPONENT OF THE HYDROTURF CS® SYSTEM
3. PENETRATING CATALYZED COLLOIDAL SILICATE CONCRETE TREATMENT
REFERENCES:
ASTM C109 - STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT
MORTARS (USING 2-IN. OR [50-MM] CUBE SPECIMENS)
ASTM C150 - STANDARD SPECIFICATION FOR PORTLAND CEMENT
ASTM C387 - STANDARD SPECIFICATION FOR PACKAGED, DRY, COMBINED MATERIALS FOR
CONCRETE AND HIGH STRENGTH MORTAR ASTM D792 – STANDARD TEST METHOD FOR
DENSITY AND SPECIFIC GRAVITY (RELATIVE DENSITY) OF PLASTICS BY DISPLACEMENT
ASTM D1004 - STANDARD TEST METHOD FOR TEAR RESISTANCE (GRAVES TEAR) OF PLASTIC
FILM AND SHEETING
ASTM D1204 - STANDARD TEST METHOD FOR LINEAR DIMENSIONAL CHANGES OF NONRIGID
THERMOPLASTIC SHEETING OR FILM AT ELEVATED TEMPERATURE
ASTM D1238 - STANDARD TEST METHOD FOR MELT FLOW RATES OF THERMOPLASTICS BY
EXTRUSION PLASTOMETER
ASTM D1505 - STANDARD TEST METHOD FOR DENSITY OF PLASTICS BY DENSITY-GRADIENT
TECHNIQUE
ASTM D1603 - STANDARD TEST METHOD FOR CARBON BLACK CONTENT IN OLEFIN PLASTICS
ASTM D1693 - STANDARD TEST METHOD FOR ENVIRONMENTAL STRESS-CRACKING OF
ETHYLENE PLASTICS
p.39 v.22343
ASTM D1907 - STANDARD TEST METHOD FOR LINEAR DENSITY OF YARN (YARN NUMBER) BY
THE SKEIN METHOD
ASTM D2256 - STANDARD TEST METHOD FOR TENSILE PROPERTIES OF YARNS BY THE SINGLE-
STRAND METHOD
ASTM D3218 - STANDARD SPECIFICATION FOR POLYOLEFIN MONOFILAMENTS
ASTM D3895 – STANDARD TEST METHOD FOR OXIDATIVE-INDUCTION TIME OF POLYOLEFINS BY
DIFFERENTIAL SCANNING CALORIMETRY.
ASTM D4218 - STANDARD TEST METHOD FOR DETERMINATION OF CARBON BLACK CONTENT IN
POLYETHYLENE COMPOUNDS BY THE MUFFLE-FURNACE TECHNIQUE.
ASTM D4833 - STANDARD TEST METHOD FOR INDEX PUNCTURE RESISTANCE OF
GEOMEMBRANES AND RELATED PRODUCTS
ASTM D5261 - STANDARD TEST METHOD FOR MEASURING MASS PER UNIT AREA OF
GEOTEXTILES
ASTM D5321 - STANDARD TEST METHOD FOR DETERMINING THE COEFFICIENT OF SOIL AND
GEOSYNTHETIC OR GEOSYNTHETIC AND GEOSYNTHETIC FRICTION BY THE DIRECT SHEAR
METHOD
ASTM D5323 – STANDARD TEST METHOD FOR DETERMINATION OF 2% SECANT MODULUS FOR
POLYETHYLENE GEOMEMBRANES
ASTM D5397 – STANDARD TEST METHOD FOR EVALUATION OF STRESS CRACK RESISTANCE OF
POLYOLEFIN GEOMEMBRANES USING NOTCHED CONSTANT TENSILE LOAD TEST
ASTM D5596 - STANDARD TEST METHOD FOR MICROSCOPIC EVALUATION OF THE DISPERSION
OF CARBON BLACK IN POLYOLEFIN GEOSYNTHETICS
ASTM D5617 – STANDARD TEST METHOD FOR MULTI-AXIAL TENSION TEST FOR GEOSYNTHETICS
ASTM D5721 – STANDARD PRACTICE FOR AIR-OVEN AGING OF POLYOLEFIN GEOMEMBRANES
ASTM D5885 – STANDARD TEST METHOD FOR OXIDATIVE INDUCTION TIME OF POLYOLEFIN
GEOSYNTHETICS BY HIGH-PRESSURE DIFFERENTIAL SCANNING CALORIMETRY
ASTM D5994 – STANDARD TEST METHOD FOR MEASURING CORE THICKNESS OF TEXTURED
GEOMEMBRANE
ASTM D6392 – STANDARD TEST METHOD FOR DETERMINING THE INTEGRITY OF
NONREINFORCED GEOMEMBRANE SEAMS PRODUCED USING THERMO-FUSION METHODS
ASTM D6693 – STANDARD TEST METHOD FOR DETERMINING TENSILE PROPERTIES OF
NONREINFORCED POLYETHYLENE AND NONREINFORCED FLEXIBLE POLYPROPYLENE
GEOMEMBRANES
ASTM D6913 - STANDARD TEST METHODS FOR PARTICLE-SIZE DISTRIBUTION (GRADATION) OF
SOILS USING SIEVE ANALYSIS
p.40 v.22343
ASTM D7007 – STANDARD PRACTICES FOR ELECTRICAL METHODS FOR LOCATING LEAKS IN
GEOMEMBRANES COVERED WITH WATER OR EARTH MATERIALS
ASTM C109 - STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT
MORTARS (USING 2-IN. OR [50-MM] CUBE SPECIMENS)
ASTM C150 - STANDARD SPECIFICATION FOR PORTLAND CEMENT
ASTM C387 - STANDARD SPECIFICATION FOR PACKAGED, DRY, COMBINED MATERIALS FOR
CONCRETE AND HIGH STRENGTH MORTAR
ASTM D1335 - STANDARD TEST METHOD FOR TUFT BIND OF PILE YARN FLOOR COVERINGS
ASTM D1577 - STANDARD TEST METHODS FOR LINEAR DENSITY OF TEXTILE FIBERS
ASTM D4595 - STANDARD TEST METHOD FOR TENSILE PROPERTIES OF GEOTEXTILES BY THE
WIDE-WIDTH STRIP METHOD
ASTM D5793 - STANDARD TEST METHOD FOR BINDING SITES PER UNIT LENGTH OR WIDTH OF
PILE YARN FLOOR COVERINGS
ASTM D5823 - STANDARD TEST METHOD FOR TUFT HEIGHT OF PILE FLOOR COVERINGS
ASTM D5848 - STANDARD TEST METHOD FOR MASS PER UNIT AREA OF PILE YARN FLOOR
COVERINGS
ASTM D6241 - STANDARD TEST METHOD FOR STATIC PUNCTURE STRENGTH OF GEOTEXTILES
AND GEOTEXTILE-RELATED PRODUCTS USING A 50-MM PROBE
AMERICAN CONCRETE INSTITUTE (ACI) - 306R-10 GUIDE TO COLD WEATHER CONCRETING
LATEST VERSION OF GEOSYNTHETICS RESEARCH INSTITUTE (GRI) TESTING METHODS:
GRI-GM11– ACCELERATED WEATHERING OF GEOMEMBRANES USING A FLUORESCENT
UVA DEVICE.
GRI-GM12 –MEASUREMENT OF THE ASPERITY HEIGHT OF TEXTURED GEOMEMBRANES
USING A DEPTH GAGE
GRI-GM13 – TEST METHODS, TEST PROPERTIES, AND TESTING FREQUENCY AND FOR
HIGH DENSITY POLYETHYLENE (HDPE) SMOOTH AND TEXTURED GEOMEMBRANES
GRI-GM19 - SEAM STRENGTH AND RELATED PROPERTIES OF THERMALLY BONDED
POLYOLEFIN GEOMEMBRANES
2. DEFINITIONS:
ACCLIMATION
PHYSIOLOGICAL/THERMAL ADJUSTMENT. REQUIRED IN THE GEOMEMBRANE
DEPLOYMENT PROCESS.
p.41 v.22343
ASTM
ASTM INTERNATIONAL, KNOWN UNTIL 2001 AS THE AMERICAN SOCIETY FOR TESTING
AND MATERIALS, IS AN INTERNATIONAL STANDARDS ORGANIZATION THAT DEVELOPS
AND PUBLISHES VOLUNTARY CONSENSUS TECHNICAL STANDARDS FOR A WIDE RANGE
OF MATERIALS, PRODUCTS, SYSTEMS, AND SERVICES.
HYDROTURF® CS
HYDROTURF CS IS A COMPOSITE SYSTEM OF A STRUCTURED GEOMEMBRANE OVERLAIN
BY AN ENGINEERED SYNTHETIC TURF WHICH IS INFILLED WITH A CEMENTITIOUS MIX
(HYDROBINDER).
CONSTRUCTION QUALITY ASSURANCE (CQA)
CONSTRUCTION QUALITY ASSURANCE INCLUDES BUT IS NOT LIMITED TO
OBSERVATIONS AND DOCUMENTATION OF MATERIALS AND WORKMANSHIP
NECESSARY TO SHOW THAT A PARTICULAR PROJECT IS BEING CONSTRUCTED
ACCORDING TO SITE-SPECIFIC SPECIFICATIONS AND WITHIN REGULATORY GUIDELINES.
CONSTRUCTION QUALITY ASSURANCE (CQA) PERSONNEL
CONSTRUCTION QUALITY ASSURANCE (CQA) PERSONNEL ARE REPRESENTATIVES OF THE
PROFESSIONAL OF RECORD (CO/COR) WHO WORK UNDER DIRECT SUPERVISION OF THE
CO/COR. THE CQA PERSONNEL ARE RESPONSIBLE FOR QUALITY ASSURANCE
MONITORING, APPLICABLE CONFORMANCE SAMPLING AND PERFORMING ONSITE
TESTS AND OBSERVATIONS.
CONTRACTING OFFICER / CONTRACTING OFFICER’S REPRESENTATIVE (CO/COR)
THE CO/COR IS AN AUTHORIZED REPRESENTATIVE OF THE USDA AND HAS OVERALL
RESPONSIBILITY FOR CQA EFFORTS AND TO CONFIRM THE PROJECT WAS CONSTRUCTED
IN GENERAL ACCORDANCE WITH SITE-SPECIFIC SPECIFICATIONS APPROVED BY THE
REGULATORY AUTHORITY AND CONTRACT DOCUMENTS.
CONSTRUCTION QUALITY CONTROL (CQC) PERSONNEL
CQC PERSONNEL ARE REPRESENTATIVES OF THE GEOSYNTHETICS INSTALLER WHO
WORK UNDER DIRECT SUPERVISION OF THE GEOSYNTHETICS INSTALLER. THE
GEOSYNTHETICS INSTALLERS’ CQC PERSONNEL ARE RESPONSIBLE FOR CONSTRUCTION
QUALITY CONTROL, APPLICABLE CONFORMANCE SAMPLING AND PERFORMING ONSITE
TESTS AND OBSERVATIONS.
CONTRACT DOCUMENTS
WRITTEN, PRINTED, OR ELECTRONIC MATTER THAT PROVIDES INFORMATION OR
EVIDENCE THAT SERVES AS AN OFFICIAL RECORD AND ARE ISSUED BY THE OWNER OR
OPERATOR. THE DOCUMENTS INCLUDE BIDDING REQUIREMENTS THAT INCLUDE BUT
ARE NOT LIMITED TO, CONTRACT FORMS, CONTRACT CONDITIONS, CONTRACT
SPECIFICATIONS, CQA PLAN, CONTRACT DRAWINGS, ADDENDA, AND CONTRACT
MODIFICATIONS.
p.42 v.22343
CONTRACT SPECIFICATIONS
THE REQUIREMENTS WHICH ARE TO BE FOLLOWED IN THE CONSTRUCTION OF THE
HYDROTURF® SYSTEM. THE STANDARD SPECIFICATIONS, SUPPLEMENTAL
SPECIFICATIONS, SPECIAL PROVISIONS, AND ALL WRITTEN OR PRINTED AGREEMENTS
AND INSTRUCTIONS THAT PERTAIN TO THE METHOD AND MANNER OF PERFORMING
THE WORK.
CONTRACTOR
ONE THAT AGREES TO FURNISH MATERIALS OR PERFORM SERVICES AT A SPECIFIED
PRICE, ESPECIALLY FOR CONSTRUCTION WORK.
DESIGN ENGINEER
AN INDIVIDUAL LICENSED TO PRACTICE AS A PROFESSIONAL ENGINEER OR A
PROFESSIONAL SERVICE FIRM THAT IS RESPONSIBLE FOR THE PREPARATION OF THE
PROJECT CONSTRUCTION DRAWINGS AND SPECIFICATIONS.
EARTHWORK
A GENERAL ENGINEERING TERM RELATING TO THE RELOCATION AND UTILIZATION OF
SOIL DURING THE PROCESS OF CONSTRUCTION.
ENGINEERED TURF
COMPONENT 3 OF THE HYDROTURF® SYSTEM. A SYNTHETIC STRUCTURED MATERIAL
CONSISTING OF ONE OR MORE GEOTEXTILES TUFTED WITH POLYETHYLENE YARNS THAT
RESEMBLE GRASS BLADES.
FINAL COVER SYSTEM EVALUATION RECO/CORT (FCSER)
UPON SUBSTANTIAL COMPLETION OF CLOSURE ACTIVITIES, THE CO/COR IS
RESPONSIBLE FOR THE DOCUMENTATION OF CONSTRUCTION ACTIVITIES RELATING TO
THE PROJECT, AND ANY OTHER INSPECTIONS OR VERIFICATIONS REQUIRED BY THE
REGULATORY AUTHORITY. THE FCSER WILL BE SIGNED AND STAMPED BY THE CO/COR
AND INCLUDE DOCUMENTATION NECESSARY FOR CERTIFICATION CLOSURE.
FISH MOUTH
A SEMI-CONICAL OPENING OF THE SEAM THAT IS FORMED BY AN EDGE WRINKLE IN
ONE SHEET OF THE GEOMEMBRANE COMPONENT.
GEOMEMBRANE
A SYNTHETIC LINING MATERIAL THAT IS ALSO KNOWN AS COMPONENT 2 AND/OR
AGRU SUPER GRIPNET® HDPE GEOMEMBRANE LINER AS IT RELATES TO THE
HYDROTURF® SYSTEM. USED AS THE PRIMARY BARRIER TO INFILTRATION AND
EXFILTRATION OF COVERED MATERIALS. ALSO REFERRED TO AS THE GEOMEMBRANE
COMPONENT THROUGHOUT THIS DOCUMENT.
GSI
GEOSYNTHETIC INSTITUTE
475 KEDRON AVENUE
FOLSOM, PA 19033-1208 USA
p.43 v.22343
TEL (610) 522-8440
FAX (610) 522-8441
HYDROBINDER®
A PROPRIETARY CEMENTITIOUS INFILL UTILIZED AS AN INFILL WHERE HIGHER SURFACE
WATER VELOCITIES MAY OCCUR AS WELL AS IN ANCHOR TRENCHES WHERE SPECIFIED.
GEOSYNTHETICS CONTRACTOR / INSTALLER
THE ENTITY RESPONSIBLE FOR GEOSYNTHETIC INSTALLATION.
INDEPENDENT TESTING LABORATORY
AN ORGANIZATION, PERSON, OR COMPANY THAT TESTS PRODUCTS AND MATERIALS,
ETC. ACCORDING TO AGREED REQUIREMENTS. THE ENTITY SHALL BE INDEPENDENT OF
OWNERSHIP OR CONTROL BY THE OWNER OR ANY PARTY TO THE CONSTRUCTION OF
THE FINAL COVER OR THE MANUFACTURER OF THE FINAL COVER PRODUCTS USED. THE
ENTITY SHALL ALSO HAVE PROPER LEGAL AUTHORITY WHERE REQUIRED TO ISSUE
OPINIONS AND DOCUMENT THE RESULTS OF TESTS REQUESTED BY THE OWNER.
INSTALLATION SUPERVISOR
THE PERSON ON-SITE WHO WORKS FOR THE GEOSYNTHETICS INSTALLER AND IS IN
CHARGE OF THE GEOSYNTHETICS PERSONNEL AND FOLLOWING THE SITE
SPECIFICATIONS FOR THE INSTALLATION OF THE GEOSYNTHETICS.
MANUFACTURING QUALITY CONTROL (MQC)
A PLANNED SYSTEM OF INSPECTION AND VERIFICATION TO ENSURE THE QUALITY OF
THE FINAL PRODUCT.
NONCONFORMANCE
A DEFICIENCY IN CHARACTERISTICS, DOCUMENTATION, OR PROCEDURES THAT RENDER
THE QUALITY OF AN ITEM OR ACTIVITY UNACCEPTABLE OR INDETERMINATE. EXAMPLES
OF NON-CONFORMANCES INCLUDE, BUT ARE NOT LIMITED TO, PHYSICAL DEFECTS, TEST
FAILURES, AND INADEQUATE DOCUMENTATION.
OPERATOR
THE ENTITY IN CONTROL AND RESPONSIBLE FOR THE FACILITY.
OWNER
THE ENTITY THAT OWNS FACILITY AND LAND.
OWNER OR OPERATOR REPRESENTATIVE
AN OFFICIAL REPRESENTATIVE OF THE OWNER OR OPERATOR RESPONSIBLE FOR
PLANNING, ORGANIZING, AND CONTROLLING CONSTRUCTION ACTIVITIES.
PANEL
A GENERAL REFERENCE TO A UNIT AREA OF EITHER COMPONENT 2 – AGRU SUPER
GRIPNET® HDPE GEOMEMBRANE OR COMPONENT 3 – ENGINEERED TURF.
p.44 v.22343
QUALITY ASSURANCE
A PLANNED AND SYSTEMATIC PATTERN OF PROCEDURES AND DOCUMENTATION TO
ENSURE THAT ITEMS OF WORK OR SERVICES MEET THE REQUIREMENTS OF THE
CONTRACT DOCUMENTS.
QUALITY CONTROL
THESE ACTIONS PROVIDE A MEANS TO MEASURE AND REGULATE THE CHARACTERISTICS
OF AN ITEM OR SERVICE TO COMPLY WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
REPRESENTATIVE SAMPLE
(WITH RESPECT TO GEOMEMBRANE DESTRUCTIVE TESTING) - A RANDOM SPECIMEN OF
EITHER COMPONENT 2 – AGRU SUPER GRIPNET HDPE GEOMEMBRANE OR COMPONENT
3 – ENGINEERED TURF MATERIAL CONSISTING OF 1 OR MORE CUT PIECES (COMMONLY
REFERRED TO AS COUPONS) FROM THE SAME RECTANGULAR PORTION OF MATERIAL,
ORIENTED ALONG A SEAM THAT IS REMOVED FOR FIELD OR LABORATORY TESTING
PURPOSES.
RIPPLE
SMALLER IN NATURE THAN A WRINKLE. A RESULT OF THERMAL/OR MANUFACTURING
THAT CANNOT BE FOLDED OVER.
SNAPPING
A MANUAL METHOD TO AN OPEN ENDED SEAM TO REMOVE TENTING AS A RESULT OF
THE WELDING OF THE GEOMEMBRANE SEAMS.
SPIKE
A SYSTEMATIC DESIGN FOR INTERFACE FRICTION LOCATED ON THE BOTTOM OF THE
SUPER GRIPNET®.
SPECIMEN
(WITH RESPECT TO GEOMEMBRANE DESTRUCTIVE TESTING) - A SPECIMEN IS THE
INDIVIDUAL TEST STRIP (SOMETIMES CALLED COUPON) FROM A SAMPLE LOCATION. A